CN208844957U - A kind of construction metope drilling repair apparatus - Google Patents
A kind of construction metope drilling repair apparatus Download PDFInfo
- Publication number
- CN208844957U CN208844957U CN201821299744.8U CN201821299744U CN208844957U CN 208844957 U CN208844957 U CN 208844957U CN 201821299744 U CN201821299744 U CN 201821299744U CN 208844957 U CN208844957 U CN 208844957U
- Authority
- CN
- China
- Prior art keywords
- installing frame
- fixedly connected
- fixed
- right end
- quoit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model provides a kind of construction metope drilling repair apparatus, including third installing frame;The third installing frame lower external face is all around symmetrically fixedly welded with mounting rack;The material-pumping tube upper end is fixedly connected with the second fixed quoit;Described second fixed quoit is fixedly mounted on the left end upper surface of third installing frame by the second screw, and the upper end is fixedly connected with hose;The hose upper end is fixedly connected on the lower end of the first fixed quoit;Described first fixed quoit is fixedly mounted on the lower surface of moving mass by the first screw, is located in movement slots;Moving mass right end outer surface is fixedly connected with compression cylinder;The compression cylinder is located at right end inside the right end of fixed cylinder and is fixedly installed with weight;The weight is located at the right part of fixed cylinder;The utility model is easy to operate, and mobile flexibly structure is simple, meets a variety of use conditions, and practicability is high.
Description
Technical field
The utility model relates to construction equipment, specifically a kind of construction metope drilling repair apparatus.
Background technique
Hole is processed on solid material with drill bit drilling.The hole machined of various parts removes a part by vehicle, boring, milling
It is greatly to be completed by pincers worker using drilling machine and boring bar tool (drill bit, reamer, reamer etc.) outside equal lathes are completed.
When drilling on drilling machine, under normal circumstances, drill bit should be completed at the same time two movements;Main motion, i.e. drill bit are transported around the rotation of axis
Dynamic (cutting movement);Synkinesia, i.e. drill bit along axis direction against the linear motion (feed motion) of workpiece, when drilling,
Mainly due to disadvantage present on drill bit structure, processing quality is influenced, machining accuracy is generally at IT10 grades hereinafter, surface roughness
For Ra12.5 μm or so, category roughing.
With the rapid development of human civilization, the type of building is also more and more varied, during architecture construction,
Wall drilling is an essential job, punches and is easy perforations adding hardly possible, it is usually worker that the prior art, which carries out perforations adding to wall,
Manually by cement mortar insert hole in after smeared it is smooth, with increasingly increasing for floor, the intracorporal hole of building wall
Can be more and more, and hole location height is different, if time-consuming and laborious, working efficiency is low all using manually filling up.
Utility model content
The purpose of this utility model is to provide a kind of construction metope drilling repair apparatus, to solve above-mentioned background
The problem of being proposed in technology.
To achieve the above object, the utility model provides the following technical solutions:
A kind of construction metope drilling repair apparatus, including third installing frame;The third installing frame lower external
Face is all around symmetrically fixedly welded with mounting rack;The mounting rack lower end is rotatably connected to wheel;The wheel right end appearance
Face is equipped with fixed cover;Third installing frame right upper portion outer surface is welded with push rod;Push rod right end upper surface is equipped with switch;The
The inside right end lower surface of three installing frames is fixedly connected with the second mounting plate;Second mounting plate upper surface is fixedly installed with storage
Battery;The battery left end is equipped with mortar storage box;The inside that the mortar storage box is fixedly mounted on third installing frame is left
Lower surface is held, middle part is equipped with material-pumping tube, is equipped with filling tube inside left end;It is fixed that the material-pumping tube upper end is fixedly connected with second
Quoit;Described second fixed quoit is fixedly mounted on the left end upper surface of third installing frame, the upper end by the second screw
It is fixedly connected with hose;The hose upper end is fixedly connected on the lower end of the first fixed quoit;Described first fixed quoit
It is fixedly mounted on the lower surface of moving mass by the first screw, is located in movement slots;Moving mass right end outer surface is fixed to be connected
It is connected to compression cylinder;The compression cylinder is located at right end inside the right end of fixed cylinder and is fixedly installed with weight;The exacerbation
Block is located at the right part of fixed cylinder;The right end of fixed cylinder is located at the inside of the first installing frame;First installing frame lower end
It is slidably connected in the second installing frame;Second installing frame is welded on the right end outer surface of upper of third installing frame, inside
Lower surface is fixedly connected with hydraulic stem;The hydraulic stem upper end is fixedly mounted on the lower external face of the first installing frame.
As a further solution of the present invention: the material-pumping tube upper end is fixedly connected on the left end of third installing frame
In portion's wall;The filling tube upper end is fixedly connected in the left upper part edge wall of third installing frame, and the upper end is equipped with closure plug;
Top is equipped with the first mounting plate on the right side of mortar storage box;The first mounting plate right end top is fixedly connected on third installing frame
Left end inside upper surface, upper surface are fixedly installed with mateiral pump.
As a further solution of the present invention: the movement slots are located at the lower section of moving mass, it is provided with fixed cylinder
Lower section wall in.
As a further solution of the present invention: being equipped with transmission pipeline inside the moving mass, it is slidably connected at fixation
The inside of cylinder;The transmission pipeline lower end is connected with the first fixed quoit;Fixed cylinder left end is fixedly connected with closed
Rubber ring.
As a further solution of the present invention: first installing frame is located above the right end of third installing frame,
Balance plate is fixedly welded with inside left end;The balance plate is located at the right side of fixed cylinder, inside offer working hole;It is described
Screen post is equipped with inside working hole;The screen post left end is fixedly connected on the right surface of weight, and right end is fixedly connected with
Limited block;The limited block is located at the right side of working hole, and right end is fixed with fixing bolt;The fixing bolt outer surface rotation connects
It is connected to the second driver plate;The second driver plate rear end thereof is connected with the second shaft.
Second shaft is fixedly connected on the front end of the first driver plate as a further solution of the present invention,;
The first driver plate rear end thereof is connected to the left side of fast pulley;Shaft is equipped with inside the fast pulley;The shaft and the
One driver plate is fixedly connected, and right end rotation is connected with motor;The motor lower end is fixedly connected with third mounting plate;The third
Mounting plate right end is welded in the right end interior wall of the first installing frame.
Compared with prior art, the utility model has the beneficial effects that
The utility model is worked using mechanical device, greatly reduces the manual labor amount of worker, bottom of device adds
The wheel of dress more greatly improves the flexibility of device, can be with Multi-angle working, and the hydraulic stem in the second installs case can be free
Regulating device height also can also can freely be coped with when some bore positions are relatively high, not need additionally to carry out using artificial
Repairing, the first driver plate and the second driver plate of inside installation can be such that repaired components move left and right pair using crank gearing principle
The drilling for injecting mortar carries out finishing operations;The utility model is easy to operate, and mobile flexible, structure is simple, meets a variety of uses
Condition, practicability are high.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of construction metope drilling repair apparatus.
Fig. 2 is the structural schematic diagram of crank gearing component in a kind of construction metope drilling repair apparatus.
Fig. 3 is a kind of construction structural schematic diagram that bottom of cylinder is fixed in metope drilling repair apparatus.
Fig. 4 is the structural schematic diagram of repaired components in a kind of construction metope drilling repair apparatus.
In figure: the first installing frame of 1-, 2- working hole, 3- balance plate, 4- weight, the fixed cylinder of 5-, 6- compression cylinder, 7-
Moving mass, 8- transmission pipeline, the closed rubber ring of 9-, 10- movement slots, the first screw of 11-, the fixed quoit of 12- first, 13- are soft
Pipe, the second screw of 14-, the fixed quoit of 15- second, 16- closure plug, 17- third installing frame, 18- filling tube, 19- mortar are deposited
Put case, 20- mounting rack, 21- wheel, the fixed cover of 22-, 23- material-pumping tube, the first mounting plate of 24-, 25- mateiral pump, the peace of 26- second
Loading board, 27- battery, 28- push rod, 29- switch, the second installing frame of 30-, 31- hydraulic stem, 32- limited block, 33- first are driven
Plate, 34- fast pulley, 35- third mounting plate, 36- motor, 37- shaft, the second driver plate of 38-, 39- screen post, second turn of 40-
Axis, 41- fixing bolt, 42- wall, 43- drilling.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
Please refer to Fig. 1-4, a kind of construction metope drilling repair apparatus, including third installing frame 17;The third
Installing frame 17 is in cuboid-type, and framework is made of steel, is mainly used for providing space and carrier for the installation of other component, under
Portion outer surface is all around symmetrically fixedly welded with mounting rack 20;20 lower end of mounting rack is rotatably connected to wheel 21;It is described
Wheel 21 is mainly used for improving device flexibility in order to complete a variety of job requirements, and right end outer surface is equipped with fixed cover 22,
It is mainly used for fixing vehicle wheel 21, prevents device is mobile during the work time from repairing being caused to fail;17 right upper portion of third installing frame
Outer surface is welded with push rod 28;The push rod 28 is mainly used for mobile device, and right end upper surface is equipped with switch 29, is mainly used for
Power components on control device;The inside right end lower surface of third installing frame 17 is fixedly connected with the second mounting plate 26;It is described
Second mounting plate, 26 upper surface is fixedly installed with battery 27, for providing electric power support for the power components on device;It is described
27 left end of battery is equipped with mortar storage box 19;The mortar storage box 19 is fixedly mounted on the inside left end of third installing frame 17
Lower surface, for temporarily storing cement mortar, middle part is equipped with material-pumping tube 23, is equipped with filling tube 18 inside left end;The pumping material
23 upper end of pipe is fixedly connected in the left upper part wall of third installing frame 17, mainly for delivery of cement mortar;The filling tube
18 upper ends are fixedly connected in the left upper part edge wall of third installing frame 17, are mainly used for injecting toward inside mortar storage box 19
Cement mortar, the upper end are equipped with closure plug 16, prevent mortar storage box 19 from entering dust for being closed inlet;Mortar storage box
19 right sides top are equipped with the first mounting plate 24;First mounting plate, the 24 right end top is fixedly connected on a left side for third installing frame 17
Inside upper surface is held, upper surface is fixedly installed with mateiral pump 25, is mainly used for taking out the cement mortar in mortar storage box 19
Out to complete work requirements;23 upper end of material-pumping tube is fixedly connected with the second fixed quoit 15;Described second fixed quoit 15
It is fixedly mounted on the left end upper surface of third installing frame 17 by the second screw 14, is mainly used for playing connection function, the upper end
It is fixedly connected with hose 13;13 upper end of hose is fixedly connected on the lower end of the first fixed quoit 12, mainly for delivery of
Cement mortar, and hose deformability is strong, can satisfy different use conditions;Described first fixed quoit 12 passes through the first spiral shell
Nail 11 is fixedly mounted on the lower surface of moving mass 7, is located in movement slots 10, is mainly used for playing connection function;The movement slots
10 are located at the lower section of moving mass 7, are provided in the lower section wall of fixed cylinder 5, are mainly used for mobile convenient for hose 13;Moving mass 7
Inside is equipped with transmission pipeline 8, is slidably connected at the inside of fixed cylinder 5, is mainly used for being moved to designated position to complete work
It is required that;8 lower end of transmission pipeline is connected with the first fixed quoit 12, and when mateiral pump 25 starts, cement mortar passes through pumping
Expects pipe 23, hose 13 and transmission pipeline 8 are delivered to designated position to reach job requirement;Fixed 5 cross section of cylinder is rectangle,
It is mainly used for providing space for the installation of other component, left end is fixedly connected with closed rubber ring 9;The closed rubber ring 9
Being mainly used for the fitting formation confined space of wall 42 prevents cement mortar from oozing out;7 right end outer surface of moving mass is fixedly connected with pressure
Contracting cylinder 6;The compression cylinder 6 is located inside the right end of fixed cylinder 5, is mainly used for controlling moving left and right for moving mass 7,
Right end is fixedly installed with weight 4;The weight 4 is located at the right part of fixed cylinder 5, for playing the work of hamming
With raising device stability;The right end of fixed cylinder 5 is located at the inside of the first installing frame 1;First installing frame 1 is located at
Above the right end of three installing frames 17, it is mainly used for providing installation space for other component, balance is fixedly welded with inside left end
Plate 3;The balance plate 3 is located at the right side of fixed cylinder 5, inside offer working hole 2;Card is equipped with inside the working hole 2
Position column 39;39 left end of screen post is fixedly connected on the right surface of weight 4, is mainly used for playing the role of transmission, right
End is fixedly connected with limited block 32;The limited block 32 is located at the right side of working hole 2, can make with the mutual cooperation of screen post 39 solid
Determine cylinder 5 to move left and right on working hole 2, right end is fixed with fixing bolt 41;41 outer surface of the fixing bolt rotation connection
There is the second driver plate 38;Second driver plate, 38 rear end thereof is connected with the second shaft 40;Second shaft 40 is fixed to be connected
It connects in the front end of the first driver plate 33;First driver plate, 33 rear end thereof is connected to the left side of fast pulley 34, when its up time
When needle rotates, 38 side-to-side movement of the second driver plate, the i.e. side-to-side movement in working hole 2 of limited block 32 are driven by the second shaft 40
In order to which moving mass 7 completes finishing operations;Shaft 37 is equipped with inside the fast pulley 34;The shaft 37 and the first driver plate 33
It is fixedly connected, right end rotation is connected with motor 36;The motor 36 is used to provide rotatory force for device, and lower end is fixedly connected with
Third mounting plate 35;35 right end of third mounting plate is welded in the right end interior wall of the first installing frame 1, is used to support motor
36;First installing frame, 1 lower end is slidably connected in the second installing frame 30;Second installing frame 30 is welded on third installing frame 17
Right end outer surface of upper, be mainly used for providing installation space for other component, bottom inner surface is fixedly connected with hydraulic stem
31;31 upper end of hydraulic stem is fixedly mounted on the lower external face of the first installing frame 1, for control its upper-lower height in order to
Complete more work requirements.
The working principle of the utility model is: using the cement mortar after dilution is first passed through 18 note of filling tube before the present apparatus
Enter in mortar storage box 19, closing inlet using closure plug 16 prevents from falling into dust, then pushes the present apparatus by push rod 28
Into construction floor, needing to repair if any drilling, the drilling 43 that closed rubber ring 9 is aligned on wall 42 is close to by mobile device,
Starting compression cylinder 6 pushes moving mass 7 to move downward until fitting closely wall 42, restarts mateiral pump 25, mortar is stored
Cement mortar in case 19 passes through in 8 injection hole 43 of material-pumping tube 23, hose 13 and transmission pipeline, by the present apparatus after the completion of injection
Closed rubber ring 9 is set to leave wall 42 by past move back of push rod 28, starting compression cylinder 6 makes moving mass 7 continue to move downward directly
To being pierced by from closed rubber ring 9, start motor 36, the shaking of 5 left and right horizontal of cylinder is fixed under the action of crank gearing, to rigid note
The cement mortar surface for entering completion carries out finishing operations, and pass hull closure is moved to storage place after the completion of operation.
The preferred embodiment of the patent is described in detail above, but this patent is not limited to above-mentioned embodiment party
Formula within the knowledge of one of ordinary skill in the art can also be under the premise of not departing from this patent objective
It makes a variety of changes.
Claims (6)
- Repair apparatus, including third installing frame (17) 1. a kind of construction metope drills;It is characterized in that, the third installation Frame (17) lower external face is all around symmetrically fixedly welded with mounting rack (20);Mounting rack (20) lower end is rotatably connected to Wheel (21);Wheel (21) the right end outer surface is equipped with fixed cover (22);The weldering of third installing frame (17) right upper portion outer surface It is connected to push rod (28);Push rod (28) the right end upper surface is equipped with switch (29);The inside right end following table of third installing frame (17) Face is fixedly connected with the second mounting plate (26);Second mounting plate (26) upper surface is fixedly installed with battery (27);It is described Battery (27) left end is equipped with mortar storage box (19);The mortar storage box (19) is fixedly mounted on third installing frame (17) Internal left end lower surface, middle part are equipped with material-pumping tube (23), are equipped with filling tube (18) inside left end;Material-pumping tube (23) upper end It is fixedly connected with second fixed quoit (15);Described second fixed quoit (15) are fixedly mounted on by the second screw (14) The left end upper surface of third installing frame (17), the upper end are fixedly connected with hose (13);Hose (13) upper end is fixedly connected In the lower end of first fixed quoit (12);Described first fixed quoit (12) are fixedly mounted on fortune by the first screw (11) The lower surface of motion block (7) is located in movement slots (10);Moving mass (7) the right end outer surface is fixedly connected with compression cylinder (6);The compression cylinder (6) is located at right end inside the right end of fixed cylinder (5) and is fixedly installed with weight (4);The exacerbation Block (4) is located at the right part of fixed cylinder (5);The right end of fixed cylinder (5) is located at the inside of the first installing frame (1);Described One installing frame (1) lower end is slidably connected in the second installing frame (30);Second installing frame (30) is welded on third installing frame (17) right end outer surface of upper, bottom inner surface are fixedly connected with hydraulic stem (31);Hydraulic stem (31) upper end is fixed It is mounted on the lower external face of the first installing frame (1).
- The repair apparatus 2. a kind of construction according to claim 1 metope drills, which is characterized in that the material-pumping tube (23) upper end is fixedly connected in the left upper part wall of third installing frame (17);Filling tube (18) upper end is fixedly connected on In the left upper part edge wall of three installing frames (17), the upper end is equipped with closure plug (16);Top is set on the right side of mortar storage box (19) There are the first mounting plate (24);First mounting plate (24) the right end top is fixedly connected on inside the left end of third installing frame (17) Upper surface, upper surface are fixedly installed with mateiral pump (25).
- The repair apparatus 3. a kind of construction according to claim 1 metope drills, which is characterized in that the movement slots (10) it is located at the lower section of moving mass (7), is provided in the lower section wall of fixed cylinder (5).
- The repair apparatus 4. a kind of construction according to claim 1 metope drills, which is characterized in that the moving mass (7) internal to be equipped with transmission pipeline (8), it is slidably connected at the inside of fixed cylinder (5);Transmission pipeline (8) lower end and first Fixed quoit (12) are connected;Fixed cylinder (5) left end is fixedly connected with closed rubber ring (9).
- The repair apparatus 5. a kind of construction according to claim 1 metope drills, which is characterized in that first peace Frame up (1) be located above the right end of third installing frame (17), be fixedly welded with balance plate (3) inside left end;The balance plate (3) be located at the right side of fixed cylinder (5), inside offer working hole (2);Screen post is equipped with inside the working hole (2) (39);Screen post (39) left end is fixedly connected on the right surface of weight (4), and right end is fixedly connected with limited block (32);The limited block (32) is located at the right side of working hole (2), and right end is fixed with fixing bolt (41);The fixing bolt (41) outer surface is rotatably connected to the second driver plate (38);Second driver plate (38) rear end thereof is connected with the second shaft (40).
- The repair apparatus 6. a kind of construction according to claim 5 metope drills, which is characterized in that described second turn Axis (40) is fixedly connected on the front end of the first driver plate (33);First driver plate (33) rear end thereof is connected to fast pulley (34) left side;Shaft (37) are equipped with inside the fast pulley (34);The shaft (37) and the first driver plate (33) fixed company It connects, right end rotation is connected with motor (36);Motor (36) lower end is fixedly connected with third mounting plate (35);The third peace Loading board (35) right end is welded in the right end interior wall of the first installing frame (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821299744.8U CN208844957U (en) | 2018-08-13 | 2018-08-13 | A kind of construction metope drilling repair apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821299744.8U CN208844957U (en) | 2018-08-13 | 2018-08-13 | A kind of construction metope drilling repair apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208844957U true CN208844957U (en) | 2019-05-10 |
Family
ID=66353800
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821299744.8U Expired - Fee Related CN208844957U (en) | 2018-08-13 | 2018-08-13 | A kind of construction metope drilling repair apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208844957U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111155780A (en) * | 2019-09-02 | 2020-05-15 | 广东博智林机器人有限公司 | Screw hole plugging robot and building system with same |
CN114352065A (en) * | 2022-01-24 | 2022-04-15 | 丁琰 | Wall body patching device |
-
2018
- 2018-08-13 CN CN201821299744.8U patent/CN208844957U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111155780A (en) * | 2019-09-02 | 2020-05-15 | 广东博智林机器人有限公司 | Screw hole plugging robot and building system with same |
CN111155780B (en) * | 2019-09-02 | 2021-05-07 | 广东博智林机器人有限公司 | Screw hole plugging robot and building system with same |
CN114352065A (en) * | 2022-01-24 | 2022-04-15 | 丁琰 | Wall body patching device |
CN114352065B (en) * | 2022-01-24 | 2023-09-22 | 源心舍建筑科技有限公司 | Wall repairing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201320694Y (en) | Clamp for processing spatial angular hole | |
CN104612581B (en) | The noiseless brill of rock splits all-in-one | |
CN208844957U (en) | A kind of construction metope drilling repair apparatus | |
CN206536044U (en) | It is a kind of can automatic scrap iron cleaning radial drilling machine | |
CN108544580A (en) | Drilling device for plank | |
CN106053129A (en) | Full-automatic coal sample preparing and sampling machine | |
CN107199458A (en) | It is a kind of to open screw device for valve | |
CN205464441U (en) | Porous drilling machine | |
CN105922227B (en) | A kind of hole position fast positioning device for dotting and method | |
CN209648913U (en) | A kind of simple eye puncher of plank | |
CN208277067U (en) | Drilling device for plank | |
CN201644856U (en) | Special drilling machine for machining 465Q cylinder cover connecting holes | |
CN206702249U (en) | Crankshaft-flywheel hole processing device | |
CN206605276U (en) | A kind of miniature parts rig | |
CN210548252U (en) | Porous processing structure of product | |
CN108081474A (en) | A kind of construction site fork lifting-type drill hole on wall equipment | |
CN208263060U (en) | Novel Men Li stile, crosspiece processing integrated machine | |
CN105945328B (en) | Pneumatic track drill | |
CN207656973U (en) | A kind of sprocket chain strip drill hole on wall device for building | |
KR20200107158A (en) | Regulating device for Vertical of AugerCrane | |
CN206622659U (en) | Automobile using fagging automatic punch | |
CN205733082U (en) | A kind of high-precision pneumatic drilling machine | |
CN211331434U (en) | Drilling device for machining automobile engine parts | |
CN208962160U (en) | A kind of automatic drilling foam device | |
CN205673859U (en) | A kind of cage full-automatic drilling Hole chamfering all-in-one |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190510 Termination date: 20200813 |
|
CF01 | Termination of patent right due to non-payment of annual fee |