CN208817701U CN201821400096.0U CN201821400096U CN208817701U CN 208817701 U CN208817701 U CN 208817701U CN 201821400096 U CN201821400096 U CN 201821400096U CN 208817701 U CN208817701 U CN 208817701U
Authority
CN
China
Prior art keywords
inlet pipe
boiler
air inlet
boiler body
stable burning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821400096.0U
Other languages
Chinese (zh)
Inventor
范志高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Aifuwei Environmental Energy Technology Co ltd
Original Assignee
Hubei Aifuwei Environmental Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Aifuwei Environmental Energy Technology Co ltd filed Critical Hubei Aifuwei Environmental Energy Technology Co ltd
Priority to CN201821400096.0U priority Critical patent/CN208817701U/en
Application granted granted Critical
Publication of CN208817701U publication Critical patent/CN208817701U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model discloses a stable combustion boiler of intake pipe installation, inlet channel has been seted up including the inside of boiler main part, inlet channel's inboard movable mounting has the intake pipe, recess and standing groove are seted up to the inside of boiler main part, the standing groove is located the top of recess, the inboard movable mounting of recess has two-way threaded rod, the one end of two-way threaded rod runs through the boiler main part and extends to the outside of boiler main part, two-way threaded rod is located the one end fixedly connected with handle in the boiler main part outside, two-way threaded rod is located the inboard surface screw thread of recess and has cup jointed the slider, the quantity of slider is two. The utility model discloses it drives the two-way threaded rod and rotates to rotate the handle, makes the slider remove on two-way threaded rod surface, has controlled the lift of connecting rod to changed the height of supporting pad, changed the fixed degree to the intake pipe, improved the device's practicality.

Description

A kind of air inlet pipe installs stable burning boiler
Technical field
The present invention relates to burning boiler technical fields more particularly to a kind of air inlet pipe to install stable burning boiler.
Background technique
Boiler is a kind of energy conversion, and the energy inputted to boiler has chemical energy, electric energy in fuel, boiler output Steam, high-temperature water or organic heat carrier with certain thermal energy.The original meaning of pot refers to that the water container heated on fire, furnace refer to burning The place of fuel, boiler include pot and furnace two large divisions.The hot water or steam generated in boiler can directly be industrial production and people The people's livelihood is living to provide required thermal energy, mechanical energy can also be converted to by Steam Power Equipment, or again turn mechanical energy by generator It is changed to electric energy.The boiler for providing hot water is known as hot-water boiler, is mainly used for living, also there is a small amount of application in industrial production.It generates The boiler of steam is known as steam boiler, is often simply called boiler, is chiefly used in thermal power station, ship, locomotive and industrial and mining enterprises.
Currently on the market burning boiler when in use, be all directly by air inlet pipe and inlet channel activity installation connect, but Be air inlet pipe during the installation process, due to not fixed to it, be easy to cause certain shaking, therefore, need a kind of air inlet pipe Stable burning boiler is installed to solve the above problems.
Summary of the invention
The purpose of the present invention is to solve disadvantages existing in the prior art, and a kind of air inlet pipe proposed is installed and stablized Burning boiler.
To achieve the goals above, present invention employs following technical solutions:
A kind of air inlet pipe installs stable burning boiler, including boiler body, the inside of the boiler body offer into Gas channel, air inlet pipe is movably installed on the inside of the inlet channel, and the inside of the boiler body opens up fluted and places Slot, the placing groove are located at the top of groove, and bidirectional helical bar, the bidirectional helical bar are movably installed on the inside of the groove One end through boiler body and extend to the outside of boiler body, the bidirectional helical bar is located at one end on the outside of boiler body It is fixedly connected with handle, the surface screw thread that the bidirectional helical bar is located on the inside of groove is socketed with sliding block, the quantity of the sliding block It is two, the top movable of the sliding block is equipped with connecting rod, and the top of the connecting rod, which is run through boiler body and extended to, puts The inside of slot is set, the top movable of two connecting rods is equipped with supporting pad, and the air inlet pipe is located at upper on the inside of supporting pad It is square, it is fixedly installed with clamping plate at the top of the placing groove, the supporting pad and clamping plate are arcuate structure, the boiler body Inside is fixedly installed with heating duct, and the top fixation of the heating duct is communicated with heating branch pipe, and the inlet channel is located at Between heating duct and heating branch pipe.
Preferably, the boiler body is communicated with outlet pipe and water inlet pipe, the water inlet pipe far from the side fixation of handle Positioned at the top of outlet pipe, and the both ends of heating duct are connected to water inlet pipe and outlet pipe fixation respectively.
Preferably, the bottom of the boiler body is fixedly installed with support column, and the quantity of the support column is two, described The bottom of support column is fixedly installed with pedestal.
Preferably, the inside of the boiler body is fixedly installed with water tank, and the water tank is located under heating duct Side.
Preferably, the bottom of the water tank is fixed is communicated with drainpipe, and boiler body is run through in the bottom end of the drainpipe And extend to the outside of boiler body.
Preferably, the two sides of the boiler body are fixedly installed with connecting plate, and the quantity of the connecting plate is four.
Preferably, the inside of the connecting plate offers screw hole, and the connecting plate is threaded with screw rod by screw hole.
The invention has the benefit that
1. the air inlet pipe installs stable burning boiler, by being provided with bidirectional helical bar, swing handle drives two-way spiral shell Rasp bar rotation keeps sliding block mobile on bidirectional helical bar surface, the lifting of connecting rod is controlled, to change the height of supporting pad Degree, changes the fixation degree to air inlet pipe, improves the practicability of the device.
2. the air inlet pipe installs stable burning boiler, by being provided with water tank, since water tank is incline structure, add The condensed water that heat pipe generates falls on the bottom of water tank, and drainpipe is obliquely installed, and flows out ponding by drainpipe, avoids There are the hidden danger of ponding inside water tank.
3. the air inlet pipe installs stable burning boiler, by being provided with heating branch pipe, when air inlet pipe is into inlet channel When being passed through combustion gas makes boiler work, part water flow can be diverted to inside heating duct by heating branch pipe, the heat generated to boiler Amount is fully absorbed, and the utilization rate of resource is improved.
Detailed description of the invention
Fig. 1 is the air inlet pipe fixation structure schematic diagram that a kind of air inlet pipe proposed by the present invention installs stable burning boiler;
Fig. 2 is the schematic view of the front view that a kind of air inlet pipe proposed by the present invention installs stable burning boiler;
Fig. 3 is the schematic cross-sectional view that a kind of air inlet pipe proposed by the present invention installs stable burning boiler;
Fig. 4 is the air inlet pipe installation side view structure signal that a kind of air inlet pipe proposed by the present invention installs stable burning boiler Figure.
In figure: 1 pedestal, 2 support columns, 3 screw rods, 4 outlet pipes, 5 boiler bodies, 6 water inlet pipes, 7 connecting plates, 8 inlet channels, 9 air inlet pipe, 10 heating ducts, 11 water tanks, 12 drainpipes, 13 grooves, 14 sliding blocks, 15 connecting rods, 16 placing grooves, 17 supports Pad, 18 clamping plates, 19 bidirectional helical bars, 20 handles, 21 heating branch pipes.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-4, a kind of air inlet pipe installs stable burning boiler, including boiler body 5, the inside of boiler body 5 Inlet channel 8 is offered, the inside of inlet channel 8 is movably installed with air inlet pipe 9, and the inside of boiler body 5 opens up fluted 13 With placing groove 16, placing groove 16 is located at the top of groove 13, and the inside of groove 13 is movably installed with bidirectional helical bar 19, two-way spiral shell One end of rasp bar 19 runs through boiler body 5 and extends to the outside of boiler body 5, and bidirectional helical bar 19 is located at outside boiler body 5 One end of side is fixedly connected with handle 20, and the surface screw thread that bidirectional helical bar 19 is located at 13 inside of groove is socketed with sliding block 14, sliding The quantity of block 14 is two, and the top movable of sliding block 14 is equipped with connecting rod 15, and boiler body 5 is run through simultaneously in the top of connecting rod 15 The inside of placing groove 16 is extended to, the top movable of two connecting rods 15 is equipped with supporting pad 17, and air inlet pipe 9 is located at supporting pad 17 The top of inside, the top of placing groove 16 are fixedly installed with clamping plate 18, and supporting pad 17 and clamping plate 18 are arcuate structure, turning handle Hand 20 drives bidirectional helical bar 19 to rotate, and keeps sliding block 14 mobile on 19 surface of bidirectional helical bar, controls the lifting of connecting rod 15, To change the height of supporting pad 17, the fixation degree to air inlet pipe 9 is changed, the practicability of the device, boiler are improved The inside of main body 5 is fixedly installed with heating duct 10, and the top of heating duct 10 is fixed to be communicated with heating branch pipe 21, inlet channel 8 are located between heating duct 10 and heating branch pipe 21, when air inlet pipe 9 is passed through combustion gas into inlet channel 8, and boiler is made to work, portion Point water flow can be diverted to inside heating duct 10 by heating branch pipe 21, and the heat generated to boiler fully absorbs, and improves The utilization rate of resource.
In the present invention, boiler body 5 is communicated with outlet pipe 4 and water inlet pipe 6, water inlet pipe 6 far from the side fixation of handle 20 Positioned at the top of outlet pipe 4, and the both ends of heating duct 10 are connected to water inlet pipe 6 and the fixation of outlet pipe 4 respectively, boiler body 5 Bottom be fixedly installed with support column 2, the quantity of support column 2 is two, and the bottom of support column 2 is fixedly installed with pedestal 1, boiler The inside of main body 5 is fixedly installed with water tank 11, and water tank 11 is located at the lower section of heating duct 10, and the bottom of water tank 11 is fixed It is communicated with drainpipe 12, the bottom end of drainpipe 12 runs through boiler body 5 and extends to the outside of boiler body 5, due to water tank 11 be incline structure, and the condensed water that heating duct 10 generates falls on the bottom of water tank 11, and drainpipe 12 is obliquely installed, makes to accumulate Water is flowed out by drainpipe 12, avoids the hidden danger inside water tank 11 there are ponding, the two sides of boiler body 5 are fixedly mounted There is connecting plate 7, the quantity of connecting plate 7 is four, and the inside of connecting plate 7 offers screw hole, and connecting plate 7 is threadedly coupled by screw hole There is screw rod 3.
Working principle: in use, air inlet pipe 9 is flexibly connected with inlet channel 8, swing handle 20 drives bidirectional helical bar 19 rotations keep sliding block 14 mobile on 19 surface of bidirectional helical bar, the rising of connecting rod 15 are controlled, to change supporting pad 17 Height, supporting pad 17 is fixed to air inlet pipe 9 together with clamping plate 18, then by air inlet pipe 9 to inside inlet channel 8 Being passed through combustion gas makes boiler work, while injecting water source to heating duct 10 by water inlet pipe 6, and part water flow can be by heating branch pipe 21 are diverted to inside heating duct 10, and the heat generated to boiler fully absorbs, and the utilization rate of resource are improved, to boiler After work, the condensed water that heating duct 10 generates falls on the bottom of water tank 11, and being obliquely installed for drainpipe 12 makes ponding It is flowed out by drainpipe 12.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. a kind of air inlet pipe installs stable burning boiler, including boiler body (5), which is characterized in that the boiler body (5) Inside offer inlet channel (8), be movably installed with air inlet pipe (9), the boiler body on the inside of the inlet channel (8) (5) inside opens up fluted (13) and placing groove (16), and the placing groove (16) is located at the top of groove (13), the groove (13) it is movably installed on the inside of bidirectional helical bar (19), boiler body (5) are run through simultaneously in one end of the bidirectional helical bar (19) The outside of boiler body (5) is extended to, one end that the bidirectional helical bar (19) is located on the outside of boiler body (5) is fixedly connected with Handle (20), the bidirectional helical bar (19) are located at the surface screw thread on the inside of groove (13) and are socketed with sliding block (14), the sliding block (14) quantity is two, and the top movable of the sliding block (14) is equipped with connecting rod (15), the top of the connecting rod (15) Through boiler body (5) and the insides of placing groove (16) is extended to, the top movable of two connecting rods (15) is equipped with branch Stake pad (17), the air inlet pipe (9) are located at the top on the inside of supporting pad (17), are fixedly installed at the top of the placing groove (16) Clamping plate (18), the supporting pad (17) and clamping plate (18) are arcuate structure, and the inside of the boiler body (5) is fixedly installed with Heating duct (10), the top of the heating duct (10) is fixed to be communicated with heating branch pipe (21), and the inlet channel (8) is located at Between heating duct (10) and heating branch pipe (21).
2. a kind of air inlet pipe according to claim 1 installs stable burning boiler, which is characterized in that the boiler body (5) the side fixation far from handle (20) is communicated with outlet pipe (4) and water inlet pipe (6), and the water inlet pipe (6) is located at outlet pipe (4) top, and the both ends of heating duct (10) are connected to water inlet pipe (6) and outlet pipe (4) fixation respectively.
3. a kind of air inlet pipe according to claim 1 installs stable burning boiler, which is characterized in that the boiler body (5) bottom is fixedly installed with support column (2), and the quantity of the support column (2) is two, and the bottom of the support column (2) is solid Dingan County is equipped with pedestal (1).
4. a kind of air inlet pipe according to claim 1 installs stable burning boiler, which is characterized in that the boiler body (5) inside is fixedly installed with water tank (11), and the water tank (11) is located at the lower section of heating duct (10).
5. a kind of air inlet pipe according to claim 4 installs stable burning boiler, which is characterized in that the water tank (11) bottom fixation is communicated with drainpipe (12), and the bottom end of the drainpipe (12) through boiler body (5) and extends to pot The outside of furnace main body (5).
6. a kind of air inlet pipe according to claim 1 installs stable burning boiler, which is characterized in that the boiler body (5) two sides are fixedly installed with connecting plate (7), and the quantity of the connecting plate (7) is four.
7. a kind of air inlet pipe according to claim 6 installs stable burning boiler, which is characterized in that the connecting plate (7) inside offers screw hole, and the connecting plate (7) is threaded with screw rod (3) by screw hole.
CN201821400096.0U 2018-08-29 2018-08-29 Combustion boiler with stably installed air inlet pipe Expired - Fee Related CN208817701U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821400096.0U CN208817701U (en) 2018-08-29 2018-08-29 Combustion boiler with stably installed air inlet pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821400096.0U CN208817701U (en) 2018-08-29 2018-08-29 Combustion boiler with stably installed air inlet pipe

Publications (1)

Publication Number Publication Date
CN208817701U true CN208817701U (en) 2019-05-03

Family

ID=66274956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821400096.0U Expired - Fee Related CN208817701U (en) 2018-08-29 2018-08-29 Combustion boiler with stably installed air inlet pipe

Country Status (1)

Country Link
CN (1) CN208817701U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110514016A (en) * 2019-09-09 2019-11-29 湖南金铠新材料科技有限公司 A kind of equipment for being sintered anode material of lithium battery specific complex layer saggar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110514016A (en) * 2019-09-09 2019-11-29 湖南金铠新材料科技有限公司 A kind of equipment for being sintered anode material of lithium battery specific complex layer saggar
CN110514016B (en) * 2019-09-09 2021-01-08 湖南金铠新材料科技有限公司 Equipment for sintering composite layer saggar special for lithium battery anode material

Similar Documents

Publication Publication Date Title
CN208817701U (en) Combustion boiler with stably installed air inlet pipe
CN202452674U (en) Energy-saving boiler
CN205119209U (en) Heating system is united to production and use of marsh gas biological energy source and solar energy
CN202171315U (en) Movable high-efficiency electric water heater
CN108826665A (en) Combustion boiler with stably installed air inlet pipe
CN208817702U (en) Combustion boiler convenient to remove installation
CN208968036U (en) Combustion boiler with good air inlet pipe sealing performance
CN202125967U (en) Multifunctional cooking bench
CN204665696U (en) A kind of energy-efficient solar cooker water heater
CN208382600U (en) The hot water supply system of solar-heating
CN205351803U (en) Solar energy electrical heating heating shower all -in -one
CN204923181U (en) Novel multi -functional electric boiler of environmental protection energy storage
CN208846751U (en) Water guide pipe supporting device convenient to adjust for combustion boiler
CN206478850U (en) A kind of central air-conditioning hot-water boiler
CN201078711Y (en) Multi-functional domestic stove for room heating
CN208859855U (en) Unitized combustion boiler convenient to installation
CN204678398U (en) A kind of stove formula water heater
CN203215853U (en) Solar warming and heating integrated pressure bearing water tank
CN201225607Y (en) Energy-saving coal-firing water boiler
CN202915408U (en) Multi-heat-source collector
CN207797367U (en) A kind of boiler easy to remove
CN208010317U (en) A kind of natural gas wellhead heating device
CN202692458U (en) Compound circulating efficient hot water storage tank type solar water heater
CN208859865U (en) Smoke exhaust pipe convenient to overhaul and replace for combustion boiler
CN102135324A (en) Hot water storage tank

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190503

Termination date: 20190829

CF01 Termination of patent right due to non-payment of annual fee