CN208871663U - A kind of boiler supply air system - Google Patents

A kind of boiler supply air system Download PDF

Info

Publication number
CN208871663U
CN208871663U CN201821458098.5U CN201821458098U CN208871663U CN 208871663 U CN208871663 U CN 208871663U CN 201821458098 U CN201821458098 U CN 201821458098U CN 208871663 U CN208871663 U CN 208871663U
Authority
CN
China
Prior art keywords
air
pipe
coal
outlet pipe
blower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821458098.5U
Other languages
Chinese (zh)
Inventor
赵强
邓国龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Jiasheng Thermal Co Ltd
Original Assignee
Qingdao Jiasheng Thermal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Jiasheng Thermal Co Ltd filed Critical Qingdao Jiasheng Thermal Co Ltd
Priority to CN201821458098.5U priority Critical patent/CN208871663U/en
Application granted granted Critical
Publication of CN208871663U publication Critical patent/CN208871663U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/34Indirect CO2mitigation, i.e. by acting on non CO2directly related matters of the process, e.g. pre-heating or heat recovery

Landscapes

  • Air Supply (AREA)

Abstract

The utility model relates to a kind of boiler supply air systems, including blast pipe A, blast pipe B and vent line, blast pipe A is connected to blower A, blower A is connected to air preheater by air supply tube A, air preheater is connected to coal pulverizer by hot air pipe B, air preheater is connected to burner hearth by heating pipe A, blast pipe B is connected to blower B, blower B is connected to air supply tube B, air supply tube B includes reheated blast pipe and cool air hose, reheated blast pipe is connected to air preheater, cool air hose is connected to coal pulverizer, coal pulverizer is equipped with coal feeding pipe and coal dust outlet pipe, temperature sensor B is equipped at coal pulverizer coal dust outlet pipe, coal dust outlet pipe is connected to burner hearth, burner hearth is equipped with flue gas outlet pipe, flue gas outlet pipe is connected to air preheater, the utility model structure is simple, convenient operation and control, heat entrained by the flue gas that burning generates more fully is utilized, simultaneously more Add the oxygen supply for accurately controlling temperature and burner hearth in coal pulverizer, reduce excess air coefficient, reduces the harm gas in flue gas.

Description

A kind of boiler supply air system
Technical field
The utility model relates to a kind of boiler supply air systems.
Background technique
Boiler is a kind of energy conversion, and the energy inputted to boiler has chemical energy, electric energy in fuel, boiler output Steam, high-temperature water or organic heat carrier with certain thermal energy.
In the gas handling system of boiler combustion, need that cold wind is first preheating to certain temperature, mesh by air preheater Be while to improve intake air temperature in furnace in order to which coal dust is dry and can reduce coal consumption, the intake air temperature of coal dust exists for coal dust Burning in burner hearth has a great impact, and besides the flue gas after hearth combustion enters the straight tube of economizer bank, heat utilization Rate is poor, the content of the intake of secondary air for the sulfur dioxide of flue gas, sulfur trioxide and carbon nitrogen oxide after burning It has a very big impact, directly influences the exhaust-gas treatment in later period.
The utility model is intended to realize hot blast temperature, discharge temperature and the control to air input, improves coal The burning sufficient degree of powder reduces the content of oxygen-containing harmful substance in flue gas and realizes that the boiler of high-temperature flue gas heat recovery is blown System.
Utility model content
In view of the deficienciess of the prior art, for overcome the deficiencies in the prior art, a kind of control oxygen therapy amount and control are provided Temperature optimization processed combines, and improves burning of coal degree, while realizing a kind of boiler supply air system of flue gas heat recycling, is below Particular technique feature:
A kind of boiler supply air system, including blast pipe A, blast pipe B and vent line, the blast pipe A are connected to blower A, The blower A is connected to air preheater by air supply tube A, and the air preheater is connected to coal pulverizer by hot air pipe B, dry Coal dust, the hot wind inlet of the hot air pipe B are equipped with temperature sensor A, and the air preheater also passes through heating pipe A connection furnace Thorax, the hot air pipe A are equipped with valve A, and the blast pipe B is connected to blower B, and the blower B is connected to air supply tube B, the air supply tube B Including reheated blast pipe and cool air hose, the reheated blast pipe is connected to the air preheater, the reheated blast Guan Shangshe There is valve B, the cool air hose is connected to the coal pulverizer, and the cool air hose is equipped with valve C, and the coal pulverizer is equipped with coal feeding pipe With coal dust outlet pipe, the coal feeding pipe and coal dust outlet pipe are located at the corresponding two sides of the coal pulverizer, the coal pulverizer coal dust outlet pipe Place is equipped with temperature sensor B, and the coal dust outlet pipe is connected to the burner hearth, and the burner hearth is equipped with flue gas outlet pipe, and the flue gas goes out Pipe is connected to the air preheater, and the air preheater is also communicated with low-temperature flue gas outlet pipe, the temperature sensor A and temperature Sensor B and computer end are electrically connected.
The air preheater and the flue gas outlet pipe guarantee connection by flanged joint as a preferred technical solution, Leakproofness, the air preheater and the low-temperature flue gas outlet pipe pass through flanged joint.
The air preheater includes several economizer banks arranged in parallel, the sky as a preferred technical solution, Gas economizer bank includes the short tube that several sections are fixedly connected, and sectional area is equal up and down and is greater than intermediate cross-section product for the short tube, is reduced Laminar sublayer, enhancing heat transfer.
It is equipped with revolving fragment inside the economizer bank inlet end as a preferred technical solution, increases disturbance, reinforces passing Heat.
The non-ventilating piping connection side of the air preheater is equipped with vacuum layer as a preferred technical solution, prevents heat It scatters and disappears.
The air inlet of the blower A and blower B is equipped with blinds strainer as a preferred technical solution, separates water, dust Deng.
By adopting the above-described technical solution, a kind of boiler supply air system, when work, under the action of blower A, air warp Enter air preheater through blinds strainer boiler by blast pipe A, absorb the heat of economizer bank, form hot-air, heat is empty Gas enters coal pulverizer through hot air pipe B, is sufficiently mixed and dries with the coal dust in coal pulverizer, empty in blower under the action of blower B Gas, which is passed through, enters the temperature of air supply tube B, temperature sensor A and temperature sensor B normal through blinds strainer boiler by blast pipe B In range, then valve C is closed, examines copper valve B, if the temperature of temperature sensor A or temperature sensor B are excessively high, Open valve C, Prevent coal-grinding built-in temperature excessively high, coal dust firing closes valve B and valve C if the temperature of temperature sensor A is too low, reduces Cold air flows in air preheater increase the heat absorption of cold air, and the coal dust mixed enters furnace chamber inner combustion, air Hot-air in preheater enters the oxygen supply of burner hearth completely burned area by hot air pipe A, as coal dust can burn sufficiently, the sky The input quantity of gas is controlled by valve A, and the high-temperature flue gas after burning enters economizer bank, in revolving fragment and expansion-converging diverging Under the action of pipe, high-temperature flue gas disturbance increases, and laminar flow layer is thinning, and heat transfer enhancing, the low-temperature flue gas after heat transfer is by low-temperature flue gas pipe Discharge, the utility model structure is simple, convenient operation and control, and heat entrained by the flue gas that burning generates more fully is utilized Amount, while the oxygen supply of the more accurate temperature controlled in coal pulverizer and burner hearth, reduce excess air coefficient, reduce cigarette Harm gas in gas.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of the utility model embodiment;
Fig. 2 is the structural schematic diagram of the utility model embodiment air preheater;
Fig. 3 is the structural schematic diagram of the utility model embodiment air preheater gas inlet;
In figure: 1- blast pipe A;2- blast pipe B;3- blower A;4- air supply tube A;5- air preheater;6- hot wind Pipe B;7- coal pulverizer;8- temperature sensor A;9- hot air pipe A;10- burner hearth;11- valve A;12- blower B;13- air-supply Pipe B;14- reheated blast pipe;15- cool air hose;16- valve B;17- valve C;18- coal feeding pipe;19- coal dust outlet pipe; 20- temperature sensor B;21- flue gas outlet pipe;22- low-temperature flue gas outlet pipe;23- economizer bank;24- flange;25- rotation Rotor;26- vacuum layer;27- blinds strainer.
Specific embodiment
In order to further illustrate the present invention, it is illustrated with reference to the accompanying drawing:
Embodiment:
As shown in Figure 1 to Figure 3, a kind of boiler supply air system, including blast pipe A1, blast pipe B2 and vent line, it is described Blast pipe A1 is connected to blower A3, and the blower A3 is connected to air preheater 5 by air supply tube A4, and the air preheater 5 passes through Hot air pipe B6 is connected to coal pulverizer 7, and the hot wind inlet of the hot air pipe B6 is equipped with temperature sensor A8, and the air preheater 5 is also It is connected to burner hearth 10 by heating pipe A9, the hot air pipe A9 is equipped with valve A11, and the blast pipe B2 is connected to blower B12, the wind Machine B12 is connected to air supply tube B13, and the air supply tube B 13 includes reheated blast pipe 14 and cool air hose 15, the reheated blast pipe 14 It is connected to the air preheater 5, the reheated blast pipe 14 is equipped with valve B16, and the cool air hose 15 is connected to the coal-grinding Machine 7, the cool air hose 15 are equipped with valve C17, and the coal pulverizer 7 is equipped with coal feeding pipe 18 and coal dust outlet pipe 19, the coal feeding pipe 18 and coal dust outlet pipe 19 be located at the corresponding two sides of the coal pulverizer 7,19 are equipped with temperature sensing at the 7 coal dust outlet pipe of coal pulverizer Device B20, the coal dust outlet pipe 19 are connected to the burner hearth 10, and the burner hearth 10 is equipped with flue gas outlet pipe 21, the flue gas outlet pipe 21 Be connected to the air preheater 5, the air preheater 5 is also communicated with low-temperature flue gas outlet pipe 22, the temperature sensor A8 and Temperature sensor B20 and computer end are electrically connected.
Further, the air preheater 5 is connect with the flue gas outlet pipe 21 by flange 24, the air preheater 5 pass through flanged joint with the low-temperature flue gas outlet pipe 22.
Further, the air preheater 5 includes several economizer banks 23 arranged in parallel, the economizer bank 23 include the short tube that several sections are fixedly connected, and sectional area is equal up and down and is greater than intermediate cross-section product for the short tube.
Further, revolving fragment 25 is equipped with inside 23 inlet end of economizer bank.
Further, the non-ventilating piping connection side of the air preheater 2 is equipped with vacuum layer 26.
Further, the air inlet of the blower A3 and blower B12 is equipped with blinds strainer 27.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (6)

1. a kind of boiler supply air system, including blast pipe A, blast pipe B and vent line, it is characterised in that: the blast pipe A connects Ventilation blower A, the blower A are connected to air preheater by air supply tube A, and the air preheater is connected to coal-grinding by hot air pipe B Machine, the hot wind inlet of the hot air pipe B are equipped with temperature sensor A, and the air preheater also passes through heating pipe A connection burner hearth, The hot air pipe A is equipped with valve A, and the blast pipe B is connected to blower B, and the blower B is connected to air supply tube B, the air supply tube B packet Reheated blast pipe and cool air hose are included, the reheated blast pipe is connected to the air preheater, and the reheated blast pipe is equipped with Valve B, the cool air hose are connected to the coal pulverizer, and the cool air hose is equipped with valve C, the coal pulverizer be equipped with coal feeding pipe and Coal dust outlet pipe, the coal feeding pipe and coal dust outlet pipe are located at the corresponding two sides of the coal pulverizer, at the coal pulverizer coal dust outlet pipe Equipped with temperature sensor B, the coal dust outlet pipe is connected to the burner hearth, and the burner hearth is equipped with flue gas outlet pipe, the flue gas outlet pipe It is connected to the air preheater, the air preheater is also communicated with low-temperature flue gas outlet pipe, and the temperature sensor A and temperature pass Sensor B and computer end are electrically connected.
2. a kind of boiler supply air system as described in claim 1, it is characterised in that: the air preheater goes out with the flue gas Pipe passes through flanged joint by flanged joint, the air preheater and the low-temperature flue gas outlet pipe.
3. a kind of boiler supply air system as described in claim 1, it is characterised in that: the air preheater includes several parallel The economizer bank of arrangement, the economizer bank include the short tube that several sections are fixedly connected, sectional area phase above and below the short tube Deng and be greater than intermediate cross-section product.
4. a kind of boiler supply air system as claimed in claim 3, it is characterised in that: set inside the economizer bank inlet end There is revolving fragment.
5. a kind of boiler supply air system as claimed in claim 4, it is characterised in that: the non-through air pipe of air preheater connects Side is connect equipped with vacuum layer.
6. a kind of boiler supply air system as described in claim 1, it is characterised in that: the air inlet of the blower A and blower B is equal Equipped with blinds strainer.
CN201821458098.5U 2018-09-06 2018-09-06 A kind of boiler supply air system Expired - Fee Related CN208871663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821458098.5U CN208871663U (en) 2018-09-06 2018-09-06 A kind of boiler supply air system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821458098.5U CN208871663U (en) 2018-09-06 2018-09-06 A kind of boiler supply air system

Publications (1)

Publication Number Publication Date
CN208871663U true CN208871663U (en) 2019-05-17

Family

ID=66466971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821458098.5U Expired - Fee Related CN208871663U (en) 2018-09-06 2018-09-06 A kind of boiler supply air system

Country Status (1)

Country Link
CN (1) CN208871663U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110594775A (en) * 2019-09-30 2019-12-20 大唐东营发电有限公司 Fan unit of thermal power factory

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110594775A (en) * 2019-09-30 2019-12-20 大唐东营发电有限公司 Fan unit of thermal power factory

Similar Documents

Publication Publication Date Title
CN106090880B (en) A kind of machine stove set heat circulation afterheat recycling system
CN106196134B (en) A kind of fume afterheat energy conservation and environmental protection coal dust preparation system
CN203533526U (en) Waste-heat utilization system ensuring lignite boiler dry output and SCR safe smoke temperature
CN103486566A (en) Waste heat utilization system capable of guaranteeing lignite boiler dry output and SCR safe flue gas temperature
CN102563687A (en) Oxygen-enriched combustion system
CN107420933A (en) Lack of gas heat primary air heat exchanger system for ball mill pulverized coal carried by hot air system
CN208871663U (en) A kind of boiler supply air system
CN106895390A (en) A kind of station boiler multi-element heterogeneous afterheat utilizing system
CN107559876A (en) The reduction of rotary regenerative air preheater is leaked out anti-blocking ash system and method
CN207422244U (en) Carbon black tail gas burning boiler with the processing of carbon black dry waste gas
CN206682921U (en) A kind of station boiler multi-element heterogeneous afterheat utilizing system
CN102588997A (en) Oxygen enriched combustion system
CN209588020U (en) Station boiler cold air heating and smoke waste heat comprehensive utilization system
CN205579616U (en) Gas boiler hangs down nitrogen air preheater
CN111425878A (en) Boiler tail flue gas waste heat degree of depth cascade utilization system
CN106765035A (en) Improve SCR temperature of reactor system and device and method
CN102588996A (en) Oxygen-enriched combustion system
CN208058885U (en) A kind of multichannel cycle wind and smoke characteristic regulating system
CN207247253U (en) Lack of gas heat primary air heat exchanger system for ball mill pulverized coal carried by hot air system
CN207262700U (en) A kind of flue gas waste heat recovery water jacket furnace
CN206291225U (en) Fire coal boiler fume secondary recovery control oxygen flame retardant systems
CN204534546U (en) Biomass boiler environmental protection and energy saving control system
CN212511229U (en) Boiler tail flue gas waste heat degree of depth cascade utilization system
CN207881214U (en) Organic heat carrier furnace
CN210463080U (en) Novel air heater system of coal fired power plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190517