CN208920037U CN201821510568.8U CN201821510568U CN208920037U CN 208920037 U CN208920037 U CN 208920037U CN 201821510568 U CN201821510568 U CN 201821510568U CN 208920037 U CN208920037 U CN 208920037U
Authority
CN
China
Prior art keywords
mounting rack
heat
transferring box
bottom end
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821510568.8U
Other languages
Chinese (zh)
Inventor
侯玉华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Hualong Electric Power Equipment Manufacturing Co Ltd
Original Assignee
Qingdao Hualong Electric Power Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Hualong Electric Power Equipment Manufacturing Co Ltd filed Critical Qingdao Hualong Electric Power Equipment Manufacturing Co Ltd
Priority to CN201821510568.8U priority Critical patent/CN208920037U/en
Application granted granted Critical
Publication of CN208920037U publication Critical patent/CN208920037U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model discloses a kind of boiler built-in economizer devices, including mounting rack, the inside of the mounting rack is equipped with venthole, water storage tank is equipped in mounting rack outside the venthole, the water storage tank is connected with transferring box by connecting tube, the lower section of venthole is arranged in the transferring box, the bottom end of the transferring box is connected with heat-exchange tube, the heat-exchange tube is set as spiral structure, the outside of the heat-exchange tube is equipped with water conservancy diversion frame, the section of the mounting rack is set as inverted cone-shaped structure, the section of the transferring box is set as diamond structure, the section of the water conservancy diversion frame is set as pyramidal structure, inlet tube is connected in the water storage tank, this boiler built-in economizer device, integral installation in the inside of smoke discharging pipe, the flue gas of discharge is successively from heat-exchange tube, pass through around transferring box and mounting rack, so as to more Secondary absorbs the heat in flue gas, to ensure that the efficiency of heat absorption, convenient for the use of people.

