CN208858055U - Steel construction Fabricated balcony column bridge cut-off node - Google Patents

Steel construction Fabricated balcony column bridge cut-off node Download PDF

Info

Publication number
CN208858055U
CN208858055U CN201821233522.6U CN201821233522U CN208858055U CN 208858055 U CN208858055 U CN 208858055U CN 201821233522 U CN201821233522 U CN 201821233522U CN 208858055 U CN208858055 U CN 208858055U
Authority
CN
China
Prior art keywords
outer casing
steel
bridge cut
column
steel construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821233522.6U
Other languages
Chinese (zh)
Inventor
赵希誉
赵志刚
黎超程
石洋
郝卫杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Zhongcheng Residential Engineering Technology Co Ltd
Original Assignee
Hunan Zhongcheng Residential Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Zhongcheng Residential Engineering Technology Co Ltd filed Critical Hunan Zhongcheng Residential Engineering Technology Co Ltd
Priority to CN201821233522.6U priority Critical patent/CN208858055U/en
Application granted granted Critical
Publication of CN208858055U publication Critical patent/CN208858055U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of steel construction Fabricated balcony column bridge cut-off nodes; including steel column and outer casing; the outer casing on the outside of steel column is gone along with sb. to guard him to be spliced by outer casing I and outer casing II; surface is successively from inside to outside for the outer casing I are as follows: insulation board I, steel wire I and cement mortar protection board I; built-in connection I is provided on outer casing I; the direct inner end of built-in connection I is directly anchored to steel column side; II hierarchical structure of outer casing is directly anchored to the steel column other side with outer casing I, and by the built-in connection II on outer casing II.The utility model is factory's production convenient for construction and installation, backplate therein, and site operation is fabricated construction, it is thus only necessary to carry out grouting operation, construction efficiency is higher.

Description

Steel construction Fabricated balcony column bridge cut-off node
Technical field
The utility model is related to steel construction assembled architecture technical field.
Background technique
By taking assembling type steel structure house as an example, the main part of building is steel construction, including steel column and girder steel, steel therein Penetrated through each other between column and girder steel, that is to say, that steel building penetrates through each other on the whole, steel itself be heat and Cold good conductor, cold and hot conduction easy to form.For the generation for avoiding such case, need in steel construction, steel column, the steel of leakage Beam portion position carries out heat preservationization processing.
Balcony column is exactly the steel construction that balcony position is supported as its name suggests, its main feature is that four sides does not have wall attached, Balcony steel column position in steel construction carries out steel column heat preservation in such a way that scene is laid with insulation board or spray coating heat preservation plate at present, Main purpose is to solve the problems, such as the heat preservation of steel column.Existing steel column Insulation, needs site operation, and field operation is dirty and messy Difference, construction efficiency is low, is unable to satisfy the requirement in new process for fabricated construction.
Utility model content
In order to solve the deficiencies in the prior art, the utility model provides a kind of steel construction Fabricated balcony column bridge cut-off node, Technical problems to be solved are to realize to install the assembled at Steel balcony column position.
The utility model solves technical solution used by its technical problem are as follows: steel construction Fabricated balcony column bridge cut-off section Point, including steel column and outer casing, which is characterized in that
It goes along with sb. to guard him the outer casing on the outside of steel column to be spliced by outer casing I and outer casing II, the outer casing I is in Exterior surface is successively are as follows: insulation board I, steel wire I and cement mortar protection board I are provided with built-in connection on outer casing I I, the direct inner end of built-in connection I is directly anchored to steel column side,
II hierarchical structure of outer casing is directly anchored to steel with outer casing I, and by the built-in connection II on outer casing II The column other side.
Further, the outer casing I and outer casing II are symmetrically arranged, and structure construction is identical.
Further, the outer casing I and II section of outer casing are one of C font, V-shaped or L-shaped.
Further, the insulation board I, II is XPS plate or styrofoam.
Further, the insulation board is I, II with a thickness of 50 millimeters.
Further, cement mortar protection board I, II is with a thickness of 20 millimeters.
Further, outer casing I and II section of outer casing equal thickness everywhere.
Further, the built-in connection I, II structure are identical, and all include screw and nylon pin, wherein described Nylon pin is threaded through in insulation board, and the screw is located in cement mortar protection board.
Further, company is fixed by a dowel screw respectively between the built-in connection I, II and steel column It connects.
The beneficial effects of the utility model are: presence of the utility model by insulation board, realizes the packet at steel column position It covers and is designed with bridge cut-off, with better disconnected heat, cold effect of breaking.
Convenient for constructing and installing, backplate therein is factory's production, and site operation is fabricated construction, it is thus only necessary to be carried out Grouting operation, construction efficiency are higher.
Built-in connection itself has good bridge cut-off effect, and the benign bonding between sketch plate and plate may be implemented, Has the effect of cracking resistance.
Detailed description of the invention
Fig. 1 is one of steel construction Fabricated balcony column bridge cut-off node diagram.
Fig. 2 is the two of steel construction Fabricated balcony column bridge cut-off node diagram.
Fig. 3 is the three of steel construction Fabricated balcony column bridge cut-off node diagram.
In figure: 100 steel columns,
200 outer casings I, 210 50 millimeters of insulation boards I, 220 steel wires I, 230 20 millimeters of cement mortar protection boards I, 240 Screw I, 250 nylon pins I,
300 outer casings II, 310 50 millimeters of insulation boards II, 320 steel wires II, 330 20 millimeters of cement mortar protection boards II, 340 screws II, 350 nylon pins II,
400 dowel screws I,
500 dowel screws II.
Specific embodiment
In steel construction assembled-type house technology, steel construction is made of steel column and girder steel, and steel column and girder steel it Between frame part installation prefabricated panel or cast-in-place wallboard gone along with sb. to guard him, formed house.
At balcony position, steel column primarily serves supporting role, but due to the steel column at balcony position top and steel construction master It is perforation between body, needs to carry out heat preservation protection.
The wherein generally rectangular steel pipe of steel column 100, the utility model are exactly to pass through steel column position to carry out going along with sb. to guard him to have been formed Complete cold bridge cut-off has better heat insulation effect.
Steel column 100 itself carries out preservative treatment.It is formed around steel column and node is installed, in this node, steel column is located at building The balcony position of main body needs to form insulating layer building enclosure in the periphery of steel column 100.And carry out fabricated construction.Divide below It is other that its detailed construction is explained.
Guard portion includes outer casing I and outer casing II, and two parts splicing forms, and is filled out at splicing seams using mortar Seam.
Outer casing I 200 is gone along with sb. to guard him in the outside of steel column, and surface is successively from inside to outside are as follows: 50 millimeters of insulation boards I 210, steel wires Net I 220 and 20 millimeter cement mortar protection board I 230, steel wire I 210 is arranged in 20 millimeters of cement mortar protection boards I, and leans on Nearly inside, for enhancing integral strength.
Outer casing II 300, level are arranged with outer casing I.
Splicing is assemblied in the outside of steel column between two outer casings, is formed after splicing and is equal to profile with steel column, such as this It is square shape in embodiment, shape design, such as the steel column of eight traditional prism structures can also be carried out according to steel column profile.
Built-in connection I is provided on outer casing I 200, which includes screw I 240 and nylon pin I 250, wherein nylon pin I is threaded through in 50 millimeters of insulation boards I, and screw I is threaded through in 20 millimeters of cement mortar protection boards I, and It is threadedly coupled between screw I and nylon pin I, forms one, it is solid by dowel screw I 400 in the inner end of nylon pin I It is scheduled on steel column, it is corresponding that threaded hole is provided on steel column.
Likewise, surface is successively from inside to outside for outer casing II 300 are as follows: 50 millimeters of insulation boards II 310, II 320 and of steel wire 20 millimeters of cement mortar protection boards II 330, steel wire II 310 are arranged in 20 millimeters of cement mortar protection boards II, and close to interior Side, for enhancing integral strength.Built-in connection II is provided on outer casing II, which includes screw II 340 and nylon pin II 350, wherein nylon pin II is threaded through in 50 millimeters of insulation boards, and screw II is threaded through 20 millimeters of cement It in mortar protection board, and is threadedly coupled between screw II and nylon pin II, forms one.In the inner end of nylon pin II It is fixed on steel column by dowel screw 500 II.
Outer casing I and II section of outer casing equal thickness everywhere.
Referring to figs. 1 to Fig. 3, the shape of outer casing can be designed, before guaranteeing to assemble construction safety convenience It puts, outer casing I is designed to mutually isostructural section configuration with outer casing II by preferential selection, which can be the C in Fig. 1 Font, or the V-shaped in Fig. 2, or the L-shaped in Fig. 3 can realize good assembly performance.
For convenient for stitching operation, in the two sides of 50 millimeters of insulation boards and the stitching portion of wallboard, the protrusion of 50 millimeters of insulation boards In 20 millimeters of cement mortar protection board two sides, projective structure is formed.
The insulation board can be XPS plate or styrofoam.
Construction method is as follows:
Outer casing I, II is made in pre-fabricated factory first, then outer casing I, II is mounted on to the two sides of steel column, using double Head screw I, II is attached, and carries out joint filling processing, forms building enclosure in the periphery of steel column.
Principle, 50 millimeters of insulation boards in sketch plate on the outside of steel column form the thermal insulation layer of equal thickness, have and protect well Temp effect, meanwhile, the nylon pin in built-in connection also has the function of disconnected heat, sets so foring bridge cut-off on the outside of steel column Meter.Meanwhile it can easily carry out fabricated construction installation.
Embodiment described above is only that preferred embodiments of the present invention are described, not practical to this Novel range is defined, and under the premise of not departing from the spirit of the design of the utility model, relevant technical staff in the field is to this The various changes and improvements of utility model should all expand in the protection scope as determined by the utility model claims book.

Claims (9)

1. steel construction Fabricated balcony column bridge cut-off node, including steel column and outer casing, which is characterized in that
It goes along with sb. to guard him the outer casing on the outside of steel column to be spliced by outer casing I and outer casing II, the outer casing I is from inside to outside Surface is successively are as follows: insulation board I, steel wire I and cement mortar protection board I are provided with built-in connection I, in advance on outer casing I It buries the direct inner end of connector I and is directly anchored to steel column side,
II hierarchical structure of outer casing is with outer casing I, and it is another by the built-in connection II on outer casing II to be directly anchored to steel column Side.
2. steel construction Fabricated balcony column bridge cut-off node according to claim 1, which is characterized in that I He of outer casing Outer casing II is symmetrically arranged, and structure construction is identical.
3. steel construction Fabricated balcony column bridge cut-off node according to claim 2, which is characterized in that I He of outer casing II section of outer casing is one of C font, V-shaped or L-shaped.
4. steel construction Fabricated balcony column bridge cut-off node according to claim 1, which is characterized in that the insulation board I, II For XPS plate or styrofoam.
5. steel construction Fabricated balcony column bridge cut-off node according to claim 4, which is characterized in that the insulation board be I, II with a thickness of 50 millimeters.
6. steel construction Fabricated balcony column bridge cut-off node according to claim 1, which is characterized in that cement mortar protection board I, II with a thickness of 20 millimeters.
7. steel construction Fabricated balcony column bridge cut-off node according to claim 1, which is characterized in that outer casing I and outer shield II section of plate equal thickness everywhere.
8. steel construction Fabricated balcony column bridge cut-off node according to claim 1, which is characterized in that the built-in connection I, II structure is identical, and all includes screw and nylon pin, wherein the nylon pin is threaded through in insulation board, the screw It is located in cement mortar protection board.
9. steel construction Fabricated balcony column bridge cut-off node according to claim 8, which is characterized in that the built-in connection I, it is fixedly connected respectively by a dowel screw between II and steel column.
CN201821233522.6U 2018-08-01 2018-08-01 Steel construction Fabricated balcony column bridge cut-off node Expired - Fee Related CN208858055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821233522.6U CN208858055U (en) 2018-08-01 2018-08-01 Steel construction Fabricated balcony column bridge cut-off node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821233522.6U CN208858055U (en) 2018-08-01 2018-08-01 Steel construction Fabricated balcony column bridge cut-off node

Publications (1)

Publication Number Publication Date
CN208858055U true CN208858055U (en) 2019-05-14

Family

ID=66413641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821233522.6U Expired - Fee Related CN208858055U (en) 2018-08-01 2018-08-01 Steel construction Fabricated balcony column bridge cut-off node

Country Status (1)

Country Link
CN (1) CN208858055U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111705917A (en) * 2020-06-22 2020-09-25 中国五冶集团有限公司 Balcony structure
CN116180972A (en) * 2023-04-28 2023-05-30 北华航天工业学院 Assembled steel structure capable of reducing energy consumption

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111705917A (en) * 2020-06-22 2020-09-25 中国五冶集团有限公司 Balcony structure
CN116180972A (en) * 2023-04-28 2023-05-30 北华航天工业学院 Assembled steel structure capable of reducing energy consumption

Similar Documents

Publication Publication Date Title
CN103015623B (en) A kind of fixed installation structure of precast plate
CN104389349B (en) The novel house can quickly remove, assembled and assemble method
CN208858055U (en) Steel construction Fabricated balcony column bridge cut-off node
CN206189771U (en) A protect mould integration board for building external thermal insulation system
CN205382570U (en) Outer wall and steel column connection node
CN101319524A (en) Multifunctional combination large plate combined exterior wall and its construction method
CN207073247U (en) Metope heat-insulating decorative composite board anchoring piece and metope heat-insulating decorative composite board mounting structure
CN105298145A (en) Vertical external sun-shading welding-free construction method of hidden-frame curtain wall
CN202031203U (en) Plate-assembling type enveloping and filling system
CN111648486B (en) Building heat-insulating layer structure free of adhesion and construction method thereof
CN208857954U (en) Steel construction assembled external corner column bridge cut-off node
CN210887621U (en) Horizontal waterproof construction of precast concrete with filling heat preservation side fascia
CN205329980U (en) Assembled wallboard
CN212001736U (en) Steel construction assembled wallboard
CN203729464U (en) Decorative thermal insulation composite wall
CN209457258U (en) The connection structure in gap between a kind of two neighboring assembled out-hung panel
CN104153511A (en) Ultrathin heat insulation board composite building block and manufacturing method thereof
CN203296242U (en) STP compound block
CN208072794U (en) A kind of foam cement roofing board
CN202047611U (en) Building structure
CN208857968U (en) The flat column bridge cut-off node of steel construction assembled
CN216766338U (en) Assembled building structure heated board
CN208934353U (en) A kind of external corner compound heat preservation die plate structure
CN105178472B (en) The sandwich heat-insulating wall structure of EPS modules
CN218323591U (en) Integral type external wall insulation nail, heated board mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190514

Termination date: 20200801

CF01 Termination of patent right due to non-payment of annual fee