CN208904521U - SF6 gas insulated high voltage ac metal closing switch gear automates complete set of equipments - Google Patents

SF6 gas insulated high voltage ac metal closing switch gear automates complete set of equipments Download PDF

Info

Publication number
CN208904521U
CN208904521U CN201821938544.2U CN201821938544U CN208904521U CN 208904521 U CN208904521 U CN 208904521U CN 201821938544 U CN201821938544 U CN 201821938544U CN 208904521 U CN208904521 U CN 208904521U
Authority
CN
China
Prior art keywords
equipments
control room
complete set
gas insulated
trace slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821938544.2U
Other languages
Chinese (zh)
Inventor
张宝瑞
丰正茂
任峰峰
宁方洋
张晓冬
姜昭宏
李振
韩玉秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Taikai Apparatus Complete Co Ltd
Original Assignee
Shandong Taikai Apparatus Complete Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Taikai Apparatus Complete Co Ltd filed Critical Shandong Taikai Apparatus Complete Co Ltd
Priority to CN201821938544.2U priority Critical patent/CN208904521U/en
Application granted granted Critical
Publication of CN208904521U publication Critical patent/CN208904521U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of SF6 gas insulated high voltage ac metal closing switch gears to automate complete set of equipments, including primary equipment and secondary device, control room is provided at the top of the primary equipment, top trace slot is installed at the top of the control room, the side cabling channel being connected to the top trace slot is installed on the side wall of primary equipment, the bottom of the secondary device is installed with the bottom trace slot being connected to the side cabling channel;It further include several connecting cables being successively threaded through in top trace slot, side cabling channel and bottom trace slot, the connecting cable connection control room and secondary device.The utility model integrates primary equipment and secondary device, shorten cable kilometer, reduce installation difficulty, save the site installation test time, it ensure that the timeliness of power transmission, meanwhile, the default of cable may be implemented, the standardization of equipment production is improved, and safeguards and overhauls in the later period convenient for user.

Description

SF6 gas insulated high voltage ac metal closing switch gear automates complete set of equipments
Technical field
The utility model relates to air insulating device field more particularly to a kind of SF6 gas insulated high voltage AC metals Sealing switch equipment automates complete set of equipments.
Background technique
SF6 gas insulated high voltage ac metal closing switch gear automation complete set of equipments is a kind of common electrical complete Equipment, but current SF6 gas insulated high voltage ac metal closing switch gear automation complete set of equipments is all once to set Standby and secondary device is arranged apart, secondary terminals equipment is placed in adjacent cabin or control room, will be primary by cable Device signal is transferred to coherent signal receiving end on secondary device, and since transmission signal is more, cable length is big, causes cable laying Difficulty is big, causes debugging cycle longer, directly affects the time of site installation test, electric power feeding time of having delayed.
Utility model content
In view of the shortcomings of the prior art, the utility model provides a kind of AC metal closed switches of SF6 gas insulated high voltage Equipment automatization complete set of equipments not only can guarantee that device context installation and debugging were simple and efficient, but also can guarantee the timely of user power utilization Property.
The utility model is achieved by the following technical solution, and provides a kind of SF6 gas insulated high voltage AC metal envelope Equipment automatization complete set of equipments, including primary equipment and secondary device are closed in make and break, are provided with instrument at the top of the primary equipment Room is installed with top trace slot at the top of the control room, is installed on the side wall of primary equipment and the top trace slot connects Logical side cabling channel, the bottom of the secondary device are installed with the bottom trace slot being connected to the side cabling channel;Also wrap Several connecting cables being successively threaded through in top trace slot, side cabling channel and bottom trace slot are included, the connecting cable connects Logical control room and secondary device.
Primary equipment and secondary device can be set together by this programme when in use, will once be set by connecting cable Standby control room is connected with secondary device, shortens the length of cable, due to top trace slot, side cabling channel and bottom trace The setting of slot, presets cable in factory, the laying difficulty of cable is substantially reduced, when shortening installation and debugging Between, avoid delaying for power transmission.
As optimization, the supply voltage aviation socket connecting with instrument inside control room is equipped in the top trace slot, The supply voltage aviation plug being adapted to supply voltage aviation socket is connected on connecting cable.This prioritization scheme is using power supply electricity Pressure aviation socket and supply voltage aviation plug realize being connected to for cable, improve installation effectiveness, and ensure that connection can By property.
As optimization, the supply voltage aviation socket is 4 core supply voltage aviation sockets.This prioritization scheme uses 4 cores Supply voltage aviation socket reduces use cost while meeting voltage requirement.
It is equipped with the electric current connecting with instrument inside control room as optimization, in the top trace slot and signal aviation is inserted , the electric current and signal aviation plug being adapted to electric current and signal aviation socket are connected on connecting cable.This programme is using electricity Stream and signal aviation socket and electric current and signal aviation plug, ensure that the stability of signal transmission, avoid distorted signals.
As optimization, the electric current and signal aviation socket are 26 core electric currents and signal aviation socket.This programme uses 26 Core electric current and signal aviation socket, improve transmittability, avoid interfering with each other between signal.
As optimization, the voltage aviation socket connecting with instrument inside control room, connection are equipped in the top trace slot The voltage aviation plug being adapted to voltage aviation socket is connected on cable.This prioritization scheme uses voltage aviation socket and voltage Aviation plug realizes the connection of voltage cables, improves installation effectiveness, and ensure that the stability of measurement voltage.
As optimization, the voltage aviation socket is 10 core voltage aviation sockets.This prioritization scheme is navigated using 10 core voltages Dummy receptacle reduces use cost under the premise of guaranteeing that transmission is stablized.
The utility model has the following beneficial effects: primary equipment and secondary device are integrated, it is long to shorten cable laying Degree, reduces installation difficulty, saves the site installation test time, ensure that the timeliness of power transmission, meanwhile, cable may be implemented It is default, improve the standardization of equipment production, and safeguard and overhaul in the later period convenient for user.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is connecting cable and electric current and signal aviation plug connection schematic diagram;
It is as shown in the figure:
1, primary equipment, 2, control room, 3, top trace slot, 4, connecting cable, 5, bottom trace slot, 6, secondary device, 7, supply voltage aviation socket, 8, voltage aviation socket, 9, electric current and signal aviation socket, 10, supply voltage aviation plug, 11, voltage aviation plug, 12, electric current and signal aviation plug, 13, side cabling channel.
Specific embodiment
In order to clarify the technical characteristics of the invention, being illustrated below by specific embodiment to this programme.
A kind of SF6 gas insulated high voltage ac metal closing switch gear automates complete set of equipments, including one as shown in Figure 1 Secondary device 1 and secondary device 6, the top of the primary equipment 1 are provided with control room 2, and the top of the control room 2 is installed with top Portion's cabling channel 3 is installed with the side cabling channel 13 being connected to the top trace slot 3 on the side wall of primary equipment, described secondary The bottom of equipment is installed with the bottom trace slot 5 being connected to the side cabling channel 13;It further include successively being threaded through top trace Several connecting cables 4 in slot, side cabling channel and bottom trace slot, the connecting cable connection control room and secondary device.
It is equipped with the supply voltage aviation socket 7 connecting with instrument inside control room in top trace slot 3, connects on connecting cable It is connected to the supply voltage aviation plug 10 being adapted to supply voltage aviation socket, the supply voltage aviation socket is 4 core power supplys Voltage aviation socket.The electric current and signal aviation socket 9 connecting with instrument inside control room, connection electricity are equipped in top trace slot The electric current and signal aviation plug 12 being adapted to electric current and signal aviation socket are connected on cable, the electric current and signal aviation are inserted Seat is 26 core electric currents and signal aviation socket.The voltage aviation connecting with instrument inside control room is additionally provided in top trace slot to insert Seat 8, the voltage aviation plug 11 be adapted to voltage aviation socket is connected on connecting cable, and the voltage aviation socket is 10 cores Voltage aviation socket.
4 core supply voltage aviation socket pins are defined as follows:
10 core voltage aviation socket pins are defined as follows:
26 core electric currents and signal aviation socket pin are defined as follows:
In order to guarantee the fastness of connection, using welded connecting, cable between connecting cable and corresponding each aviation plug The plug at both ends is connect with the socket in primary equipment control room, secondary device respectively, completes primary equipment and secondary device Connection, connecting cable is laid in top trace slot, side cabling channel and bottom trace slot, completely isolated primary equipment failure Damage to secondary device, signal each of is fully cured and defines aviation plug connect electricity.Primary equipment and secondary device system After the completion of work, three distant experiments of telemetering, remote control and the remote signalling of equipment can be completed by connecting cable, shorten the tune of erecting bed It tries the time, and field adjustable can be greatly shortened by prefabricated connecting cable in factory, manufacturer according to the device location at scene The time of installation provides secure support for smooth power transmission.
The SF6 gas insulated high voltage ac metal closing switch gear of the utility model optimizes existing equipment, incorporates The function of primary equipment and secondary device improves the standardization and prefabricated of equipment production, has compressed site installation test Time, and it is convenient for user in the operation and maintenance in later period.
Certainly, above description is also not limited to the example above, and technical characteristic of the utility model without description can lead to It crosses or realizes that details are not described herein using the prior art;Above embodiments and attached drawing are merely to illustrate the technology of the utility model Scheme is not limitations of the present invention, and the utility model is described in detail referring to preferred embodiment, this Field it is to be appreciated by one skilled in the art that those skilled in the art institute in the essential scope of the utility model The variations, modifications, additions or substitutions made without departure from the objective of the utility model, want by the right that also should belong to the utility model Seek protection scope.

Claims (7)

1. a kind of SF6 gas insulated high voltage ac metal closing switch gear automates complete set of equipments, including primary equipment (1) and Secondary device (6), it is characterised in that: be provided with control room (2) at the top of the primary equipment (1), the top of the control room (2) Portion is installed with top trace slot (3), and the side cabling being connected to the top trace slot (3) is installed on the side wall of primary equipment Slot (13), the bottom of the secondary device are installed with the bottom trace slot (5) being connected to the side cabling channel (13);Also wrap Include several connecting cables (4) being successively threaded through in top trace slot, side cabling channel and bottom trace slot, the connecting cable It is connected to control room and secondary device.
2. SF6 gas insulated high voltage ac metal closing switch gear according to claim 1 automates complete set of equipments, It is characterized in that: being equipped with the supply voltage aviation socket (7) connecting with instrument inside control room in the top trace slot (3), even Connect the supply voltage aviation plug (10) for being connected on cable and being adapted to supply voltage aviation socket.
3. SF6 gas insulated high voltage ac metal closing switch gear according to claim 2 automates complete set of equipments, Be characterized in that: the supply voltage aviation socket is 4 core supply voltage aviation sockets.
4. SF6 gas insulated high voltage ac metal closing switch gear according to claim 1 automates complete set of equipments, It is characterized in that: being equipped with the electric current and signal aviation socket (9) connecting with instrument inside control room, connection in the top trace slot The electric current being adapted to electric current and signal aviation socket and signal aviation plug (12) are connected on cable.
5. SF6 gas insulated high voltage ac metal closing switch gear according to claim 4 automates complete set of equipments, Be characterized in that: the electric current and signal aviation socket are 26 core electric currents and signal aviation socket.
6. SF6 gas insulated high voltage ac metal closing switch gear according to claim 1 automates complete set of equipments, It is characterized in that: being equipped with the voltage aviation socket (8) connecting with instrument inside control room in the top trace slot, on connecting cable It is connected with the voltage aviation plug (11) being adapted to voltage aviation socket.
7. SF6 gas insulated high voltage ac metal closing switch gear according to claim 6 automates complete set of equipments, Be characterized in that: the voltage aviation socket is 10 core voltage aviation sockets.
CN201821938544.2U 2018-11-23 2018-11-23 SF6 gas insulated high voltage ac metal closing switch gear automates complete set of equipments Active CN208904521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821938544.2U CN208904521U (en) 2018-11-23 2018-11-23 SF6 gas insulated high voltage ac metal closing switch gear automates complete set of equipments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821938544.2U CN208904521U (en) 2018-11-23 2018-11-23 SF6 gas insulated high voltage ac metal closing switch gear automates complete set of equipments

Publications (1)

Publication Number Publication Date
CN208904521U true CN208904521U (en) 2019-05-24

Family

ID=66578084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821938544.2U Active CN208904521U (en) 2018-11-23 2018-11-23 SF6 gas insulated high voltage ac metal closing switch gear automates complete set of equipments

Country Status (1)

Country Link
CN (1) CN208904521U (en)

Similar Documents

Publication Publication Date Title
CN202495807U (en) Remote centralized measurement and control system for power distribution network
CN202602134U (en) Portable DC system load transfer auxiliary tank
CN204732777U (en) A kind of cable line uninterrupted operation system
CN103594895A (en) Method for defining aviation plug pins of 220kV GIS control cabinet
CN208904521U (en) SF6 gas insulated high voltage ac metal closing switch gear automates complete set of equipments
CN115792310B (en) On-site experiment device and method for switching all-in-one machine
CN203312905U (en) Portable mobile direct-current power cabinet
CN208489502U (en) A kind of cable elbow-shaped head grounding wire device
CN204205235U (en) A kind of cable switching box for intelligent substation laboratory
CN207251068U (en) A kind of intelligent ring main unit of band metering
CN202678086U (en) High-voltage sulfur hexafluoride (SF6) gas-insulation current transformer having function of monitoring superhigh-frequency partial discharge
CN205657374U (en) Solid insulation boundary switch cabinet
CN212693893U (en) Multifunctional interface simulation circuit breaker for power distribution network
CN211453743U (en) High-voltage line metering complete device
CN204760838U (en) It holds low intelligent combination formula transformer substation of decreasing to have to carry to transfer
CN203278057U (en) Intelligent prefabricated transformer substation
CN207677508U (en) A kind of distribution testing control terminal
CN219019265U (en) Distributed new energy power station grid-connected interface device
CN217507864U (en) Feeder terminal aviation plug-in adapter
CN110579665A (en) multifunctional interface simulation circuit breaker for power distribution network
CN205985812U (en) Intelligent control cabinet
CN211237877U (en) High-voltage electromagnetic induction electricity taking device
CN208820785U (en) Downhole communication transferring device
CN205210272U (en) Direct current contactor switch -on breaking capacity test device under ambient condition of plateau
CN219085111U (en) SF6 insulation armoured intelligent cable accessory special test equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant