CN208885001U - Building engineering shuttering fixes device - Google Patents
Building engineering shuttering fixes device Download PDFInfo
- Publication number
- CN208885001U CN208885001U CN201821680416.2U CN201821680416U CN208885001U CN 208885001 U CN208885001 U CN 208885001U CN 201821680416 U CN201821680416 U CN 201821680416U CN 208885001 U CN208885001 U CN 208885001U
- Authority
- CN
- China
- Prior art keywords
- main beam
- rack gear
- gear
- building engineering
- fixed plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The utility model discloses a kind of fixed devices of building engineering shuttering, including the fixed device of building engineering shuttering, including main beam, several gears along main beam arrangement are equipped with by gear shaft on main beam, it is located above and below gear on main beam and is respectively equipped with the first rack gear and the second rack gear engaged with gear, the first rack gear and the second rack gear is parallel;The end of first rack gear and the second rack gear away from each other is respectively equipped with the first fixed plate and the second fixed plate, and the first fixed plate and the second fixed plate are parallel and vertical with main beam.The utility model structure is simple, easy to operate, stable working state, can rapidly adjust different working sizes, and each component is for ease of maintenaince and quick-replaceable.
Description
Technical field
The utility model relates to building engineering fields, and in particular to a kind of fixed device of building engineering shuttering.
Background technique
Form work engineering (formwork) refers to a whole set of tectonic system of the molding template of newly-laid concrete and supporting template,
Wherein, it contacts concrete and controls predetermined size, shape, the construction portion of position are known as template, support the bar with fixed form
Part, truss, connecting piece, metal-ware, work suspension bridge etc. constitute supporting system and sleiding form are then added from rising mould plate and mentioned
Power and hoisting frame, platform etc. is risen to constitute.Form work engineering is a kind of temporary structure in concrete construction, so cannot use
It is non-removable to be fixedly connected with mode.
In existing many architectural engineerings, the fixation of building engineering shuttering is much still passed through using worker according to work
It tests and carries out rough fixation using tools in hand, wooden plate is fixed for example, by using iron wire or batten, or
It is that the plate of steel is fixed using the set of mechanical component of standard.Former fixed form is lack of standardization, can't needle
Different sizes are required to be adjusted, some building standards are not only not achieved, but also be easy to produce safety accident;Latter is solid
Determine mode, building cost is high, and it is also higher to the level of skill requirement of related personnel, furthermore if these mechanical components generate failure
Emergency processing can not be made, needs special accessory that can just repair replacement, very influence job schedule.
Utility model content
To solve the above-mentioned problems, the utility model provides a kind of fixed safety standard, structure is simple and convenient to operate,
The fixed device of building engineering shuttering of working size can be quickly adjusted, concrete scheme is as follows:
Including the fixed device of building engineering shuttering, including main beam, several edges are equipped with by gear shaft on the main beam
The gear of main beam arrangement is located to be respectively equipped with above and below the gear on the main beam and nibble with the gear
The first rack gear and the second rack gear closed, first rack gear are parallel with second rack gear;First rack gear and described second
The end of rack gear away from each other is respectively equipped with the first fixed plate and the second fixed plate, and first fixed plate and described second are fixed
Plate is parallel and vertical with the main beam.
It further, further include limiting device, the limiting device includes the driving being located therein on a gear
Arm is equipped with the spacer pin parallel with the gear shaft on the actuating arm, offers on the main beam several along the limit
The limit hole of position pin motion profile.
Further, the two sides of the main beam extend to form baffle, and the baffle, which is equipped with, is used for first rack gear
With the sliding rail of the second rack movement.
Further, the main beam is equipped with bracket attachment mount, is equipped with and the main cross on the bracket attachment mount
The vertical supporting leg of beam.
Further, the supporting leg includes the tube-like piece of several sockets, is offered on the side wall of the tube-like piece several
The adjustment hole axially arranged is equipped with regulation cock in the adjustment hole.
Further, the cavity axially arranged is formed in the supporting leg, is equipped with support foot, the sky in the cavity
The outer wall of the inner wall of chamber and the support foot is equipped with the screw thread worked in coordination, and the end of the support foot is equipped with and the main beam
Parallel support plate.
