CN208852663U - A kind of desulfurizing tower convenient to overhaul - Google Patents

A kind of desulfurizing tower convenient to overhaul Download PDF

Info

Publication number
CN208852663U
CN208852663U CN201920481294.2U CN201920481294U CN208852663U CN 208852663 U CN208852663 U CN 208852663U CN 201920481294 U CN201920481294 U CN 201920481294U CN 208852663 U CN208852663 U CN 208852663U
Authority
CN
China
Prior art keywords
fixedly connected
tower body
water tank
desulfurizing tower
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920481294.2U
Other languages
Chinese (zh)
Inventor
刘健
张永
王亮
尹冬全
孙世波
柳吉辉
付光宏
张兴华
张延鹏
谭磊
尹兴涛
张明钦
王凯亮
马卓群
白戈林
张世钺
李洋
张栋
王欣
刘利
贺鹏飞
刘伟
黄晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Wanda Environmental Protection Science & Technology Co Ltd
Original Assignee
Shandong Wanda Environmental Protection Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Wanda Environmental Protection Science & Technology Co Ltd filed Critical Shandong Wanda Environmental Protection Science & Technology Co Ltd
Priority to CN201920481294.2U priority Critical patent/CN208852663U/en
Application granted granted Critical
Publication of CN208852663U publication Critical patent/CN208852663U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model relates to desulphurization plant technical fields, and disclose a kind of desulfurizing tower convenient to overhaul, including tower body and water pump, are fixedly connected with water tank on the right side of the tower body.The desulfurizing tower convenient to overhaul, it can very easily be climbed to water tank and workbench by ladder stand and ladder, when needing to carry out spray head maintenance replacement, easily perfusion tube is disassembled by ring flange, maintenance door opening extracts perfusion tube out, after perfusion tube extraction maintenance, by the way that motion bar is pushed into inside loose slot, motion bar fixes perfusion tube by link block, sealing ring makes the maintenance door after closing possess preferable leakproofness and prevent exhaust gas leakage, workbench enables above-mentioned maintenance work very easily to implement, for desulfurizing tower needs to be safeguarded into tower on the market now, the desulfurizing tower more safe ready, it is safeguarded and is replaced due to not needing to enter inside desulfurizing tower, so that working efficiency is higher, and safety is higher.

Description

A kind of desulfurizing tower convenient to overhaul
Technical field
The utility model relates to desulphurization plant technical field, specially a kind of desulfurizing tower convenient to overhaul.
Background technique
Desulfurizing tower is the tower equipment that desulfurization process is carried out to industrial waste gas, the application that desulfurizing tower is initially built with granite The most extensively, removed using moisture film desulfurization and dedusting principle also known as granite water desulfurizing-dusting device or name granite with water film desulfurization Dirt device, advantage are easy to maintain, and can be by preparing different dedusting agents, while achieving the effect that dedusting and desulfurization (denitrogenation), existing In the development with glass fibre reinforced plastics technology, desulfurizing tower is gradually changed to use glass steel making, compares granite desulfurizing tower, glass reinforced plastic desulfurization Tower is at low cost, handling ease, stainless not rotten and light-weight, therefore becomes the development trend of desulfurizing tower from now on, by changing for many years Into it is various types of de- to have evolved into Venturi type, eddy flow template, eddy flow column type, floating-ball type, sieve plate type and pneumatic emulsifying etc. Sulphur tower, equipment and technology reach its maturity, and have their own advantages and insufficient, in general, spray column, packed tower, spray tower, plate column, venturi Absorption tower etc. is able to satisfy these requirements, wherein spray column is one of the most widely used desulfurizing tower type, and spray column has knot Structure is simple, the reliable advantage of technical maturity, is widely used in large power plant, middle-size and small-size low-sulfur smoke gas treatment, for high-sulfur flue gas It administers, coloured industry is based on Pneumatic emulsifying desulfurizing tower and Multi-layer sprinkling tower etc..
The spray liquid in spray column is calcium hydroxide solution on the market, and calcium hydroxide solution is with sulfur dioxide, three oxidations Main component carbon dioxide reaction can all generate sediment in sulphur and flue gas, these sediments can in Ta Nei or spray tube and Attachment precipitating in spray head, the pipeline especially having holidays by turns deposit more serious, to deposit in pipeline large volume of particulate matter, It can result in blockage when flowing to nozzle to nozzle, to spray part maintenance, need to enter in tower from access hole and dismantle, do so Very big difficulty, no suitable foothold inside desulfurizing tower, personnel's operating difficulties, dangerous, Er Qieta can be caused to operation Interior air harmful gas concentration is high, needs to rouse clean wind exhaust and causes the increase of time cost, so proposing a kind of convenient to overhaul Desulfurizing tower solve the problems, such as above-mentioned propose.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of desulfurizing tower convenient to overhaul, has convenient to overhaul The advantages that, solve the problems, such as that maintenance is inconvenient.
(2) technical solution
To realize above-mentioned purpose convenient to overhaul, the utility model is provided the following technical solutions: a kind of convenient to overhaul takes off Sulphur tower, including tower body and water pump are fixedly connected with water tank on the right side of the tower body, offer joining water box on the right side wall of tower body Intercommunicating pore, the top of water tank is hinged with water tank maintenance door by hinge, is fixedly connected on the right side of water tank and tank top phase The ladder stand of connection is fixedly connected with the air inlet pipe extended on front side of tower body, the right side of tower body on the front side wall inside the tower body Side is fixedly connected with the workbench that quantity is two, and the right side opening of tower body is equipped with the opening that quantity is two, and the right side of tower body is logical It crosses hinge to be hinged with quantity as four and be located at the maintenance door of open interior, is connected with sealing ring between maintenance door and opening, institute It states the left and right sides wall inside tower body and is respectively fixedly connected with the connecting rod that quantity is two, totally four connecting rods, wherein left and right The bottom of two connecting rods below two connecting rods of two upper sides and the left and right sides is fixedly connected to and tower body inner wall phase The fixed link of connection, the inside of fixed link offer loose slot, and the inside of loose slot is plugged with motion bar, and the bottom of motion bar is solid Surely quantity is connected with as five and all extends to the link block of bottom of fixed, and five link blocks are and across maintenance door Perfusion tube is fixedly connected, and the bottom part down of perfusion tube is fixedly connected with the spray head inside tower body, the bottom outside of perfusion tube The delivery pipe through workbench, the bottom of delivery pipe and the fixed company of the water pump being located on front side of water tank are fixedly connected with by ring flange It connects, the inlet of water pump is fixedly connected with the inlet tube extended to inside water tank, is fixedly connected at the top of water tank respectively with two The ladder that a workbench is connected offers gas outlet at the top of the tower body.
Preferably, there are four the maintenance door is total to, two adjacent maintenance doors are symmetric.
Preferably, the connecting rod is L shape bar, and four connecting rods are symmetric.
Preferably, the spray head shares 16, and 16 spray heads are divided into two rows, and spray head described in a row shares eight A, eight spray heads are in be equally spaced.
Preferably, the ladder is located at the rear side of workbench, the water pump altogether there are two.
Preferably, the link block is rectangular block, and the width of link block is less than the width of motion bar.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of desulfurizing tower convenient to overhaul, have it is following the utility model has the advantages that
The desulfurizing tower convenient to overhaul can be climbed very easily to water tank and workbench by ladder stand and ladder, When needing to carry out spray head maintenance replacement, easily perfusion tube is disassembled by ring flange, passes through the dimension that will merge Shield door opening extracts perfusion tube out, after perfusion tube extraction maintenance, by the way that motion bar is pushed into inside loose slot, and motion bar By link block perfusion tube is fixed, close maintenance door, possesses the maintenance door after closing preferable close Envelope property prevents exhaust gas leakage, by workbench above-mentioned maintenance work is very easily implemented, compared to present market For upper desulfurizing tower needs to be safeguarded into tower, the desulfurizing tower more safe ready, due to not needing to enter desulfurizing tower Inside is safeguarded and is replaced, so that working efficiency is higher, and safety is higher, and desulfurizing tower still can after extracting perfusion tube out To work on, the time cost of maintenance is reduced.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model structure right view;
Fig. 3 is enlarged diagram at A in the utility model structure chart 1;
Fig. 4 is enlarged diagram at B in the utility model structure chart 1;
Fig. 5 is enlarged diagram at C in the utility model structure chart 2.
In figure: 1 tower body, 2 water tanks, 3 intercommunicating pores, 4 water tank maintenance door, 5 ladder stands, 6 air inlet pipe, 7 gas outlets, 8 workbench, 9 ladders, 10 water pumps, 11 inlet tubes, 12 delivery pipes, 13 openings, 14 maintenance doors, 15 connecting rods, 16 fixed links, 17 loose slots, 18 Motion bar, 19 link blocks, 20 perfusion tubes, 21 spray heads, 22 ring flanges, 23 sealing rings.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-5, a kind of desulfurizing tower convenient to overhaul, including tower body 1 and water pump 10 are please referred to, the right side of tower body 1 is fixed to be connected It is connected to water tank 2, the intercommunicating pore 3 of joining water box 2 is offered on the right side wall of tower body 1, the top of water tank 2 is hinged with water by hinge Case maintenance door 4, the right side of water tank 2 are fixedly connected with the ladder stand 5 being connected at the top of water tank 2, on the front side wall inside tower body 1 It is fixedly connected with the air inlet pipe 6 for extending to 1 front side of tower body, the right side of tower body 1 is fixedly connected with the workbench 8 that quantity is two, The right side opening of tower body 1 is equipped with the opening 13 that quantity is two, and the right side of tower body 1 is hinged with quantity by hinge and is four and is located at Opening 13 inside maintenance door 14, maintenance door 14 altogether there are four, two adjacent maintenance doors 14 are symmetric, maintenance door 14 and It is provided with sealing ring 23 between opening 13, the left and right sides wall inside tower body 1 is fixedly connected to the connecting rod that quantity is two 15, connecting rod 15 is L shape bar, and totally four connecting rods, four connecting rods 15 are symmetric, wherein two companies in left and right sides top The bottom of two connecting rods 15 is fixedly connected to the fixed link being connected with 1 inner wall of tower body below extension bar 15 and the left and right sides 16, the inside of fixed link 16 offers loose slot 17, and the inside of loose slot 17 is plugged with motion bar 18, and the bottom of motion bar 18 is solid Surely quantity is connected with as five and all extends to the link block 19 of 16 bottom of fixed link, and link block 19 is rectangular block, link block 19 Width be less than motion bar 18 width, five link blocks 19 with pass through maintenance door 14 perfusion tube 20 be fixedly connected, be infused The bottom part down of pipe 20 is fixedly connected with the spray head 21 inside tower body 1, and spray head 21 shares 16, and 16 spray heads 21 divide For two rows, row's spray head 21 shares eight, and for eight spray heads 21 in being equally spaced, the bottom outside of perfusion tube 20 passes through ring flange 22 It is fixedly connected with the delivery pipe 12 through workbench 8, the bottom of delivery pipe 12 is fixed with the water pump 10 for being located at 2 front side of water tank to be connected Connect, ladder 9 is located at the rear side of workbench 8, water pump 10 altogether there are two, the inlet of water pump 10, which is fixedly connected with, extends to water tank 2 Internal inlet tube 11, the top of water tank 2 is fixedly connected with the ladder 9 being connected respectively with two workbench 8, the top of tower body 1 Portion offers gas outlet 7, can very easily be climbed to water tank 2 and workbench 8 by ladder stand 5 and ladder 9, in needs pair When spray head 21 carries out maintenance replacement, easily perfusion tube 20 is disassembled by ring flange 22, passes through the maintenance that will merge Door 14, which is opened, extracts perfusion tube 20 out, after the extraction maintenance of perfusion tube 20, by the way that motion bar 18 to be pushed into loose slot 17 Portion, motion bar 18 make perfusion tube 20 fixed, close maintenance door 14 by link block 19, are made after closing by sealing ring 23 Maintenance door 14 possesses preferable leakproofness and prevents exhaust gas leakage, enables above-mentioned maintenance work very convenient by workbench 8 Implementation, compared to now on the market desulfurizing tower need enter tower in safeguarded for, the desulfurizing tower more safe ready, It is safeguarded and is replaced due to not needing to enter inside desulfurizing tower, so that working efficiency is higher, and safety is higher, will be infused Desulfurizing tower can still work on after pipe 20 is extracted out, reduce the time cost of maintenance.
In conclusion the desulfurizing tower convenient to overhaul, can very easily be climbed by ladder stand 5 and ladder 9 to water tank 2 On workbench 8, when needing to carry out spray head 21 maintenance replacement, under easily perfusion tube 20 is dismantled by ring flange 22 Come, by extracting perfusion tube 20 out the combined opening of maintenance door 14, after the extraction maintenance of perfusion tube 20, by will be movable Bar 18 is pushed into inside loose slot 17, and motion bar 18 makes perfusion tube 20 fixed by link block 19, maintenance door 14 is closed, by close Seal 23 makes the maintenance door 14 after closing possess preferable leakproofness and prevent exhaust gas leakage, is made by workbench 8 above-mentioned Maintenance work can very easily be implemented, and for desulfurizing tower needs to be safeguarded into tower on the market now, this is de- Sulphur tower more safe ready is safeguarded and is replaced due to not needing to enter inside desulfurizing tower, so that working efficiency is higher, and Safety is higher, and desulfurizing tower can still work on after extracting perfusion tube 20 out, reduces the time cost of maintenance, solves The inconvenient problem of maintenance.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of desulfurizing tower convenient to overhaul, including tower body (1) and water pump (10), it is characterised in that: the right side of the tower body (1) It is fixedly connected with water tank (2), the intercommunicating pore (3) of joining water box (2), the top of water tank (2) is offered on the right side wall of tower body (1) It is hinged with water tank maintenance door (4) by hinge, the climbing being connected with water tank (2) top is fixedly connected on the right side of water tank (2) Terraced (5) are fixedly connected with the air inlet pipe (6) extended on front side of tower body (1), tower body (1) on the internal front side wall of the tower body (1) To be fixedly connected with quantity be two workbench (8) on right side, the right side opening of tower body (1) is equipped with the opening that quantity is two (13), the right side of tower body (1) is hinged with quantity by hinge and is four and is located at the internal maintenance door (14) of opening (13), maintenance It is connected with sealing ring (23) between door (14) and opening (13), the internal left and right sides wall of the tower body (1) is respectively fixedly connected with Having quantity is two connecting rods (15), totally four connecting rods (15), wherein two connecting rods (15) of left and right sides top and The bottom of two connecting rods (15) below the left and right sides is fixedly connected to the fixed link being connected with tower body (1) inner wall (16), the inside of fixed link (16) offers loose slot (17), and the inside of loose slot (17) is plugged with motion bar (18), motion bar (18) bottom is fixedly connected with quantity and is five and all extends to the link block (19) of fixed link (16) bottom, five companies It connects block (19) to be fixedly connected with the perfusion tube (20) for passing through maintenance door (14), the bottom part down of perfusion tube (20) is fixedly connected with The bottom outside of the spray head (21) internal positioned at tower body (1), perfusion tube (20) is fixedly connected with by ring flange (22) through work Make the delivery pipe (12) of platform (8), the bottom of delivery pipe (12) is fixedly connected with the water pump (10) being located on front side of water tank (2), water pump (10) inlet, which is fixedly connected with, extends to the internal inlet tube (11) of water tank (2), is fixedly connected at the top of water tank (2) point The ladder (9) not being connected with two workbench (8) offers gas outlet (7) at the top of the tower body (1).
2. one kind according to claim 1 desulfurizing tower convenient to overhaul, it is characterised in that: the maintenance door (14) shares four A, two adjacent maintenance doors (14) are symmetric.
3. one kind according to claim 1 desulfurizing tower convenient to overhaul, it is characterised in that: the connecting rod (15) is L shape Bar, four connecting rods (15) are symmetric.
4. one kind according to claim 1 desulfurizing tower convenient to overhaul, it is characterised in that: the spray head (21) shares 16 A, 16 spray heads (21) are divided into two rows, and spray head described in a row (21) shares eight, and eight spray heads (21) are in equidistant Distribution.
5. one kind according to claim 1 desulfurizing tower convenient to overhaul, it is characterised in that: the ladder (9) is located at work The rear side of platform (8), the water pump (10) altogether there are two.
6. one kind according to claim 1 desulfurizing tower convenient to overhaul, it is characterised in that: the link block (19) is rectangle Block, the width of link block (19) are less than the width of motion bar (18).
CN201920481294.2U 2019-04-11 2019-04-11 A kind of desulfurizing tower convenient to overhaul Expired - Fee Related CN208852663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920481294.2U CN208852663U (en) 2019-04-11 2019-04-11 A kind of desulfurizing tower convenient to overhaul

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920481294.2U CN208852663U (en) 2019-04-11 2019-04-11 A kind of desulfurizing tower convenient to overhaul

Publications (1)

Publication Number Publication Date
CN208852663U true CN208852663U (en) 2019-05-14

Family

ID=66422423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920481294.2U Expired - Fee Related CN208852663U (en) 2019-04-11 2019-04-11 A kind of desulfurizing tower convenient to overhaul

Country Status (1)

Country Link
CN (1) CN208852663U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110215812A (en) * 2019-06-12 2019-09-10 山东神工环保科技有限公司 A kind of anti-corrosion desulfurizing tower of liner cement and glass cloth

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110215812A (en) * 2019-06-12 2019-09-10 山东神工环保科技有限公司 A kind of anti-corrosion desulfurizing tower of liner cement and glass cloth

Similar Documents

Publication Publication Date Title
CN208852663U (en) A kind of desulfurizing tower convenient to overhaul
CN213529185U (en) Denitration tower spray set of multi-angle
CN107715684A (en) A kind of desulfurizer in thermal power plant
CN209173632U (en) A kind of environment-friendly and energy-efficient industrial waste-gas purifier
CN205145935U (en) Crossing current of being applied to flue gas desulfurization absorbs equipment
CN206778150U (en) Paper mill waste gas purification apparatus
CN206483323U (en) Desulfurization, gas wash tower and flue gas purifying equipment
CN207307594U (en) A kind of waste gas cleaning system
CN110508100A (en) Smoke multistage washing system
CN207071321U (en) A kind of emission-control equipment
CN108854468A (en) Multifunctional mobile combined exhaust gas processing unit
CN208426861U (en) A kind of L. P. G desulfurization filtration tank of high-air-tightness
CN208839326U (en) Multifunctional mobile combined exhaust gas processing unit
CN209049223U (en) A kind of part flow arrangement of thermal power plant desulfurization
CN209060880U (en) A kind of intelligence boiler waste gas purification device
CN208426870U (en) A kind of device reducing doctor solution suspension sulphur concentration
CN207591603U (en) A kind of SNCR denitration device
CN217646132U (en) Novel high-efficient desulfurizing tower
CN211159245U (en) Simple and easy type desulfurization treatment facility for chemical waste gas
CN204768235U (en) Desulfurizing dust remover
CN204107299U (en) Smoke multistage turbocharging turbulent flow wet method simultaneous SO_2 and NO removal device
CN208642293U (en) A kind of water bath impact type desulfation dust-extraction device
CN217829498U (en) Petrochemical exhaust treatment device
CN212369806U (en) Wet flue gas desulfurization tail smoke eliminating tower
CN209362200U (en) A kind of new waste gas desulfurizer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190514