CN208805095U - A kind of heat exchanger end cap of integrated rubber ball cleaning equipment - Google Patents

A kind of heat exchanger end cap of integrated rubber ball cleaning equipment Download PDF

Info

Publication number
CN208805095U
CN208805095U CN201821215230.XU CN201821215230U CN208805095U CN 208805095 U CN208805095 U CN 208805095U CN 201821215230 U CN201821215230 U CN 201821215230U CN 208805095 U CN208805095 U CN 208805095U
Authority
CN
China
Prior art keywords
heat exchanger
end cap
ball
mouth
cooling water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821215230.XU
Other languages
Chinese (zh)
Inventor
杨健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MARTON ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Original Assignee
GUANGZHOU MARTON ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=66230955&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN208805095(U) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by GUANGZHOU MARTON ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd filed Critical GUANGZHOU MARTON ENVIRONMENTAL PROTECTION TECHNOLOGY Co Ltd
Priority to CN201821215230.XU priority Critical patent/CN208805095U/en
Application granted granted Critical
Publication of CN208805095U publication Critical patent/CN208805095U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model discloses a kind of heat exchanger end caps of integrated rubber ball cleaning equipment, including the receipts ball filter screen that the ball-collecter on the outside of heat exchanger end cap and booster pump is arranged in and is arranged on the inside of heat exchanger end cap, cooling water inlet pipe connector and cooling water outlet pipe connector are connected on heat exchanger end cap, cooling water inlet pipe connector is equipped with water sucking mouth and service mouth, cooling water outlet pipe connector is equipped with discharge outlet and receives ball mouth, the utility model is by increasing booster pump in rubber ball cleaning equipment, effectively improve the pressure in entire rubber ball cleaning equipment in glueballs circulation loop, it solves water sucking mouth in the prior art and service mouth needs that longer-distance drawback at interval is arranged, simultaneously, the pressurization of circulation loop is realized by booster pump, it also can be efficiently real so that water sucking mouth and service mouth are arranged on the shorter cooling water inlet pipe connector of length The quick service and recycling of existing glueballs, space needed for greatly reducing the installation of rubber ball cleaning equipment.

