CN208816042U CN201821650932.0U CN201821650932U CN208816042U CN 208816042 U CN208816042 U CN 208816042U CN 201821650932 U CN201821650932 U CN 201821650932U CN 208816042 U CN208816042 U CN 208816042U
Authority
CN
China
Prior art keywords
drill bit
drill
crossbeam
hook
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821650932.0U
Other languages
Chinese (zh)
Inventor
陈福亮
陈有双
刘晶晶
王立民
焦阳
柴子萱
于万会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tangshan Power Supply Co of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201821650932.0U priority Critical patent/CN208816042U/en
Application granted granted Critical
Publication of CN208816042U publication Critical patent/CN208816042U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of rock bars to cheat drilling device, belong to electric pole of electric power circuit infrastructure technical field.Technical solution is: two (9) of hook one (8) and hook is respectively equipped on crossbeam (3), elevator (4) is hooked on crossbeam (3) by linking up with one (8), and elevator (4) is connected by cable one (11) with generator (17);Electric drill (14) is arranged on support arm (20), and the both ends of support arm (20) are equipped with pulley, and in slideway (6), electric drill (14) is connected by cable two (15) and start button (16) with generator for pulley matching setting;The top of electric drill is equipped with hanging ring (18), and hanging ring is connected by wirerope (10) with elevator (4);The bottom end of electric drill is connected by drill bit fixing bolt (21) with drill bit.The utility model structure is simple, easy for construction, does not have to large area and excavates, and not the advantages that welding, short construction period, work efficiency is high, and construction cost is low, and safety coefficient is high.

