CN208846732U - Combustion boiler with function of delaying water velocity - Google Patents
Combustion boiler with function of delaying water velocity Download PDFInfo
- Publication number
- CN208846732U CN208846732U CN201821400260.8U CN201821400260U CN208846732U CN 208846732 U CN208846732 U CN 208846732U CN 201821400260 U CN201821400260 U CN 201821400260U CN 208846732 U CN208846732 U CN 208846732U
- Authority
- CN
- China
- Prior art keywords
- wall
- welded
- heater box
- burning boiler
- deflector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 53
- 238000002485 combustion reaction Methods 0.000 title abstract description 7
- 238000010438 heat treatment Methods 0.000 claims abstract description 34
- 238000009413 insulation Methods 0.000 claims description 16
- 239000007789 gas Substances 0.000 claims description 10
- 239000002737 fuel gas Substances 0.000 claims description 9
- 238000007599 discharging Methods 0.000 claims description 3
- 238000009826 distribution Methods 0.000 claims description 3
- 210000003195 fascia Anatomy 0.000 claims description 3
- 238000003466 welding Methods 0.000 abstract description 5
- 238000006243 chemical reaction Methods 0.000 abstract description 4
- 239000000567 combustion gas Substances 0.000 description 9
- 238000005260 corrosion Methods 0.000 description 3
- 230000007797 corrosion Effects 0.000 description 3
- 230000007774 longterm Effects 0.000 description 3
- 239000004744 fabric Substances 0.000 description 2
- 239000000446 fuel Substances 0.000 description 2
- 238000009776 industrial production Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000001934 delay Effects 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
The utility model discloses a combustion boiler with delay velocity of water function, including the heating cabinet, the inner wall welding of heating cabinet one side has the dead lever, and the outer wall welding of dead lever one side has same heating pipe, the inner wall welding of heating pipe one side has the turbulent flow piece that the equidistance distributes, and all welds at heating pipe one side inner wall both ends has helical blade, the heating pipe top is passed heating cabinet one side outer wall and is pegged graft and have the outlet pipe, and the heating pipe bottom passes heating cabinet one side outer wall and pegs graft and have the inlet tube, the inner wall welding of heating cabinet one side has first guide plate, and pegs graft and have the honeycomb duct of. The utility model discloses not only can make cold water stop when flowing in the heating tube and delay rivers advancing speed, increase the rivers stroke, improve the degree of consistency and the heat conduction efficiency of being heated, can increase the combustion time and the stroke that the gas stopped in the burning boiler moreover, improve the combustion efficiency and the heat conversion rate of gas.
Description
Technical field
The present invention relates to burning boiler technical fields more particularly to a kind of with the burning pot for delaying water velocity function
Furnace.
Background technique
Boiler is a kind of energy conversion, and the energy inputted to boiler has chemical energy, electric energy in fuel, boiler output
Steam, high-temperature water or organic heat carrier with certain thermal energy.The original meaning of pot refers to that the water container heated on fire, furnace refer to burning
The place of fuel, boiler include pot and furnace two large divisions.The hot water or steam generated in boiler can directly be industrial production and people
The people's livelihood is living to provide required thermal energy, mechanical energy can also be converted to by Steam Power Equipment, or again turn mechanical energy by generator
It is changed to electric energy.The boiler for providing hot water is known as hot-water boiler, is mainly used for living, also there is a small amount of application in industrial production.It generates
The boiler of steam is known as steam boiler, is often simply called boiler, is chiefly used in thermal power station, ship, locomotive and industrial and mining enterprises.
Currently, existing burning boiler aqueduct does not have unhurried current function, lead to water delivery excessive velocities, water delivery temperature is not up to
To requirement, working efficiency is influenced, therefore, needs a kind of to solve above-mentioned ask with delaying the burning boiler of water velocity function
Topic.
Summary of the invention
The purpose of the present invention is to solve disadvantage existing in the prior art, and the one kind proposed has and delays water flow velocity
Spend the burning boiler of function.
To achieve the goals above, present invention employs following technical solutions:
It is a kind of with the burning boiler for delaying water velocity function, including heater box, the welding of heater box side inner wall
There is fixed link, and fixed link side outer wall is welded with the same heating tube, heating tube side inner wall is welded with equidistant point
The turbulent block of cloth, and heating tube side inner wall both ends are welded with helical blade, the heating tube top passes through heater box side
Outer wall is plugged with outlet pipe, and heating tube bottom end passes through heater box side outer wall and is plugged with water inlet pipe, in the heater box side
Wall is welded with the first deflector, and the first deflector bottom outer wall is plugged with diversion pipe, the heater box side outer wall top weldering
It is connected to flow-stopping plate, heater box side outer wall is welded with the heated beam for the distribution that intermeshes, and heated beam shape is positive six sides
Shape, heater box side outer wall is welded with the second deflector, and the second deflector is located at below heated beam, the heater box one
Side outer wall is provided with drainage hole close to the second water conservancy diversion Board position, and drainage hole side inner wall is welded with drainpipe, on the drainpipe
Equipped with water discharging valve.
Preferably, insulation board, and insulation board and heater box have been bolted at the fascia edge of the heater box side
Side outer wall is welded with link block, and the link block on insulation board and heater box is bolted.
Preferably, the insulation board side outer wall top is provided with gas port, and gas port side inner wall is welded with fuel gas conduit,
Fuel gas conduit is equipped with burnt gas valve.
Preferably, the insulation board side outer wall bottom end is provided with exhaust outlet, and exhaust outlet side inner wall is welded with exhaust pipe.
Preferably, the heater box bottom outer wall is welded with support column, and support column bottom outer wall is welded with support plate.
Preferably, the support plate bottom outer wall is provided with the mounting groove equidistantly distributed, and mounting groove side inner wall is bonded
There is non-slip mat.
The invention has the benefit that
Stop to delay water flow when 1. enabling to cold water to flow in heating tube by the setting of helical blade and turbulent block
Travel speed increases stream course, improves degree of being heated evenly and heat transfer efficiency.
2. the setting by heated beam enables to combustion gas to flow in equidistant interlaced heated beam gap, increase
Combustion gas rests on burning time and stroke in burning boiler, improves the active combustion efficiency and thermal conversion rate of combustion gas.
The condensed water generated when 3. burning boiler can be burnt by the setting of the first deflector and the second deflector is led
Out outside burning boiler, condensed water long-term corrosion device internal structure is prevented, the service life of burning boiler is increased.
Detailed description of the invention
Fig. 1 is that a kind of heater box sectional structure with the burning boiler for delaying water velocity function proposed by the present invention shows
It is intended to;
Fig. 2 is that a kind of heater box front view structure with the burning boiler for delaying water velocity function proposed by the present invention is shown
It is intended to;
Fig. 3 is a kind of side structure schematic view with the burning boiler for delaying water velocity function proposed by the present invention.
In figure: 1 heater box, 2 water inlet pipes, 3 helical blades, 4 heating tubes, 5 fixed links, 6 turbulent blocks, 7 outlet pipes, 8 first
Deflector, 9 diversion pipes, 10 support columns, 11 support plates, 12 flow-stopping plates, 13 heated beams, 14 link blocks, 15 second deflectors, 16 rows
Water pipe, 17 insulation boards, 18 fuel gas conduits, 19 exhaust pipes.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-3, a kind of with the burning boiler for delaying water velocity function, including heater box 1,1 side of heater box
Inner wall is welded with fixed link 5, and 5 side outer wall of fixed link is welded with the same heating tube 4, and 4 side inner wall of heating tube is welded with
The turbulent block 6 equidistantly distributed, and 4 side inner wall both ends of heating tube are welded with helical blade 3, by helical blade 3 and disorderly
The setting of stream block 6 stops to delay water flow travel speed when cold water being enabled to flow in heating tube 4, increases stream course, mentions
High degree of being heated evenly and heat transfer efficiency, 4 top of heating tube pass through 1 side outer wall of heater box and are plugged with outlet pipe 7, and heating tube
4 bottom ends pass through 1 side outer wall of heater box and are plugged with water inlet pipe 2, and 1 side inner wall of heater box is welded with the first deflector 8, and first
8 bottom outer wall of deflector is plugged with diversion pipe 9, and 1 side outer wall top of heater box is welded with flow-stopping plate 12, outside 1 side of heater box
Wall is welded with the heated beam 13 for the distribution that intermeshes, and 13 shape of heated beam is regular hexagon, passes through the setting energy of heated beam 13
Enough so that combustion gas is flowed in equidistant interlaced 13 gap of heated beam, increases combustion gas and rest on the burning in burning boiler
Time and stroke improve the efficiency of combustion and thermal conversion rate of combustion gas, and 1 side outer wall of heater box is welded with the second deflector 15,
And second deflector 15 be located at the lower section of heated beam 13,1 side outer wall of heater box is provided with drainage hole close to 15 position of the second deflector,
And drainage hole side inner wall is welded with drainpipe 16, drainpipe 16 is equipped with water discharging valve, is led by the first deflector 8 and second
Outside the condensed water export burning boiler that the setting of flowing plate 15 generates when burning boiler can burn, condensed water long-term corrosion is prevented
Device internal structure increases the service life of burning boiler.
In the present invention, insulation board 17, and insulation board 17 and heating have been bolted at 1 side fascia edge of heater box
1 side outer wall of case is welded with link block 14, and the link block 14 on insulation board 17 and heater box 1 is bolted, insulation board 17
Side outer wall top is provided with gas port, and gas port side inner wall is welded with fuel gas conduit 18, and fuel gas conduit 18 is equipped with burnt gas valve,
17 side outer wall bottom end of insulation board is provided with exhaust outlet, and exhaust outlet side inner wall is welded with exhaust pipe 19,1 bottom outer wall of heater box
It is welded with support column 10, and 10 bottom outer wall of support column is welded with support plate 11,11 bottom outer wall of support plate is provided with equidistant point
The mounting groove of cloth, and mounting groove side inner wall is bonded with non-slip mat, diversion pipe 9 is plugged on far from one end of the first deflector 8 to be added
In 1 bottom outer wall of hot tank, and diversion pipe 9 is equipped with diaphragm valve.
Working principle: in use, insulation board 17 and heater box 1 are fixed together by link block 14, insulation board 17 with
Heater box 1 forms a closed combustion chamber, is passed through combustion gas from fuel gas conduit 18, and water inlet pipe 2 is passed through cold water, helical blade 3 and disorderly
Stream block 6 stops to delay water flow travel speed when cold water is flowed in heating tube 4, increases stream course, heated beam 13 makes
Combustion gas is flowed in equidistant interlaced 13 gap of heated beam, increase combustion gas rest on burning time in burning boiler and
Stroke, fuel gas buring heat heated beam 13, and heated beam 13 transfers heat to the cold water in heating tube 4, and cold water is abundant
It is discharged after heating from water outlet pipe 7, exhaust gas is discharged from diversion pipe 9 and exhaust pipe 19, and the first deflector 8 and the second deflector 15 will
Outside the condensed water export burning boiler that burning boiler generates when burning, condensed water long-term corrosion device internal structure is prevented.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (7)
1. a kind of with the burning boiler for delaying water velocity function, including heater box (1), which is characterized in that the heater box
(1) side inner wall is welded with fixed link (5), and fixed link (5) side outer wall is welded with the same heating tube (4), the heating
Pipe (4) side inner wall is welded with the turbulent block (6) equidistantly distributed, and heating tube (4) side inner wall both ends are welded with spiral
Blade (3), heating tube (4) top passes through heater box (1) side outer wall and is plugged with outlet pipe (7), and heating tube (4) bottom end
Across heater box (1) side, outer wall is plugged with water inlet pipe (2), and heater box (1) side inner wall is welded with the first deflector
(8), and the first deflector (8) bottom outer wall is plugged with diversion pipe (9), and heater box (1) the side outer wall top is welded with gear
Flowing plate (12), heater box (1) side outer wall are welded with the heated beam (13) for the distribution that intermeshes, and heated beam (13) shape
For regular hexagon, heater box (1) side outer wall is welded with the second deflector (15), and the second deflector (15) is located at heating
Below column (13), heater box (1) the side outer wall is provided with drainage hole, and drainage hole side close to the second deflector (15) position
Inner wall is welded with drainpipe (16), and the drainpipe (16) is equipped with water discharging valve.
2. according to claim 1 a kind of with the burning boiler for delaying water velocity function, which is characterized in that described to add
It has been bolted insulation board (17) at the fascia edge of hot tank (1) side, and insulation board (17) and heater box (1) side outer wall
It is welded with link block (14), the link block (14) on insulation board (17) and heater box (1) is bolted.
3. according to claim 2 a kind of with the burning boiler for delaying water velocity function, which is characterized in that the guarantor
Warm plate (17) side outer wall top is provided with gas port, and gas port side inner wall is welded with fuel gas conduit (18), in fuel gas conduit (18)
Equipped with burnt gas valve.
4. according to claim 2 a kind of with the burning boiler for delaying water velocity function, which is characterized in that the guarantor
Warm plate (17) side outer wall bottom end is provided with exhaust outlet, and exhaust outlet side inner wall is welded with exhaust pipe (19).
5. according to claim 1 a kind of with the burning boiler for delaying water velocity function, which is characterized in that described to add
Hot tank (1) bottom outer wall is welded with support column (10), and support column (10) bottom outer wall is welded with support plate (11).
6. according to claim 5 a kind of with the burning boiler for delaying water velocity function, which is characterized in that the branch
Fagging (11) bottom outer wall is provided with the mounting groove equidistantly distributed, and mounting groove side inner wall is bonded with non-slip mat.
7. according to claim 1 a kind of with the burning boiler for delaying water velocity function, which is characterized in that described to lead
Flow tube (9) is plugged in heater box (1) bottom outer wall far from the one end of the first deflector (8), and diversion pipe (9) is equipped with water conservancy diversion
Valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821400260.8U CN208846732U (en) | 2018-08-29 | 2018-08-29 | Combustion boiler with function of delaying water velocity |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821400260.8U CN208846732U (en) | 2018-08-29 | 2018-08-29 | Combustion boiler with function of delaying water velocity |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208846732U true CN208846732U (en) | 2019-05-10 |
Family
ID=66356550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821400260.8U Expired - Fee Related CN208846732U (en) | 2018-08-29 | 2018-08-29 | Combustion boiler with function of delaying water velocity |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208846732U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113251826A (en) * | 2021-06-22 | 2021-08-13 | 浙江诚盈亿深冷装备有限公司 | Equipment for obtaining low-temperature hot water by preheating air |
CN113356253A (en) * | 2021-05-29 | 2021-09-07 | 中铁建工集团有限公司 | Construction method of basic raft plate of super high-rise building |
-
2018
- 2018-08-29 CN CN201821400260.8U patent/CN208846732U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113356253A (en) * | 2021-05-29 | 2021-09-07 | 中铁建工集团有限公司 | Construction method of basic raft plate of super high-rise building |
CN113251826A (en) * | 2021-06-22 | 2021-08-13 | 浙江诚盈亿深冷装备有限公司 | Equipment for obtaining low-temperature hot water by preheating air |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208846732U (en) | Combustion boiler with function of delaying water velocity | |
CN105547011A (en) | Boiler flue gas tube heat exchanger with self-cleaning effect | |
CN101929670A (en) | Oilfield steam injection boiler | |
CN100520268C (en) | Fume-fume hot pipe heater exchanger for fume desulphurization in heat-engine plant | |
CN108800556A (en) | Combustion boiler with function of delaying water velocity | |
CN108679836A (en) | Combustion boiler with uniform water outlet function | |
CN208859856U (en) | Combustion boiler with three-dimensional heating | |
CN203147726U (en) | Pi-structural catalytic unit CO incineration waste heat boiler | |
CN208846729U (en) | Combustion boiler with double water outlet pipelines | |
CN208859841U (en) | Combustion boiler with function of balancing gas feeding speed | |
CN208859862U (en) | Combustion boiler with uniformly heated water delivery pipeline | |
CN202501615U (en) | High-efficient and environmentally-friendly vertical type counter-burning hot water boiler | |
CN208859880U (en) | Combustion boiler with multi-surface heating function | |
CN208817687U (en) | Combustion boiler with lower-inlet and upper-outlet type heating pipeline | |
CN108800555A (en) | Combustion boiler with double water outlet pipelines | |
CN208817691U (en) | Combustion boiler with hot water pipe uniform heating function | |
CN108800536A (en) | Combustion boiler with function of balancing gas feeding speed | |
CN109000368A (en) | Combustion boiler with multi-surface heating function | |
CN218237068U (en) | Gas type jacket water-bath heating gasifier | |
CN208817728U (en) | Combustion boiler with guide rib plate | |
CN208846748U (en) | Water delivery device with function of changing water flow direction for combustion boiler | |
CN208817703U (en) | A kind of boiler that the Industrial Boiler rate of heat addition is fast | |
CN109059271A (en) | Combustion boiler with uniformly heated water delivery pipeline | |
CN208817700U (en) | A kind of heating boiler of fuel gas buring adequacy | |
CN207702722U (en) | A kind of spiral heat absorption heat exchange biomass hot water boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190510 Termination date: 20190829 |