Further, it is offered on first fixed plate and the opposite side of second fixed plate several threaded
Fastener hole is equipped with fastening bolt in the fastener hole.
The utility model has the beneficial effects that: the fixed device of a kind of building engineering shuttering provided by the utility model, knot
Structure is simple, easy to operate, stable working state, can rapidly adjust different working sizes, and each component is for ease of maintenaince and fastly
Speed replacement.
Detailed description of the invention
The structural schematic diagram of Fig. 1 the utility model embodiment 1,
The schematic enlarged-scale view of Fig. 2 the utility model embodiment 1 rack gear and baffle,
The working state schematic representation of Fig. 3 the utility model embodiment 1,
The structural schematic diagram of 2 supporting leg of Fig. 4 the utility model embodiment,
The structural schematic diagram of 3 fixed plate of Fig. 5 the utility model embodiment.
Figure number and title: 1, main beam, 101, gear shaft, 102, limit hole, 103, attachment base, 2, gear, 3,
One rack gear, the 4, second rack gear, the 5, first fixed plate, the 6, second fixed plate, 7, actuating arm, 701, spacer pin, 8, baffle, 801, cunning
Rail, 9, supporting leg, 901, regulation cock, 902, cavity, 903, support foot, 904, support plate, 10, fastening bolt.
Specific embodiment
The utility model will be further described with reference to the accompanying drawings and examples, and the following example is only used for explaining this
The utility model content of utility model is not used in the restriction protection scope of the utility model.
Embodiment 1
Referring to figs. 1 and 2, a kind of building engineering shuttering fixes device, including main beam 1, passes through tooth on main beam 1
Wheel shaft 101 sets that there are five the gears 2 arranged along main beam 1, be located on main beam 1 above and below gear 2 be respectively equipped with
The first rack gear 3 and the second rack gear 4 that gear 2 engages, the first rack gear 3 are parallel with the second rack gear 4;The two sides of main beam 1 extend shape
At baffle 8, baffle 8 is equipped with the sliding rail 801 moved for the first rack gear 3 and the second rack gear 4.
The end of first rack gear 3 and the second rack gear 4 away from each other is respectively equipped with the first fixed plate 5 and the second fixed plate 6, the
One fixed plate 5 and the second fixed plate 6 are parallel and vertical with main beam 1.
It further include limiting device, limiting device includes the actuating arm 7 being located therein on a gear 2, is worn on actuating arm 7
There is the spacer pin 701 parallel with gear shaft 101, several limit holes along 701 motion profile of spacer pin are offered on main beam 1
102。
Main beam 1 is equipped with bracket attachment mount 103, is equipped with the supporting leg vertical with main beam 1 on bracket attachment mount 103
9.Supporting leg 9 includes the tube-like piece of two sockets, offers several adjustment holes axially arranged, adjustment hole on the side wall of tube-like piece
Inside it is equipped with regulation cock 901.
The working principle of the utility model is as follows:
Referring to Fig. 3, drive the first rack gear and the second rack gear relatively or backwards to moving using actuating arm, so that it is solid to adjust first
Then the spacing of fixed board and the second fixed plate limits actuating arm using spacer pin, realize to various sizes of building mould
Plate is gripped;The length for adjusting supporting leg using regulation cock simultaneously, allows the height of main beam according to real work
Situation is adjusted.It is easy to operate since each structure is simple, convenient for the maintenance management in later period, and all very due to its structure
It is common, it is able to carry out quick replacement breaking down in use process, will not influence whole job schedule.
Embodiment 2
As shown in figure 4, the present embodiment the difference from embodiment 1 is that: the cavity axially arranged is formed in supporting leg 9
902, cavity 902 is interior to be equipped with support foot 903, and the inner wall of cavity 902 and the outer wall of support foot 903 are equipped with the screw thread worked in coordination,
The end of support foot 903 is equipped with the support plate 904 parallel with main beam 1.
Relative to embodiment 1, the height of the present embodiment main beam can be realized by rotation support leg, the essence for adjusting it
Du Genggao, suitable for different construction requirements.
Embodiment 3
As described in Figure 5, the present embodiment the difference from embodiment 1 is that:
Several threaded fastener holes are offered in first fixed plate 5 and the opposite side of the second fixed plate 6, in fastener hole
It is equipped with fastening bolt 10.
Compared to embodiment 1, the present embodiment can utilize the Bu Tong mutual mistake of height and position using multiple fixed devices
It opens arrangement and is combined use, the fine tuning of fixed board size is then realized using fastening bolt.
To sum up, the only preferred embodiment of the utility model, does not limit the protection scope of the utility model, Fan Yiben with this
Equivalent changes and modifications made by utility model patent range and description are all the range that the utility model patent covers
Within.
Claims (7)
1. building engineering shuttering fixes device, it is characterised in that: including main beam (1), pass through gear shaft on the main beam (1)
(101) several gears (2) along the main beam (1) arrangement are equipped with, are located at the upper of the gear (2) on the main beam (1)
Side and be respectively arranged below with the first rack gear (3) and the second rack gear (4) engaged with the gear (2), first rack gear (3) and
Second rack gear (4) is parallel;First rack gear (3) and the end of second rack gear (4) away from each other are respectively equipped with
One fixed plate (5) and the second fixed plate (6), first fixed plate (5) and second fixed plate (6) it is parallel and with it is described
Main beam (1) is vertical.
2. the fixed device of building engineering shuttering according to claim 1, it is characterised in that: it further include limiting device, it is described
Limiting device includes the actuating arm (7) that is located therein on a gear (2), be equipped on the actuating arm (7) with it is described
Gear shaft (101) parallel spacer pin (701) offers on the main beam (1) and several moves rail along the spacer pin (701)
The limit hole (102) of mark.
3. the fixed device of building engineering shuttering according to claim 2, it is characterised in that: the two sides of the main beam (1)
It extends to form baffle (8), the baffle (8) is equipped with the sliding rail moved for first rack gear (3) and the second rack gear (4)
(801)。
4. the fixed device of building engineering shuttering according to claim 1, it is characterised in that: the main beam (1) is equipped with
Bracket attachment mount (103) is equipped with the supporting leg vertical with the main beam (1) (9) on the bracket attachment mount (103).
5. the fixed device of building engineering shuttering according to claim 4, it is characterised in that: the supporting leg (9) is if include
The tube-like piece of socket is done, several adjustment holes axially arranged is offered on the side wall of the tube-like piece, is worn in the adjustment hole
There are regulation cock (901).
6. the fixed device of building engineering shuttering according to claim 4, it is characterised in that: molding in the supporting leg (9)
There is the cavity (902) axially arranged, is equipped with support foot (903), the inner wall of the cavity (902) and institute in the cavity (902)
The outer wall for stating support foot (903) is equipped with the screw thread worked in coordination, and the end of the support foot (903) is equipped with and the main beam
(1) parallel support plate (904).
7. the fixed device of building engineering shuttering described in -6 any one according to claim 1, it is characterised in that: described first is solid
Several threaded fastener holes are offered on fixed board (5) and the opposite side of second fixed plate (6), are worn in the fastener hole
Equipped with fastening bolt (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821680416.2U CN208885001U (en) | 2018-10-16 | 2018-10-16 | Building engineering shuttering fixes device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821680416.2U CN208885001U (en) | 2018-10-16 | 2018-10-16 | Building engineering shuttering fixes device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208885001U true CN208885001U (en) | 2019-05-21 |
Family
ID=66516390
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821680416.2U Expired - Fee Related CN208885001U (en) | 2018-10-16 | 2018-10-16 | Building engineering shuttering fixes device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208885001U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206230A (en) * | 2019-06-10 | 2019-09-06 | 上海建工四建集团有限公司 | Concrete column framework of steel reinforcement and template system integral structure and construction method |
CN110820589A (en) * | 2019-11-30 | 2020-02-21 | 武汉瑞锦丰路桥设备股份有限公司 | Bridge construction safety anti-falling device |
CN111456427A (en) * | 2020-04-20 | 2020-07-28 | 中冶建工集团有限公司 | Template bracket capable of fixing suspended building template |
CN111946060A (en) * | 2020-08-20 | 2020-11-17 | 中国建筑第二工程局有限公司 | Template pouring device for building construction |
CN111996922A (en) * | 2020-09-10 | 2020-11-27 | 金扬余 | Bridge construction is with concatenation formula pile foundation protection template convenient to demolish |
CN112096062A (en) * | 2020-09-02 | 2020-12-18 | 中国建筑第八工程局有限公司 | Adjustable beam template fixing clamp and beam template fixing method |
CN112324137A (en) * | 2020-10-21 | 2021-02-05 | 中国五冶集团有限公司 | Multi-purpose external member of consolidating of template |
CN114607171A (en) * | 2022-03-24 | 2022-06-10 | 中海华祥建设发展有限公司 | Reinforcing device and reinforcing method for concrete column |
-
2018
- 2018-10-16 CN CN201821680416.2U patent/CN208885001U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110206230A (en) * | 2019-06-10 | 2019-09-06 | 上海建工四建集团有限公司 | Concrete column framework of steel reinforcement and template system integral structure and construction method |
CN110820589A (en) * | 2019-11-30 | 2020-02-21 | 武汉瑞锦丰路桥设备股份有限公司 | Bridge construction safety anti-falling device |
CN111456427A (en) * | 2020-04-20 | 2020-07-28 | 中冶建工集团有限公司 | Template bracket capable of fixing suspended building template |
CN111946060A (en) * | 2020-08-20 | 2020-11-17 | 中国建筑第二工程局有限公司 | Template pouring device for building construction |
CN112096062A (en) * | 2020-09-02 | 2020-12-18 | 中国建筑第八工程局有限公司 | Adjustable beam template fixing clamp and beam template fixing method |
CN111996922A (en) * | 2020-09-10 | 2020-11-27 | 金扬余 | Bridge construction is with concatenation formula pile foundation protection template convenient to demolish |
CN112324137A (en) * | 2020-10-21 | 2021-02-05 | 中国五冶集团有限公司 | Multi-purpose external member of consolidating of template |
CN114607171A (en) * | 2022-03-24 | 2022-06-10 | 中海华祥建设发展有限公司 | Reinforcing device and reinforcing method for concrete column |
CN114607171B (en) * | 2022-03-24 | 2024-01-23 | 中海华祥建设发展有限公司 | Reinforcing device and reinforcing method for concrete column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208885001U (en) | Building engineering shuttering fixes device | |
CN208054811U (en) | A kind of portable hinge connecting rod lifting device | |
CN107662880B (en) | Adjusting method of adjustable lifting appliance for lifting flat plate | |
CN109775625A (en) | A kind of adjustable multi-use architecture operation platform | |
CN110303341A (en) | A kind of multi-function steel structure cutting drilling device | |
CN203654701U (en) | Anti-toppling and anti-falling guide seat for longitudinal track | |
CN202081427U (en) | Embedded bolt positioning device for tower crane foundation | |
CN110469109A (en) | A kind of building template location and installation auxiliary device | |
CN205600259U (en) | Quick locking mechanism of screw | |
CN211081031U (en) | Building engineering template fixing device | |
CN205764030U (en) | A kind of ceiling hole drilling auxiliary device | |
CN215955735U (en) | PLC control cabinet for bag-type dust collector | |
CN210685334U (en) | Assembly type building external hanging platform | |
CN209478612U (en) | A kind of scalable auxiliary tool of movable type for vertically drilling | |
KR200465907Y1 (en) | scaffolding frame for turbine case | |
CN206246936U (en) | Horizontal universal adjustment platform | |
CN112324153A (en) | A reinforcement auxiliary device for job site | |
CN205873722U (en) | Large -scale balance is hung suitable for building | |
CN205976373U (en) | Gate -type scaffold frame with material lifting equipment | |
CN217552810U (en) | Adsorption equipment for aerated brick cutting machine | |
CN203834041U (en) | Vertical continuous electroplating line floating frame automatic lifting system | |
CN213654161U (en) | Scaffold that has stable structure and be convenient for equipment for building engineering construction | |
CN209723701U (en) | A kind of support device suitable for steel construction processing | |
CN202023363U (en) | High-rise wall-attached climbing formwork for building operations | |
CN211946162U (en) | Electric power engineering aerial working platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190521 Termination date: 20201016 |
|