CN208886237U - Lithium salts transmission pipeline repairs component - Google Patents

Lithium salts transmission pipeline repairs component Download PDF

Info

Publication number
CN208886237U
CN208886237U CN201821329193.5U CN201821329193U CN208886237U CN 208886237 U CN208886237 U CN 208886237U CN 201821329193 U CN201821329193 U CN 201821329193U CN 208886237 U CN208886237 U CN 208886237U
Authority
CN
China
Prior art keywords
sealing strip
elastic sealing
lithium salts
transmission pipeline
cutting ferrule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821329193.5U
Other languages
Chinese (zh)
Inventor
李亚德
曾文强
王晓荣
骆锦红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jinquan New Material Co.,Ltd.
Original Assignee
Hubei Shang Ho Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Shang Ho Chemical Co Ltd filed Critical Hubei Shang Ho Chemical Co Ltd
Priority to CN201821329193.5U priority Critical patent/CN208886237U/en
Application granted granted Critical
Publication of CN208886237U publication Critical patent/CN208886237U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gasket Seals (AREA)

Abstract

A kind of lithium salts transmission pipeline repairing component includes: seal assembly, fixation kit and locking assembly.Seal assembly includes the first elastic sealing strip, second elastic sealing strip and multiple locating pieces, fixation kit includes the first cutting ferrule and the second cutting ferrule, locking assembly includes upper adapter sleeve, lower adapter sleeve, two the first thrust rings and two the second thrust rings, above-mentioned lithium salts transmission pipeline repairing component passes through setting seal assembly, fixation kit and locking assembly, seal assembly is coated on the surface of lithium salts transmission pipeline leakage position, seal assembly is arranged on fixation kit, fixation kit shapes to seal assembly, locking assembly applies pressure to fixation kit, so that seal assembly is close to lithium salts transmission pipeline, thus the leakage position of lithium salts transmission pipeline is blocked, prevent solution from flowing out from leakage position, it does not need to be welded, and assembling is convenient, repair operation can be carried out to lithium salts transmission pipeline in time, it avoids that accident occurs when repairing pipeline.

Description

Lithium salts transmission pipeline repairs component
Technical field
The utility model relates to lithium battery recovery technology fields, repair component more particularly to a kind of lithium salts transmission pipeline.
Background technique
It by lithium metal or lithium alloy is negative electrode material, using the battery of non-aqueous electrolytic solution that lithium battery ", which is a kind of,.Lithium Battery is widely used in shining since energy density is high, battery weight is light, long service life, self-discharge rate are low, memory-less effect The electrical appliances fields such as camera, cigarette sense alarm device, gas meter, ammeter, water meter, with the development of lithium battery industry, lithium battery is returned Industry is received also to develop therewith.
However, in Chemical Manufacture, pipeline can be because of interior media property or external cause when recycling the lithium salts in lithium battery Corroded and generate leakage, once leakage will seriously influence to produce, part or complete plant shutdown is caused to repair.It is let out to control Dew, and the continuity for ensuring to produce, the mode frequently with part with positive pressure repair welding carry out.And work as leak point peripheral conduits thickness too It is thin when can not weld, and existing repairing pipe component is welded when repairing to pipeline, operator into Biggish electric shock risk is faced when row repair operation, the repairing difficulty of pipeline is also larger.
Utility model content
The purpose of the utility model is to overcome shortcomings in the prior art, provide a kind of lithium salts transmission pipeline repairing group Part is repaired the position leaked on lithium salts transmission pipeline in the case where not needing to be welded, safely and effectively Pipeline is repaired.
The purpose of this utility model is achieved through the following technical solutions:
A kind of lithium salts transmission pipeline repairing component includes: seal assembly, fixation kit and locking assembly;
The seal assembly includes the first elastic sealing strip, the second elastic sealing strip and multiple locating pieces, first bullet Property diaphragm seal fit with lithium salts transmission pipeline, second elastic sealing strip fits with lithium salts transmission pipeline, multiple described Locating piece is arranged at intervals on the edge of first elastic sealing strip, is offered on the edge of second elastic sealing strip more A mistake proofing groove, each locating piece correspondence are placed in the mistake proofing groove, the first end of first elastic sealing strip It is clamped with the first end of second elastic sealing strip, the second end of first elastic sealing strip and second elastic packing The second end of piece is clamped;
The fixation kit includes the first cutting ferrule and the second cutting ferrule, and first elastic sealing strip is set to first card On the inner sidewall of set, second elastic sealing strip is set on the inner sidewall of second cutting ferrule, and first cutting ferrule and Interval is provided between second cutting ferrule;
The locking assembly includes upper adapter sleeve, lower adapter sleeve, two the first thrust rings and two the second thrust rings, and two First thrust ring is respectively arranged on the both ends of the upper adapter sleeve, and two first thrust rings block with described first respectively The lateral wall of the lateral wall of set and second cutting ferrule abuts, and is provided with screw, two institutes on two first thrust rings It states the second thrust ring to be respectively arranged on the both ends of the lower adapter sleeve, and two second thrust rings are respectively with described first The lateral wall of the lateral wall of cutting ferrule and second cutting ferrule abuts, and corresponds to and one described second on each first thrust ring Thrust ring is threadedly coupled.
The seal assembly further includes two the first blocks, two first blocks point in one of the embodiments, It is not installed on the both ends of first elastic sealing strip, two the first blocks are arranged towards second elastic sealing strip.
The seal assembly further includes two the second blocks, two second blocks point in one of the embodiments, It is not installed on the both ends of second elastic sealing strip, two the second blocks are arranged towards first elastic sealing strip.
Interval is provided between first block and second block in one of the embodiments,.
First is offered on the lateral wall of first cutting ferrule in one of the embodiments, to prevent being disengaged from the groove.
Second is offered on the lateral wall of second cutting ferrule in one of the embodiments, to prevent being disengaged from the groove.
The described first anti-width being disengaged from the groove is equal to the described second anti-width being disengaged from the groove in one of the embodiments, described The first anti-width being disengaged from the groove is greater than the height of first thrust ring.
First thrust ring includes interconnecting piece and bending part in one of the embodiments, the interconnecting piece with it is described The connection of upper adapter sleeve, the bending part for being abutted with the lateral wall of the first cutting ferrule, and the interconnecting piece and the bending part it Between be provided with interval.
The upper adapter sleeve includes expansion plate and two intermediate plates, two intermediate plates in one of the embodiments, It is respectively arranged on the opposite two sides of the expansion plate.
The thickness of the expansion plate is less than the thickness of the intermediate plate in one of the embodiments,.
Compared with prior art, the utility model at least has the following advantages:
Above-mentioned lithium salts transmission pipeline repairing component passes through setting seal assembly, fixation kit and locking assembly, seal assembly It is coated on the surface of lithium salts transmission pipeline leakage position, seal assembly is arranged on fixation kit, and fixation kit is to seal assembly It shapes, locking assembly applies pressure to fixation kit and thus blocks lithium so that seal assembly is close to lithium salts transmission pipeline The leakage position of salt transmission pipeline prevents solution from flowing out from leakage position, and the repairing component setting of above-mentioned lithium salts transmission pipeline is existed It when on lithium salts transmission pipeline, does not need to be welded, and assembling is convenient, can carry out repairing behaviour to lithium salts transmission pipeline in time Make, avoids that accident occurs when repairing pipeline.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the explosive view of the lithium salts transmission pipeline repairing component in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of the lithium salts transmission pipeline repairing component in an embodiment of the present invention.
Specific embodiment
The utility model is more fully retouched below with reference to relevant drawings for the ease of understanding the utility model, It states.The better embodiment of the utility model is given in attached drawing.But the utility model can come in many different forms It realizes, however it is not limited to embodiments described herein.On the contrary, the purpose of providing these embodiments is that making practical new to this The disclosure of type understands more thorough and comprehensive.
It should be noted that it can directly on the other element when element is referred to as " being fixed on " another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", " right side " and similar statement for illustrative purposes only, are not meant to be the only embodiment.
Unless otherwise defined, all technical and scientific terms used herein are led with the technology for belonging to the utility model The normally understood meaning of the technical staff in domain is identical.Terminology used in the description of the utility model herein only be The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term " and or " used herein packet Include any and all combinations of one or more related listed items.
As shown in Figure 1, a kind of lithium salts transmission pipeline repairing component 10 includes: seal assembly 100, fixation kit 200 and lock Tight component 300.The position that seal assembly 100 is leaked with lithium salts transmission pipeline fits, and fixation kit 200 is sheathed on sealing On component 100, fixation kit 200 shapes to seal assembly 100, so that the lateral wall of seal assembly 100 and lithium salts transmission pipeline Fit-state is kept, locking assembly 300 is set on fixation kit 200, and locking assembly 300 applies pressure to fixation kit 200, So that seal assembly 100 is pressed on the lateral wall of lithium salts transmission pipeline by fixation kit 200, the lithium salts transfer tube in a manner of Solution leakage in road comes out.
Referring to Fig. 1, seal assembly 100 includes the first elastic sealing strip 110, the second elastic sealing strip 120 and multiple fixed Position block 130, first elastic sealing strip 110 fit with lithium salts transmission pipeline, second elastic sealing strip 120 and lithium salts Transmission pipeline fits, and multiple locating pieces 130 are arranged at intervals on the edge of the first elastic sealing strip 110, the second elastic packing Multiple mistake proofing grooves are offered on the edge of piece 120, every correspondence of a positioning block 130 is placed in a mistake proofing groove, and the first elasticity is close The first end of the first end of mounting 110 and the second elastic sealing strip 120 is clamped, the second end of the first elastic sealing strip 110 and the The second end of two elastic sealing strips 120 is clamped.The both ends of first elastic sealing strip 110 and the second elastic sealing strip 120 mutually interconnect Connect the body to be formed for sealing, and the first elastic sealing strip 110 and the second elastic sealing strip 120 with lithium salts transmission pipeline Lateral wall is close to, and prevents solution from the leakage position outflow on lithium salts transmission pipeline, the side of the first elastic sealing strip 110 is arranged in Multiple mistake proofing grooves on multiple locating pieces 130 and the second elastic sealing strip 120 on edge correspond, if the first elastic sealing strip 110 or second elastic sealing strip 120 install it is incorrect, then between the first elastic sealing strip 110 and the second elastic sealing strip 120 There can be apparent interval, the first elastic sealing strip 110 and 120 both ends of the second elastic sealing strip is caused not to be bonded completely, and It carries out the subsequent installation to locking assembly 300 and fixation kit 200 to operate, setup error is thus avoided to result in the need for re-starting The case where assembly.
Fig. 1 and Fig. 2 is please referred to, fixation kit 200 includes the first cutting ferrule 210 and the second cutting ferrule 220, the first elastic sealing strip 110 are set on the inner sidewall of the first cutting ferrule 210, and the second elastic sealing strip 120 is set on the inner sidewall of the second cutting ferrule 220, And first is provided with interval between cutting ferrule 210 and the second cutting ferrule 220.First elastic sealing strip 110 and the second elastic sealing strip 120 It is made of elastic preferable resin, the first elastic sealing strip 110 and the second elastic sealing strip 120 is fixed on lithium salts transfer tube When on the lateral wall in road, need the first cutting ferrule 210 and the second cutting ferrule 220 that it is fixed respectively, using the first cutting ferrule 210 and Second cutting ferrule 220 limits the scope of activities of the first elastic sealing strip 110 and the second elastic sealing strip 120 respectively, and makes first Elastic sealing strip 110 and the second elastic sealing strip 120 are close to the lateral wall of lithium salts transmission pipeline, and locking assembly 300 applies Pressure the first elastic sealing strip 110 and the second elastic sealing strip are transmitted to by the first cutting ferrule 210 and the second cutting ferrule 220 again On 120, so that the pressure being applied on the first elastic sealing strip 110 and the second elastic sealing strip 120 is more uniform, sealing is improved Component 100 to the sealing effect of lithium salts transmission pipeline leakage position, avoid the first cutting ferrule 210 and the second cutting ferrule 220 because part by It presses through and leads to the problem of abnormal deformation reduction sealing effect greatly.
Fig. 1 and Fig. 2 is please referred to, locking assembly 300 includes 320, two upper adapter sleeve 310, lower adapter sleeve the first thrust rings 330 and two the second thrust rings 340, two the first thrust rings 330 be respectively arranged on the both ends of adapter sleeve 310, and two First thrust ring 330 is abutted with the lateral wall of the lateral wall of the first cutting ferrule 210 and the second cutting ferrule 220 respectively, two the first thrusts Screw is provided on ring 330, two the second thrust rings 340 are respectively arranged on the both ends of lower adapter sleeve 320, and two second Thrust ring 340 is abutted with the lateral wall of the lateral wall of the first cutting ferrule 210 and the second cutting ferrule 220 respectively, every one first thrust ring 330 Upper correspondence is threadedly coupled with second thrust ring 340.Upper adapter sleeve 310 and lower adapter sleeve 320 are connected with each other by screw, are twisted When tight screw, upper adapter sleeve 310 and lower adapter sleeve 320 are close to each other, so that the first thrust ring 330 and the second thrust ring 340 squeeze The first cutting ferrule 210 and the second cutting ferrule 220 are pressed, the first cutting ferrule 210 and the second cutting ferrule 220 are under pressure and mutually draw close, and then to packet The first elastic sealing strip 110 and the pressurization of the second elastic sealing strip 120 on lithium salts transmission pipeline leakage position surface are overlayed on, so that the One elastic sealing strip 110 is close to the second elastic sealing strip 120 to lithium salts transmission pipeline leakage position is coated on, and blocks to cladding In lithium salts transmission pipeline leakage position, to prevent solution leakage.
Further, in order to improve the structural stability that lithium salts transmission pipeline repairs component, seal assembly further includes two First block, two the first blocks are respectively arranged on the both ends of the first elastic sealing strip 110, and two the first blocks are towards the The setting of two elastic sealing strips 120, seal assembly further include two the second blocks, and two the second blocks are respectively arranged in the second elasticity On the both ends of diaphragm seal 120, two the second blocks are arranged towards the first elastic sealing strip 110, the first block and the second block Between be provided with interval, offered on the lateral wall of the first cutting ferrule 210 first it is anti-be disengaged from the groove, opened on the lateral wall of the second cutting ferrule 220 Prevent being disengaged from the groove equipped with second, the first anti-width being disengaged from the groove is equal to the second anti-width being disengaged from the groove, and the first anti-width being disengaged from the groove is greater than first The width of thrust ring 330, the first thrust ring 330 include interconnecting piece and bending part, and interconnecting piece is connect with upper adapter sleeve 310, bending Portion is provided with interval for abutting with the lateral wall of the first cutting ferrule 210 between interconnecting piece and bending part, upper adapter sleeve 310 wraps Expansion plate and two intermediate plates are included, two intermediate plates are respectively arranged on the opposite two sides of expansion plate, and the thickness of expansion plate is small In the thickness of intermediate plate.
Compared with prior art, the utility model at least has the following advantages:
Above-mentioned lithium salts transmission pipeline repairing component passes through setting seal assembly, fixation kit and locking assembly, seal assembly It is coated on the surface of lithium salts transmission pipeline leakage position, seal assembly is arranged on fixation kit, and fixation kit is to seal assembly It shapes, locking assembly applies pressure to fixation kit and thus blocks lithium so that seal assembly is close to lithium salts transmission pipeline The leakage position of salt transmission pipeline prevents solution from flowing out from leakage position, and the repairing component setting of above-mentioned lithium salts transmission pipeline is existed It when on lithium salts transmission pipeline, does not need to be welded, and assembling is convenient, can carry out repairing behaviour to lithium salts transmission pipeline in time Make, avoids that accident occurs when repairing pipeline.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed, But it cannot be understood as the limitations to utility model patent range.It should be pointed out that for the common skill of this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The protection scope of the utility model.Therefore, the scope of protection shall be subject to the appended claims for the utility model patent.

Claims (10)

1. a kind of lithium salts transmission pipeline repairs component characterized by comprising
Seal assembly, the seal assembly include the first elastic sealing strip, the second elastic sealing strip and multiple locating pieces, and described the One elastic sealing strip fits with lithium salts transmission pipeline, and second elastic sealing strip fits with lithium salts transmission pipeline, multiple The locating piece is arranged at intervals on the edge of first elastic sealing strip, is opened up on the edge of second elastic sealing strip There are multiple mistake proofing grooves, each locating piece correspondence is placed in the mistake proofing groove, and the of first elastic sealing strip The first end of one end and second elastic sealing strip is clamped, the second end of first elastic sealing strip and second elasticity The second end of diaphragm seal is clamped;
Fixation kit, the fixation kit include the first cutting ferrule and the second cutting ferrule, and first elastic sealing strip is set to described On the inner sidewall of first cutting ferrule, second elastic sealing strip is set on the inner sidewall of second cutting ferrule, and described first Interval is provided between cutting ferrule and second cutting ferrule;
Locking assembly, the locking assembly include upper adapter sleeve, lower adapter sleeve, two the first thrust rings and two the second thrusts Ring, two the first thrust rings are respectively arranged on the both ends of the upper adapter sleeve, and two first thrust rings respectively with institute The lateral wall of the lateral wall and second cutting ferrule of stating the first cutting ferrule abuts, and is provided with spiral shell on two first thrust rings Nail, two second thrust rings are respectively arranged on the both ends of the lower adapter sleeve, and two the second thrust ring difference It abuts with the lateral wall of the lateral wall of first cutting ferrule and second cutting ferrule, is corresponded to and one on each first thrust ring A second thrust ring is threadedly coupled.
2. lithium salts transmission pipeline according to claim 1 repairs component, which is characterized in that the seal assembly further includes two A first block, two first blocks are respectively arranged on the both ends of first elastic sealing strip, two the first blocks It is arranged towards second elastic sealing strip.
3. lithium salts transmission pipeline according to claim 2 repairs component, which is characterized in that the seal assembly further includes two A second block, two second blocks are respectively arranged on the both ends of second elastic sealing strip, two the second blocks It is arranged towards first elastic sealing strip.
4. lithium salts transmission pipeline according to claim 3 repairs component, which is characterized in that first block and described the Interval is provided between two blocks.
5. lithium salts transmission pipeline according to claim 1 repairs component, which is characterized in that the lateral wall of first cutting ferrule On offer first and anti-be disengaged from the groove.
6. lithium salts transmission pipeline according to claim 5 repairs component, which is characterized in that the lateral wall of second cutting ferrule On offer second and anti-be disengaged from the groove.
7. lithium salts transmission pipeline according to claim 6 repairs component, which is characterized in that the described first anti-width being disengaged from the groove Equal to the described second anti-width being disengaged from the groove, the described first anti-width being disengaged from the groove is greater than the height of first thrust ring.
8. lithium salts transmission pipeline according to claim 1 repairs component, which is characterized in that first thrust ring includes connecting Socket part and bending part, the interconnecting piece are connect with the upper adapter sleeve, and the bending part is used to support with the lateral wall of the first cutting ferrule It connects, and is provided with interval between the interconnecting piece and the bending part.
9. lithium salts transmission pipeline according to claim 8 repairs component, which is characterized in that the upper adapter sleeve includes flexible Plate and two intermediate plates, two intermediate plates are respectively arranged on the opposite two sides of the expansion plate.
10. lithium salts transmission pipeline according to claim 9 repairs component, which is characterized in that the thickness of the expansion plate is small In the thickness of the intermediate plate.
CN201821329193.5U 2018-08-16 2018-08-16 Lithium salts transmission pipeline repairs component Active CN208886237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821329193.5U CN208886237U (en) 2018-08-16 2018-08-16 Lithium salts transmission pipeline repairs component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821329193.5U CN208886237U (en) 2018-08-16 2018-08-16 Lithium salts transmission pipeline repairs component

Publications (1)

Publication Number Publication Date
CN208886237U true CN208886237U (en) 2019-05-21

Family

ID=66509145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821329193.5U Active CN208886237U (en) 2018-08-16 2018-08-16 Lithium salts transmission pipeline repairs component

Country Status (1)

Country Link
CN (1) CN208886237U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112648470A (en) * 2019-10-11 2021-04-13 中国石油天然气股份有限公司 Pipeline repairing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112648470A (en) * 2019-10-11 2021-04-13 中国石油天然气股份有限公司 Pipeline repairing device
CN112648470B (en) * 2019-10-11 2022-11-04 中国石油天然气股份有限公司 Pipeline repairing device

Similar Documents

Publication Publication Date Title
CN208886237U (en) Lithium salts transmission pipeline repairs component
CN207475168U (en) Cable sealing module and cable crossing firewall
CN213239742U (en) Flange pipe weld pressure testing device
CN211875364U (en) Water pipe connecting flange with good sealing performance for village and town water supply engineering
CN211231972U (en) Anti-drop flange
CN211042340U (en) Nozzle flowmeter
CN210400733U (en) Automatic butt joint plugging mechanism for sealing test
CN210531826U (en) Pipe fitting flange that leakproofness is good
CN213361430U (en) Supporting flange convenient to connect and that leakproofness is good
CN213633373U (en) PH probe flow cell
CN204116272U (en) Electrochemical device for testing under-deposit corrosion of elemental sulfur
CN218063825U (en) Sealing plate with good applicability
CN208886234U (en) Blocking component for lithium salts transmission pipeline
CN210953234U (en) Pressure gauge spring body welding mould
JPH067157U (en) Redox flow battery cell
CN220893695U (en) Fuel cell bipolar plate leakage testing device
CN210266331U (en) Waterproof conversion head
CN214119310U (en) Pipeline connecting device and vanadium redox flow battery device with same
CN220585280U (en) High-capacity battery
CN214839101U (en) Zirconia ceramic flange with stable connection and good sealing performance
CN221145624U (en) Welded pipe joint with observation window
CN215721675U (en) Leakage stopping device
CN211371566U (en) Spherical compensator with quick pipe connecting structure
CN212567838U (en) Device for checking air tightness of tube bundle of floating head heat exchanger
CN220337757U (en) Quick joint for rubber washing pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 448000 5th floor, 39 Jingdong Avenue, Duodao District, Jingmen high tech Zone, Jingmen City, Hubei Province

Patentee after: Hubei Jinquan New Material Co.,Ltd.

Address before: 448000 5th floor, 39 Jingdong Avenue, Duodao District, Jingmen high tech Zone, Jingmen City, Hubei Province

Patentee before: Hubei Shanghe New Material Co.,Ltd.

Address after: 448000 5th floor, 39 Jingdong Avenue, Duodao District, Jingmen high tech Zone, Jingmen City, Hubei Province

Patentee after: Hubei Shanghe New Material Co.,Ltd.

Address before: 448000 5th floor, 39 Jingdong Avenue, Duodao District, Jingmen high tech Zone, Jingmen City, Hubei Province

Patentee before: HUBEI SHANGHE CHEMICAL Co.,Ltd.