CN208917609U - Level tune component, regulating mechanism and track install system - Google Patents

Level tune component, regulating mechanism and track install system Download PDF

Info

Publication number
CN208917609U
CN208917609U CN201821311774.6U CN201821311774U CN208917609U CN 208917609 U CN208917609 U CN 208917609U CN 201821311774 U CN201821311774 U CN 201821311774U CN 208917609 U CN208917609 U CN 208917609U
Authority
CN
China
Prior art keywords
track
connection piece
fastening connection
height adjusting
adjusting part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821311774.6U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Ruizhu residential technology Co.,Ltd.
Original Assignee
Guangdong Remac Equipment Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Remac Equipment Information Technology Co Ltd filed Critical Guangdong Remac Equipment Information Technology Co Ltd
Priority to CN201821311774.6U priority Critical patent/CN208917609U/en
Application granted granted Critical
Publication of CN208917609U publication Critical patent/CN208917609U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a kind of Level tune component, regulating mechanism and tracks to install system, which includes: adjustment seat, and the adjustment seat is for being installed in track;First fastening connection piece, the second fastening connection piece, first fastening connection piece and the second fastening connection piece are removable and are arranged at intervals in the adjustment seat, and first fastening connection piece and second fastening connection piece with the track for gripping;And first height adjusting part, the second height adjusting part, first height adjusting part and the second height adjusting part are moved and are arranged at intervals in the adjustment seat, and first height adjusting part and second height adjusting part are for adjusting the absolute altitude and levelness of the track.The Level tune component can quickly and accurately carry out the installation exercise of track, and the installed height mark and levelness controllability of track are good, and its mode of operation is simple, high-efficient, be conducive to guarantee construction speed.

Description

Level tune component, regulating mechanism and track install system
Technical field
The utility model relates to track installation technical field, more particularly to a kind of Level tune component, regulating mechanism and Track installs system.
Background technique
In the equipment installation of the prefabricated building of assembled integrated building, the industrialized production assembly line of wallboard, equipment component is needed Track is installed.And in the installation exercise of track, the engineering method that " second pouring " is usually used is constructed.But in track Second pouring construction before, need by the horizontal Pass line adjustment of two parallel guide rails to unanimously and need to keep being parallel to each other, namely It needs wherein a guide rail to level, is later again adjusted to two guide rails in parallel.
Padded original method is manually carried out with sundries however, also only resting on to the height adjustment of track at present, no Only degree of regulation can not control, guarantee, can not be finely adjusted, seriously affect the quality that track is mated formation, and inefficient operation, Influence construction speed.
Utility model content
Based on this, it is necessary to provide a kind of Level tune component, can be realized the accurate adjusting of track mounting height, track Installed height mark and levelness controllability it is good, and install it is easy to operate, it is high-efficient, be conducive to guarantee construction speed;Regulating mechanism and Track installs system by assembling the Level tune component, can ensure that the installation accuracy of track, and be able to carry out height and level Degree fine tuning, guarantees the quality of mating formation of track, while construction operation is high-efficient, is conducive to guarantee construction speed.
Its technical solution is as follows:
On the one hand, the application provides a kind of Level tune component, comprising:
Adjustment seat, the adjustment seat is for being installed in track;
First fastening connection piece, the second fastening connection piece, first fastening connection piece and the second fastening connection piece are removable It moves and is arranged at intervals in the adjustment seat, first fastening connection piece and second fastening connection piece are for described Rail grips;And
First height adjusting part, the second height adjusting part, first height adjusting part and the second height adjusting part are removable It moves and is arranged at intervals in the adjustment seat, first height adjusting part and second height adjusting part are described for adjusting The absolute altitude and levelness of track.
Above-mentioned Level tune component is mainly used for that its absolute altitude and levelness is adjusted when track installation.It is specifically used When, adjustment seat is installed in the required track adjusted first, passes through and adjusts the first fastening connection piece and the second fastening connection piece With two clamping sides of track, the secured dress of Lai Shixian adjustment seat and track joins and can guarantee opposing stationary movement relation. And then, by adjusting the first height adjusting part and the second height being adjusted by the professional tool for calibrating absolute altitude and levelness Section part is synchronous or makes a relative move respectively with adjustment seat, enable track and adjustment seat synchronize carry out rising or falling shifting Operation dynamic, that the absolute altitude that thus can complete track is set up and levelness is harmonized.The Level tune component can be quickly and quasi- The installation exercise of true carry out track, the installed height mark and levelness controllability of track are good, and its mode of operation is simple, efficiency Height is conducive to guarantee construction speed.
The technical solution of the application is further described below:
The adjustment seat includes mainboard and is arranged at intervals on the same face of the mainboard in one of the embodiments, The first support plate and the second support plate, first support plate offers the first mounting hole, and second support plate offers Second mounting hole, first fastening connection piece is removable to be arranged in first mounting hole, second fastening connection piece It is removable to be arranged in second mounting hole.
First fastening connection piece and second fastening connection piece are fastening spiral shell in one of the embodiments, Bolt, first mounting hole and second mounting hole are threaded hole, and the fastening bolt is bolted in the threaded hole.
It in one of the embodiments, include more than two first fastening connection pieces, more than two second fastenings company Second mounting hole of fitting, the first mounting hole of two or more quantity and two or more quantity, described first is fastenedly connected Part is worn correspondingly to be fixed in first mounting hole, and second fastening connection piece is worn correspondingly to be fixed on In second mounting hole.
First support plate and second support plate include connecting with the mainboard in one of the embodiments, Fixing end and the free end that extends away from the direction of the mainboard, and first support plate and second support plate Cross-sectional area along the fixing end to the free end be in the trend gradually successively decreased.
It is respectively provided with to avoid with first fastening connection piece on the mainboard in one of the embodiments, and cooperate The first notch and for second fastening connection piece evacuation cooperation the second notch.
The mainboard offers spaced third mounting hole and the 4th mounting hole, institute in one of the embodiments, It states the first support plate and second support plate is laid between the third mounting hole and the 4th mounting hole;Described first Height adjusting part is removable to be arranged in the third mounting hole and for abutting with built-in fitting or ground, second height Regulating part is removable to be arranged in the 4th mounting hole and for abutting with the built-in fitting or the ground.
First fastening connection piece and first height adjusting part dislocation are arranged in one of the embodiments, institute It states the second fastening connection piece and second height adjusting part dislocation is arranged.
On the other hand, the application also provides a kind of regulating mechanism comprising level, level meter and two are as described above Level tune component, two Level tune components are used to be respectively installed in the both ends of track, and the level meter is for installing On the surface of track, the level is used to be arranged in any end of the track.Regulating mechanism is by assembling the level Component is adjusted, can ensure that the installation accuracy of track, and is able to carry out height and levelness fine tuning, guarantees the quality of mating formation of track, Construction operation is high-efficient simultaneously, is conducive to guarantee construction speed.
In addition, the application also provides a kind of track installation system comprising concrete foundation is arranged at intervals at the coagulation Two built-in fittings on soil base, two tracks being set on the built-in fitting correspondingly and two as described above adjust Mechanism is saved, the regulating mechanism is installed in correspondingly in the track, for adjusting two tracks to same absolute altitude simultaneously It is parallel to each other.Track installs system by assembling the Level tune component, can ensure that the installation accuracy of track, and be able to carry out height Degree and levelness fine tuning, guarantee the quality of mating formation of track, while construction operation is high-efficient, are conducive to guarantee construction speed.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of Level tune component described in an embodiment of the present invention;
Fig. 2 is the mounting structure schematic diagram of regulating mechanism described in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram that track described in an embodiment of the present invention installs system.
Description of symbols:
10, Level tune component, 20, regulating mechanism, 30, track installation system, 100, adjustment seat, 110, mainboard, 111, First notch, the 112, second notch, the 120, first support plate, the 130, second support plate, 131, fixing end, 132, free end, 200, the first fastening connection piece, the 300, second fastening connection piece, the 400, first height adjusting part, the 500, second height adjusting part, 600, level, 700, level meter, 800, concrete foundation, 900, built-in fitting, 900a, track.
Specific embodiment
It is below in conjunction with attached drawing and specifically real for the purpose of this utility model, technical solution and advantage is more clearly understood Mode is applied, the utility model is described in further detail.It should be understood that the specific embodiments described herein Only to explain the utility model, the protection scope of the utility model is not limited.
It should be noted that when element is referred to as " being fixedly arranged on ", " being set to " or " install in " another element, it can be with Directly on the other element or there may also be elements placed in the middle.When an element is considered as " connection " another yuan Part, it can be directly to another element or may be simultaneously present centering elements;One element and another element The concrete mode being fixedly connected can be achieved by the prior art, and details are not described herein, it is preferred to use the fixation side of threaded connection Formula.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more Any and all combinations of relevant listed item.
" first " described in the utility model, " second " do not represent specific quantity and sequence, are only used for title It distinguishes.
As shown in Figure 1, a kind of Level tune component 10 of the embodiment shown for the application, comprising: adjustment seat 100, institute Adjustment seat 100 is stated for being installed in track 900a;One group of fastener, one group of fastener include removable and interval setting In the first fastening connection piece 200 and the second fastening connection piece 300 in the adjustment seat 100, first fastening connection piece 200 It is used to grip with the track 900a with second fastening connection piece 300;And one group of regulating part, one group of regulating part Including the first height adjusting part 400 and the second height adjusting part 500 removable and be arranged at intervals in the adjustment seat 100, First height adjusting part 400 and second height adjusting part 500 are used to adjust the absolute altitude and level of the track 900a Degree.
Above-mentioned Level tune component 10 is mainly used for that its absolute altitude and levelness is adjusted when track 900a installation.Specifically In use, on the track 900a adjusted needed for being first installed to adjustment seat 100, by adjusting the first fastening connection piece 200, the The secured dress of two fastening connection pieces 300 and two clamping sides of track 900a, Lai Shixian adjustment seat 100 and track 900a join, simultaneously It can guarantee opposing stationary movement relation.And then, by synchronizing by the professional tool for calibrating absolute altitude and levelness Or the first height adjusting part 400, the second height adjusting part 500 and the relative movement of adjustment seat 100 are adjusted respectively, so that track 900a Can with adjustment seat 100 synchronize carry out rising or falling movement, the absolute altitude that thus can complete track 900a is set up and horizontal Spend the operation harmonized.The Level tune component 10 can quickly and accurately carry out the installation exercise of track 900a, track 900a Installed height mark and levelness controllability it is good, and its mode of operation is simple, high-efficient, is conducive to guarantee construction speed.
It should be noted that being clamped by the first fastening connection piece 200, the second fastening connection piece 300 and track 900a solid Fixed, when being in order to ensure the first height adjusting part 400 of operation and the second height adjusting part 500, track 900a can be with adjustment seat 100 synchronization lifting movements together.
And it is fixed using chucking power and track 900a to replace the non-dismountable connection type such as traditional welding, riveting, So that this Level tune component 10 has the secondary function of reusing, more save, environmental protection, is conducive to reduce construction cost.
Please continue to refer to Fig. 1, in an alternative embodiment, the adjustment seat 100 includes mainboard 110 and is arranged at intervals at The first support plate 120 and the second support plate 130 on the same face of the mainboard 110, first support plate 120 offer One mounting hole, second support plate 130 offer the second mounting hole, and first fastening connection piece 200 is removable to be arranged in In first mounting hole, second fastening connection piece 300 is removable to be arranged in second mounting hole.In this way, first Support plate 120, which can support, fixes the first fastening connection piece 200, and the second support plate 130, which can support, fixes second and be fastenedly connected Part 300, so that the first fastening connection piece 200 and the second fastening connection piece 300 are respectively in the first mounting hole and the second mounting hole When mobile, the end of two fastening connection pieces can form effectively lateral clamping to track 900a and the stabilization of longitudinal direction is lifted, Ensure to clamp the synchronizing moving of the track 900a and adjustment seat 100 in firm and adjustment process.
In order to further enhance the convenience for adjusting operation, construction efficiency is improved, in the present embodiment, first fastening Connector 200 and second fastening connection piece 300 are fastening bolt, and first mounting hole and second mounting hole are equal For threaded hole, the fastening bolt is bolted in the threaded hole.The screw connection manner of fastening bolt and threaded hole is thus used, more Add to facilitate and tightened and unscrewed adjusting, reliable, firm clamping can not only be formed to track 900a, and facilitate Level tune The assembly and disassembly of component 10.
However be not difficult to know, the first height adjusting part 400 and the second height adjusting part 500 carry out in adjustment process Be vertical or almost vertical direction length travel, and the first fastening connection piece 200 and the second fastening connection piece 300 are being adjusted What is carried out in the process is then horizontal or level of approximation direction horizontal displacement, and this requires should not interfere to touch each other It hits, avoids that operation can not be normally carried out.It is therefore desirable to which first fastening connection piece 200 is required to adjust with first height The dislocation arrangement of part 400 is saved, second fastening connection piece 300 is arranged with second height adjusting part 500 dislocation.Also can It is interpreted as the first fastening connection piece 200 and the first height adjusting part 400, the second fastening connection piece 300 and the second height adjusting part 500 are spaced the certain distance that is staggeredly arranged, which may insure the problem of mutual interference and collision will not occur, and energy Enough fit clearances are reserved, enough in order to which operation is tightened or unscrewed by tool.
Please continue to refer to Fig. 1, further, it is respectively provided on the mainboard 110 and first fastening connection piece The first notch 111 that 200 evacuation cooperate and the second notch for cooperating with second fastening connection piece 300 evacuation 112.First notch 111 is located at the oblique upper of the first fastening connection piece 200, and the second notch 112 is located at the second fastening connection piece 300 Oblique upper, so can two fastening bolts bolt head position it is vacant go out enough operating spaces so that the special tools such as spanner Tool can normal use, eliminate due to limited space can not normal regulating fastening bolt the problem of.
In view of track 900a is generally iron or steel material, weight is larger, in order to guarantee Level tune component 10 to track The chucking power of 900a and the heavy load that power support track 900a enough is lifted, in the application further technical solution, level Adjust the fastening connection piece of component 10 including two groups or more quantity, the first mounting hole of two or more quantity and two Or the second mounting hole of the above quantity, fastening connection piece and mounting hole correspond assembly connection.Therefore, above scheme is by adopting With more clamping points, clamping can be further promoted to track 900a and lifts performance.
Please continue to refer to Fig. 1, also, in view of the first fastening connection piece 200 and the second fastening connection piece 300 and track 900a is firmly to hard rigid connection, thus the structural strength of the first support plate 120 and the second support plate 130 is played with fastness Vital effect.In consideration of it, first support plate 120 and second support plate 130 are equal in an alternative embodiment Including the fixing end 131 being connect with the mainboard 110 and the free end 132 extended away from the direction of the mainboard 110, and The cross-sectional area of first support plate 120 and second support plate 130 is along the fixing end 131 to the free end 132 In the trend gradually successively decreased.It is designed by such structure, the contact of the first support plate 120 and the second support plate 130 and mainboard 110 Area is bigger, and bond strength is higher, stronger to the support reliability of the first fastening connection piece 200 and the second fastening connection piece 300, The problem of can preventing stress and deformation bending or even fatigue break.In addition, using the design of area of section gradual change, so that horizontal The whole manufacture of regulating part can be less with material, and weight is lighter, is readily transported carrying and assembly and disassembly operations.
It should be understood that other technological means in the prior art can also be used in other embodiments, such as two The modes such as reinforcing rib or floor are installed to improve the structural strength and rigidity of adjustment seat in a support plate and mainboard corner, also all exist In the protection scope of the application.
