Utility model content
Purpose of this disclosure is to provide a kind of connection component, which can be avoided stress and concentrates the component peace generated
Fill damaging problem.
To achieve the goals above, the disclosure provides a kind of connection component, for the first component to be fixed to second component
On, wherein match respectively including fastener, two briquettings and the support base below two briquettings, described two briquettings
Conjunction is connected on the support base, for respectively by be disposed adjacent two first components connections, the fastener position
Between described two briquettings, and the support base, the second component are sequentially passed through, the first component is connected to institute
It states on second component.
Optionally, described two briquettings are symmetrical arranged about the fastener, and are snapped fit on the support base, each
It is formed with slot between the briquetting and the support base, for fixing the edge of the first component.
Optionally, the briquetting includes matrix and the first grab for extending to form from the matrix towards the support base, institute
State the position limit arm that support base includes the pedestal being arranged substantially in parallel with described matrix and the setting of two relative spacings, each limit
One end extension of the position arm towards described matrix close to the fastener, and each position limit arm is formed with for described first
The second grab that grab is engaged by clamping, interval is arranged to be formed with the slot between described matrix and the pedestal, and described
Fastener is between described two position limit arms.
Optionally, it is connected between two position limit arms by linking arm, the fastener includes head and fixed part, institute
It states fixed part and sequentially passes through the linking arm, the pedestal so that the first component is fixed to the second component, the head
Portion is locked on the linking arm.
Optionally, described matrix is provided with sealing joint strip far from the other end end of the fastener, correspondingly, the base
The both ends end of seat is also equipped with the sealing joint strip, and the first component snaps fit between two sealing joint strips to abut
On to second grab.
Optionally, what second grab and the first component abutted against is bonded with one side glue on one side.
Optionally, the first limiting slot for fixing the sealing joint strip is offered on the other end end of described matrix,
First limiting slot is formed as T-shaped, and correspondingly, the end of the pedestal offers for fixing the sealing joint strip
Two limiting slots, second limiting slot are formed as inverted T-shape.
Optionally, double-sided adhesive is additionally provided between the first component and the pedestal.
Optionally, one end of described matrix close to the fastener is formed with L-shaped backstop platform, and the position limit arm is far from institute
It keeps out on the backstop platform one end for stating pedestal.
According to another aspect of the present disclosure, a kind of mounting structure of solar components is also provided, including purlin and it is multiple too
Positive energy component, wherein further include connection component disclosed above, wherein the purlin is the second component, the solar energy
Component is the first component.
The beneficial effect of this technology is: support base is responsible for supporting the first component, and dexterously by that will cooperate with support base
Briquetting replaced by monoblock type in the prior art by the briquetting of two split settings, in this way, in whole installation process, outside
Portion's load is not applied on the first component, and the first component to be installed just will not be easy to be damaged, and is significantly reduced
The spoilage of installing component.
Other feature and advantage of the disclosure will the following detailed description will be given in the detailed implementation section.
Specific embodiment
It is described in detail below in conjunction with specific embodiment of the attached drawing to the disclosure.It should be understood that this place is retouched
The specific embodiment stated is only used for describing and explaining the disclosure, is not limited to the disclosure.
In the disclosure, in the absence of explanation to the contrary, the noun of locality used such as " upper and lower, left and right " typically refers to
Page shown in Fig. 1, wherein above, purlin 8 is arranged according to fastener 1 on a left side briquetting 2 respectively in lower section, two briquettings 2
Right both sides.
As depicted in figs. 1 and 2, the disclosure provides a kind of connection component, for the first component to be fixed to second component,
Wherein, the support base 3 including 1, two briquetting 2 of fastener and positioned at two briquettings, 2 lower section, two briquettings 2 are respectively cooperating with
Be connected to support base 3, on for be disposed adjacent two first components to be connected respectively, fastener 1 be located at two briquettings 2 it
Between, and support base 3, second component are sequentially passed through, the first component is connected on second component.
That is, in the present embodiment, being fixed on support base 3 by two briquettings first, will be disposed adjacent with realizing
Two first components be fixed, pass through support base 3 and second component after the first component is fixed, then through fastener 1, it is real
Show and the first component has been fixed on second component, in whole process, the first component is to be fixed to second by support base 3
On part, in this way, fastener 1 is during the installation process, external load just will not be applied on the first component, would not also cause
The phenomenon that one component causes installation to damage due to locally generating stress and concentrating.
In other words, in the disclosure, support base 3 is responsible for the support first component, and dexterously by that will cooperate with support base 3
Briquetting replaced by monoblock type in the prior art by the briquetting 2 of two split settings, in this way, in whole installation process,
External load is not applied on the first component, and the first component to be installed just will not be easy to be damaged, and is greatly reduced
The spoilage of installing component.
Specifically, in order to facilitate the installation and removal of briquetting 2 and support base 3, in the present embodiment, two briquettings 2 are closed
It is symmetrical arranged, and is snapped fit on support base 3 in fastener 1.Wherein, two briquettings 2 are symmetrical arranged, convenient and support base 3
Installation is symmetrical arranged that is, support base 3 also corresponds to briquetting 2, while facilitating molding and manufacture.Certainly, in other embodiments
In, two briquettings 2 can also arrange otherwise, be coupled as long as can satisfy with support base 3.
In addition to this, as shown in Figure 1, in the present embodiment, being formed with slot 4 between each briquetting 2 and support base 3,
For accommodating the edge of the first component.During the installation process, briquetting 2 can be snapped fit on support base 3 first, then by first
Component is plugged into slot 4 and is fixed.
Specifically, in the present embodiment, briquetting 2 includes matrix 21 and extends to form from the matrix 21 towards support base 3
The first grab 22, support base 3 include the pedestal 31 being arranged substantially in parallel with matrix 21 and two relative spacings setting limit
Arm 32, one end towards matrix 21 close to fastener 1 of each position limit arm 32 extend, and each position limit arm 32 is formed with for the
The second grab 33 that one grab 22 is engaged by clamping.In this way, snapping fit onto the second grab 33 by the first grab 22, briquetting is realized
2 snap fit on support base 3.Wherein, the first grab 22 and the second grab 33 can be any appropriate shape, as shown in Figure 1, making
For a kind of embodiment, the first grab 22 is increasingly towards the inclination of position limit arm 32 from matrix 21 and extends and towards 21 inflection of matrix to shape
At the first hook portion, and the second grab 33 then extends from position limit arm 32 towards the direction of parallel matrix 21 first, then perpendicular to base
The direction of body 21 extends towards the first grab 22, and be ultimately towards 33 inflection of position limit arm extend to form with the cooperation of the first hook portion the
Two hook portions.Wherein, first grab 22 is obliquely installed, and briquetting 2 is firmly snapped fit onto support base 3.
It should be noted that " substantially parallel " mentioned above refers to matrix 21 and the substantially parallel setting of pedestal 31.
In addition, interval is arranged to be formed with slot 4, in this way, between matrix 21 and pedestal 31 between matrix 21 and pedestal 31
Space constitute the slot space for installing the first component.And fastener 1 is located between two position limit arms 32, is installing
Cheng Zhong, fastener 1 directly pass through between two position limit arms 32, and to pass through support base 3, the first component is fixed to second
Part.
Further, in order to guarantee installation process in place, and it can satisfy degree of firmly installing, in present embodiment
In, it is connected between two position limit arms 32 by linking arm 34, fastener 1 includes head 11 and fixed part 12, and fixed part 12 is successively
Across linking arm 34, pedestal 31 the first component is fixed to second component, head 11 is locked on linking arm 34.In this way, logical
The setting for crossing linking arm 34 provides an installation extreme position, when head 11 reaches the position of linking arm 34, illustrates to pacify at this time
It is attached to position.And the position of linking arm 34 can also be arranged is just met for for head 11 being received into linking arm 34 and two position limit arms
In 33 U-lags formed, avoid exposed to cause the accidents such as scratch.
In order to be firmly installed to the first component in above-mentioned slot 4, in the present embodiment, matrix 21 is remote
Other end end from fastener 1 is provided with sealing joint strip 5, and correspondingly, the both ends end of pedestal 31 is also equipped with sealing joint strip
5, the first component snaps fit between two sealing joint strips 5 to abut to the second grab 33.That is, each briquetting 2 and support base 3
One end on two be oppositely arranged sealing joint strip 5 and the second grab 33 constitute slot 4, pass through using sealing joint strip 5 bullet
Property characteristic, can be compacted the installation of the first component, guarantee the first component it is firm be installed to briquetting 2 and what support base 3 was constituted inserts
In slot 4, it is avoided to generate shaking.Wherein, sealing joint strip 5 can be the ethylene-propylene-diene monomer adhesive tape with stronger ageing-resistant performance.
Specifically, sealing joint strip 5 is fixed on matrix 21 and pedestal 31 in order to realize, in the present embodiment, such as Fig. 1
It is shown, the first limiting slot 211 for fixing seal adhesive tape 5, the first limiting slot 211 are offered on the other end end of matrix 21
Be formed as T-shaped, correspondingly, the end of pedestal 31 offers the second limiting slot 311 for fixing seal adhesive tape 5, the second limit
Position slot 311 is formed as inverted T-shape.Wherein, the opening portion of T-shaped slot is formed as necking, when sealing joint strip 5 is entered by necking
It to after limiting slot inner space, can be installed in slot by limitation, realize the fixed installation of sealing joint strip 5.And in other realities
It applies in mode, sealing joint strip 5 can also be fixed by the way of bonding, with no restriction to this.
Further, in the present embodiment, the second grab 33 is bonded with one side glue with what the first component abutted against on one side
6.Wherein, one side glue 6 can be avoided the first component and the direct rigid contact of support base 3, cause contact wear, and one side glue 6
With preferable elasticity, installation error can be eliminated, buffering is played the role of, further realize the firm installation of the first component.
Meanwhile for the firm installation of the further satisfaction first component, in the present embodiment, the first component and pedestal 31
Between be additionally provided with double-sided adhesive 7.By the way that double-sided adhesive is arranged in local location, realizes that the first component is bonding with pedestal 31, pass through
The dual fixation of clamping and bonding, realizes being bonded between the first component and briquetting 2, support base 3.
As shown in Figure 1, for the connection between further satisfaction briquetting 2 and support base 3, in the present embodiment, matrix
21 are formed as L-shaped backstop platform close to one end of fastener 1, and one end backstop of the position limit arm 32 far from pedestal 31 is in the backstop platform
On.That is, position limit arm 32 is supported in the backstop platform of above-mentioned L-shaped structure, in this way, can not only limit support base 3 upper and lower
Displacement on direction can also limit the displacement of its left and right directions, meet assembly between the two, can then meet first
The mounting stability of component and second component.
According to another aspect of the present disclosure, a kind of mounting structure of solar components is also provided, including purlin 8 and it is multiple to
The solar components 9 being installed on purlin 8, wherein further include connection component disclosed above, purlin 8 is above-mentioned second
Part, solar components are the above-mentioned first component.That is, purlin 8 is used as above-mentioned second component, solar components 9 are used as upper
The first component stated, and multiple solar components are firmly installed on purlin 8 by connection component, and in installation process
In, it can be avoided the damaging problem that stress concentrates the solar components generated, the installation for significantly reducing solar components is broken
Damage problem.
The preferred embodiment of the disclosure is described in detail in conjunction with attached drawing above, still, the disclosure is not limited to above-mentioned reality
The detail in mode is applied, in the range of the technology design of the disclosure, a variety of letters can be carried out to the technical solution of the disclosure
Monotropic type, these simple variants belong to the protection scope of the disclosure.
It is further to note that specific technical features described in the above specific embodiments, in not lance
In the case where shield, can be combined in any appropriate way, in order to avoid unnecessary repetition, the disclosure to it is various can
No further explanation will be given for the combination of energy.
In addition, any combination can also be carried out between a variety of different embodiments of the disclosure, as long as it is without prejudice to originally
Disclosed thought equally should be considered as disclosure disclosure of that.