Description

A kind of boiler built-in economizer device
Technical field
The utility model relates to economizer technical field, specially a kind of boiler built-in economizer device.
Background technique
Economizer is the heat exchanger that water supply is heated using boiler exhaust gas waste heat, can absorb smoke discharging residual heat, the row of reduction Smoke temperature degree improves boiler efficiency, therefore the use that economizer is relatively broad by people, application number 201720479395.7 disclose A kind of boiler built-in economizer device, structure include solar energy equipment, front panel, left support foot, shell, right support foot, Outlet, economizer, backplate, combustion chamber, combustion head, inner cavity, solar energy equipment are connected with front panel, and front panel is set to shell Left end, front panel are connected by shell with backplate, and the left support foot is set to shell left end bottom, and left support foot passes through shell Body is connected with right support foot, and combustion chamber is set in the housing the left front part in portion, and right support foot is connected by shell with combustion chamber, Inner cavity is connected with front panel, although having the effect of certain, there is lower for the heat absorption efficiency in flue gas Problem, to cause the waste of resource, it is impossible to meet the use demands of people.
Utility model content
The technical problems to be solved in the utility model is to overcome existing defect, provides a kind of boiler built-in economizer dress It sets, improves the efficiency of heat absorption, to reduce the waste of resource, meet the use demand of people, can effectively solve to carry on the back The problems in scape technology.
To achieve the above object, the utility model provides the following technical solutions: a kind of boiler built-in economizer device, packet Mounting rack is included, the inside of the mounting rack is equipped with venthole, is equipped with water storage tank, the storage in the mounting rack outside the venthole Sink is connected with transferring box by connecting tube, and the lower section of venthole, the bottom end connection of the transferring box is arranged in the transferring box There is heat-exchange tube, the heat-exchange tube is set as spiral structure, and the outside of the heat-exchange tube is equipped with water conservancy diversion frame, the peace The section shelved is set as inverted cone-shaped structure, and the section of the transferring box is set as diamond structure, and the section of the water conservancy diversion frame is set It is set to pyramidal structure, inlet tube is connected in the water storage tank, the bottom end of the heat-exchange tube is connected with outlet tube.
As a kind of optimal technical scheme of the utility model, the top of the mounting rack is equipped with support plate, the support The top of plate is equipped with top cover, and the section of the top cover is also configured as inverted cone-shaped structure.
As a kind of optimal technical scheme of the utility model, the side of the mounting rack is equipped with the first fixing seat, described It is equipped with the first fixation hole in first fixing seat the, is rotatably connected to the first fixed column in first fixation hole.
As a kind of optimal technical scheme of the utility model, the bottom end of the mounting rack and the bottom end of transferring box are all provided with There is heat exchanging fin, the heat exchanging fin of the mounting rack bottom end runs through and extend to the inside of water storage tank, the transferring box bottom end Heat exchanging fin runs through and extends to the inner cavity of transferring box.
As a kind of optimal technical scheme of the utility model, the side of the water conservancy diversion frame is equipped with the second fixing seat, described Second fixing seat is equipped with the second fixation hole, is rotatably connected to the second fixed column in second fixation hole.
Compared with prior art, the utility model has the beneficial effects that this boiler built-in economizer device, whole peace Mounted in the inside of smoke discharging pipe, the flue gas of discharge successively passes through around heat-exchange tube, transferring box and mounting rack, so as to more Secondary absorbs the heat in flue gas, to ensure that the efficiency of heat absorption, convenient for the use of people.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model section structural schematic diagram.
In figure: 1 mounting rack, 2 water storage tanks, 3 transferring box, 4 connecting tubes, 5 ventholes, 6 heat-exchange tubes, 7 inlet tubes, 8 go out liquid Pipe, 9 support plates, 10 top covers, 11 first fixing seats, 12 first fixation holes, 13 first fixed columns, 14 heat exchanging fins, 15 second are consolidated Reservation, 16 second fixation holes, 17 second fixed columns, 18 water conservancy diversion framves.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2: a kind of boiler built-in economizer device, including Mounting rack 1, the inside of mounting rack 1 are equipped with venthole 5, setting the passing through convenient for flue gas of venthole 5, the peace outside venthole 5 It shelves and is equipped with water storage tank 2 in 1, water storage tank 2 is connected with transferring box 3 by connecting tube 4, and transferring box 3 is arranged under venthole 5 Side, the bottom end of transferring box 3 are connected with heat-exchange tube 6, and the water that the external world enters is successively from water storage tank 2, transferring box 3 and heat-exchange tube 6 Middle process is more adequately heated so that water energy is enough, and heat-exchange tube 6 is set as spiral structure, so that heat exchange Pipe 6 as much as possible can be contacted with flue gas, to ensure that the effect of heat exchange, the outside of heat-exchange tube 6, which is equipped with, is led Frame 18 is flowed, the setting of water conservancy diversion frame 18 can gather the flue gas of process, so that flue gas is from the inside of heat-exchange tube 6 By the section of mounting rack 1 is set as inverted cone-shaped structure, and the section of transferring box 3 is set as diamond structure, can be the cigarette gathered Gas is dispersed, so that flue gas is adequately contacted with the bottom end of mounting rack 1, the section of water conservancy diversion frame 18 is set as taper Structure is connected with inlet tube 7 in water storage tank 2, and the bottom end of heat-exchange tube 6 is connected with outlet tube 8, and the top of mounting rack 1 is equipped with branch The top of fagging 9, support plate 9 is equipped with top cover 10, and the section of top cover 10 is also configured as inverted cone-shaped structure, so that from 5 row of venthole Flue gas out is contacted under the action of top cover 10 with the top of mounting rack 1, so that heat exchange is carried out, the side of mounting rack 1 Equipped with the first fixing seat 11, it is equipped with the first fixation hole 12 in the first fixing seat 11 the, the is rotatably connected in the first fixation hole 12 One fixed column 13, convenient for installation is fixed to mounting rack 1, the bottom end of mounting rack 1 and the bottom end of transferring box 3 are equipped with hot friendship Piece 14 is changed, the heat exchanging fin 14 of 1 bottom end of mounting rack runs through and extend to the inside of water storage tank 2, the heat exchanging fin of 3 bottom end of transferring box 14 run through and extend to the inner cavity of transferring box 3, and heat is more quickly exchanged, to improve the speed of heat exchange Degree, the side of water conservancy diversion frame 18 are equipped with the second fixing seat 15, and the second fixing seat 15 is equipped with the second fixation hole 16, the second fixation hole 16 It is rotatably connected to the second fixed column 17, inside convenient for installation is fixed to water conservancy diversion frame 18.
When in use: first fixing seat 11 is fixed on by the first fixed column 13 inside of smoke exhaust pipe, it is solid by second The position of water conservancy diversion frame 18 is fixed in fixed column 17, and inlet tube 7 and extraneous water source are attached, outlet tube 8 and the external world Conveyance conduit be attached, when being discharged fume, flue gas is first contacted with the heat-exchange tube 6 below water conservancy diversion frame 18, then Gathered by water conservancy diversion frame 18, so that flue gas is discharged from the inside of heat-exchange tube 6, then passes through the dispersion of transferring box 3 So that flue gas is contacted with the bottom end of mounting rack 1, then flue gas is discharged from venthole 5, by the blocking of top cover 10, thus makes It obtains flue gas to be contacted with the top of mounting rack 1, thus carries out heat exchange operation.
The utility model by being gathered to flue gas and being dispersed so that it is whole can as much as possible and flue gas into Row contact, to ensure that the effect of heat exchange, while the structure setting of heat exchanging fin 14, so that the heat that heat exchanging fin 14 absorbs It can quickly be transported in the water contacted with heat exchanging fin 14, so that the speed of heat exchange is accelerated, by fixed to mounting rack 1 Thus it draws to whole, by the way that water conservancy diversion frame 18 is fixed, is thus supported to whole, to ensure that installation Fastness, while whole external structure setting, enable liquid contained in flue gas to fall with inclined angle, thus Corrosive liquid is avoided to assemble on mounting rack 1, transferring box 3, top cover 10 and water conservancy diversion frame 18, to extend whole service life.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of boiler built-in economizer device, including mounting rack (1), it is characterised in that: the inside of the mounting rack (1) is set Have venthole (5), is equipped with water storage tank (2) in the external mounting rack (1) of the venthole (5), the water storage tank (2) passes through connection Pipe (4) is connected with transferring box (3), and transferring box (3) setting connects in the lower section of venthole (5), the bottom end of the transferring box (3) It is connected to heat-exchange tube (6), the heat-exchange tube (6) is set as spiral structure, and the outside of the heat-exchange tube (6), which is equipped with, leads It flows frame (18), the section of the mounting rack (1) is set as inverted cone-shaped structure, and the section of the transferring box (3) is set as diamond shape knot Structure, the section of the water conservancy diversion frame (18) are set as pyramidal structure, are connected with inlet tube (7) in the water storage tank (2), and the heat is handed over The bottom end for changing pipe (6) is connected with outlet tube (8).
2. a kind of boiler built-in economizer device according to claim 1, it is characterised in that: the mounting rack (1) Top is equipped with support plate (9), and the top of the support plate (9) is equipped with top cover (10), and the section of the top cover (10) is also configured as Inverted cone-shaped structure.
3. a kind of boiler built-in economizer device according to claim 1, it is characterised in that: the mounting rack (1) Side is equipped with the first fixing seat (11), is equipped with the first fixation hole (12) in first fixing seat (11) the, described first is fixed The first fixed column (13) are rotatably connected in hole (12).
4. a kind of boiler built-in economizer device according to claim 1, it is characterised in that: the mounting rack (1) Bottom end and the bottom end of transferring box (3) are equipped with heat exchanging fin (14), and the heat exchanging fin (14) of mounting rack (1) bottom end runs through And the inside of water storage tank (2) is extended to, the heat exchanging fin (14) of transferring box (3) bottom end runs through and extends to transferring box (3) Inner cavity.
5. a kind of boiler built-in economizer device according to claim 1, it is characterised in that: the water conservancy diversion frame (18) Side is equipped with the second fixing seat (15), and second fixing seat (15) is equipped with the second fixation hole (16), second fixation hole (16) the second fixed column (17) are rotatably connected in.
CN201821510568.8U 2018-09-17 2018-09-17 A kind of boiler built-in economizer device Expired - Fee Related CN208920037U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821510568.8U CN208920037U (en) 2018-09-17 2018-09-17 A kind of boiler built-in economizer device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821510568.8U CN208920037U (en) 2018-09-17 2018-09-17 A kind of boiler built-in economizer device

Publications (1)

Publication Number Publication Date
CN208920037U true CN208920037U (en) 2019-05-31

Family

ID=66705748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821510568.8U Expired - Fee Related CN208920037U (en) 2018-09-17 2018-09-17 A kind of boiler built-in economizer device

Country Status (1)

Country Link
CN (1) CN208920037U (en)

Similar Documents

Publication Publication Date Title
CN202012904U (en) Boiler waste heat recovery system
CN208920037U (en) A kind of boiler built-in economizer device
CN201196491Y (en) Boiler exhaust heat recovery and utilization apparatus
CN205718584U (en) A kind of dual pathways wall hanging heat exchanger
CN209840145U (en) Biomass fuel boiler's waste heat from flue gas device
CN201637298U (en) Smoke gas condensed-type combined energy saver
CN203928789U (en) A kind of boiler combined condenser
CN201569139U (en) Hot water boiler with N-shaped guide device
CN208205865U (en) A kind of novel high-temperature flue gas waste-heat recovery device
CN207831326U (en) A kind of boiler with baffle plate type heat exchanger
CN209470193U (en) A kind of efficient circulating fluid bed coal-burning boiler coal economizer
CN209386275U (en) A kind of coil tubes condensing coal economizer
CN210979795U (en) Horizontal two-stage energy saver
CN210268289U (en) Spray type heat exchanger
CN209558303U (en) A kind of vertical heat pipe waste heat boiler
CN208998579U (en) A kind of Steam Turbine Integral Condenser
CN209197493U (en) Heating furnace waste heat recovery device
CN208671135U (en) Electrical heating system
CN207472076U (en) A kind of waste-heat recovery device of aluminium melting furnace
CN202253695U (en) Movable smoke hood for waste heat boiler
CN109386827A (en) A kind of coil tubes condensing coal economizer
CN207661975U (en) A kind of efficient hot water boiler
CN206724723U (en) Casting furnace waste-heat recovery device
CN203642469U (en) Oil-fired heat exchange device
CN104534667A (en) Condensing gas heating water heating furnace heat exchanger

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190531

Termination date: 20210917

CF01 Termination of patent right due to non-payment of annual fee