On the basis of the above embodiments, the mainboard 110 offers spaced third mounting hole and the 4th installation Hole, first support plate 120 and second support plate 130 be laid in the third mounting hole and the 4th mounting hole it Between;First height adjusting part 400 is removable to be arranged in the third mounting hole and is used for and built-in fitting 900 or ground It abuts, second height adjusting part 500 is removable to be arranged in the 4th mounting hole and be used for and the built-in fitting 900 Or the ground abuts.Optionally, the first height adjusting part 400 and the second height adjusting part 500 are to adjust bolt, third installation Hole and the 4th mounting hole are threaded hole, and when operation, which adjusts bolt, makes its turn in threaded hole, the end for adjusting bolt is pushed Built-in fitting 900 or ground, by the force-transfer characteristic of reaction force and helicitic texture that built-in fitting 900 or ground apply, so that Adjustment seat 100 can be directed away from built-in fitting 900 or the direction of ground is mobile to make the absolute altitude of track 900a change.Adjusting side Formula is easy to operate, and adjustable controllability is good.
This Level tune component 10 is applicable to the track of P38 and P50, the first height adjusting part 400, the second height adjustment Part 500 connect the stepless changing, it can be achieved that orbit altitude, the head of height adjustment bolt and connecing for ground with adjustment seat 100 Contacting surface product is small, and because ground is usually uneven, contact area is small, is more advantageous to the stability of adjustment seat 100.
By the pitch of the first height adjusting part 400 of control, the second height adjusting part 500 and screw hole, it can also be achieved ground The accurate fine tuning of rail 900a height can further promote the accuracy of track 900a absolute altitude and levelness.
It of courses, the behaviour of bolt (the first height adjusting part 400 and the second height adjusting part 500) is adjusted in above scheme Make to adjust by manpower manual and complete, the degree of automation is not high, can also expend certain manual labor.To solve this problem, Motor-driven mechanism can be installed additional in adjustment seat 100, construction personnel can control adjusting bolt by operating controller automatically Rotation, and then the automatic adjustment of track height is completed, achieve the purpose that time saving and energy saving, raising operation convenience.The program and its Similar technological means is also within the scope of protection of this application.
Please continue to refer to Fig. 2, on the other hand, the application also provides a kind of regulating mechanism 20 comprising level 600, water Level 700 and two Level tune components 10 as described above, two Level tune components 10 are for being respectively installed in ground The both ends of rail 900a, the level meter 700 are used to be installed in the surface of track 900a, and the level 600 is for being arranged Any end of the track 900a.Regulating mechanism 20 can ensure that the peace of track 900a by assembling the Level tune component 10 Precision is filled, and is able to carry out height and levelness fine tuning, guarantees the quality of mating formation of track 900a, while construction operation is high-efficient, Conducive to guarantee construction speed.
When practical operation, level 600 is placed on to one end of track 900a first, and adjusts the horizontal tune for being located at the end Component 10 is saved, so that the height at the end reaches the absolute altitude value of setting;And then level meter 700 is placed into track 900a Between position, later adjust be located at the track 900a other end Level tune component 10 work as level so that this one end gradually rises After the instruction of instrument 700 has leveled, then show that the end also has reached setting absolute altitude value, track 900a is in horizontal attitude, track 900a is installed.
As shown in figure 3, in addition, the application also provides a kind of track 900a installation system 30 comprising concrete foundation 800, two built-in fittings 900 being arranged at intervals on the concrete foundation 800 are set to the built-in fitting correspondingly Two track 900a and regulating mechanism as described above 20 on 900, the regulating mechanism 20 are installed in described correspondingly It to same absolute altitude and is parallel to each other on track 900a, for adjusting two track 900a.Track 900a installation system 30 passes through The Level tune component 10 is assembled, can ensure that the installation accuracy of track 900a, and is able to carry out height and levelness fine tuning, is guaranteed The quality of mating formation of track 900a, while construction operation is high-efficient, is conducive to guarantee construction speed.
In track 900a installation process, it will be mounted with that two track 900a of Level tune component 10 are placed individually into ground On built-in fitting 900 in tunnel, the verticality and two track 900a of two track 900a and assembly line center line are adjusted The depth of parallelism.It is high with level 600 mark in one end of two track 900a respectively, adjust the end the first height adjusting part 400, The length of second height adjusting part 500, makes up to design requirement height.Later respectively in the middle position of two track 900a Level meter 700 is placed, the first height adjusting part 400 in the adjustment seat 100 of the other end of two track 900a, the are adjusted separately The length of two height adjusting parts 500 makes two track 900a be in horizontality.Finally with welding machine by two track 900a points It is not fixed with corresponding 900 spot welding of built-in fitting, then removes the Level tune component 10 on two track 900a, then in ground Tunnel in pour into slurry, vibration compacting completes track 900a installation after theing cement solidifies.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, all should be considered as described in this specification.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed, But it cannot be understood as the limitations to utility model patent range.It should be pointed out that for the common skill of this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The protection scope of the utility model.Therefore, the scope of protection shall be subject to the appended claims for the utility model patent.

Claims (10)

1. a kind of Level tune component characterized by comprising
Adjustment seat, the adjustment seat is for being installed in track;
First fastening connection piece, the second fastening connection piece, first fastening connection piece and the second fastening connection piece it is removable and It is arranged at intervals in the adjustment seat, first fastening connection piece and second fastening connection piece are used to press from both sides with the track Hold fixation;And
First height adjusting part, the second height adjusting part, first height adjusting part and the second height adjusting part it is removable and It is arranged at intervals in the adjustment seat, first height adjusting part and second height adjusting part are for adjusting the track Absolute altitude and levelness.
2. Level tune component according to claim 1, which is characterized in that the adjustment seat includes that mainboard and interval are set The first support plate and the second support plate being placed on the same face of the mainboard, first support plate offer the first installation Hole, second support plate offer the second mounting hole, and first fastening connection piece is removable to be arranged in first installation In hole, second fastening connection piece is removable to be arranged in second mounting hole.
3. Level tune component according to claim 2, which is characterized in that first fastening connection piece and described second Fastening connection piece is fastening bolt, and first mounting hole and second mounting hole are threaded hole, the fastening bolt It is bolted in the threaded hole.
4. Level tune component according to claim 3, which is characterized in that be fastenedly connected including more than two first Part, more than two second fastening connection pieces, the first mounting hole of two or more quantity and two or more quantity second Mounting hole, first fastening connection piece is worn correspondingly to be fixed in first mounting hole, and second fastening connects Fitting is worn correspondingly to be fixed in second mounting hole.
5. Level tune component according to claim 2, which is characterized in that first support plate and second support Plate includes the fixing end connecting with the mainboard and the free end that extends away from the direction of the mainboard, and described first The cross-sectional area of support plate and second support plate is in the trend gradually successively decreased along the fixing end to the free end.
6. Level tune component according to claim 2, which is characterized in that be respectively provided on the mainboard with it is described First notch of the first fastening connection piece evacuation cooperation and second for cooperating with second fastening connection piece evacuation lack Mouthful.
7. Level tune component according to claim 2, which is characterized in that the mainboard offers spaced third Mounting hole and the 4th mounting hole, first support plate and second support plate are laid in the third mounting hole and described Between four mounting holes;First height adjusting part is removable be arranged in the third mounting hole and for built-in fitting or Ground abuts, second height adjusting part is removable be arranged in the 4th mounting hole and for the built-in fitting or The ground abuts.
8. Level tune component according to claim 1, which is characterized in that first fastening connection piece and described first Height adjusting part dislocation arrangement, second fastening connection piece and second height adjusting part dislocation are arranged.
9. a kind of regulating mechanism, which is characterized in that including any one of such as the claims 1 to 8 of level, level meter and two The Level tune component, two Level tune components are used to be respectively installed in the both ends of track, and the level meter is used In on the surface for being installed in the track, the level is used to be arranged in any end of the track.
10. a kind of track installs system, which is characterized in that including concrete foundation, be arranged at intervals on the concrete foundation Two built-in fittings, two tracks being set on the built-in fitting correspondingly and two are as described in the claims 9 Regulating mechanism, the regulating mechanism is installed in correspondingly in the track, for adjusting two tracks to same mark Height is simultaneously parallel to each other.
CN201821311774.6U 2018-08-14 2018-08-14 Level tune component, regulating mechanism and track install system Active CN208917609U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821311774.6U CN208917609U (en) 2018-08-14 2018-08-14 Level tune component, regulating mechanism and track install system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821311774.6U CN208917609U (en) 2018-08-14 2018-08-14 Level tune component, regulating mechanism and track install system

Publications (1)

Publication Number Publication Date
CN208917609U true CN208917609U (en) 2019-05-31

Family

ID=66702545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821311774.6U Active CN208917609U (en) 2018-08-14 2018-08-14 Level tune component, regulating mechanism and track install system

Country Status (1)

Country Link
CN (1) CN208917609U (en)

Similar Documents

Publication Publication Date Title
CN108204089A (en) A kind of Side fascia connector and construction method
CN102472029B (en) Method and device for controlling transmission of power between a structure and its base during installation
CN102135223A (en) Method for adjusting base plates for high-accuracy machinery installation
CN105887590A (en) Height direction adjusting system and method after railway foundation subsidence
CN112064833A (en) Assembled partition wall structure
CN208917609U (en) Level tune component, regulating mechanism and track install system
CN202672485U (en) Fabricated steel pipe column and connecting structure system thereof
CN104759814B (en) Processing platform of a kind of load ground beam-and-rail and preparation method thereof
CN204876449U (en) Anti - decorative structure that supports of dry link plate material of wall foaming polyurethane
CN201535418U (en) Iron gasket for machine tool
CN207988406U (en) A kind of Side fascia connector
CN206800657U (en) A kind of connecting plate being used between prefabricated wallboard
CN213806669U (en) Prefabricated post of assembled and precast beam connection location frock
CN106499062A (en) Concrete component adjusting apparatus, concrete component and its method of adjustment
CN210440920U (en) Fixing device of electric power undercut tunnel measuring instrument
CN207715163U (en) A kind of fabricated construction assembly sliding contact formula movement supporting platform
CN112942814A (en) Recyclable wall column template reinforcing and supporting structure and construction method thereof
CN220414838U (en) Adjustable temporary support for floor support plate
CN207348413U (en) A kind of entirety ground sequence placing formwork supporting system
CN206500894U (en) The fixed support device drilled for battered leg channel-section steel
CN204639487U (en) The processing platform of a kind of load ground beam-and-rail
CN220395709U (en) Prefabricated channel positioning device
CN207379288U (en) A kind of twin beams kiln bottom seat
CN206476956U (en) A kind of track foundation support precise adjusting device
CN210032234U (en) Take height adjustment device's wallboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 528300 Guanglong Industrial Park, Chencun Town, Shunde District, Foshan City, Guangdong Province, No. 6, No. 14 Xingye Road

Patentee after: Guangdong Ruizhu residential technology Co.,Ltd.

Address before: 528300 Guanglong Industrial Park, Chencun Town, Shunde District, Foshan City, Guangdong Province, No. 6, No. 14 Xingye Road

Patentee before: GUANGDONG REMAC EQUIPMENT INFORMATION TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder