CN208918233U - Industrial furnace construction operation platform - Google Patents

Industrial furnace construction operation platform Download PDF

Info

Publication number
CN208918233U
CN208918233U CN201821313943.XU CN201821313943U CN208918233U CN 208918233 U CN208918233 U CN 208918233U CN 201821313943 U CN201821313943 U CN 201821313943U CN 208918233 U CN208918233 U CN 208918233U
Authority
CN
China
Prior art keywords
fastener
wallboard
shackle
girder
annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821313943.XU
Other languages
Chinese (zh)
Inventor
程子东
韩青峰
陈辉
刘长远
陈建忠
林波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Shanghai Baoye Metallurgy Engineering Co Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Shanghai Baoye Metallurgy Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd, Shanghai Baoye Metallurgy Engineering Co Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201821313943.XU priority Critical patent/CN208918233U/en
Application granted granted Critical
Publication of CN208918233U publication Critical patent/CN208918233U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a kind of industrial furnace construction operation platform, it include: walking mechanism, comprising: the first fastener, it is set on the annular girder and can be moved along the annular girder, driving equipment, for driving first fastener to move, the second fastener, it is set on the rotating beam and can move back and forth along its length, first fastener and second fastener are connected by buckle.Industrial furnace construction operation platform provided by the utility model, when there is irregular situation in annular girder (annular girder radius is not unified), second fastener reciprocatingly slides, constantly change radius of action with the walking of the first fastener on irregular annular girder, so that rotating beam is smoothly moved and is walked, be not in because annular girder it is irregular caused by get stuck or break.

Description

Industrial furnace construction operation platform
Technical field
The utility model relates to industrial furnace technology field, especially a kind of industrial furnace construction operation platform.
Background technique
General industrial furnace construction is a columnar steel construction furnace shell, builds one along steel construction furnace shell inner wall inside it Circle is used for the refractory material of insulation, and lower part builds 5 layers of large volume refractory material in furnace.Currently, medium and small blast furnace builds furnace When, it is limited by place inside blast furnace, building materials transport in furnace mostly uses artificial or single-beam electric block (two degrees of freedom) To realize.It being only capable of making movement in two-degree-of-freedom plane on straight hanging beam by electric block being limited, material needs manually to drag in place, Large labor intensity, and it is not able to satisfy the requirement of iron-smelting process requirement masonry of well material enlargement, material breakage rate is high;Serious shadow Ring construction period and construction quality.
Therefore, lack efficient omnidirectional hoisting tool into the restriction for reducing traditional brickwork duration, improving construction efficiency Factor, while the type selecting of Blast Furnace Bottom, cupola well material is limited, fritter carbon brick can only be selected to meet the requirement of manpower transport.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of industrial furnace construction operation platforms, reduce medium and small blast furnace and build Labor intensity when building reduces material breakage rate, shortens the construction period, improves construction quality.
The utility model provides a kind of industrial furnace construction operation platform characterized by comprising
One platform;
Four girders are located at below the platform, are assembled into groined type structure;
More secondary beams and the girder are in the same plane, each secondary beam be connected to two girders it Between;
Central rotating shaft system, it is arranged in the platform central and is fixed on the girder or the secondary beam;
Annular girder is round circular orbit, is fixed under the girder and/or the secondary beam;
At least one rotating beam is located at below the annular girder, and described rotating beam one end is fixed on the central rotating shaft system It can be rotated on system and centered on it, the other end is connect by walking mechanism with the annular girder, and can be along the annular girder Movement;
Lifting appliance is set on the rotating beam and can move back and forth along its length;
Wherein, the walking mechanism includes: the first fastener, is set on the annular girder and can transport along the annular girder Dynamic, driving equipment, for driving first fastener to move, the second fastener is set on the rotating beam and can be along its length Direction moves back and forth, and first fastener and second fastener are connected by buckle.
Further, the cross section of the annular girder and the rotating beam is I-shaped, first fastener and institute Stating the second fastener is monorail trolley.
Further, first fastener includes: the first wallboard and the second wallboard, on first wallboard and the second wallboard It is equipped with one group of idler wheel, the first connecting plate, the first connection board ends are connected between first wallboard and the second wallboard Two pieces of parallel first mounting plates and the second mounting plate are respectively arranged with, between first mounting plate and second mounting plate It is connected with connecting rod, the connecting rod is for installing shackle;Second fastener includes: third wallboard and the 4th wallboard, described It is equipped with one group of idler wheel on third wallboard and the 4th wallboard, is connected with the second connection between the third wallboard and the 4th wallboard Plate, the second connecting plate middle part are provided with third mounting plate, mounting hole are offered on the mounting plate, the mounting hole is used for Shackle is installed.
Further, the shackle includes:
Shackle main body, for the open annular state in side;
Dead ring, in the one end at the position of the opening of the shackle main body, the annular penetrated through in the horizontal direction with inside State is formed, and is formed with the first nut surface of nut form in inner face;
Launch ring, the other end at the position of the opening of the shackle main body, the ring penetrated through in the horizontal direction with inside Form is formed, and is configured in opposite directions with the dead ring, is formed with the second nut surface of nut form in inner face;And
Shackle pin main body, successively penetrates through the ejection ring and the dead ring and can be with first nut surface and The fastening of two nut surfaces or separation;
Wherein, the shackle pin main body runs through the mounting hole, and the shackle main body is sheathed in the connecting rod.
Industrial furnace construction operation platform provided by the utility model, reduce can medium and small blast furnace build when labor intensity, drop Low material breakage rate, shortens the construction period, improves construction quality.In addition, the first fastener, the second fastener and shackle connect It connects, when irregular situation occurs in annular girder (annular girder radius is not unified), the second fastener reciprocatingly slides, with irregular annular The walking of the first fastener on beam and constantly change radius of action, so that rotating beam is smoothly moved and is walked, will not Occur because annular girder it is irregular caused by get stuck or break.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model industrial furnace construction operation platform;
Fig. 2 is the 1-1 cross-sectional view of Fig. 1;
Fig. 3 is the structural schematic diagram of walking mechanism in the utility model;
Fig. 4 is the schematic perspective view of shackle in the utility model.
In figure, 1. girders, 2. secondary beams, 3. central rotating shaft systems, 4. annular girders, 5. rotating beams, 6. walking mechanisms, 7. Hang equipment, 8. industrial furnaces, 100. first fasteners, 101. first wallboards, 102. second wallboards, 103. first connecting plates, 104. One mounting plate, 105. second mounting plates, 106. connecting rods, 200. second fasteners, 201. third wallboards, 202. the 4th wallboards, 203. second connecting plates, 204. third mounting plates, 300. shackles, 301. shackle main bodys, 302. dead rings, 303. ejection rings, 304. shackle pin main bodys.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments, so that those skilled in the art The utility model may be better understood and can be practiced, but illustrated embodiment is not as the restriction to the utility model.
The present embodiment provides a kind of industrial furnace construction operation platform (not shown), and as shown in Fig. 1 and Fig. 2, it is arranged In industrial furnace 8, and including a platform, it is additionally provided under the platform:
Four girders 1 are located at below the platform, are assembled into groined type structure;
More secondary beams 2 and the girder 1 are in the same plane, and each secondary beam 2 is connected to two girders Between 1;
Central rotating shaft system 3, it is arranged in the platform central and is fixed on the girder 1 or the secondary beam 2;
Annular girder 4 is round circular orbit, is fixed under the girder 1 and/or the secondary beam 2;
At least one rotating beam 5 is located at 4 lower section of annular girder, and described 5 one end of rotating beam is fixed on the central rotating shaft It can be rotated in system 3 and centered on it, the other end is connect by walking mechanism 6 with the annular girder 4, and can be along the ring Ellbeam 4 moves;
Lifting appliance 7 is set on the rotating beam 5 and can move back and forth along its length.
Wherein, the walking mechanism 6 includes: the first fastener 100, is set on the annular girder 4 and can be along the ring Ellbeam 4 moves, driving equipment (not shown), and for driving first fastener 100 to move, the second fastener 200 is set to described It can move back and forth on rotating beam 5 and along its length, first fastener 100 and second fastener 200 pass through shackle 300 Connection.When irregular situation occurs in annular girder 4 (4 radius of annular girder is not unified), the second fastener 200 reciprocatingly slides, with not The walking of the first fastener 100 on regular annular girder 4 and constantly change radius of action, so that rotating beam 5 is smoothly moved Dynamic and walking, be not in because annular girder 4 it is irregular caused by get stuck or break.
In one optional embodiment of the present embodiment, the cross section of the annular girder 4 and the rotating beam 5 is " work " word Shape, first fastener 100 and second fastener 200 are monorail trolley.
In one optional embodiment of the present embodiment, as shown in figure 3, first fastener 100 includes: the first wallboard 101 With the second wallboard 102, be equipped with one group of idler wheel on first wallboard 101 and the second wallboard 102, first wallboard 101 with Be connected with the first connecting plate 103 between second wallboard 102,103 both ends of the first connecting plate be respectively arranged with two pieces it is parallel First mounting plate 104 and the second mounting plate 105, are connected between first mounting plate 104 and second mounting plate 105 Extension bar 106, the connecting rod 106 is for installing shackle 300;Second fastener 200 includes: third wallboard 201 and the 4th wall Plate 202 is equipped with one group of idler wheel, the third wallboard 201 and the 4th wallboard on the third wallboard 201 and the 4th wallboard 202 It is connected with the second connecting plate 203 between 202, third mounting plate 204, the installation are provided in the middle part of second connecting plate 203 Mounting hole is offered on plate 204, the mounting hole is for installing shackle 300.
In one optional embodiment of the present embodiment, as shown in figure 4, the shackle 300 includes:
Shackle main body 301, for the open annular state in side;
Dead ring 302 is penetrated through in the one end at the position of the opening of the shackle main body 301 with inside in the horizontal direction Annular state formed, be formed with the first nut surface of nut form in inner face;
Ring 303 is launched, the other end at the position of the opening of the shackle main body 301 is passed through in the horizontal direction with inside Logical annular state is formed, and is configured in opposite directions with the dead ring 302, is formed with the second nut surface of nut form in inner face;And
Shackle pin main body 304, successively penetrates through the ejection ring 303 and the dead ring 302 and can be with described first Nut surface and the fastening of the second nut surface or separation;
Wherein, the shackle pin main body 304 runs through the mounting hole, and the shackle main body 301 is sheathed on the connecting rod On 106.
The protection scope of the utility model is not limited thereto.Those skilled in the art are in the utility model on the basis of institute The equivalent substitute or transformation of work, both are within the protection scope of the present invention.The protection scope of the utility model is wanted with right It asks subject to book.

Claims (4)

1. a kind of industrial furnace construction operation platform characterized by comprising
One platform;
Four girders are located at below the platform, are assembled into groined type structure;
More secondary beams and the girder are in the same plane, and each secondary beam is connected between two girders;
Central rotating shaft system, it is arranged in the platform central and is fixed on the girder or the secondary beam;
Annular girder is round circular orbit, is fixed under the girder and/or the secondary beam;
At least one rotating beam is located at below the annular girder, and described rotating beam one end is fixed in the central rotating shaft system And can be rotated centered on it, the other end is connect by walking mechanism with the annular girder, and can be moved along the annular girder;
Lifting appliance is set on the rotating beam and can move back and forth along its length;
Wherein, the walking mechanism includes: the first fastener, is set on the annular girder and can move along the annular girder, Driving equipment, for driving first fastener to move, the second fastener is set on the rotating beam and can be along its length It moves back and forth, first fastener and second fastener are connected by buckle.
2. industrial furnace construction operation platform as described in claim 1, which is characterized in that the annular girder and the rotating beam Cross section is I-shaped, and first fastener and second fastener are monorail trolley.
3. industrial furnace construction operation platform as claimed in claim 2, which is characterized in that first fastener includes: the first wall Plate and the second wallboard, are equipped with one group of idler wheel on first wallboard and the second wallboard, first wallboard and the second wallboard it Between be connected with the first connecting plate, the first connection board ends are respectively arranged with two pieces of first parallel mounting plates and the second installation Plate is connected with connecting rod between first mounting plate and second mounting plate, the connecting rod is for installing shackle;It is described Second fastener includes: third wallboard and the 4th wallboard, is equipped with one group of idler wheel on the third wallboard and the 4th wallboard, and described It is connected with the second connecting plate between three wallboards and the 4th wallboard, is provided with third mounting plate in the middle part of second connecting plate, it is described Mounting hole is offered on mounting plate, the mounting hole is for installing shackle.
4. industrial furnace construction operation platform as claimed in claim 3, which is characterized in that the shackle includes:
Shackle main body, for the open annular state in side;
Dead ring, in the one end at the position of the opening of the shackle main body, the annular state shape penetrated through in the horizontal direction with inside At being formed with the first nut surface of nut form in inner face;
Launch ring, the other end at the position of the opening of the shackle main body, the annular state penetrated through in the horizontal direction with inside It is formed, and is configured in opposite directions with the dead ring, be formed with the second nut surface of nut form in inner face;And
Shackle pin main body, successively penetrates through the ejection ring and the dead ring and can be with first nut surface and the second spiral shell Generatrix fastening or separation;
Wherein, the shackle pin main body runs through the mounting hole, and the shackle main body is sheathed in the connecting rod.
CN201821313943.XU 2018-08-15 2018-08-15 Industrial furnace construction operation platform Active CN208918233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821313943.XU CN208918233U (en) 2018-08-15 2018-08-15 Industrial furnace construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821313943.XU CN208918233U (en) 2018-08-15 2018-08-15 Industrial furnace construction operation platform

Publications (1)

Publication Number Publication Date
CN208918233U true CN208918233U (en) 2019-05-31

Family

ID=66701899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821313943.XU Active CN208918233U (en) 2018-08-15 2018-08-15 Industrial furnace construction operation platform

Country Status (1)

Country Link
CN (1) CN208918233U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112048584A (en) * 2020-08-19 2020-12-08 上海宝冶冶金工程有限公司 Installation method of modular blast furnace in-situ large-scale maintenance shed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112048584A (en) * 2020-08-19 2020-12-08 上海宝冶冶金工程有限公司 Installation method of modular blast furnace in-situ large-scale maintenance shed

Similar Documents

Publication Publication Date Title
CN208918233U (en) Industrial furnace construction operation platform
CN104354780A (en) Grasping claw mechanism of rough wall climbing robot
CN201214594Y (en) Loop crane hoisting disk device for blast furnace inner lining construction
CN204184485U (en) The graping chaw mechanism of hydraulically rough surface climbing robot
CN207700708U (en) A kind of shellring shape ceiling mounted tracks of unit glass curtain wall
CN212799260U (en) Converter steam pocket hoisting device based on hydraulic lifter
CN200949003Y (en) Charcoal element roasting furnace fire channel wall hoisting framework
CN204096948U (en) Annular double track sliding rail Special hoisting mechanism
CN111003634B (en) Umbrella-shaped hoisting device for hoisting hollow cylinder in subway construction
CN210081604U (en) Core pulling device for maintenance
CN102320525A (en) Single-beam cantilever crane
CN209352424U (en) A kind of hoisting prefabricated part of embedded small hoisting ring group
CN203190805U (en) Anchoring part
CN205555882U (en) Heavy single track hangs
CN103754802A (en) Annular guide rail for external wall construction
CN210064891U (en) Linear four-point-crane universal hoisting device for precast concrete member
CN202945004U (en) Gantry crane for installing large equipment
CN217650699U (en) Assembly type structure hoist and mount hoist
CN203624983U (en) Annular guide rail for external wall construction
CN203583367U (en) Movable type material storage device for arch ring construction
CN203794429U (en) Spray tower bin lifting appliance
CN202245812U (en) Single beam type cantilever crane
CN210140374U (en) Universal lifting device for straight horizontal lifting of precast concrete member
CN218320213U (en) Gearbox hoisting tool
CN102311043A (en) Hoisting device and method of integral flue wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant