CN208911691U CN201821303401.4U CN201821303401U CN208911691U CN 208911691 U CN208911691 U CN 208911691U CN 201821303401 U CN201821303401 U CN 201821303401U CN 208911691 U CN208911691 U CN 208911691U
Authority
CN
China
Prior art keywords
water
tube body
atomizing
construction site
water tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821303401.4U
Other languages
Chinese (zh)
Inventor
周会韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Kaixiang Construction Group Co Ltd
Original Assignee
Jiangsu Kaixiang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Kaixiang Construction Group Co Ltd filed Critical Jiangsu Kaixiang Construction Group Co Ltd
Priority to CN201821303401.4U priority Critical patent/CN208911691U/en
Application granted granted Critical
Publication of CN208911691U publication Critical patent/CN208911691U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses a kind of atomizing de-dusting equipment in construction site, it is related to building technical field of environment protection equipment, aim to solve the problem that the susceptible to plugging problem of atomizer, its key points of the technical solution are that being provided with water tank in body, it is provided with water pump between water tank and atomizer, is provided with filter device between water pump and water tank;Filter device includes tube body, the outlet pipe that the water inlet pipe connecting with water tank is provided on tube body and is connect with water pump, and filter plate is provided on the inner sidewall of tube body, magnet is arranged in tube body.The utility model has achieved the purpose that reduce atomizer blocking risk.

Description

A kind of atomizing de-dusting equipment in construction site
Technical field
The utility model relates to build technical field of environment protection equipment, more specifically, it relates to a kind of construction site Atomizing de-dusting equipment.
Background technique
With life development, in constantly carrying out, some in the construction in city are in city for the modernization construction in city Around resident region, the construction in building site be unable to do without sand, cement and soil, these tiny dust are extremely easy by wind It rises, The Surroundings in Cities is polluted, the life of surrounding resident has been seriously affected, the dust blown afloat is easy to be sucked by people and breathe Road makes one to feel unsmooth breath, and serious to may cause respiratory tract infection, the fugitive dust on construction site can threaten construction worker Health influences the working efficiency in construction site.
The Chinese patent of existing Publication No. CN105944476A discloses a kind of construction site atomizing dust removing device, packet Water tank and vehicle frame are included, the front end face of water tank is provided with control cabinet, and the rear end of water tank is provided with outlet pipe, is equipped on outlet pipe Atomized dust settling nozzle is equipped with adjustable electromagnetic valve on the outlet pipe of atomized dust settling nozzle, and adjustable electromagnetic valve is connected with control Case, central processing unit, display screen and control button are provided on control cabinet, and control button can control the rotation of atomized dust settling nozzle Turn, the upper surface of water tank is provided with filler, is welded with water-adding bucket on filler.
But the atomized dust settling nozzle diameter of above-mentioned construction site atomizing dust removing device is very small, has centainly to water quality Requirement, if water quality is unsatisfactory for requiring, the impurity in water will block atomized dust settling nozzle, prevent it from normally working, Working efficiency is reduced, maintenance cost is increased, which has to be solved.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of spray drops in construction site Dirt equipment has the advantage for reducing atomizer blocking risk.
To achieve the above object, the utility model provides following technical solution:
A kind of atomizing de-dusting equipment in construction site, including body are provided with spray canister on the roof of the body, described It is provided with atomizer in spray canister, water tank is provided in the body, water pump, institute are connected between the water tank and atomizer It states and is provided with filter device between water pump and water tank;The filter device includes tube body, is provided on the inner sidewall of the tube body Filter plate, the outlet pipe for being provided with the water inlet pipe connecting with water tank and being connect with water pump on the tube body, the filter plate position Between outlet pipe and water inlet pipe, magnet is provided in the tube body.
By using above-mentioned technical proposal, water pump extracts the water in water tank out, then sprays water mist, shape by atomizer At veil, makes the tiny hard particles generated when the particulate dirt drifted in air and labour, condense into gravity medium.Drawing Power acts on lower natural subsidence, reaches dedusting purpose.Filter device is set between water tank and water pump, makes the water into atomizer Filtering is first passed through, impurity is filtered out, to achieve the purpose that reduce atomizer blocking risk.Filter plate will be by stopping impurity Pass through, to realize the purpose of impurity screening.Due to water and contacting external air, dust, atomizing de-dusting equipment are contained in air It is easily got rusty by water effect for a long time, iron filings, dust and water with rust, which are mixed, enters water tank.Not aoxidizing complete iron filings can To be adsorbed on magnet, so that filtration of the filter device to water is further improved, to prevent atomizer from blocking.
Further, column is provided in the tube body, the magnet is fixedly connected with column.
By using above-mentioned technical proposal, magnet is fixed on column, avoids magnet under the momentum effect of water flow The side wall of tube body is hit, to play the role of protecting tube body.
Further, the magnet is set as annular, and the central axis of the magnet and the central axis of tube body are same On straight line.
By using above-mentioned technical proposal, on the one hand annular magnet can make tube wall phase everywhere at a distance from magnet Together, to make the probability that irony object is contacted with magnet entrained by water flow more evenly.On the other hand, the annular shape of magnet makes Also, to improve the flow of water in the identical situation of flow velocity, atomizer can be made to spray water mist by water flow in the middle part of magnet Impulse force it is stronger.
Further, filter hole is provided on the filter plate, the filter plate is provided with multilayer;Filter plate described in multilayer On filter hole aperture taper off setting along the direction close to outlet pipe.
By using above-mentioned technical proposal, the aperture that filter plate is provided with filter hole on multilayer and each layer is different, to make Water flow can first pass through the biggish filter plate in aperture and fall biggish impurity, then gradually after being entered in tube body by water inlet pipe By other filter plates, impurity smaller and smaller in water is filtered out, the work load of each layer of filter plate is reduced, is effectively reduced The risk of filter plate blocking to improve the filter effect of filter plate, and then improves filter device and imitates to the filtering of water Fruit avoids the blocking of atomizer.
Further, active carbon net is provided between the adjacent filter plate.
By using above-mentioned technical proposal, there is peculiar smell containing some invisible planktonic organisms or water in water, when Water is fallen on the skin of human body, and certain injury can be caused to the skin of human body, by active carbon net, can be adsorbed floating in water Trip biology, removes the peculiar smell of water, so that water quality is more in line with the requirement of environmental protection.
Further, the tube body is made of underlying installing pipe and the connecting tube being located above, the installing pipe With connecting tube flanged joint, the filter plate is detachably connected with installing pipe.
By using above-mentioned technical proposal, installing pipe and connecting tube flanged joint, thus installing pipe easy to disassemble, Jin Erfang Just it dismantles filter plate and periodic cleaning is carried out to filter plate, avoid causing atomizer not spray normally since filter plate blocks Water mist out ensure that the normal work of atomizing de-dusting apparatus.
Further, it is provided with sewage pipe on the tube wall, is provided with water valve on the sewage pipe.
By using above-mentioned technical proposal, the impurity in water can not be concentrated in tube body by filter plate.When machine stops When work, blowdown valve is opened, water flow, which will carry, to be flowed away by the sundries of filter plate by blow-off line, and sundries heap is avoided Product influences the normal work of filter device.
Further, the water inlet pipe is connected to the bottom of water tank, and the bottom wall of the water tank is close to one end of filter device Lower than the other end.
By using above-mentioned technical proposal, avoid also there is a small amount of water in water tank.If not at the water in water tank Reason is clean, under the action of long term high temperature, will go bad, corruption, breed some mushrooms, lead to water degradation, be ejected into air Air is impacted afterwards.The bottom wall of water tank is inclined to set, so that water flow is focused under the effect of gravity close to water inlet pipe One end improves water quality to reduce the residual of water in water tank.
In conclusion the utility model has the following beneficial effects:
1, by setting filter device, it is filtered water flow first before entering atomizer, to reach effective Reduce the effect of atomisation blocking risk;
2, successively decreased by the filter hole aperture on setting multiple filtration plate and filter plate along the direction close to outlet pipe, mentioned High filtration of the filter device to water, to achieve the effect that further decrease atomisation blocking risk;
3, by setting sewage pipe and water valve, sundries accumulation is avoided to influence filtering, to ensure the normal of filter device Work, and then achieved the effect that reduce atomisation blocking risk.
Detailed description of the invention
Fig. 1 is a kind of cross-sectional view of the atomizing de-dusting equipment in construction site in embodiment;
Fig. 2 is a kind of cross-sectional view of the filter device of the atomizing de-dusting equipment in construction site in embodiment.
In figure: 1, body;11, spray canister;12, atomizer;13, bracket;2, water tank;3, water pump;4, tube body;41, it intakes Pipe;42, outlet pipe;43, sliding slot;5, filter plate;51, filter hole;52, active carbon net;53, fixed link;6, magnet;61, column; 7, installing pipe;71, connecting tube;8, sewage pipe;81, water valve.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Embodiment:
A kind of atomizing de-dusting equipment in construction site, referring to Fig.1 comprising in the body 1 of cuboid, 1 roof of body On be provided with bracket, spray canister 11 is provided on bracket, the side of spray canister 11 is provided with atomizer 12.Side is arranged in body 1 There is water tank 2, the other side is placed with water pump 3.Water pump 3 can draw water out of water tank 2 and be pipelined to atomizer 12, by Atomizer 12 generates water mist, in conjunction with the tiny hard particles generated when the particulate dirt and labour drifted in air, coagulates Form gravity medium.Under gravity, dust and particulate matter natural subsidence, to reach dedusting purpose.
Referring to Fig.1, filter device is additionally provided in body 1, filter device includes pipe cylindrical and closed at both ends Body 4, the setting of 4 inner hollow of tube body.It is provided on tube body 4 positioned at the water inlet pipe 41 of 4 circumferential side wall bottom of tube body and is pushed up by tube body 4 The outlet pipe 42 that portion extends, water inlet pipe 41 and outlet pipe 42 are communicated with inside tube body 4.Water inlet pipe 41 is connect with water tank 2, out Water pipe 42 is connect with water pump 3.Water inlet pipe 41 is connect with the bottom of the side wall of water tank 2, and the bottom wall of water tank 2 is close to the one of water inlet pipe 41 End reduces the contaminant capacity of water to reduce the water accumulating volume in water tank 2 lower than the other end.Water pump 3 extracts water, water flow out of water tank 2 It first passes through filter device to be filtered, filters out the impurity in water, then can just be sent into atomizer 12, to be effectively reduced The risk that atomizer 12 blocks.
Referring to Fig. 2, tube body 4 includes the installing pipe 7 positioned at 4 lower section of tube body and the connecting tube 71 above tube body 4, installation Pipe 7 is communicated with connecting tube 71 and the flanged joint between installing pipe 7 and connecting tube 71.It is provided on the bottom wall of installing pipe 7 several A column 61 perpendicular to bottom wall setting, the top of column 61 is fixed with a magnet 6 in a ring, the center of magnet 6 jointly The central axis of axis and tube body 4 on the same line, facilitates the iron filings that will be carried in water flow to be fixed on magnet 6, to keep away Exempt from iron filings blocking atomizer 12.
Referring to Fig. 2, it is provided with the filter plate 5 positioned at water inlet pipe 41 above in installing pipe 7, through its thickness on filter plate 5 It is provided with filter hole 51.Filter plate 5 is provided with multilayer, and multiple filtration plate 5 is parallel to each other.The direction of the close outlet pipe 42 in edge, The aperture of filter hole 51 on multiple filtration plate 5 is gradually reduced.Being provided between adjacent filter plate 5 protects two filter plates 5 Hold the fixed link 53 of certain distance.It is provided with active carbon net 52 between adjacent filter plate 5, is placed in active carbon net 52 active Charcoal, for adsorbing and settling the planktonic organism in water and remove odors.Water flow, which enters under the action of water pump 3 from water inlet pipe 41, manages In body 4, the iron filings in water removal are removed by magnet 6, successively the impurity in water are stopped to pass through from big to small by multiple filtration plate 5 Filter plate 5, to make cleaner water quality by apopore, so that reducing atomizer 12 blocks risk.
Referring to Fig. 2, it is provided with sliding slot 43 on the inner sidewall of tube body 4, is provided on the side wall of filter plate 5 and is slided with sliding slot 43 The sliding block of cooperation.After flange between installing pipe 7 and connecting tube 71 is removed, moving up filter plate 5 makes sliding block along the chute 43 Sliding, after sliding block is thoroughly detached from sliding slot 43, filter plate 5 can be removed, so that filter plate easy to clean 5, prevented Filter plate 5 blocks.
Referring to Fig. 2, it is provided with sewage pipe 8 on the bottom wall of installing pipe 7, is communicated inside sewage pipe 8 and tube body 4, sewage pipe 8 Water valve 81 is provided on side wall.Impurity in water is blocked in the bottom of installing pipe 7 by filter plate 5, so that sundries is accumulated.Close water After pump 3, opening water valve 81 in time flows out the sewage with impurity by sewage pipe 8, to avoid impurity effect filter effect.
Working principle is as follows:
After water pump 3 is electrified and opens water pump 3, the water in water tank 2 is entered in filter device by water inlet pipe 41, first Iron filings in water are adsorbed by magnet 6, then multiple filtration plate 5 stops the sundries in water to pass through, by filtered water flow It is transported to atomizer 12 by outlet pipe 42, and water mist is formed by atomizer 12, makes ash fall.Water flow is by filtering dress It postpones, impurity is filtered out, so that realizing reduces the purpose that atomizer 12 blocks risk.

Claims (8)

1. a kind of atomizing de-dusting equipment in construction site, including body (1), spray canister is provided on the roof of the body (1) (11), atomizer (12) are provided on the spray canister (11), it is characterised in that: water tank (2) are provided in the body (1), It is connected with water pump (3) between the water tank (2) and atomizer (12), is provided with filtering between the water pump (3) and water tank (2) Device;The filter device includes tube body (4), be provided on the tube body (4) water inlet pipe (41) being connect with water tank (2) and The outlet pipe (42) connecting with water pump (3) is provided with filter plate (5) on the inner sidewall of the tube body (4), the filter plate (5) Between outlet pipe (42) and water inlet pipe (41), magnet (6) are provided in the tube body (4).
2. the atomizing de-dusting equipment in construction site according to claim 1, it is characterised in that: set in the tube body (4) It is equipped with column (61), the magnet (6) is fixedly connected with column (61).
3. the atomizing de-dusting equipment in construction site according to claim 2, it is characterised in that: magnet (6) setting For annular, the central axis of the central axis of the magnet (6) and tube body (4) is on the same line.
4. the atomizing de-dusting equipment in construction site according to claim 1, it is characterised in that: on the filter plate (5) It is provided with filter hole (51), the filter plate (5) is provided with multilayer;Filter hole (51) aperture on filter plate described in multilayer (5) It tapers off setting along the direction close to outlet pipe (42).
5. the atomizing de-dusting equipment in construction site according to claim 4, it is characterised in that: the adjacent filter plate (5) active carbon net (52) are provided between.
6. the atomizing de-dusting equipment in construction site according to claim 5, it is characterised in that: the tube body (4) is by position Installing pipe (7) in lower section and connecting tube (71) composition that is located above, the installing pipe (7) and connecting tube (71) flange connect It connects, the filter plate (5) is detachably connected with installing pipe (7).
7. the atomizing de-dusting equipment in construction site according to claim 6, it is characterised in that: tube body (4) side wall On be provided with sewage pipe (8), be provided with water valve (81) on the sewage pipe (8).
8. the atomizing de-dusting equipment in construction site according to claim 1, it is characterised in that: the water inlet pipe (41) is even The bottom in water tank (2) is connect, the bottom wall of the water tank (2) is lower than the other end close to one end of filter device.
CN201821303401.4U 2018-08-13 2018-08-13 A kind of atomizing de-dusting equipment in construction site Active CN208911691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821303401.4U CN208911691U (en) 2018-08-13 2018-08-13 A kind of atomizing de-dusting equipment in construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821303401.4U CN208911691U (en) 2018-08-13 2018-08-13 A kind of atomizing de-dusting equipment in construction site

Publications (1)

Publication Number Publication Date
CN208911691U true CN208911691U (en) 2019-05-31

Family

ID=66702509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821303401.4U Active CN208911691U (en) 2018-08-13 2018-08-13 A kind of atomizing de-dusting equipment in construction site

Country Status (1)

Country Link
CN (1) CN208911691U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112538835A (en) * 2020-12-09 2021-03-23 中国建筑第五工程局有限公司 Multifunctional trolley for construction site

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112538835A (en) * 2020-12-09 2021-03-23 中国建筑第五工程局有限公司 Multifunctional trolley for construction site

Similar Documents

Publication Publication Date Title
CN205435302U (en) Novel dedusting device
CN202427310U (en) Water curtain type dust and waste gas treatment device
KR101612519B1 (en) Dust collector
CN108087017A (en) A kind of mining dust-extraction unit of depositing dust absorption
CN106492575B (en) A kind of efficient central dust-removing system
CN107096344A (en) A kind of industrial waste gas and floating outstanding particle purifying processing system
CN206613331U (en) Industrial waste gas, floating outstanding particulate matter stage construction spraying intercept cleaning treatment system device
CN208911691U (en) A kind of atomizing de-dusting equipment in construction site
CN109126347A (en) A kind of industrial and mining enterprises' smog dust collection purification device
CN209519545U (en) A kind of boiler of power plant smoke dust filter
CN209501324U (en) A kind of glass reinforced plastic wet type desulfurizing dust collector
CN209519528U (en) A kind of environment friendly wall material process mating air contaminant treatment equipment
CN207941322U (en) Dust treatment system for workshop of dusting
CN209092978U (en) A kind of air deduster easy to use
CN207237608U (en) A kind of dust separation system of hot pepper flouring processing factory
CN206404512U (en) A kind of ore reduction dust arrester
CN206701004U (en) A kind of tunnel cave dust pelletizing system
CN205627458U (en) Dedusting device
CN107441861A (en) A kind of efficient emission-control equipment
CN209502092U (en) A kind of Drencher spray booth
CN209302388U (en) A kind of electric welding deduster
CN209630856U (en) A kind of water curtain dust-removing equipment
CN103908859B (en) Integrated efficient wet scrubber
CN201070566Y (en) Dust removing device
CN207056215U (en) A kind of industrial furnace filtrating smoke dust retracting device