Description

A kind of rock bar hole drilling device
Technical field
The utility model relates to a kind of rock bars to cheat drilling device, belong to electric pole of electric power circuit infrastructure technical field.
Background technique
In rural power grids engineering pole-foundation excavation construction, artificial cutting would generally be taken when encountering rock geology, uses hand The equipment such as hammer, hammer drill, electric pick, pneumatic pick;Mechanical work is dug using hook crusher machine hammer;Medicament uses voiceless demolition swelling agent.People It is long, at high cost that work digs speed slow, low efficiency, period.It is hammered into shape using hook crusher machine since work surface is narrow and digs hour hammer in rock bar hole Body is slightly not easy catalase, must large area excavate, can only get half the result with twice the effort, and some places machinery is also difficult to Position.First perforating, powder charge are needed using swelling agent, rock could be overhanged to a striped after waiting 24 hours, then carry out artificial or machine Tool is dug.For this method to ambient temperature requirements harshness, long construction period is costly.
Utility model content
The purpose of the utility model is to provide a kind of rock bars to cheat drilling device, changes previous rock bar hole excavation method, Short construction period, work efficiency is high, and construction cost is low, not welding, solves the above problem existing for background technique.
The technical solution of the utility model is:
A kind of rock bar hole drilling device includes pedestal, bracket, crossbeam, elevator, slideway, hook one, hook two, steel The fixed spiral shell of cord, cable one, water tank, water pipe, electric drill, cable two, start button, generator, hanging ring, drill bit, support arm and drill bit Bolt;Pedestal is rectangular frame, and bracket is two, is symmetricly set on the two sides of pedestal, the top of two brackets is arranged in beam vertical Between end, bracket is equipped with slideway;Hook one and hook two are respectively equipped on crossbeam, elevator is hooked on crossbeam by hook one On, water tank is hooked on crossbeam by hook two, and elevator is connected by cable one with generator;Electric drill is arranged in support arm On, the both ends of support arm are equipped with pulley, and pulley matching is arranged in slideway, and electric drill passes through cable two and start button and generator phase Connection;The top of electric drill is equipped with hanging ring, and hanging ring is connected by wirerope with elevator, and water tank is connected by water pipe with drill bit It connects;The bottom end of electric drill is connected by drill bit fixing bolt with drill bit.
Drilling platform structure is made of pedestal, bracket, crossbeam, elevator, slideway, hook one, hook two and wirerope;Electricity Source device includes cable one, cable two, start button and generator;Drilling device includes water tank, water pipe, electric drill, hanging ring, brill Head, support arm, drill bit fixing bolt and hitch.
Two brackets are symmetricly set on the two sides of pedestal by fixing bolt, and crossbeam is vertically arranged by fixing bolt Between the top of two brackets.
It also include remote controler, the wireless signal receive-transmit system of remote controler and elevator matches.
The drilling device also includes extension bar, and the drill bit fixing bolt of electric drill bottom end passes through the top of hitch and extension bar It is connected, the bottom end of extension bar is connected by hitch with drill bit.
The drill bit is drill bit one, and drill bit one is diameter 350mm core drill bucket, long 50mm.
The drill bit is drill bit two, and drill bit two is diameter 80mm core drill bucket, long 50mm.
The elevator, wireless signal receive-transmit system, remote controler and generator are common equipment known in this field.
The good effect of the utility model: having structure simple, easy for construction, does not have to large area and excavates, not welding The advantages that, short construction period, work efficiency is high, and construction cost is low, and safety coefficient is high.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is one structural schematic diagram of drill bit of the present invention;
Fig. 3 is extension bar structural schematic diagram of the present invention;
Fig. 4 is two structural schematic diagram of drill bit of the present invention;
In figure: pedestal 1, bracket 2, crossbeam 3, elevator 4, remote controler 5, slideway 6, fixing bolt 7, hook 1, hook two 9, wirerope 10, cable 1, water tank 12, water pipe 13, electric drill 14, cable 2 15, start button 16, generator 17, hanging ring 18, Drill bit 1, support arm 20, drill bit fixing bolt 21, extension bar 22, hitch 23, drill bit 2 24, stone column 30, central aperture 31.
Specific embodiment
The utility model is described further with reference to the accompanying drawings and examples:
A kind of rock bar hole drilling device, includes pedestal 1, bracket 2, crossbeam 3, elevator 4, slideway 6, hook 1, hook 29, wirerope 10, cable 1, water tank 12, water pipe 13, electric drill 14, cable 2 15, start button 16, generator 17, hanging ring 18, drill bit, support arm 20 and drill bit fixing bolt 21;Pedestal 1 is rectangular frame, and bracket 2 is two, is symmetricly set on pedestal 1 Two sides, crossbeam 3 are vertically set between the top of two brackets 2, and bracket 2 is equipped with slideway 6;Hook is respectively equipped on crossbeam 3 One 8 are hooked on crossbeam 3 with hook 29, elevator 4 by hook 1, and water tank 12 is hooked on crossbeam 3 by linking up with 29, Elevator 4 is connected by cable 1 with generator 17;Electric drill 14 is arranged on support arm 20, and the both ends of support arm 20, which are equipped with, to be slided Wheel, pulley matching are arranged in slideway 6, and electric drill 14 is connected by cable 2 15 and start button 16 with generator 17;Electric drill 14 top is equipped with hanging ring 18, and hanging ring 18 is connected by wirerope 10 with elevator 4, and water tank 12 passes through water pipe 13 and drill bit phase Connection;The bottom end of electric drill 14 is connected by drill bit fixing bolt 21 with drill bit.
Two brackets 2 are symmetricly set on the two sides of pedestal 1 by fixing bolt 7, and crossbeam 3 is hung down by fixing bolt 7 Directly it is arranged between the top of two brackets 2.
It include also remote controler 5, remote controler 5 and the wireless signal receive-transmit system of elevator 4 match.
The drilling device also includes extension bar 22, and the drill bit fixing bolt 21 of 14 bottom end of electric drill by hitch 23 and lengthens The top of bar 22 is connected, and the bottom end of extension bar 22 is connected by hitch 23 with drill bit.
The drill bit is drill bit 1, and drill bit 1 is diameter 350mm core drill bucket, long 50mm.
The drill bit is drill bit 2 24, and drill bit 2 24 is diameter 80mm core drill bucket, long 50mm.
The bracket 2 is 150mm high, and bracket is equipped with slideway 6.
The pedestal 1 is square frame, and every side length 100mm, the right and left fixing bolt 7 and bracket 2 are fixed.
The crossbeam 3 is 100mm long, and centre is equipped with hook one, for hanging elevator 4, hook 29 is additionally provided with, for hanging Hang water tank 12.
Described 20 one end of support arm and electric drill 14 are fixed, and the other end makes electric drill 14 with pulley, pulley setting is equipped in slideway 6 It is moved up and down in slideway 6 with support arm 20.
Construction method step is as follows:
The first step walks clearly the bar hole peripheral ground surface dust for needing to excavate, smooth one piece of 1.2m square construction site out;
Second step installs drilling platform structure:
1. pedestal 1 is placed above center on construction ground, two 2 bottom end fixing bolts 7 of bracket are fixed on 1 two sides of pedestal, then crossbeam 3 and 2 top of bracket is fixed with fixing bolt 7;
2. elevator 4 is suspended on hook 1,10 one end of wirerope is hung on elevator 4, and the other end hangs over electric drill 14 Hanging ring 18 on, connect the cable 1 between elevator 4 and generator 17;
Third step installs drilling device, carries out bore operation:
1. being arranged electric drill 14 on support arm 20, the both ends of support arm 20 are equipped with pulley, and pulley is arranged in slideway 6, opens Dynamic elevator 4 tightens wirerope 10, and electric drill 14 is suspended to 2 lower section of bracket;
2. connecting the cable 2 15 between electric drill 14 and generator 17, water tank 12 is suspended on hook 29, even good water pipe 13;
3. installing the drill bit 1 of electric drill 14, drill bit 1 is fallen on what needs excavated by remote controller 5, elevator 4 Bar is cheated on position, and electric drill 14 is started;
4. remote controller 5 promotes electric drill 14, when drill bit 1 bassets when drill bit 1 gets into 50mm depth Afterwards, 14 shutdown switch of electric drill is pressed, the rock face of construction site is drilled out the stone column that a diameter is 350mm by drill bit 1 at this time 30;
5. drill bit 1 is unloaded, more bit change 2 24, drill bit 2 24 is fallen on the center of circle position of stone column 30 by remote controller 5 It sets, starts electric drill 14;
6. remote controller 5 promotes electric drill 14 and presses electricity after drill bit 2 24 bassets when getting into 50mm depth 14 shutdown switches are bored, drill bit 2 24 drills out central aperture 31 on the center location of stone column 30 at this time.

Claims (5)

1. a kind of rock bar cheats drilling device, it is characterised in that: comprising pedestal (1), bracket (2), crossbeam (3), elevator (4), Slideway (6), hook one (8), hook two (9), wirerope (10), cable one (11), water tank (12), water pipe (13), electric drill (14), Cable two (15), start button (16), generator (17), hanging ring (18), drill bit, support arm (20) and drill bit fixing bolt (21); Pedestal (1) is rectangular frame, and bracket (2) is two, is symmetricly set on the two sides of pedestal (1), crossbeam (3) is vertically set on two Between the top of bracket (2), bracket (2) is equipped with slideway (6);Two (9) of hook one (8) and hook are respectively equipped on crossbeam (3), Elevator (4) is hooked on crossbeam (3) by linking up with one (8), and water tank (12) is hooked on crossbeam (3) by linking up with two (9), is mentioned Machine (4) are risen to be connected by cable one (11) with generator (17);Electric drill (14) is arranged on support arm (20), and the two of support arm (20) End is equipped with pulley, and in slideway (6), electric drill (14) passes through cable two (15) and start button (16) and power generation for pulley matching setting Machine (17) is connected;The top of electric drill (14) is equipped with hanging ring (18), and hanging ring (18) is connected by wirerope (10) with elevator (4) It connects, water tank (12) is connected by water pipe (13) with drill bit;The bottom end of electric drill (14) passes through drill bit fixing bolt (21) and drill bit It is connected.
2. a kind of rock bar according to claim 1 cheats drilling device, it is characterised in that: two brackets (2) pass through Fixing bolt (7) is symmetricly set on the two sides of pedestal (1), and crossbeam (3) is vertically set on two brackets by fixing bolt (7) (2) between top.
3. a kind of rock bar according to claim 1 cheats drilling device, it is characterised in that: also include extension bar (22) electricity The drill bit fixing bolt (21) for boring (14) bottom end is connected by hitch (23) with the top of extension bar (22), extension bar (22) Bottom end is connected by hitch (23) with drill bit.
4. a kind of rock bar according to claim 1 or 3 cheats drilling device, it is characterised in that: the drill bit is drill bit one (19), drill bit one (19) is diameter 350mm core drill bucket, long 50mm.
5. a kind of rock bar according to claim 1 or 3 cheats drilling device, it is characterised in that: the drill bit is drill bit two (24), drill bit two (24) is diameter 80mm core drill bucket, long 50mm.
CN201821650932.0U 2018-10-12 2018-10-12 A kind of rock bar hole drilling device Active CN208816042U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821650932.0U CN208816042U (en) 2018-10-12 2018-10-12 A kind of rock bar hole drilling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821650932.0U CN208816042U (en) 2018-10-12 2018-10-12 A kind of rock bar hole drilling device

Publications (1)

Publication Number Publication Date
CN208816042U true CN208816042U (en) 2019-05-03

Family

ID=66279588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821650932.0U Active CN208816042U (en) 2018-10-12 2018-10-12 A kind of rock bar hole drilling device

Country Status (1)

Country Link
CN (1) CN208816042U (en)

Similar Documents

Publication Publication Date Title
CN101832103B (en) Movable two-arm hanging wall anchor rod and anchor cable construction drill carriage
CN104929517A (en) Full-hydraulic drill type pressure relieving equipment with double drill bits and pressure relieving method
CN102733433A (en) Hole-digging and poling all-in-one machine
CN105697018A (en) Shaft excavation construction technology
CN209604053U (en) Combined bolting and shotcrete operation rock bolting jumbo
CN208816042U (en) A kind of rock bar hole drilling device
CN110344414A (en) A kind of pilot hole plant stake piling all-in-one machine
CN102926654B (en) Stake holes ring cutting system and stake holes ring cutting method
CN110206571B (en) Anchor rod trolley for tunnel anchor rod support construction and operation method thereof
CN106049495B (en) A kind of special equipment and its construction method for the cutting of underground engineering anchor cable
CN208431000U (en) Deep shaft rock ripper
CN201306118Y (en) Hydraulic shaft-well drill
CN204326963U (en) The anti-well boring device of a kind of vertical shaft
CN202946012U (en) Sleeving spiral drilling machine for pile head processing
CN205400768U (en) Anchor rope integration platform truck
CN109083592A (en) A kind of rock bar hole excavation structure and its construction method
CN201817809U (en) DTH hammer and all casing drill combined machine
CN102913121B (en) Flexible swing pipe vibrator boring machine
CN210289617U (en) Ultra-large aperture pore-forming working device suitable for complex geological conditions
CN214035518U (en) Trompil device is used in mine blasting
CN109519120B (en) Fragmentation device for rock excavation of fractured rock stratum and mounting and using methods thereof
CN202937179U (en) Pile hole circular cutting system
CN220581850U (en) Pipe-jacking pipeline support device and pipe-jacking pipeline
CN203756030U (en) Drill machine device