CN208884527U - A kind of waterproof foundation pit - Google Patents

A kind of waterproof foundation pit Download PDF

Info

Publication number
CN208884527U
CN208884527U CN201821478879.0U CN201821478879U CN208884527U CN 208884527 U CN208884527 U CN 208884527U CN 201821478879 U CN201821478879 U CN 201821478879U CN 208884527 U CN208884527 U CN 208884527U
Authority
CN
China
Prior art keywords
foundation pit
layer
waterproof
waterproof roll
roll layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821478879.0U
Other languages
Chinese (zh)
Inventor
还红年
王晓武
吉安辉
蔡景龙
王玉超
侯前江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongji Construction Group Co Ltd
Original Assignee
Jiangsu Zhongji Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongji Construction Group Co Ltd filed Critical Jiangsu Zhongji Construction Group Co Ltd
Priority to CN201821478879.0U priority Critical patent/CN208884527U/en
Application granted granted Critical
Publication of CN208884527U publication Critical patent/CN208884527U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of waterproof foundation pit, more particularly to building field, including foundation pit, side is enclosed in the foundation pit equipped with protecting wall, the bottom of the foundation pit is equipped with cement sand bed, first waterproof roll layer above the cement sand bed, the bottom edges and corners of the first waterproof roll layer and the foundation pit fit;Top the second waterproof roll layer of the first waterproof roll layer, the second waterproof roll layer are attached to the interior bottom for enclosing side and the foundation pit of the cofferdam upper end of the foundation pit, the foundation pit;The top of the second waterproof roll layer is equipped with concrete layer, and the concrete layer is attached to the interior bottom for enclosing side and the foundation pit of the foundation pit.The utility model waterproof performance is good, improves the safety of foundation pit.

Description

A kind of waterproof foundation pit
Technical field
The utility model belongs to building field, and in particular to a kind of waterproof foundation pit.
Background technique
Foundation pit is the heatable adobe sleeping platform excavated in basic engineering position by substrate absolute altitude and basic plane size.It should basis before excavation Geological hydrology data determines excavation plan in conjunction with live nearby buildings situation, and performs water-proof drainage work;Foundation pit infiltration The safety accidents such as collapsing can be caused, therefore the waterproof performance of foundation pit is essential.Existing foundation pit waterproof construction, has much room for improvement, To improve waterproof performance.
In view of the above deficiencies, a kind of waterproof foundation pit is now needed, waterproof performance is good, improves the safety of foundation pit.
Utility model content
The purpose of the utility model is to provide a kind of waterproof foundation pits, and waterproof performance is good, improve the safety of foundation pit.
The utility model provides the following technical solution:
A kind of waterproof foundation pit, including foundation pit, equipped with protecting wall, the bottom of the foundation pit is equipped with for the interior side of enclosing of the foundation pit Cement sand bed, the first waterproof roll layer of the cement sand bed top, the bottom of the first waterproof roll layer and the foundation pit Portion edges and corners fit;Top the second waterproof roll layer of the first waterproof roll layer, the second waterproof roll layer attach The bottom of side and the foundation pit is enclosed in the cofferdam upper end of the foundation pit, the foundation pit;The second waterproof roll layer Top is equipped with concrete layer, and the concrete layer is attached to the interior bottom for enclosing side and the foundation pit of the foundation pit.
Preferably, pea gravel concreten layer is additionally provided between the concrete layer and the second waterproof roll layer.
Preferably, the first waterproof roll slice width degree is 200 to 300 millimeters.
Preferably, the fit chamfer radius at place of the bottom edges and corners of the first waterproof roll layer and the foundation pit is 50 Millimeter is to 100 millimeters.
Preferably, pressure brick layer is equipped with above the cofferdam of the foundation pit.
Preferably, froth bed is equipped between the pressure brick layer and the second waterproof roll layer.
The utility model has the beneficial effects that
(1) the utility model solves deep foundation pit construction basal plane humidity moisture using flexible, sealing, wet-laying type waterproof material The problem of hardly possible construction, basic easily settled cracking, waterproof safety is reliable;
(2) the utility model uses flexible waterproof sheet layer, by binary creep cracking structure, solves bottom plate, top plate is big Span structure cracking destruction waterproof layer, the problem for causing leakage to be leaked;
(3) the utility model can construct under the complex environments such as moist moisture, reduce the basal plane dry waiting time, be suitble to catch up with The requirement of duration, and construction efficiency is high, can effectively meet project progress demand.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is the utility model structure chart.
In the figure, it is marked as 1, foundation pit;2, protecting wall;3, cement sand bed;4, the first waterproof roll layer;5, the second waterproof roll Material layer;6, pea gravel concreten layer;7, concrete layer;8, froth bed;9, brick layer is pressed.
Specific embodiment
As shown in Figure 1, a kind of waterproof foundation pit, including foundation pit 1, the interior side of enclosing of foundation pit 1 is equipped with protecting wall 2, the bottom of foundation pit 1 Portion is equipped with cement sand bed 3,3 the first waterproof roll layer 4 of top of cement sand bed, the bottom of the first waterproof roll layer 4 and foundation pit 1 Edges and corners fit;Top the second waterproof roll layer 5 of first waterproof roll layer 4, the second waterproof roll layer 5 is attached to foundation pit 1 Cofferdam upper end, foundation pit 1 in enclose the bottom of side and foundation pit 1;The top of second waterproof roll layer 5 is equipped with concrete layer 7, mixes Solidifying soil layer 7 is attached to the interior bottom for enclosing side and foundation pit 1 of foundation pit 1;
Wherein, pea gravel concreten layer 6, pea gravel concreten layer 6 are additionally provided between concrete layer 7 and the second waterproof roll layer 5 The second waterproof roll layer 5 can be protected;First waterproof roll layer, 4 width is 200 to 300 millimeters, the width;First waterproof roll layer 4 with the fit chamfer radius at place of the bottom edges and corners of foundation pit 1 be 50 millimeters to 100 millimeters, avoids the first waterproof by chamfering Coiled material layer 4 ruptures, and improves service life;Pressure brick layer 9 is equipped with above the cofferdam of foundation pit 1, it can be by the second waterproof roll by pressure brick layer 9 Material layer 5 is fixed;It presses and is equipped with froth bed 8 between brick layer 9 and the second waterproof roll layer 5, froth bed 8 can protect the second waterproof roll Material layer 5
The advantages of the utility model:
As shown in Figure 1, the utility model is using flexible, sealing, the first waterproof roll of wet-laying type layer 4 and the second waterproof roll Layer 5 solves the problem of the easily settled cracking in deep foundation pit construction basal plane humidity moisture difficulty construction basis, and waterproof safety is reliable, and use is soft Property waterproof roll bottom plate solved by binary creep cracking structure, top plate longspan structure cracking destruction waterproof layer causes to seep The problem for leaking leakage, can construct under the complex environments such as moist moisture, reduce the basal plane dry waiting time, be suitble to work to tight deadlines wants It asks, and construction efficiency is high, can effectively meet project progress demand, can save screed-coat, the water proof structures cost such as protective layer;Using 3 wet-laying of cement sand bed, basal plane is required it is low, for bottom cushion, top plate, side wall sectional repair, it goes without doing screed-coat, Cost is lower, and cement sand bed 3 does bottom plate coiled material protective layer, instead of traditional pea gravel concreten protective layer, this save the cost 80% or more;By mixed mud layer 7, the waterproofness and fastness of foundation pit 1 can further improve;
The above is only the preferred embodiments of the utility model, are not intended to limit the utility model, although referring to before Embodiment is stated the utility model is described in detail, it for those skilled in the art, still can be to preceding Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features.It is all this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (6)

1. a kind of waterproof foundation pit, it is characterised in that: including foundation pit, side is enclosed in the foundation pit equipped with protecting wall, the foundation pit Bottom be equipped with cement sand bed, the first waterproof roll layer above the cement sand bed, the first waterproof roll layer and institute The bottom edges and corners for stating foundation pit fit;
Top the second waterproof roll layer of the first waterproof roll layer, the second waterproof roll layer are attached to the foundation pit Cofferdam upper end, the foundation pit in enclose the bottom of side and the foundation pit;
The top of the second waterproof roll layer be equipped with concrete layer, the concrete layer be attached to the foundation pit in enclose side and The bottom of the foundation pit.
2. a kind of waterproof foundation pit according to claim 1, it is characterised in that: the concrete layer and second waterproof roll Pea gravel concreten layer is additionally provided between material layer.
3. a kind of waterproof foundation pit according to claim 1, it is characterised in that: the first waterproof roll slice width degree is 200 To 300 millimeters.
4. a kind of waterproof foundation pit according to claim 1, it is characterised in that: the first waterproof roll layer and the foundation pit Bottom edges and corners fit place chamfer radius be 50 millimeters to 100 millimeters.
5. a kind of waterproof foundation pit according to claim 1, it is characterised in that: be equipped with pressure brick above the cofferdam of the foundation pit Layer.
6. a kind of waterproof foundation pit according to claim 5, it is characterised in that: the pressure brick layer and second waterproof roll Froth bed is equipped between layer.
CN201821478879.0U 2018-09-11 2018-09-11 A kind of waterproof foundation pit Active CN208884527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821478879.0U CN208884527U (en) 2018-09-11 2018-09-11 A kind of waterproof foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821478879.0U CN208884527U (en) 2018-09-11 2018-09-11 A kind of waterproof foundation pit

Publications (1)

Publication Number Publication Date
CN208884527U true CN208884527U (en) 2019-05-21

Family

ID=66511845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821478879.0U Active CN208884527U (en) 2018-09-11 2018-09-11 A kind of waterproof foundation pit

Country Status (1)

Country Link
CN (1) CN208884527U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719575A (en) * 2020-06-30 2020-09-29 贵州建工集团第一建筑工程有限责任公司 Foundation pit anti-settling drainage method
CN111894124A (en) * 2020-08-06 2020-11-06 广州市人防建筑设计研究院有限公司 Waterproof construction method for large-area civil air defense basement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719575A (en) * 2020-06-30 2020-09-29 贵州建工集团第一建筑工程有限责任公司 Foundation pit anti-settling drainage method
CN111894124A (en) * 2020-08-06 2020-11-06 广州市人防建筑设计研究院有限公司 Waterproof construction method for large-area civil air defense basement
CN111894124B (en) * 2020-08-06 2021-08-10 广州市人防建筑设计研究院有限公司 Waterproof construction method for large-area civil air defense basement

Similar Documents

Publication Publication Date Title
CN101096850B (en) Plastics water discharge plate application method for underground engineering wall surface
CN203222815U (en) Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall
CN208884527U (en) A kind of waterproof foundation pit
CN202450559U (en) Waterproof structure of basement
CN203583528U (en) Waterproof structure for joints of sidewall and top and bottom plates of peat soft soil stratum subway station
CN203834772U (en) Sound insulation and shock absorption floating platform
CN218175929U (en) Underground anti-seepage pressure-reducing anti-floating blind pipe structure
CN106869304A (en) Outer wall of basement waterproof construction and construction method in a kind of confined space
CN204298860U (en) Lid digs the inverse side wall construction joint waterproofing node that does and constructs
CN101215127A (en) Rigid and flexible water-proof sealing material for underground engineering and application thereof
CN207714385U (en) A kind of mixing pile cut-pff wall and bottom plate connecting structure
CN213572282U (en) Anti-seepage road water guide ditch structure based on concrete blanket
CN210341986U (en) Piping lane composite waterproof structure
CN213358694U (en) Cement mixing stake cut-off wall top connection structure
CN211816461U (en) Waterproof layer structure of passive room heating underground outdoor heat insulation material
CN206545252U (en) Leak down water waterproof construction a kind ofly
CN201485883U (en) Basement deformation joint
CN208294159U (en) A kind of assembled swimming pool
CN208996663U (en) Coupling, borehole wall casing for missile silo wall casing
CN206545284U (en) A kind of subsided rest room
CN205557242U (en) Prevention of seepage seal structure of concrete barrier layer
CN209873864U (en) Waterproof construction of arch steel buckled plate utility tunnel
CN216183367U (en) Waterproof structure of foamed concrete
CN220620765U (en) Water seepage prevention structure of building roof
CN215977401U (en) Putty type self-adhesive water-swelling water stop strip

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant