CN208885025U CN201821318108.5U CN201821318108U CN208885025U CN 208885025 U CN208885025 U CN 208885025U CN 201821318108 U CN201821318108 U CN 201821318108U CN 208885025 U CN208885025 U CN 208885025U
Authority
CN
China
Prior art keywords
steel column
die ontology
mold
clamping part
column positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821318108.5U
Other languages
Chinese (zh)
Inventor
张前
谷林友
唐小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing International Investment Consultation Group Co Ltd
Engineering Management Co Ltd Of Chongqing City
Original Assignee
Chongqing International Investment Consultation Group Co Ltd
Engineering Management Co Ltd Of Chongqing City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing International Investment Consultation Group Co Ltd, Engineering Management Co Ltd Of Chongqing City filed Critical Chongqing International Investment Consultation Group Co Ltd
Priority to CN201821318108.5U priority Critical patent/CN208885025U/en
Application granted granted Critical
Publication of CN208885025U publication Critical patent/CN208885025U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a kind of steel column positioning mold, including die ontology, the die ontology is the ducted body of both ends perforation, clamping part, the clamping part includes two folders for being at least symmetrically disposed on the die ontology two sides of the bottom, the folder two sides of the bottom are provided with adsorption piece, wherein, when the steel column positioning mold uses, the die ontology is placed at the position of provided pipe road junction, then complete to position by adsorption piece after positioning in fixture is respectively set in clamping part according to the pre-set dimension of steel column.It installs and removes with can be convenient, and it is possible to prevente effectively from damage in demolishing process to mold periphery concrete structure during dismounting, in addition, according to the requirement of the construction size at different provided pipe road junctions, adjust the size of fixture, and the width of holding jig and the sum of the width of die ontology are consistent with construction width dimensions, reduce the cost for removing mold and curing concrete structure, and extend the service life of mold.

Description

A kind of steel column positioning mold
Technical field
The utility model relates to steel building technical field of construction, specifically, being related to a kind of steel column positioning mold.
Background technique
In the construction of Modern Residence building, since skyscraper is more and more, in the area that the pipelines such as the kitchen and bath of skyscraper are intensive In the construction of domain, the phenomenon that pipeline through-flooring, is more universal.In order to cope with such phenomenon, in the Construction of High-rise of the prior art, meeting A large amount of pipe hole is reserved, carries out the setting of pipeline between building by reserved pipe hole again after the completion of concreting.
Common, for existing conventional construction method one is rectangular box is made using plank sheathing, another kind is using plastics Mold fixes position.In long-term construction and practice it has been found that the above method all there is a problem of it is respective:
1) rectangular box is made using plank sheathing, needs construction personnel to make on the spot in construction site, due to provided pipe hole Quantity it is more, so to need to expend a large amount of artificial and material largely rectangular to prepare for the method for such production rectangular box Box, also, since rectangular box is made of plank sheathing, easily generated not when needing to remove rectangular box after the completion of concreting With the breakage of degree, so that the recycling rate of waterused of rectangular box is extremely low, in addition, when the reserved opening of construction requirement is too small, Then the dismounting difficulty of the rectangular box of dimension increases, and the concrete knot around reserved location is easily damaged in demolishing process Structure;
2) method for using plastic mould is to place plastic mould, the dismounting of plastic mould in the position at provided pipe hole Difficulty is small, and preparation cost is low, and transport is more light, compared to the method for preparing plank sheathing, can save in Construction of High-rise A large amount of manpower and material, still, plastic mould are easy to happen deformation and displacement in concreting process, or even occur disconnected Phenomena such as splitting, in this way, concrete pouring quality and the placement of the pipeline in later period can be seriously affected.
For the above-mentioned technical problems in the prior art, people propose a kind of new floor pipe in production practice Mold is reserved in road, is mold well prepared in advance to be placed at provided pipe hole, then construct in mold position.It is existing This mode in technology has had both the advantages of above-mentioned plank sheathing production rectangular box and plastic mould two ways, but people exist , it was also found that this kind of above-mentioned floor slab pipeline reserves mold in construction, it is attached that provided pipe openings position is easily damaged in demolishing process Close floorslab concrete structure, on the other hand, when used for a long time, the concrete adhered on mold side is increasing, in this way meeting So that the positional accuracy of mold is difficult to ensure, and further influence the construction quality of floor steel column.
In view of this, should be improved to the prior art, to solve the above-mentioned technical problems in the prior art.
Utility model content
In order to solve the above-mentioned technical problem the utility model is made, the purpose is to provide one kind to can be avoided floor Reserved mold can destroy the concrete structure on periphery in demolishing process when steel column is constructed, and can be avoided reserved mold and removing Reserved opening position precision is influenced in the process, and is adapted to the needs of the different construction sizes at provided pipe hole, is further mentioned The steel column positioning mold of high steel column positioning construction quality.
To achieve the goals above, the utility model provides a kind of steel column positioning mold, the steel column positioning mold Including die ontology, which is the ducted body of both ends perforation;Clamping part, the clamping part include at least being symmetrically disposed on institute Two folders of die ontology two sides of the bottom are stated, the folder two sides of the bottom are provided with adsorption piece, wherein in the steel column positioning mould Tool is in use, the die ontology is placed at the position of provided pipe road junction, then according to the pre-set dimension of steel column, in the folder It holds and fixture is respectively set in portion, complete to position by the adsorption piece and construction adsorption after positioning.
Preferably, grip part can be set at the top of the die ontology.
Preferably, including multiple intermediate plates and setting with the multiple intermediate plate bottom and for connecting the multiple intermediate plate Egative film, multiple intermediate plates and the egative film surround the folder.
It is further preferred that the clamping part can be multiple.
Further preferably, the intermediate plate has elasticity.
Preferably, the adsorption piece can be sucker.
Preferably, the fixture can be flitch, the sum of the width of the flitch and the width of the die ontology with it is pre- Stay the equivalent width of pipeline opening.
As described above with practice it is found that this kind of steel column positioning mold described in the utility model is at die ontology bottom Clamping part is arranged in multiple positions of portion's surrounding, and clamping part is surrounded by multiple turnover intermediate plates and egative film, when positioning mold is placed When the construction location at provided pipe road junction, according to the different sizes requirement of provided pipe road junction steel column construction, in clamping part respectively Placing clamp, and make the sum of the width of fixture and the width of steel column positioning mold consistent with the dimension width of construction requirement, The adsorption piece of clamping part two sides of the bottom is bonded with construction surface again, to complete positioning work, before steel column construction, it is only necessary to will press from both sides The adsorption piece separation for holding portion, takes out the fixture in clamping part, then lift die ontology by the grip part at the top of die ontology, Work is removed to complete mold.In conclusion this kind of steel column positioning mold described in the utility model has simplified structure, it can Easily to install and remove, and it is possible to prevente effectively to mold periphery concrete knot in demolishing process during dismounting The damage of structure adjusts the size of fixture in addition, according to the requirement of the construction size at different provided pipe road junctions, and holding jig The sum of width of width and die ontology is consistent with construction width dimensions, can be further improved the precision of construction in this way, And further guarantee steel column positioning construction accuracy and quality, while improving construction efficiency, reduce remove mold and The cost of curing concrete structure, and extend the service life of mold.
Detailed description of the invention
Fig. 1 is cross-sectional view, shows a kind of cuing open for steel column positioning device described in one embodiment of the utility model Face structure;
Fig. 2 is schematic diagram, shows the structure of clamping part in steel column positioning device shown in FIG. 1;
Fig. 3 is state diagram, shows the state that clamping part shown in Fig. 2 is provided with fixture;
Fig. 4 is state diagram, shows the state of clamping part setting fixture in another embodiment of the utility model.
Specific embodiment
The embodiment of steel column positioning mold described in the utility model described below with reference to the accompanying drawings.This field it is common Technical staff will recognize, without departing from the spirit and scope of the utility model, can use a variety of different sides Formula is modified described embodiment.Therefore, attached drawing and description are regarded as illustrative in nature, rather than for limiting power The protection scope that benefit requires.In addition, in the present specification, attached drawing is drawn not in scale, and identical appended drawing reference indicates phase Same part.
Fig. 1 is cross-sectional view, shows a kind of cuing open for steel column positioning device described in one embodiment of the utility model Face structure.Fig. 2 is schematic diagram, shows the structure of clamping part in steel column positioning device shown in FIG. 1.Fig. 3 is state diagram, is shown Clamping part shown in Fig. 2 is provided with the state of fixture.As shown in Figure 1, in the steel as described in the examples of the utility model Column positioning device includes die ontology 1 and is symmetrically disposed on the folder of the folder 2 of 1 bottom circumferential surface of die ontology including at least two Portion is held, in the embodiment of the utility model, clamping part includes four be symmetrically disposed on 1 bottom circumferential surface of die ontology two-by-two A folder 2, in the other embodiments of the utility model, the quantity of folder 2 can also be needed according to specific construction positioning into Row adjustment, to meet the needs of different construction conditions and positioning requirements.Multiple folders 2 can make steel described in the utility model The locating effect of column positioning mold is more preferably firm and is conveniently adjusted.
Specifically, die ontology 1 is the ducted body of both ends perforation, grip part 3, grip part 3 has been can be set in top It can make when removing mold, construction personnel is lifted die ontology 1 by grip part 3 from concrete structure.Such as Fig. 2 and Shown in Fig. 3, two side bottoms of folder 2 are provided with adsorption piece 21, can be made by adsorption piece 21 after the completion of positioning mold with Construction adsorption, to reach positioning action.In the embodiment of the utility model, adsorption piece 21 can select sucker, Can also be for example, by other adsorption pieces with suction-operated such as adhesive strip in the other embodiments of the utility model, this is practical Novel embodiment is without being limited thereto.Whole folder 2 is in concave comprising multiple intermediate plates 22 and is set to 22 bottom of intermediate plate Portion and the egative film 23 for being used to connect multiple intermediate plates 22, and intermediate plate 22 has elasticity so that intermediate plate 22 can be 23 turns relative to egative film Dynamic, in the embodiment of the utility model, intermediate plate 22 can select the flexible foil such as reed to be made, in this reality It is connected by egative film 23 with three intermediate plates 22 in the novel embodiment, are arranged to and is surrounded folder 2, in the utility model Other embodiments in, can also be needed according to specific construction and positioning requirements increase and decrease 22 quantity of intermediate plate, with full The different constructions of foot and positioning need, and the embodiments of the present invention are without being limited thereto.Fixture 24 can be set in folder 2, in this reality With in the novel embodiment, extra flitch can be chosen at the construction field (site) and need to prepare fixture 24 according to construction, and make It is consistent with the dimension width that construction needs to obtain the sum of width and width of die ontology 1 of fixture 24, it is specifically, practical at this Under the novel steel column positioning device use state, positioning device is first placed in the steel column construction location at provided pipe road junction, Then according to the steel column construction requirement at provided pipe road junction, the fixture 24 of corresponding size is prepared, and makes the width and mould of fixture 24 Have the sum of the width of ontology 1, the equivalent width with provided pipe road junction, then multiple intermediate plates 22 that fixture 24 is placed in folder 2 are enclosed It closes in the region formed, it, only need to be by adsorption piece 21 when needing to remove by adsorption piece 21 and construction adsorption after the completion of positioning It is separated with construction surface, then removes fixture 24, and die ontology 1 is mentioned above to complete to remove work by grip part 3.
Fig. 4 is state diagram, shows the state of clamping part setting fixture in another embodiment of the utility model.At this In another embodiment of utility model, when provided pipe road junction steel column size to be onstructed is larger, the fixture 24 of selection is located at Between two intermediate plates 22 being correspondingly arranged, since intermediate plate 22 has elasticity, fixture 24 can will be vertical with the intermediate plate 22 that two are correspondingly arranged It is pushed down in the plane that the intermediate plate of setting is shifted onto where rotation to egative film 23 and by intermediate plate 22, so that intermediate plate 22 is located at fixture 24 Bottom, certainly in the other embodiments of the utility model, fixture 24 can also push down three intermediate plates 22, and make three A intermediate plate 22 is all located at the bottom of fixture 24.
As described above with practice it is found that this kind of steel column positioning mold described in the utility model is at die ontology bottom Clamping part is arranged in multiple positions of portion's surrounding, and clamping part is surrounded by multiple turnover intermediate plates and egative film, when positioning mold is placed When the construction location at provided pipe road junction, according to the different sizes requirement of provided pipe road junction steel column construction, in clamping part respectively Placing clamp, and make the sum of the width of fixture and the width of steel column positioning mold consistent with the dimension width of construction requirement, The adsorption piece of clamping part two sides of the bottom is bonded with construction surface again, to complete positioning work, before steel column construction, it is only necessary to will press from both sides The adsorption piece separation for holding portion, takes out the fixture in clamping part, then lift die ontology by the grip part at the top of die ontology, Work is removed to complete mold.In conclusion this kind of steel column positioning mold described in the utility model has simplified structure, it can Easily to install and remove, and it is possible to prevente effectively to mold periphery concrete knot in demolishing process during dismounting The damage of structure adjusts the size of fixture in addition, according to the requirement of the construction size at different provided pipe road junctions, and holding jig The sum of width of width and die ontology is consistent with construction width dimensions, can be further improved the precision of construction in this way, And further guarantee steel column positioning construction accuracy and quality, while improving construction efficiency, reduce remove mold and The cost of curing concrete structure, and extend the service life of mold.
It is described in an illustrative manner above with reference to attached drawing according to steel column positioning mold described in the utility model.But It will be appreciated by those skilled in the art that can also not departed from for the steel column positioning mold that above-mentioned the utility model is proposed Various improvement are made on the basis of the content of the present invention.Therefore, the protection scope of the utility model should be by appended right The content of claim determines.

Claims (7)

1. a kind of steel column positioning mold, which is characterized in that the steel column positioning mold includes
Die ontology, the die ontology are the ducted body of both ends perforation,
Clamping part, the clamping part include two folders for being at least symmetrically disposed on the die ontology two sides of the bottom, the folder bottom Portion two sides are provided with adsorption piece, wherein
In the steel column positioning mold in use, the die ontology is placed at the position of provided pipe road junction, then according to steel Fixture is respectively set in Yu Suoshu clamping part in the pre-set dimension of column, complete by the adsorption piece and adsorption of constructing after positioning At positioning.
2. steel column positioning mold as described in claim 1, which is characterized in that be provided with gripping at the top of the die ontology Portion.
3. steel column positioning mold as described in claim 1, which is characterized in that the folder is in concave, including multiple folders The egative film of piece and setting with the multiple intermediate plate bottom and for connecting the multiple intermediate plate, multiple intermediate plates and the bottom Piece surrounds the folder.
4. steel column positioning mold as claimed in claim 1 or 3, which is characterized in that the clamping part is multiple.
5. steel column positioning mold as claimed in claim 3, which is characterized in that the intermediate plate has elasticity.
6. steel column positioning mold as described in claim 1, which is characterized in that the adsorption piece is sucker.
7. steel column positioning mold as described in claim 1, which is characterized in that the fixture is flitch, the width of the flitch Equivalent width with the sum of the width of the die ontology with provided pipe road junction.
CN201821318108.5U 2018-08-15 2018-08-15 A kind of steel column positioning mold Active CN208885025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821318108.5U CN208885025U (en) 2018-08-15 2018-08-15 A kind of steel column positioning mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821318108.5U CN208885025U (en) 2018-08-15 2018-08-15 A kind of steel column positioning mold

Publications (1)

Publication Number Publication Date
CN208885025U true CN208885025U (en) 2019-05-21

Family

ID=66508964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821318108.5U Active CN208885025U (en) 2018-08-15 2018-08-15 A kind of steel column positioning mold

Country Status (1)

Country Link
CN (1) CN208885025U (en)

Similar Documents

Publication Publication Date Title
CN202467176U (en) Post-cast strip isolation template
CN212772699U (en) Butt joint device for construction of drainage layer pipeline for environment-friendly building construction
CN208885025U (en) A kind of steel column positioning mold
CN207673045U (en) Fabricated shear wall superimposed sheet connecting integration support system
CN208072967U (en) A kind of beam for building side fixing piece
CN110936617B (en) Tool is pasted with cover to steel band hot pressing sheet stock adhesive tape
CN214739905U (en) Hole instrument of pouring is reserved to floor
CN213927501U (en) Hole reservation device for building engineering
FI69423C (en) SAETT VID FRAMSTAELLNING AV ETT LAMINAT
CN209323958U (en) Dismountable aluminum alloy mould plate
CN205959767U (en) Smoothing reactor coil winding device
CN205348771U (en) Template system of imitative tang jianzhu's wing angle upturned eaves
CN206747340U (en) A kind of simple book joint setting machine
CN204311743U (en) Mark time tooth raft formula from fissure of displacement internal corner formwork
CN213858951U (en) Hydraulic engineering's water conservancy pipeline supports connection structure
CN220599294U (en) Pass material hole shutoff construction equipment
CN219825566U (en) Wall body induced joint filling system convenient to dismantle and become groove regular
CN204311744U (en) Mark time tooth raft formula from fissure of displacement external angle formwork
CN211974301U (en) Pouring aluminum mold convenient for demolding
CN218176649U (en) Reserved hole structure for building
CN206774515U (en) A kind of chip cutting clamp for machining
CN219826116U (en) Accurate control supporting tool of slab band template suitable for assembled superimposed sheet
CN220267142U (en) Wall brick paving auxiliary device
CN216084611U (en) Pouring type winding die outer mold structure
CN109441100B (en) Reverse pulling supporting tool for PC laminated plate with bottom template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant