CN208844618U - A kind of rod piece and hand well lines connectivity structure - Google Patents

A kind of rod piece and hand well lines connectivity structure Download PDF

Info

Publication number
CN208844618U
CN208844618U CN201821131400.6U CN201821131400U CN208844618U CN 208844618 U CN208844618 U CN 208844618U CN 201821131400 U CN201821131400 U CN 201821131400U CN 208844618 U CN208844618 U CN 208844618U
Authority
CN
China
Prior art keywords
pipeline
rod piece
hand well
basis
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821131400.6U
Other languages
Chinese (zh)
Inventor
王文彪
李攀
唐术熙
盛勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201821131400.6U priority Critical patent/CN208844618U/en
Application granted granted Critical
Publication of CN208844618U publication Critical patent/CN208844618U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to pipeline hand well construction fields, specifically a kind of rod piece and hand well lines connectivity structure, on vertical section, a pipeline connection hand well is laid respectively in rod piece basis two sides, pipeline connection hand well positioned at basic first side of rod piece is known as the first pipeline connection hand well, and the pipeline connection hand well positioned at rod piece basis second side is known as the second pipeline connection hand well;On cross section, the first pipeline connection hand well and the second pipeline connect the centerline that hand well is laid in rod piece basis.The utility model realizes that limited road upper lever basis is connected to the reasonable Arrangement of pipeline hand well and rod piece with the pipeline of hand well by design rod piece basis and the relationship of hand well and the space layout of pipeline.

Description

A kind of rod piece and hand well lines connectivity structure
Technical field
The utility model relates to pipeline hand well construction field, specifically a kind of rod piece and hand well lines connectivity structure, By design rod piece basis and the relationship of hand well and the space layout of pipeline, limited road upper lever basis and pipeline hand well are realized Reasonable Arrangement and rod piece be connected to the pipeline of hand well.
Background technique
Road rod piece has laying in regions such as urban road, residential quarter, commercial circles, is widely distributed in city and extremely Important public infrastructure, be it is a kind of it is very important be city public resource.Numerous, the excessive occupancy of China's road rod piece Limited road or exterior public area resource, increase public fund injection, influence that traffic is current and urban.For solution Certainly rod piece stands in great numbers problem, and the conjunction bar regulation for carrying out polymorphic type rod piece positive at present, multiclass facility is equipped on same rod piece, builds together It enjoys, the public input of the repetition to reduce road equipment, the harmonious comfortable urban environment of construction.
The rod piece for carrying the equipment such as street lamp, signal lamp, monitoring needs to be equipped with hand well, so as to the main pipeline and bar of road pavement Part equipment carries out pipeline connection, while pipeline being facilitated to be overhauled.Original distribution method is one far from kerbstone in rod piece Lay hand well in side.But the conjunction bar of existing road is renovated and is built, original sidewalk width is insufficient, without spatial arrangement hand well. The mode to original hand well and line layout is needed to be adjusted.
Utility model content
The purpose of this utility model is that a kind of rod piece and hand well lines connectivity structure, pass through design rod piece basis and hand well Relationship and pipeline space layout, realize the reasonable Arrangement and rod piece and hand well of limited road upper lever basis and pipeline hand well Pipeline connection.
To achieve the goals above, the technical solution of the utility model is as follows: a kind of rod piece and hand well lines connectivity structure, Hand well is connected with pipeline including rod piece, rod piece bottom sets rod piece basis, which is characterized in that
On vertical section, a pipeline connection hand well, the pipe positioned at basic first side of rod piece are laid in rod piece basis two sides respectively Line connection hand well is known as the first pipeline connection hand well, is known as the second pipeline positioned at the pipeline connection hand well of rod piece basis second side and connects Take over well;On cross section, the first pipeline connection hand well and the second pipeline connect the center that hand well is laid in rod piece basis At line;
Pipeline connects side setting external supervisor pipeline joint of the hand well far from rod piece basis, and the pipeline connection hand well is close The intermediate supervisor's pipeline joint of side setting on rod piece basis and it is in charge of pipeline joint, rod piece basis instrument main pipeline channel and and is located at The subtube of rod piece basis two sides;
External main pipeline positioned at basic first side of rod piece connect the external of hand well with the first pipeline and is responsible for pipeline joint connection, Intermediate supervisor's pipeline joint of first pipeline connection hand well is connect with intermediate main pipeline, and intermediate main pipeline passes through the supervisor on rod piece basis Behind road channel, intermediate supervisor's pipeline joint connection of hand well is connect with the second pipeline, the second pipeline connects the external main pipeline of hand well Interface is then connect with the external main pipeline for being located at rod piece basis second side;
The pipeline joint of being in charge of of first pipeline connection hand well is connect with the subtube positioned at basic first side of rod piece, the second pipeline The pipeline joint of being in charge of of connection hand well is connect with the subtube positioned at rod piece basis second side.
Further, the subtube on the rod piece basis includes the steel hose being embedded in rod piece basis, the steel hose One end protrude into the rod piece and opening upwards of rod piece basis top, it is outer that the other end then extends to rod piece basis.
Further, the pipeline joint of being in charge of that the steel hose directly connect hand well with pipeline connects.
Further, the pipeline joint of being in charge of that the steel hose connect hand well by connecting steel hose with pipeline connects.
Further, the external main pipeline, intermediate main pipeline are all made of φ 100mm steel pipe.
Further, the steel hose uses φ 50mm steel hose.
The utility model has apparent technical characterstic:
(1) it realizes that hand well and road piping are laid in along same longitudinal direction, is applicable to narrow pavement upper lever construction;
(2) it realizes the connection of main pipeline pipeline and rod piece equipment, while pipeline being facilitated to overhaul;
(3) two hand wells are laid in the longitudinal two sides in rod piece basis, facilitates main pipeline connection and maintenance and main pipeline and divides Pipeline connection and maintenance.
Detailed description of the invention
Fig. 1 is hand well artwork of the utility model along road longitudinal direction.
Fig. 2 is the pipeline connection floor map of the utility model.
Fig. 3 is pipeline connection schematic cross-sectional view.
Fig. 4 is former hand well artwork.
Specific embodiment
The utility model is described further below according to specific embodiment of the utility model and Figure of description.
Include: in figure the first pipeline connection hand well 1, the second pipeline connection hand well 2, rod piece basis 3, external main pipeline 4, in Between main pipeline 5, subtube 6, rod piece 7, main pipeline channel 8, steel hose 9, kerbstone 10.
A kind of rod piece and hand well lines connectivity structure, including rod piece connects hand well with pipeline, and it is basic that rod piece bottom sets rod piece, It is characterized in that,
On vertical section, a pipeline connection hand well, the pipe positioned at basic first side of rod piece are laid in rod piece basis two sides respectively Line connection hand well is known as the first pipeline connection hand well 1, and the pipeline connection hand well positioned at basic 3 second side of rod piece is known as the second pipeline Connect hand well 2;On cross section, the first pipeline connection hand well 1 connects hand well 2 with the second pipeline and is laid in rod piece basis 3 Centerline;
Pipeline connects side setting external supervisor pipeline joint of the hand well far from rod piece basis, and the pipeline connection hand well is close Main pipeline channel 8 and and position is arranged with pipeline joint, rod piece basis 3 is in charge of in the intermediate supervisor's pipeline joint of side setting on rod piece basis Subtube 6 in rod piece basis two sides;
External main pipeline 4 positioned at basic first side of rod piece connect the external of hand well 1 with the first pipeline and is responsible for pipeline joint company It connects, intermediate supervisor's pipeline joint of the first pipeline connection hand well 1 is connect with intermediate main pipeline 5, and intermediate main pipeline 5 passes through rod piece basis Behind 3 main pipeline channel, intermediate supervisor's pipeline joint connection of hand well 2 is connect with the second pipeline, the second pipeline connects the outer of hand well Portion's supervisor's pipeline joint is then connect with the external main pipeline 4 for being located at rod piece basis second side;
The pipeline joint of being in charge of of first pipeline connection hand well is connect with the subtube 6 positioned at basic first side of rod piece, the second pipe The pipeline joint of being in charge of of line connection hand well is connect with the subtube 6 positioned at rod piece basis second side.
Specific embodiment according to the present utility model, the first pipeline connect inlet wire of the hand well 1 for equipment on connecting rod, Second pipeline connects outlet of the hand well 2 for equipment on connecting rod.
Further, the subtube on the rod piece basis includes the steel hose 9 being embedded in rod piece basis, the steel hose One end protrude into the rod piece of rod piece basis top and opening upwards, it is outer that the other end then extends to rod piece basis.
Further, the pipeline joint of being in charge of that the steel hose 9 directly connect hand well with pipeline connects.
Further, the pipeline joint of being in charge of that the steel hose 9 connect hand well by connecting steel hose with pipeline connects.
Further, pipeline connection hand well can be only responsible for outside side setting of the pipeline connection hand well far from rod piece basis Pipeline joint, side setting of the pipeline connection hand well close to rod piece basis is intermediate to be responsible for pipeline joint and is in charge of pipeline joint, in pipe Line connects in hand well through internal pipeline cabling, completes main pipeline and subtube connection and maintenance, can also lead to external main pipeline It crosses external supervisor's pipeline joint and connects hand well across entire pipeline with centre supervisor's pipeline joint, only open up one in pipeline connection hand well Line outlet, by the route for needing to draw after line outlet extraction, the subtube for connecting hand well with pipeline by internal pipeline is connect Mouth connection.
The core innovative point of the utility model is: laying a pipeline connection hand well respectively in rod piece basis two sides, adopts It is divided to the design method of two hand wells with inlet-outlet line, realizes route walking in streetlamp foundation, to saves side in narrow road section Basic space utilization rate is improved in the space of face parallel pipeline, and the region for Downtown road underground space anxiety provides Lay the possibility on novel lamp stand basis.The characteristics of the utility model, is as follows:
(1) hand well is laid: on cross section, pipeline connection hand well is laid at the rod piece line of centres;It is laid on vertical section Rod piece basis two sides, a rod piece need to be equipped with two hand wells;
(2) Trunk Line connection: pipeline main pipeline is using hand well as node, and pipeline is attached and converts in hand well, simultaneously Main pipeline is facilitated to overhaul;Main pipeline uses φ 100mm steel pipe, passes through rod piece basis.
(3) Trunk Line and rod piece connection: subtube access rod piece basis is separated from main pipeline in hand Jing Chu, subtube uses φ 50mm steel hose, by rod piece basis, by pre-buried in advance, steel hose penetrates inside rod piece from basis, to realize supervisor Road is connect with rod piece equipment.

Claims (6)

1. a kind of rod piece and hand well lines connectivity structure, including rod piece connect hand well with pipeline, rod piece bottom sets rod piece basis, It is characterized in that,
On vertical section, a pipeline connection hand well is laid in rod piece basis two sides respectively, and the pipeline positioned at basic first side of rod piece connects Catcher well is known as the first pipeline connection hand well, and the pipeline connection hand well positioned at rod piece basis second side is known as the second pipeline connection hand Well;On cross section, the first pipeline connection hand well and the second pipeline connect the centerline that hand well is laid in rod piece basis;
Pipeline connects side setting external supervisor pipeline joint of the hand well far from rod piece basis, and the pipeline connection hand well is close to rod piece The intermediate supervisor's pipeline joint of side setting on basis and it is in charge of pipeline joint, rod piece basis instrument main pipeline channel and and is located at rod piece The subtube of basic two sides;
Positioned at basic first side of rod piece external main pipeline connect with the first pipeline hand well outside be responsible for pipeline joint and connect, first Intermediate supervisor's pipeline joint of pipeline connection hand well is connect with intermediate main pipeline, and the main pipeline that intermediate main pipeline passes through rod piece basis is logical Behind road, intermediate supervisor's pipeline joint connection of hand well is connect with the second pipeline, the second pipeline connects the external of hand well and is responsible for pipeline joint Then it is connect with the external main pipeline for being located at rod piece basis second side;
The pipeline joint of being in charge of of first pipeline connection hand well is connect with the subtube positioned at basic first side of rod piece, the connection of the second pipeline The pipeline joint of being in charge of of hand well is connect with the subtube positioned at rod piece basis second side.
2. rod piece as described in claim 1 and hand well lines connectivity structure, which is characterized in that the subtube on the rod piece basis Including be embedded in rod piece basis in steel hose, one end of the steel hose protrude into rod piece basis top rod piece and be open to On, it is outer that the other end then extends to rod piece basis.
3. rod piece as claimed in claim 2 and hand well lines connectivity structure, which is characterized in that the steel hose is directly and pipeline Connection hand well is in charge of pipeline joint connection.
4. rod piece as claimed in claim 2 and hand well lines connectivity structure, which is characterized in that the steel hose passes through connection steel The pipeline joint of being in charge of that hose connect hand well with pipeline connects.
5. rod piece as claimed in claim 2 and hand well lines connectivity structure, which is characterized in that the steel hose uses φ 50mm Steel hose.
6. rod piece as described in claim 1 and hand well lines connectivity structure, which is characterized in that the external main pipeline, centre Main pipeline is all made of φ 100mm steel pipe.
CN201821131400.6U 2018-07-17 2018-07-17 A kind of rod piece and hand well lines connectivity structure Active CN208844618U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821131400.6U CN208844618U (en) 2018-07-17 2018-07-17 A kind of rod piece and hand well lines connectivity structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821131400.6U CN208844618U (en) 2018-07-17 2018-07-17 A kind of rod piece and hand well lines connectivity structure

Publications (1)

Publication Number Publication Date
CN208844618U true CN208844618U (en) 2019-05-10

Family

ID=66353368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821131400.6U Active CN208844618U (en) 2018-07-17 2018-07-17 A kind of rod piece and hand well lines connectivity structure

Country Status (1)

Country Link
CN (1) CN208844618U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951707A (en) * 2018-07-17 2018-12-07 上海市政工程设计研究总院(集团)有限公司 A kind of building method that rod piece is connected to hand well lines
CN108951707B (en) * 2018-07-17 2024-06-04 上海市政工程设计研究总院(集团)有限公司 Construction method for communicating rod piece with hand well pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951707A (en) * 2018-07-17 2018-12-07 上海市政工程设计研究总院(集团)有限公司 A kind of building method that rod piece is connected to hand well lines
CN108951707B (en) * 2018-07-17 2024-06-04 上海市政工程设计研究总院(集团)有限公司 Construction method for communicating rod piece with hand well pipeline

Similar Documents

Publication Publication Date Title
CN208844618U (en) A kind of rod piece and hand well lines connectivity structure
CN205954679U (en) Utility tunnel's pipeline branch mouth
CN211257080U (en) Novel communication inspection well of utility tunnel communication branch mouth play branch line
CN110258632A (en) A kind of pipe gallery line branches mouth of direct-burried outlet
CN204151824U (en) A kind of glass reinforced plastic underground comprehensive pipe network common trench
CN108951707A (en) A kind of building method that rod piece is connected to hand well lines
CN205348223U (en) Node structure of being connected control center and two cabin utility tunnel
CN206647110U (en) Tunnel pre-buried channel flow mounting structure
CN108951707B (en) Construction method for communicating rod piece with hand well pipeline
CN205894100U (en) Underground transfer passage
CN206396789U (en) A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge
CN202023167U (en) Improved movable anti-collision steel pipe cable barrier
CN205604295U (en) Utility tunnel dog -house structure
CN206396793U (en) City integrated piping lane is connected structure of building together with track traffic underground open-cut station
CN211113738U (en) Stride across shallow utility tunnel structure who buries structure in underground
CN106592625A (en) Urban road comprehensive pipe gallery wire-outgoing connection structure
CN208328988U (en) A kind of Urban Underground pipe gallery
CN206298905U (en) A kind of urban road pipe gallery outlet connecting structure
CN209482352U (en) Upper straddle type pipe gallery flowing line confluence node structure
CN205778807U (en) A kind of booster station Miniature gas-liquid separating device
CN103334355A (en) Pipe network and construction method thereof of urban underground automobile pipeline traffic and traffic method
CN206418519U (en) A kind of Urban Underground intelligent comprehensive piping lane
CN207109853U (en) City integrated piping lane builds structure jointly with track traffic underground open-cut station main body
CN205171554U (en) Chute inspection shaft is inlayed to socket joint formula
CN206581296U (en) Multichannel underground pipe gallery with ventilation escape mouth structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant