CN208818146U - A kind of Energy Conservation Project in Construction mass detector verticality detector - Google Patents

A kind of Energy Conservation Project in Construction mass detector verticality detector Download PDF

Info

Publication number
CN208818146U
CN208818146U CN201821661500.XU CN201821661500U CN208818146U CN 208818146 U CN208818146 U CN 208818146U CN 201821661500 U CN201821661500 U CN 201821661500U CN 208818146 U CN208818146 U CN 208818146U
Authority
CN
China
Prior art keywords
fixedly installed
gauge rod
gauge
side external
external surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821661500.XU
Other languages
Chinese (zh)
Inventor
林茂勇
施东海
施秀洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Kefeng Construction Engineering Testing Co Ltd
Original Assignee
Fujian Kefeng Construction Engineering Testing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Kefeng Construction Engineering Testing Co Ltd filed Critical Fujian Kefeng Construction Engineering Testing Co Ltd
Priority to CN201821661500.XU priority Critical patent/CN208818146U/en
Application granted granted Critical
Publication of CN208818146U publication Critical patent/CN208818146U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The utility model discloses a kind of Energy Conservation Project in Construction mass detector verticality detectors, including the first gauge rod, the leading exterior surface of first gauge rod, which is fixedly installed with, holds plate, and first gauge rod a side external surface close to the position of upper end be fixedly installed with around rotation column, the side inner surface of first gauge rod is provided with second sliding slot, and first the other side inner surface of gauge rod be provided with first sliding groove, the inside of the first sliding groove is fixedly installed with L-square, the lower end outer surface of first gauge rod is fixedly installed with Ka Gai, the inside of first gauge rod is provided with card sliding slot close to the position of upper end.A kind of Energy Conservation Project in Construction mass detector verticality detector described in the utility model, equipped with snap-gauge, L-square and sash weight, it can make the more convenient stabilization of the connection of two gauge rods, enable to two gauge rods when measuring verticality can it is more stable with it is accurate, it enables to the function of equipment more perfect, brings better prospect of the application.

Description

A kind of Energy Conservation Project in Construction mass detector verticality detector
Technical field
The utility model relates to measuring for verticality technical field, in particular to a kind of Energy Conservation Project in Construction mass detector hangs down Straightness detector.
Background technique
The inspection of verticality is that architectural engineering detects essential a part, if two metopes is not vertical enough, then It will affect to construction quality, the inspection of verticality mainly relies on verticality detector to check it, Verticality detector it is many kinds of, detection rule for verticality is also one kind of verticality detector, existing detection rule for verticality It has been relatively mature in terms of structure and function, but the place that still has much room for improvement in use;Firstly, two gages are in combination Connection be not sufficiently stable with it is convenient;Secondly, gage when measuring verticality, more can not accurately keep 90 degree between two rulers Vertically;Finally, the function of equipment is more single, and when metope back gauge is longer, the levelness of metope is not easy to measure, thus I Design a kind of Energy Conservation Project in Construction mass detector verticality detector.
Utility model content
The main purpose of the utility model is to provide a kind of Energy Conservation Project in Construction mass detector verticality detectors, can Effectively to solve the problems in background technique.
To achieve the above object, the technical solution that the utility model is taken are as follows:
A kind of Energy Conservation Project in Construction mass detector verticality detector, including the first gauge rod, before first gauge rod End outer surface, which is fixedly installed with, holds plate, and a side external surface of the first gauge rod is fixedly installed with close to the position of upper end around rotation column, The side inner surface of first gauge rod is provided with second sliding slot, and the other side inner surface of the first gauge rod is provided with first and slides Slot, the inside of the first sliding groove are fixedly installed with L-square, and the lower end outer surface of first gauge rod is fixedly installed with Ka Gai, The inside of first gauge rod is provided with card sliding slot close to the position of upper end, and another side external surface of first gauge rod is close to upper The position at end is fixedly installed with pushing cover, and the lower end outer surface of pushing cover is fixedly installed with connecting rod, outside the lower end of the connecting rod Surface is fixedly connected with spring lever, and the lower end outer surface of spring lever is fixedly installed with snap-gauge, described in the outer surface of rotation column Portion is movably installed with column spinner, and a side external surface of column spinner has been solidly connected the second gauge rod, and the inside of second gauge rod is leaned on The position of nearly upper end is movably installed with connecting plate, and a side external surface of the second gauge rod is fixedly installed with point close to the position at middle part Table is spent, a side external surface of second gauge rod is movably installed with rotating handles, and the one of rotating handles close to the position of lower end End outer surface is fixedly installed with wiring bar, is wound with lifting rope in the middle part of the outer surface of the wiring bar, and outside lower end one end of lifting rope Surface is fixedly connected with sash weight, and the lower end outer surface of second gauge rod is hinged with sealing plate.
Further, one end outer surface of the spring lever is fixedly installed with spring ring, and spring lever passes through spring ring and card Plate is fixedly connected, and a side external surface of the L-square is fixedly installed with fixing bolt, a side external surface of the first sliding groove Position close to lower end is provided with the first fixation hole, and a side external surface of the second sliding slot is provided with the close to the position of upper end Two fixation holes.
Further, a side external surface of the sealing plate is fixedly installed with hinge, and sealing plate is living by hinge and the second gauge rod Dynamic connection, another side external surface of the sealing plate are fixedly installed with by lock.
Further, a side external surface of the L-square is fixedly installed with card slide plate, and L-square passes through card slide plate and the One sliding slot is flexibly connected.
Further, the upper end outer surface of the connecting plate is provided with card slot, and the leading exterior surface of second gauge rod is fixed It is equipped with by foot.
Further, the side inner surface of the Ka Gai is fixedly installed with spring card pole, the side appearance of first gauge rod Face is fixedly installed with pillar close to the position of lower end.
Compared with prior art, the utility model has the following beneficial effects: the Energy Conservation Project in Construction mass detector hangs down Straightness detector can enable the first gauge rod to connect with the second gauge rod by the use of the snap-gauge mating connection plate of setting Together, and connection type was not only simple but also firm, convenient for users to the use of gage, passed through the L-square of setting, L-square Two rulers can be made when being at right angles, 90 degree of angles can be kept constant, so that equipment is more simple to the measurement of verticality Just with stabilization, by the sash weight of setting, sash weight can make the function of equipment more complete, and wall longer for back gauge Face also can be good at measuring levelness, and the effect used is more preferable relative to traditional approach.
Detailed description of the invention
Fig. 1 is that a kind of overall structure of Energy Conservation Project in Construction mass detector verticality detector of the utility model is illustrated Figure.
Fig. 2 is the snap-gauge and the first gauge rod of a kind of Energy Conservation Project in Construction mass detector verticality detector of the utility model Match view.
Fig. 3 is the L-square and the first amount of a kind of Energy Conservation Project in Construction mass detector verticality detector of the utility model Bar matches view.
Fig. 4 is the sash weight and the second gauge rod of a kind of Energy Conservation Project in Construction mass detector verticality detector of the utility model Match view.
In figure: 1, around rotation column;2, card sliding slot;3, plate is held;4, the first gauge rod;5, L-square;6, column spinner;7, connecting plate; 8, the second gauge rod;9, phasing meter;10, rotating handles;11, pushing cover;12, connecting rod;13, spring lever;14, first sliding groove;15, Two sliding slots;16, Ka Gai;17, wiring bar;18, sealing plate;19, lifting rope;20, sash weight;21, snap-gauge.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below In conjunction with specific embodiment, the utility model is further described.
As shown in Figs 1-4, a kind of Energy Conservation Project in Construction mass detector verticality detector, including the first gauge rod 4, first The leading exterior surface of gauge rod 4, which is fixedly installed with, holds plate 3, and a side external surface of the first gauge rod 4 is close to the fixed peace in position of upper end Equipped with around rotation column 1, the side inner surface of the first gauge rod 4 is provided with second sliding slot 15, and the other side inner surface of the first gauge rod 4 is set It is equipped with first sliding groove 14, the inside of first sliding groove 14 is fixedly installed with L-square 5, the fixed peace in the lower end outer surface of the first gauge rod 4 Equipped with card lid 16, the inside of the first gauge rod 4 is provided with card sliding slot 2, another side external surface of the first gauge rod 4 close to the position of upper end Position close to upper end is fixedly installed with pushing cover 11, and the lower end outer surface of pushing cover 11 is fixedly installed with connecting rod 12, connecting rod 12 lower end outer surface is fixedly connected with spring lever 13, and the lower end outer surface of spring lever 13 is fixedly installed with snap-gauge 21, around rotation It is movably installed with column spinner 6 in the middle part of the outer surface of column 1, and a side external surface of column spinner 6 has been solidly connected the second gauge rod 8, second The inside of gauge rod 8 is movably installed with connecting plate 7 close to the position of upper end, and a side external surface of the second gauge rod 8 is close to middle part Position is fixedly installed with phasing meter 9, and a side external surface of the second gauge rod 8 is movably installed with rotating handles close to the position of lower end 10, and one end outer surface of rotating handles 10 is fixedly installed with wiring bar 17, is wound with lifting rope in the middle part of the outer surface of wiring bar 17 19, and lower end one end outer surface of lifting rope 19 is fixedly connected with sash weight 20, the lower end outer surface of the second gauge rod 8 is hinged with sealing plate 18。
One end outer surface of spring lever 13 is fixedly installed with spring ring, and spring lever 13 is fixed by spring ring and snap-gauge 21 Connection, a side external surface of L-square 5 are fixedly installed with fixing bolt, the position of a side external surface of first sliding groove 14 close to lower end It installs and is equipped with the first fixation hole, a side external surface of second sliding slot 15 is provided with the second fixation hole, spring close to the position of upper end Circle returns in situ after snap-gauge 21 can be enabled to pull again;One side external surface of sealing plate 18 is fixedly installed with hinge, and sealing plate 18 are flexibly connected by hinge with the second gauge rod 8, and another side external surface of sealing plate 18 is fixedly installed with by lock, and hinge can control The rotation of sealing plate 18;One side external surface of L-square 5 is fixedly installed with card slide plate, and L-square 5 is sliding by card slide plate and first Slot 14 is flexibly connected, and card slide plate can enable L-square 5 to be stuck in the inside of first sliding groove 14;The upper end appearance of connecting plate 7 Face is provided with card slot, and the leading exterior surface of the second gauge rod 8 is fixedly installed with by foot;The side inner surface of card lid 16 is fixedly installed with One side external surface of spring card pole, the first gauge rod 4 is fixedly installed with pillar close to the position of lower end, and pillar cooperates spring card pole Using can enable card lid 16 to be mounted and dismantle.
It should be noted that the utility model is a kind of Energy Conservation Project in Construction mass detector verticality detector, make Used time holds plate 3, and the first gauge rod 4 and the second gauge rod 8 are leaned against to the levelness for detecting metope on wall, encountering list When a gage is not enough to detect metope levelness, 8 one hundred eight ten degree of the second gauge rod is rotated, so that the card slot on connecting plate 7 is caught in The inside of snap-gauge 21 enables the first gauge rod 4 to link together with what the second gauge rod 8 more fastened, after detection, downwards Pushing cover 11 is pulled, the movement of connecting rod 12 is driven to drive the rotation of spring lever 13 snap-gauge 21 to be rotated, thus Connecting plate 7 is removed from the inside of card sliding slot 2, when detecting verticality, card lid 16 is opened, by L-square 5 from first The inside of sliding slot 14 is taken out, then L-square 5 is stuck in the inside of second sliding slot 15, then card lid 16 is blocked, and L-square 5 is mobile To the upper end of second sliding slot 15, the second gauge rod 8 is rotated, the plane of the second gauge rod 8 is enabled to be attached to the upper plane of L-square 5, First gauge rod 4 is mutually perpendicular to the second gauge rod 8, the fixing bolt of 5 side of rotational right angle plate is fixed by L-square 5, Phasing meter 9 can show the angle value between two metopes, when measuring the longer metope of back gauge, by sash weight 20 from the second gauge rod 8 Inside drop out, close to metope, when measurement finishes, rotation rotating handles 10 drive wiring bar 17 rotation, thus will Sash weight 20 takes in the inside of the second gauge rod 8, rotates sealing plate 18, by the way that sealing plate 18 is fixed on the second gauge rod 8 by lock, by second The base opening of gauge rod 8 seals, more practical.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (6)

1. a kind of Energy Conservation Project in Construction mass detector verticality detector, including the first gauge rod (4), it is characterised in that: described The leading exterior surface of first gauge rod (4), which is fixedly installed with, to be held plate (3), and a side external surface of the first gauge rod (4) is close to upper end Position is fixedly installed with around rotation column (1), and the side inner surface of first gauge rod (4) is provided with second sliding slot (15), and first The other side inner surface of gauge rod (4) is provided with first sliding groove (14), and the inside of the first sliding groove (14) is fixedly installed with right angle The lower end outer surface of plate (5), first gauge rod (4) is fixedly installed with Ka Gai (16), and the inside of first gauge rod (4) is close The position of upper end is provided with card sliding slot (2), and another side external surface of first gauge rod (4) is fixedly mounted close to the position of upper end Have pushing cover (11), and the lower end outer surface of pushing cover (11) is fixedly installed with connecting rod (12), outside the lower end of the connecting rod (12) Surface is fixedly connected with spring lever (13), and the lower end outer surface of spring lever (13) is fixedly installed with snap-gauge (21), described around rotation It is movably installed with column spinner (6) in the middle part of the outer surface of column (1), and a side external surface of column spinner (6) has been solidly connected the second gauge rod (8), the inside of second gauge rod (8) is movably installed with connecting plate (7) close to the position of upper end, and the one of the second gauge rod (8) Side external surface is fixedly installed with phasing meter (9) close to the position at middle part, and a side external surface of second gauge rod (8) is close to lower end Position be movably installed with rotating handles (10), and one end outer surface of rotating handles (10) is fixedly installed with wiring bar (17), It is wound with lifting rope (19) in the middle part of the outer surface of the wiring bar (17), and lower end one end outer surface of lifting rope (19) is fixedly connected with The lower end outer surface of sash weight (20), second gauge rod (8) is hinged with sealing plate (18).
2. a kind of Energy Conservation Project in Construction mass detector verticality detector according to claim 1, it is characterised in that: institute One end outer surface for stating spring lever (13) is fixedly installed with spring ring, and spring lever (13) is fixed by spring ring and snap-gauge (21) Connection, a side external surface of the L-square (5) are fixedly installed with fixing bolt, a side external surface of the first sliding groove (14) The position of lower end is provided with the first fixation hole, a side external surface of the second sliding slot (15) is arranged close to the position of upper end There is the second fixation hole.
3. a kind of Energy Conservation Project in Construction mass detector verticality detector according to claim 1, it is characterised in that: institute The side external surface for stating sealing plate (18) is fixedly installed with hinge, and sealing plate (18) is flexibly connected by hinge with the second gauge rod (8), Another side external surface of the sealing plate (18) is fixedly installed with by lock.
4. a kind of Energy Conservation Project in Construction mass detector verticality detector according to claim 1, it is characterised in that: institute The side external surface for stating L-square (5) is fixedly installed with card slide plate, and L-square (5) is living by card slide plate and first sliding groove (14) Dynamic connection.
5. a kind of Energy Conservation Project in Construction mass detector verticality detector according to claim 1, it is characterised in that: institute The upper end outer surface for stating connecting plate (7) is provided with card slot, and the leading exterior surface of second gauge rod (8) is fixedly installed with by foot.
6. a kind of Energy Conservation Project in Construction mass detector verticality detector according to claim 1, it is characterised in that: institute The side inner surface for stating Ka Gai (16) is fixedly installed with spring card pole, and a side external surface of first gauge rod (4) is close to lower end Position be fixedly installed with pillar.
CN201821661500.XU 2018-10-15 2018-10-15 A kind of Energy Conservation Project in Construction mass detector verticality detector Expired - Fee Related CN208818146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821661500.XU CN208818146U (en) 2018-10-15 2018-10-15 A kind of Energy Conservation Project in Construction mass detector verticality detector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821661500.XU CN208818146U (en) 2018-10-15 2018-10-15 A kind of Energy Conservation Project in Construction mass detector verticality detector

Publications (1)

Publication Number Publication Date
CN208818146U true CN208818146U (en) 2019-05-03

Family

ID=66279607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821661500.XU Expired - Fee Related CN208818146U (en) 2018-10-15 2018-10-15 A kind of Energy Conservation Project in Construction mass detector verticality detector

Country Status (1)

Country Link
CN (1) CN208818146U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110726357A (en) * 2019-10-09 2020-01-24 沈丹丹 Engineering quality detection equipment applied to stress detection of building shear wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110726357A (en) * 2019-10-09 2020-01-24 沈丹丹 Engineering quality detection equipment applied to stress detection of building shear wall

Similar Documents

Publication Publication Date Title
CN208818146U (en) A kind of Energy Conservation Project in Construction mass detector verticality detector
CN113513308A (en) Wellhead protection device for underground water automatic monitoring well and installation and use methods
CN203148347U (en) Thickness measurement scale for floor
CN207991435U (en) A kind of punching block testing apparatus for verticality
CN218268292U (en) Measuring device for geological environment
CN211042821U (en) Water sampling device for environmental detection
CN208075756U (en) A kind of measuring device of anti-float anchor rod hole perpendicularity
CN209247395U (en) A kind of Municipal Engineering Construction soil sampling apparatus
CN211527295U (en) Building engineering is with straightness detection device that hangs down
CN213748469U (en) Wall surface verticality detection device for building construction
CN208818380U (en) A kind of steel construction prestress detection device
CN209167298U (en) A kind of underground water detection device
CN208748719U (en) A kind of anchoring pile counterforce device
CN211460196U (en) Central venous pressure measuring device
CN209086003U (en) A kind of Stratified Sampling device for water quality detection
CN203811172U (en) Building perpendicularity tester
CN113686612A (en) Soil sampling device for environmental protection
CN220508032U (en) High-rise shear wall structure perpendicularity detection tool
CN221199582U (en) Buret for detecting residual chlorine in water
CN217238079U (en) Silk moisture percentage testing arrangement
CN218331418U (en) Air detection device for subway with good stability
CN209197721U (en) A kind of building elevation detection device
CN215666397U (en) Automatic take-up reading device for hole depth measurement
CN206523124U (en) Scalable dial framework
CN219914451U (en) Perpendicularity detection equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190503

Termination date: 20211015

CF01 Termination of patent right due to non-payment of annual fee