CN208797543U - A kind of open caisson of overhanging type bracket staggered floor transposition cable laying - Google Patents
A kind of open caisson of overhanging type bracket staggered floor transposition cable laying Download PDFInfo
- Publication number
- CN208797543U CN208797543U CN201821105100.0U CN201821105100U CN208797543U CN 208797543 U CN208797543 U CN 208797543U CN 201821105100 U CN201821105100 U CN 201821105100U CN 208797543 U CN208797543 U CN 208797543U
- Authority
- CN
- China
- Prior art keywords
- column
- open caisson
- cable
- built
- fitting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
A kind of open caisson of overhanging type bracket staggered floor transposition cable laying.The open caisson two sides are respectively that the comb that is passed through of cable laying disengaging open caisson punches mouth and push pipe punches mouth, upper manhole is that the hole to punch at the top of open caisson is arranged in, the cantilever support is connected with high column, the cable anchor ear and fixed two connecting assemblies of T-type fishplate bar are connected with cantilever support, the fixed bracket is connected with low column, the high column is connect with bottom plate by built-in fitting, built-in fitting is made of column fixed plate and expansion bolt, the low column is connect with bottom plate by built-in fitting, built-in fitting is made of column fixed plate and expansion bolt, the connected column of the side wall and pre-embedded steel slab are welded to connect, pre-embedded steel slab is the steel plate for being embedded in side wall.It can make cable raising compared with big corner to the utility model, substantially reduce the length of open caisson, achieve the purpose that reduce construction cost, and open caisson also more adapts to the demand of larger depth than conventional cable work well.
Description
[technical field]
The utility model relates to power cable technical field, especially a kind of overhanging type bracket staggered floor transposition cable laying
Open caisson.
[background technique]
The construction of power cable line engineering is the important component in power grid construction, and power cable is in electric system
To transmit and distribute the cable product of high-power power in basic routing line, with the stable development of Chinese society economy, power grid
Construction level is constantly promoted, power transmission line corridor resource growing tension, and power cable engineering is in increasing trend.
It repeats to excavate to reduce and control urban road, improve urban traffic congestion and environment looks, in power cable
No-dig technique pipelaying techniques, this no-dig technique pipelaying techniques (such as pipe-jacking technology) are widely used in pipeline underground traversing
Result in cable work well push pipe open side and comb open side height difference larger, the cable laying of this staggered floor arrangement occurs repeatedly.
In Practical Project, for this staggered floor arrangement cable laying the case where, influenced by landform and environment, only with one
As cable work well design be often difficult to meet the requirements, main cause has following two:
1) current normal cable work well is unable to satisfy the larger situation of depth in the design of section and arrangement of reinforcement.
Even if 2) normal cable work well meets calculating demand, but to be difficult to realize height difference biggish for current fixation bracket
The conversion of cable staggered floor, if gradually raising cable by light grade, the cable work well for thus needing to grow is considerably increased very much
Line construction cost, and in the land area being becoming tight present day, do not allow the excavation of so large area yet.
In conclusion current designed reliability is low, comprehensive cost is high and practicability is low, it is unfavorable for engineering construction and pushes away
Extensively.
[utility model content]
The main purpose of the utility model is to provide a kind of open caissons of overhanging type bracket staggered floor transposition cable laying, it can
Make cable raising compared with big corner, substantially reduce the length of open caisson, achievees the purpose that reduce construction cost, and open caisson also compares
Conventional cable work well more adapts to the demand of larger depth.
To achieve the above object, the technical solution that the utility model is taken are as follows:
A kind of open caisson of overhanging type bracket staggered floor transposition cable laying, it includes cantilever support, fixed bracket, Gao Li
Column, low column, column fixed plate, expansion bolt, cable are embraced, fixed T-type fishplate bar, pre-embedded steel slab, comb punch, and mouth, push pipe punch
Mouth, aluminum alloy holding cuffs, upper manhole, the column being connected with side wall;
The open caisson two sides have been provided with the biggish mouth that punches of height difference great disparity, and respectively cable laying disengaging open caisson is passed through
Comb punch mouth and push pipe punches mouth, upper manhole is that the hole to punch at the top of open caisson is arranged in, the cantilever support and Gao Li
Column is connected with, and the cable anchor ear and fixed two connecting assemblies of T-type fishplate bar are connected with cantilever support, institute
It states fixed bracket to be connected with low column, aluminum alloy holding cuffs, the high column and bottom is provided on the fixed bracket
Plate is connected by built-in fitting, and built-in fitting is made of column fixed plate and expansion bolt, and the low column and bottom plate pass through built-in fitting
Connection, the connected column of the side wall and pre-embedded steel slab are welded to connect, and pre-embedded steel slab is the steel plate for being embedded in side wall.
Further, the high column root joints cement mortar protective cap.
Further, the low column root joints cement mortar protective cap.
Compared with prior art, the utility model has the beneficial effects that the cable bearer of the open caisson uses a kind of overhanging type
Bracket, this overhanging type bracket can make cable raising compared with big corner, substantially reduce the length of open caisson, reach reduction construction and make
The purpose of valence, and open caisson also more adapts to the demand of larger depth than conventional cable work well.
[Detailed description of the invention]
Fig. 1 is the diagrammatic cross-section of the utility model;
Fig. 2 is the high column diagrammatic cross-section of the utility model;
Fig. 3 is the low column diagrammatic cross-section of the utility model;
Cable anchor ear and fixed T-type fishplate bar connection schematic diagram of the Fig. 4 for the utility model;
Fig. 5 is the cable anchor ear schematic diagram of the utility model.
[specific embodiment]
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below
In conjunction with specific embodiment, the utility model is further described.
Referring to Fig.1-5, a kind of open caisson of overhanging type bracket staggered floor transposition cable laying, it includes cantilever support 1, fixes
Bracket 1A, Gao Lizhu 2, low column 2A, column fixed plate 3, expansion bolt 4, cable anchor ear 5, fixed T-type fishplate bar 6, pre-embedded steel slab
7, punch mouth 8, push pipe of comb punches mouth 9, aluminum alloy holding cuffs 10, upper manhole 11, the column 13 being connected with side wall.
The open caisson two sides have been provided with the biggish mouth that punches of height difference great disparity, and respectively cable laying disengaging open caisson is passed through
Comb punch mouth 8 and push pipe punches mouth 9.
The cantilever support 1 is connected with high column 2, and the placing height of cantilever support 1 can be according to cable
Laying height change reasonably adjusts, so that cable is from comb hole height steadily excessively to the purpose of the proper height of push pipe mouth.
The cable anchor ear 5 and fixed 6 two connecting assemblies of T-type fishplate bar are connected with cantilever support 1, cable
Anchor ear 5 can flexibly be adjusted with rotational angle according to angle of the cable in different support.
The fixed bracket 1A and low column 2A is connected with, and the placing height of fixed bracket 1A can be applied according to cable
If height change reasonably adjusts, so that cable is from comb hole height steadily excessively to the purpose of the proper height of push pipe mouth, institute
It states and is provided with aluminum alloy holding cuffs 10 on fixed bracket 1A.
The high column 2 is connect with bottom plate by built-in fitting, and built-in fitting is made of column fixed plate 3 and expansion bolt 4,
High 2 root joints cement mortar protective cap of column, the position of built-in fitting should be appropriate according to shaft bottom catch pit and floor reinforcement bar arrangement
Adjustment.
The low column 2A is connect with bottom plate by built-in fitting, and built-in fitting is made of column fixed plate 3 and expansion bolt 4,
The position of the root low column 2A joints cement mortar protective cap, built-in fitting should be appropriate according to shaft bottom catch pit and floor reinforcement bar arrangement
Adjustment.
The connected column 13 of the side wall and pre-embedded steel slab 7 are welded to connect, and pre-embedded steel slab 7 is the steel plate for being embedded in side wall.
Referring to Fig.1, mouth 9 is punched by push pipe in cable or comb punches mouth 8 into when open caisson operation, staggered floor cable laying is logical
It crosses overhanging type bracket 1 reasonably to adjust the angle, by cable 12 from a lower height of top within the scope of the turning radius that cable allows
Pipe punch 9 side of mouth be lifted to the higher comb of height punch 8 side of mouth or the higher comb of height punch 8 side of mouth be reduced to it is a lower height of
Push pipe punches 9 side of mouth, and upper manhole 11 is that the hole to punch at the top of open caisson is arranged in, and facilitates open caisson equipment hoisting and later period O&M, on
Manhole size is determining according to the Sizes of equipment and meets the minimum requirements of operation maintenance personnel discrepancy.
Referring to Fig. 4, cable anchor ear 5 and fixed 6 two connecting assemblies of T-type fishplate bar are connected with cantilever support 1,
Cable anchor ear 5 can flexibly be adjusted, the placement of cable bearer with rotational angle according to angle of the cable in different support
Height can be reasonably adjusted according to cable laying height change, so that cable is from comb hole height steadily excessively to push pipe mouth
The purpose of proper height.
The utility model provides a kind of cantilever support staggered floor transposition cable laying open caisson, and the cable bearer of the open caisson is adopted
With a kind of overhanging type bracket, this overhanging type bracket can make cable raising compared with big corner, substantially reduce the length of open caisson,
Achieve the purpose that reduce construction cost, and open caisson also more adapts to the demand of larger depth than conventional cable work well.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this
For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model
Within, any modification, equivalent replacement, improvement and so on should be included in the protection scope of the utility model.
Claims (3)
1. a kind of open caisson of overhanging type bracket staggered floor transposition cable laying, it is characterised in that: it includes cantilever support, fixed branch
Frame, Gao Lizhu, low column, column fixed plate, expansion bolt, cable are embraced, fixed T-type fishplate bar, pre-embedded steel slab, comb punch mouth,
Push pipe punches mouth, aluminum alloy holding cuffs, upper manhole, the column being connected with side wall;
The open caisson two sides are provided with the biggish mouth that punches of height difference great disparity, and respectively cable laying passes in and out the comb that open caisson is passed through
It punches mouth and push pipe punches mouth, upper manhole is that the hole to punch at the top of open caisson is arranged in, the cantilever support and high column spiral shell
It tethers and connects, the cable anchor ear and fixed two connecting assemblies of T-type fishplate bar are connected with cantilever support, the fixation
Bracket is connected with low column, and aluminum alloy holding cuffs is provided on the fixed bracket, and the high column passes through with bottom plate
Built-in fitting connection, built-in fitting are made of column fixed plate and expansion bolt, and the low column is connect with bottom plate by built-in fitting, institute
It states the connected column of side wall and pre-embedded steel slab is welded to connect, pre-embedded steel slab is the steel plate for being embedded in side wall.
2. open caisson according to claim 1, which is characterized in that the high column root joints cement mortar protective cap.
3. open caisson according to claim 1, which is characterized in that the low column root joints cement mortar protective cap.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821105100.0U CN208797543U (en) | 2018-07-13 | 2018-07-13 | A kind of open caisson of overhanging type bracket staggered floor transposition cable laying |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821105100.0U CN208797543U (en) | 2018-07-13 | 2018-07-13 | A kind of open caisson of overhanging type bracket staggered floor transposition cable laying |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208797543U true CN208797543U (en) | 2019-04-26 |
Family
ID=66202278
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821105100.0U Active CN208797543U (en) | 2018-07-13 | 2018-07-13 | A kind of open caisson of overhanging type bracket staggered floor transposition cable laying |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208797543U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108736430A (en) * | 2018-07-13 | 2018-11-02 | 安徽华电工程咨询设计有限公司 | A kind of open caisson of overhanging type holder staggered floor transposition cable laying |
-
2018
- 2018-07-13 CN CN201821105100.0U patent/CN208797543U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108736430A (en) * | 2018-07-13 | 2018-11-02 | 安徽华电工程咨询设计有限公司 | A kind of open caisson of overhanging type holder staggered floor transposition cable laying |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207363606U (en) | A kind of drilling machine sliding system | |
CN208797543U (en) | A kind of open caisson of overhanging type bracket staggered floor transposition cable laying | |
CN104652419A (en) | Construction method for preserving curtain grouting pipe in underground impervious wall | |
CN208479146U (en) | A kind of open caisson of staggered floor cable laying | |
CN206448293U (en) | A kind of reverse construction ground prop structure | |
CN211257014U (en) | Ultra-deep foundation pit settlement post-cast strip force transmission structure | |
CN206736876U (en) | Once excavate the repacking bucket device of shaping in a kind of trapezoidal ditch | |
CN217417897U (en) | Pipeline hoisting auxiliary tool and pipeline hoisting equipment | |
CN108736430A (en) | A kind of open caisson of overhanging type holder staggered floor transposition cable laying | |
CN108616104A (en) | A kind of open caisson of staggered floor cable laying | |
CN107120126B (en) | A kind of shield prefabricated pipe section connection structure | |
CN109706970A (en) | A kind of prefabricated square cable active well | |
CN211735501U (en) | Connection node from control center to comprehensive pipe gallery | |
CN210418434U (en) | Frock is laid fast to metallic steel tank bottom plate in restricted space | |
CN106592632A (en) | Underground supporting structure for reverse construction method and construction method | |
CN202401386U (en) | Cable bridge for frame bridge | |
CN113668399A (en) | Construction method of half-through tied steel box arch bridge | |
CN208124677U (en) | Non junction underground pipe heat-exchanging component in a kind of foundation pit | |
CN201598670U (en) | Top plate structure | |
CN206591544U (en) | Pipe gallery with corrugated steel shear wall | |
CN111463738A (en) | Cable trench structure based on assembled | |
CN215104292U (en) | Track structure comprising telescopic floating plate connecting piece | |
CN103195089B (en) | Method for improving existing underground passage clearance on basis of grouting reinforcement | |
CN219491087U (en) | Device for coordinating non-uniform settlement of structures on two sides of deformation joint of underground pipe gallery | |