Description

A kind of heat exchanger end cap of integrated rubber ball cleaning equipment
Technical field
The utility model relates to technical field of heat exchangers, in particular to a kind of heat exchanger end of integrated rubber ball cleaning equipment Lid.
Background technique
Currently, in order to make the glueballs in heat exchanger cleaning equipment that can realize service under the power of hydraulic pressure and receive following for ball Ring, generally all can be arranged larger distance at interval for water sucking mouth and service mouth, be greater than service mouth to reach the pressure of water sucking mouth Pressure, guarantee glueballs can smoothly be issued out of ball-collecter.In this patent of Publication No. CN104896993A, it is exactly Glueballs recycling is carried out as driving force using the difference of hydrodynamic and static pressure and glueballs injects, in order to obtain biggish pressure difference, Water sucking mouth and service mouth need to be arranged to be spaced a distance, and just be able to satisfy required pressure difference.In this way, which heat exchanger cleaning is set Standby can only be arranged on the cooling water inlet pipe and cooling water outlet pipe being connected with heat exchanger end cap, this also results in heat exchanger Cleaning equipment can occupy a large amount of installation space, on the one hand reduce the installation adaptability of integral device, be on the other hand not easy to Realize space saving with make full use of.
Utility model content
The integrated glueballs that equipment occupation space can be reduced the technical problem to be solved by the utility model is to provide one kind is clear Wash the heat exchanger end cap of equipment.
Used technical solution to solve above-mentioned technical problem: a kind of heat exchanger end cap of integrated rubber ball cleaning equipment, Including the receipts ball filter screen that the ball-collecter on the outside of heat exchanger end cap and booster pump is arranged in and is arranged on the inside of heat exchanger end cap, Cooling water inlet pipe connector and cooling water outlet pipe connector, the cooling water inlet pipe connector are connected on the heat exchanger end cap It is equipped with water sucking mouth and service mouth, the cooling water outlet pipe connector is equipped with discharge outlet and receives ball mouth, the both ends of the ball-collecter Portion is respectively equipped with upper port and lower port, and the bosom of the ball-collecter is equipped with filter and places between filter and upper port There is glueballs, the lower port is divided into two to form the first pipeline being connected to water sucking mouth and second be connected to discharge outlet pipe Road, is provided with triple valve A, two water inlets of the triple valve A and the first pipeline connection on first pipeline, and described second Triple valve B, two water inlets of the triple valve B and the second pipeline connection, the triple valve A and triple valve are provided on pipeline Booster pump is connected between the water outlet of B, the upper port is divided into two to form third pipeline and the 4th pipeline, the third pipe Road is equipped with check valve A and passes through service mouth and stretches in cooling water inlet pipe connector, and the 4th pipeline is equipped with check valve B, the 4th pipeline pass through receipts ball mouth and stretch in cooling water outlet pipe connector and be connected to ball filter screen is received.
Further, the ball-collecter is horizontally installed on cooling water inlet pipe connector and cooling water outlet pipe connector is formed Gap in, the upper port and lower port are directed to the radial direction of heat exchanger end cap.
Further, the booster pump is arranged side by side against ball-collecter.
Further, the pipeline section of check valve A and check valve B is provided in horizontally disposed.
Further, the triple valve A and triple valve B is three-way electric valve.
The utility model has the advantages that by rubber ball cleaning integration of equipments heat exchanger end cap, and with heat exchanger end cap formed integral type peace Dress, on the one hand greatly reduces the outer dimension of whole equipment, reduces requirement of the equipment to installation dimension, on the other hand Reduce the installation complexity of integral device.Meanwhile by increasing booster pump in rubber ball cleaning equipment, effectively improve Pressure in entire rubber ball cleaning equipment in glueballs circulation loop, solves water sucking mouth in the prior art and service mouth needs to be arranged Longer-distance drawback at interval, the utility model realizes the pressurization of circulation loop by booster pump, so that by water sucking mouth and hair The quick service and recycling that also can efficiently realize glueballs is arranged on the shorter cooling water inlet pipe connector of length in ball mouth, significantly Space needed for reducing the installation of rubber ball cleaning equipment.
Detailed description of the invention
The utility model is described further with reference to the accompanying drawings and examples:
Fig. 1 is the diagrammatic cross-section of the heat exchanger end cap of integrated rubber ball cleaning equipment;
Fig. 2 is the front view of the heat exchanger end cap of integrated rubber ball cleaning equipment;
Fig. 3 is the leftschematic diagram of Fig. 2;
Fig. 4 is the right side schematic view of Fig. 2.
Specific embodiment
Referring to figs. 1 to Fig. 4, the utility model provides a kind of heat exchanger end cap of integrated rubber ball cleaning equipment, the heat exchanger The outside of end cap 1 is symmetrically arranged with cooling water inlet pipe connector 3 and cooling water outlet pipe connector 2, and wherein cooling water inlet pipe connects First 3 are located at the lower part in figure, and cooling water outlet pipe connector 2 is located at the top in figure.The inside of heat exchanger end cap 1 is provided with receipts ball Filter screen 4.
Gap between cooling water inlet pipe connector 3 and cooling water outlet pipe connector 2 is placed with ball-collecter 5 and booster pump 6, specifically, ball-collecter 5 is in be horizontally installed between cooling water inlet pipe connector 3 and cooling water outlet pipe connector 2, ball-collecter 5 Upper port and lower port be directed to the radial direction of heat exchanger end cap 1, booster pump 6 is arranged side by side against ball-collecter 5, and booster pump 6 are located substantially near the end that heat exchanger end cap 1 is arranged in.Meanwhile cooling water inlet pipe connector 3 is equipped with water sucking mouth 21 and service mouth 22, in axially spaced a small distance of cooling water inlet pipe connector 3, water sucking mouth 21 is located at cooling for water sucking mouth 21 and service mouth 22 The upstream of water admitting pipe joint 3.Or water sucking mouth 21 and service mouth 22 are substantially disposed in the same diameter of cooling water inlet pipe connector 3 Into plane, this spacing for just sufficiently shortening water sucking mouth 21 between mouth 22 of serving a ball, while ensuring that at water sucking mouth 21 Pressure is greater than the pressure at service mouth 22;Cooling water outlet pipe connector 2 is equipped with discharge outlet 23 and receives ball mouth 24, discharge outlet 23 and receipts Ball mouth 24 is substantially disposed in the same sagittal plane of cooling water outlet pipe connector 2, also be can reach and is shortened discharge outlet 23 and receipts ball Spacing between mouth 24.
The bosom of ball-collecter 5 is equipped with filter and is placed with glueballs between filter and upper port, and the lower of ball-collecter 5 leads to Mouth is divided into two to form the first pipeline 31 being connected to water sucking mouth 21 and the second pipeline 32 being connected to discharge outlet 23, such as Fig. 4 It is shown, water sucking mouth 21 and discharge outlet 23 and lower port be located at it is ipsilateral, convenient for simplifying pipeline and shortening the length of pipeline.First pipe Triple valve A12 is provided on road 31, two water inlets of triple valve A12 are connected to the first pipeline 31, are arranged on the second pipeline 32 There is triple valve B11, two water inlets of triple valve B11 are connected to the second pipeline 32, the water outlet of triple valve A12 and triple valve B11 Booster pump 6 is connected between mouthful.Specifically, triple valve A12 and triple valve B11 is three-way electric valve.
The upper port of ball-collecter 5 is divided into two to form third pipeline 33 and the 4th pipeline 34, and third pipeline 33 is equipped with single To valve A14 and pass through service mouth 22 stretch in cooling water inlet pipe connector 3, the 4th pipeline 34 be equipped with check valve B13, the 4th Pipeline 34 passes through receipts ball mouth 24 and stretches in cooling water outlet pipe connector 2 and be connected to ball filter screen 4 is received.Wherein, serve a ball mouth 22, It receives ball mouth 24 and upper port is located at ipsilateral, the same length convenient for simplifying pipeline and shortening pipeline.
First pipeline 31, the second pipeline 32, third pipeline 33 and the 4th pipeline 34 can be weldingly fixed on cooling water into In water pipe head 3 or cooling water outlet pipe connector 2, and then realize the fixed installation of entire rubber ball cleaning equipment.
By rubber ball cleaning integration of equipments heat exchanger end cap, and with heat exchanger end cap 1 formed integral type installation, sufficiently benefit With the space of heat exchanger end cap 1, the outer dimension of whole equipment is on the one hand greatly reduced, reduces the equipment to installation dimension Requirement, on the other hand also reduce the installation complexity of integral device.Meanwhile being increased by increasing in rubber ball cleaning equipment Press pump 6 effectively improves the pressure in entire rubber ball cleaning equipment in glueballs circulation loop, solves and absorb water in the prior art Mouth 21 and service mouth 22 need to be arranged longer-distance drawback at interval, and the utility model passes through booster pump 6 and realizes circulation loop Pressurization so that be arranged in also can be efficient on the shorter cooling water inlet pipe connector 3 of length by water sucking mouth 21 and service mouth 22 Realize the quick service and recycling of glueballs, space needed for greatly reducing the installation of rubber ball cleaning equipment.
The following are the descriptions of the working principle of rubber ball cleaning equipment:
Service process: one of water inlet of control triple valve A12 is connected to water sucking mouth 21, another water inlet closes It closes, while the water outlet of triple valve A12 is connected to the entrance of booster pump 6;Control the water outlet and booster pump 6 of triple valve B11 Outlet, meanwhile, one of water inlet of triple valve B11 is connected to lower port, another water outlet is closed.In booster pump Under the action of 6, glueballs is flowed out out of ball-collecter 5, injects cooling water inlet pipe connector 3 from service mouth 22 after check valve A14 In, then enter condenser with cooling water, clean copper pipe, glueballs rests in receipts ball filter screen 4 after having cleaned copper pipe, cooling Water is discharged through cooling water outlet pipe connector 2.Wherein, although water sucking mouth 21 and service mouth 22 are the same as on cooling water inlet pipe connector 3 And it is separated by not far, but under the action of booster pump 6, improve the water flow pressure in water sucking mouth 21 and third pipeline 33, phase When in provide one make cooling water flow into the power in cooling water inlet pipe connector 3, allow glueballs smoothly through sending out Ball mouth 22 enters in cooling water outlet pipe connector 2, solves service mouth 22 and water sucking mouth 21 needs to be arranged the disadvantage of larger space (purpose of service mouth 22 and the setting of water sucking mouth 21 larger space is to provide for a biggish pressure difference drop, so that water suction at end The pressure of mouth 21 is greater than the pressure of service mouth 22), and then reached the problem for saving installation space.
Receive ball process: control triple valve A12 water outlet be connected to the entrance of booster pump 6, meanwhile, triple valve A12 its In a water inlet be connected to lower port, another water outlet close;Control one of water inlet and the draining of triple valve B11 Mouth 23 is connected to, another water inlet is closed, while the outlet of the water outlet of triple valve B11 and booster pump 6.In booster pump 6 Under the action of, glueballs is flowed out and washes check valve B13 open from receiving in ball filter screen 4, and then is recycled in ball-collecter 5, glueballs every It is rested under the action of net in ball-collecter 5, water flow is after filter again after triple valve A12, booster pump 6 and triple valve B11 It flows out in cooling water outlet pipe connector 2.Wherein, although receiving ball mouth 24 and discharge outlet 23 on cooling water outlet pipe connector 2 And be separated by not far or be arranged in parallel, but under the action of booster pump 6, improve and receive in ball mouth 24 and the second pipeline 32 Water flow pressure is equivalent to offer one and cooling water is made to flow into the power in cooling water outlet pipe connector 2, is easy to implement entire The circulation for receiving ball process, solves receipts ball mouth 24 and discharge outlet 23 needs the drawbacks of larger space is arranged (to receive ball mouth 24 and draining The purposes that larger spaces are arranged in mouth 23 are to provide for a biggish pressure difference drop, drain so that the pressure for receiving ball mouth 24 is greater than The pressure of mouth 23), and then reached the problem for saving installation space.
Meanwhile this rubber ball cleaning equipment has preferably versatility, the rubber ball cleaning equipment is by common general component It is composed.In most of medium-and-large-sized refrigeration equipments, this rubber ball cleaning equipment can be used as completely plug-in appurtenances into Row design installation, and apparent influence will not be generated on the end cap of refrigeration equipment.After being designed in this way, rubber ball cleaning equipment and system Cool equipment end cap is integrated, and the outer dimension and installation difficulty of whole equipment can be greatly reduced, and the installation of whole system just turns The conventional installation for becoming refrigeration equipment, without considering further that the design and installation problem of rubber ball cleaning equipment, greatly simplifies peace The workload of dress and save installation space.
Preferably, the pipeline section design for being provided with check valve A14 and check valve B13 is horizontal, it is easy to implement check valve A14's and check valve B13 is on and off.
The embodiments of the present invention is explained in detail above in conjunction with attached drawing, but the utility model is not limited to State embodiment, technical field those of ordinary skill within the scope of knowledge, the utility model can also not departed from Various changes can be made under the premise of objective.

Claims (5)

1. a kind of heat exchanger end cap of integrated rubber ball cleaning equipment, it is characterised in that: including being arranged on the outside of heat exchanger end cap Ball-collecter and booster pump and the receipts ball filter screen being arranged on the inside of heat exchanger end cap are connected with cooling on the heat exchanger end cap Water admitting pipe joint and cooling water outlet pipe connector, the cooling water inlet pipe connector is equipped with water sucking mouth and service mouth, described Cooling water outlet pipe connector is equipped with discharge outlet and receives ball mouth, and the both ends of the ball-collecter are respectively equipped with upper port and lower port, The bosom of the ball-collecter is equipped with filter and is placed with glueballs between filter and upper port, and the lower port is divided into two The first pipeline being connected to water sucking mouth and the second pipeline being connected to discharge outlet are formed, is provided with threeway on first pipeline Valve A, two water inlets of the triple valve A and the first pipeline connection, are provided with triple valve B on second pipeline, and described three Two water inlets of port valve B and the second pipeline connection are connected with booster pump between the triple valve A and the water outlet of triple valve B, The upper port is divided into two to form third pipeline and the 4th pipeline, and the third pipeline is equipped with check valve A and passes through service Mouth stretches in cooling water inlet pipe connector, and the 4th pipeline is equipped with check valve B, and the 4th pipeline passes through receipts ball mouth and stretches Enter in cooling water outlet pipe connector and with ball filter screen is received and is connected to.
2. the heat exchanger end cap of integrated rubber ball cleaning equipment according to claim 1, it is characterised in that: the ball-collecter is horizontal It is formed by gap to being arranged in cooling water inlet pipe connector and cooling water outlet pipe connector, the upper port and lower port are equal It is directed toward the radial direction of heat exchanger end cap.
3. the heat exchanger end cap of integrated rubber ball cleaning equipment according to claim 2, it is characterised in that: the booster pump is tight It is arranged side by side by ball-collecter.
4. the heat exchanger end cap of integrated rubber ball cleaning equipment according to claim 1, it is characterised in that: be provided with check valve The pipeline section of A and check valve B are in horizontally disposed.
5. the heat exchanger end cap of integrated rubber ball cleaning equipment according to any one of claims 1 to 4, it is characterised in that: institute Stating triple valve A and triple valve B is three-way electric valve.
CN201821215230.XU 2018-07-27 2018-07-27 A kind of heat exchanger end cap of integrated rubber ball cleaning equipment Active CN208805095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821215230.XU CN208805095U (en) 2018-07-27 2018-07-27 A kind of heat exchanger end cap of integrated rubber ball cleaning equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821215230.XU CN208805095U (en) 2018-07-27 2018-07-27 A kind of heat exchanger end cap of integrated rubber ball cleaning equipment

Publications (1)

Publication Number Publication Date
CN208805095U true CN208805095U (en) 2019-04-30

Family

ID=66230955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821215230.XU Active CN208805095U (en) 2018-07-27 2018-07-27 A kind of heat exchanger end cap of integrated rubber ball cleaning equipment

Country Status (1)

Country Link
CN (1) CN208805095U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110470168A (en) * 2019-09-20 2019-11-19 深圳市勤达富流体机电设备有限公司 A kind of duplex formula rubber ball cleaning machine
WO2020020065A1 (en) * 2018-07-27 2020-01-30 广州马顿环保科技有限公司 Heat exchanger end cover for integrated rubber ball cleaning apparatus
CN113804041A (en) * 2020-06-17 2021-12-17 重庆美的通用制冷设备有限公司 End cover structure and water chilling unit

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020020065A1 (en) * 2018-07-27 2020-01-30 广州马顿环保科技有限公司 Heat exchanger end cover for integrated rubber ball cleaning apparatus
US11965703B2 (en) 2018-07-27 2024-04-23 Guangzhou Marton Environmental Technology Co., Ltd. Heat exchanger end cover integrated with rubber ball cleaning apparatus
CN110470168A (en) * 2019-09-20 2019-11-19 深圳市勤达富流体机电设备有限公司 A kind of duplex formula rubber ball cleaning machine
CN110470168B (en) * 2019-09-20 2024-01-30 深圳市勤达富流体机电设备有限公司 Duplex type rubber ball cleaning machine
CN113804041A (en) * 2020-06-17 2021-12-17 重庆美的通用制冷设备有限公司 End cover structure and water chilling unit
CN113804041B (en) * 2020-06-17 2022-09-23 重庆美的通用制冷设备有限公司 End cover structure and water chilling unit
EP4119883A4 (en) * 2020-06-17 2023-09-20 Chongqing Midea General Refrigeration Equipment Co., Ltd. End cover structure and water chiller

Similar Documents

Publication Publication Date Title
CN208805095U (en) A kind of heat exchanger end cap of integrated rubber ball cleaning equipment
CN108687027A (en) Energy-saving CIP automatic cleaning systems with pneumatic jack soda acid technology
CN211405196U (en) Cooling device for box-type substation
CN207963536U (en) A kind of cooling tower fog dispersal water collector
US11965703B2 (en) Heat exchanger end cover integrated with rubber ball cleaning apparatus
CN203336987U (en) Condenser
CN108286913A (en) A kind of rubber ball cleaning angled service system with high and low pressure condenser
CN208765572U (en) A kind of condenser on-line cleaning system
CN105387612B (en) A kind of energy-saving shower bath
CN201582984U (en) Heat pump water heater capable of recovering heat energy of waste water
CN205841533U (en) There is the turbine-generator units bearing cooling system of recoil effect
CN204483378U (en) A kind of heat pump is hair washing bed
CN206089631U (en) Novel monomer saccharification is filtered in cooling from area device
CN101749861A (en) Heat pump water heater capable of recovering heat energy of waste water
CN205628945U (en) Novel improve metal wire drawing cooling of structure and receive silk equipment
CN204891524U (en) Compressed -air cleaner
CN108871045A (en) A kind of condenser on-line cleaning system
CN207561129U (en) A kind of live pig cleaning storehouse
CN206604223U (en) A kind of heated type apparatus,Soxhlet's provided with cooling system
CN209518748U (en) Water treatment facilities
CN205909734U (en) Online condenser belt cleaning device
CN208075671U (en) A kind of Status of air duct cleaning device
CN105624716B (en) A kind of self-help multifunctional circulation waterway cleaning machine
CN211598941U (en) Water circulating device of cooling vacuum pump
CN205919574U (en) Idle call condenser of fully changeing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant