CN208785840U - A kind of sewage treatment tower - Google Patents
A kind of sewage treatment tower Download PDFInfo
- Publication number
- CN208785840U CN208785840U CN201821099389.XU CN201821099389U CN208785840U CN 208785840 U CN208785840 U CN 208785840U CN 201821099389 U CN201821099389 U CN 201821099389U CN 208785840 U CN208785840 U CN 208785840U
- Authority
- CN
- China
- Prior art keywords
- storehouse
- water
- pipe
- secondary treatment
- liquid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Heat Treatment Of Water, Waste Water Or Sewage (AREA)
Abstract
The utility model discloses a kind of sewage treatment towers, its structure includes waste liquid storehouse, exhaust gas storehouse, filtering ponds, channel, upper cover, gas secondary treatment storehouse, water-supply-pipe, fixed frame, support frame, ventilation opening, liquid secondary treatment storehouse, motor housing, clarifier, heating device, filtering ponds right end fits with waste liquid storehouse left end surface, it is mutually welded with channel in exhaust gas storehouse, structure is equipped with heating device, it can be by being processed from filter, flow through each processing storehouse, finally water pipe is flowed into from water-supply-pipe, heater at this time is starting, and release heat, since water pipe is in inner cavity, certain air-tight state is in shell, so the heat that heater is discharged can only disseminate in the water of inner cavity, by water by calorie spread feed pipe, the water energy for flowing through water pipe adequately keeps heat, under the control of water-supply-pipe, every A period of time water pipe will flow into water to be heated again, and sewage is preferably handled.
Description
Technical field
The utility model is a kind of sewage treatment tower, belongs to treating column field.
Background technique
For sewage treatment tower first is that the sanitary sewage in city can be effectively treated in kind, the industrial equipment of industrial wastewater etc. avoids dirt
Water and pollutant flow directly into waters, are of great significance to improving the ecological environment, promoting city taste and promote economic development.
Prior art discloses application No. is a kind of sewage treatment tower of CN201720114020.0, sewage treatment tower packets
Filter chamber and purify cavity are included, filter layer is equipped between filter chamber and purify cavity and the two is separated by filter layer, set in filter chamber
Have a filter, filter includes filtrate housing and sewage pipe, and filtrate housing lower end is equipped with the connecting pin in back taper, connecting pin with
Sewage pipe is connected, and filter layer includes activated carbon filter layer and zeolite filtration layer, is equipped with cylindrantherae and blender in purify cavity, can make
Sludge is efficiently separated with water, while the sewage treatment tower good to wastewater purifying efficiency, but the prior art is carried out to sewage
When processing, it is difficult to be heated to sewage, so that sewage is difficult to the processing purified.
Utility model content
In view of the deficienciess of the prior art, the utility model aim is to provide a kind of sewage treatment tower, it is existing to solve
When handling sewage, it is difficult to be heated to sewage, so that the problem of sewage is difficult to the processing purified.
To achieve the goals above, the utility model is achieved through the following technical solutions: a kind of sewage treatment tower,
Its structure include waste liquid storehouse, exhaust gas storehouse, filtering ponds, channel, upper cover, gas secondary treatment storehouse, water-supply-pipe, fixed frame, support frame,
Ventilation opening, liquid secondary treatment storehouse, motor housing, clarifier, heating device, the filtering ponds right end and waste liquid storehouse left end surface phase
Fitting, the exhaust gas storehouse are mutually welded with channel, and the upper cover bottom is located at gas secondary treatment silo roof end and is nested, the ventilation
Mouth insertion is installed on gas secondary treatment storehouse front surface, and the water-supply-pipe is installed on liquid secondary treatment storehouse right end, the support
Frame is welded in waste liquid storehouse front surface, and the motor housing is installed on liquid secondary treatment storehouse front surface, and the clarifier is located at motor
Case right end, the fixed frame are mutually welded with liquid secondary treatment storehouse surface, and the heating device is located at liquid secondary treatment storehouse back
Face, the heating device include electric wire, shell, water pipe, inner cavity, heater, screw, and the electric wire is electrically connected with heater, institute
It states water pipe to be located on the inside of inner cavity, the screw insertion is installed on the upper and lower ends of heater, and the heater right end and shell are left
End surfaces fit, and the water pipe is installed on liquid secondary treatment storehouse right end.
Further, waste liquid silo roof end is mutually welded with exhaust gas orlop portion, and the ventilation opening insertion is installed on liquid two
Secondary processing storehouse front surface.
Further, the gas secondary treatment orlop portion is mutually welded with liquid secondary treatment silo roof end, the clarifier
It fits with heating device surface.
Further, waste liquid storehouse right end fits with liquid secondary treatment storehouse left end.
Further, the filtering ponds height is 1.5m.
Further, the model GFD-800 in the exhaust gas storehouse, the discarded storehouse long service life, the electric discharge of anti-frequent impact
Ability is strong, maintenance is few.
Further, the model FP of the ventilation opening, the ventilation opening using angle be it is fixed, cannot arbitrarily adjust,
Entire blade and frame use separated structure.
Beneficial effect
A kind of sewage treatment tower of the utility model, structure be equipped with heating device, can by being processed from filter,
Each processing storehouse is flowed through, finally flows into water pipe from water-supply-pipe, heater at this time is starting, and releases heat, due to
Water pipe is in inner cavity, certain air-tight state is in shell, so the heat that heater is discharged can only be in the water of inner cavity
In disseminate, by water by calorie spread feed pipe, the water energy for flowing through water pipe adequately keeps heat, in the control of water-supply-pipe
Under, water pipe will flow into water to be heated again at regular intervals, and sewage is preferably handled.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other spies of the utility model
Sign, objects and advantages will become more apparent upon:
Fig. 1 is a kind of structural schematic diagram of sewage treatment tower of the utility model;
Fig. 2 is a kind of the schematic diagram of the section structure of heating device of the utility model.
In figure: waste liquid storehouse -1, exhaust gas storehouse -2, filtering ponds -3, channel -4, upper cover -5, gas secondary treatment storehouse -6, water delivery
Pipe -7, fixed frame -8, support frame -9, ventilation opening -10, liquid secondary treatment storehouse -11, motor housing -12, clarifier -13, heating dress
Set -14, electric wire -1401, shell -1402, water pipe -1403, inner cavity -1404, heater -1405, screw -1406.
Specific embodiment
To be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, below
In conjunction with specific embodiment, the utility model is further described.
Please refer to Fig. 1, Fig. 2, the utility model provides a kind of sewage treatment tower technical solution: its structure include waste liquid storehouse 1,
Exhaust gas storehouse 2, filtering ponds 3, channel 4, upper cover 5, gas secondary treatment storehouse 6, water-supply-pipe 7, fixed frame 8, support frame 9, ventilation opening 10,
Liquid secondary treatment storehouse 11, motor housing 12, clarifier 13, heating device 14,3 right end of filtering ponds and 1 left end table of waste liquid storehouse
Face fits, and the exhaust gas storehouse 2 is welded with 4 phase of channel, and 5 bottom of upper cover is located at 6 top of gas secondary treatment storehouse and is nested,
The insertion of ventilation opening 10 is installed on 6 front surface of gas secondary treatment storehouse, and the water-supply-pipe 7 is installed on liquid secondary treatment storehouse 11
Right end, support frame as described above 9 are welded in 1 front surface of waste liquid storehouse, and the motor housing 12 is installed on 11 front surface of liquid secondary treatment storehouse,
The clarifier 13 is located at 12 right end of motor housing, and the fixed frame 8 is mutually welded with 11 surface of liquid secondary treatment storehouse, the heating
Device 14 is located at 11 back side of liquid secondary treatment storehouse, the heating device 14 include electric wire 1401, shell 1402, water pipe 1403,
Inner cavity 1404, heater 1405, screw 1406, the electric wire 1401 are electrically connected with heater 1405, and the water pipe 1403 is located at
The inside of inner cavity 1404, the screw 1406 are embedded in the upper and lower ends for being installed on heater 1405,1405 right end of heater with
1402 left end surface of shell fits, and the water pipe 1403 is installed on 11 right end of liquid secondary treatment storehouse, 1 top of waste liquid storehouse
It is mutually welded with 2 bottom of exhaust gas storehouse, the insertion of ventilation opening 10 is installed on 11 front surface of liquid secondary treatment storehouse, and the gas is secondary
Processing 6 bottom of storehouse is mutually welded with 11 top of liquid secondary treatment storehouse, and the clarifier 13 fits with 14 surface of heating device, institute
It states 1 right end of waste liquid storehouse to fit with 11 left end of liquid secondary treatment storehouse, the filtering ponds height is 1.5m, the type in the exhaust gas storehouse
It number is GFD-800, the discarded storehouse long service life, anti-frequent impact discharge capability is strong, maintenance is few, the model of the ventilation opening
For FP, the ventilation opening using angle be it is fixed, cannot arbitrarily adjust, entire blade and frame use separated structure.
Filtering ponds 3 described in this patent are to pass through filter material layer and supporting layer after waste water is entered in pond by water pipe, in waste water
Fine suspension and colloidal substance be retained in filter material surface and internal layer gap, so that waste water be made to be purified, the branch
Support 9, usually also referred to as scaffold are to guarantee each work progress is gone on smoothly and is set up workbench.
It, can be with for example, the small China of operator wants to obtain the filtration, purification of sewage progress, and by the water of heat treatment
It is processed by the filtering from filter tank 3, flows through each processing storehouse, finally flow into water pipe 1403 from water-supply-pipe 7, heater at this time
1405 be starting, and releases heat, since water pipe 1403 is in inner cavity 1404, is in centainly close in shell 1402
Closed state is given calorie spread by water so the heat that heater 1405 is discharged can only disseminate in the water of inner cavity 1404
Water pipe 1403, the water energy for flowing through water pipe 1403 adequately keep heat, under the control of water-supply-pipe 7, water at regular intervals
Pipe 1403 will flow into water to be heated again, and sewage is preferably handled.
The utility model is solved when handling sewage, it is difficult to sewage is heated so that sewage be difficult into
The problem of processing of row purification, the utility model is combined with each other by above-mentioned component, and structure is equipped with heating device, Ke Yitong
It crosses and is processed from filter, flow through each processing storehouse, finally flow into water pipe from water-supply-pipe, heater at this time is starting,
And heat is released, since water pipe is in inner cavity, certain air-tight state is in shell, so what heater was discharged
Heat can only disseminate in the water of inner cavity, and by water by calorie spread feed pipe, the water energy for flowing through water pipe adequately keeps heat
Amount, under the control of water-supply-pipe, water pipe will flow into water to be heated again at regular intervals, enable sewage preferably into
Row processing.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above, for
For those skilled in the art, it is clear that the present invention is not limited to the details of the above exemplary embodiments, and without departing substantially from this
In the case where the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the utility model is by institute
Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent elements of the claims
All changes are embraced therein.It should not treat any reference in the claims as limiting related right
It is required that.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (5)
1. a kind of sewage treatment tower, it is characterised in that: its structure includes waste liquid storehouse (1), exhaust gas storehouse (2), filtering ponds (3), channel
(4), upper cover (5), gas secondary treatment storehouse (6), water-supply-pipe (7), fixed frame (8), support frame (9), ventilation opening (10), liquid two
Secondary processing storehouse (11), motor housing (12), clarifier (13), heating device (14), filtering ponds (3) right end and waste liquid storehouse (1)
Left end surface fits, and the exhaust gas storehouse (2) is mutually welded with channel (4), and upper cover (5) bottom is located at gas secondary treatment storehouse
(6) top is nested, and ventilation opening (10) insertion is installed on gas secondary treatment storehouse (6) front surface, water-supply-pipe (7) peace
Loaded on liquid secondary treatment storehouse (11) right end, support frame as described above (9) is welded in waste liquid storehouse (1) front surface, the motor housing (12)
It is installed on liquid secondary treatment storehouse (11) front surface, the clarifier (13) is located at motor housing (12) right end, the fixed frame (8)
It is mutually welded with liquid secondary treatment storehouse (11) surface, the heating device (14) is located at liquid secondary treatment storehouse (11) back side, institute
Stating heating device (14) includes electric wire (1401), shell (1402), water pipe (1403), inner cavity (1404), heater (1405), spiral shell
Silk (1406), the electric wire (1401) are electrically connected with heater (1405), and the water pipe (1403) is located on the inside of inner cavity (1404),
Screw (1406) insertion is installed on the upper and lower ends of heater (1405), heater (1405) right end and shell
(1402) left end surface fits, and the water pipe (1403) is installed on liquid secondary treatment storehouse (11) right end.
2. a kind of sewage treatment tower according to claim 1, it is characterised in that: waste liquid storehouse (1) top and exhaust gas storehouse
(2) bottom is mutually welded, and ventilation opening (10) insertion is installed on liquid secondary treatment storehouse (11) front surface.
3. a kind of sewage treatment tower according to claim 1, it is characterised in that: gas secondary treatment storehouse (6) bottom
It is mutually welded with liquid secondary treatment storehouse (11) top, the clarifier (13) fits with heating device (14) surface.
4. a kind of sewage treatment tower according to claim 1, it is characterised in that: waste liquid storehouse (1) right end and liquid two
Secondary processing storehouse (11) left end fits.
5. a kind of sewage treatment tower according to claim 1, it is characterised in that: the filtering ponds (3) are highly 1.5m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821099389.XU CN208785840U (en) | 2018-07-11 | 2018-07-11 | A kind of sewage treatment tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821099389.XU CN208785840U (en) | 2018-07-11 | 2018-07-11 | A kind of sewage treatment tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208785840U true CN208785840U (en) | 2019-04-26 |
Family
ID=66202157
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821099389.XU Expired - Fee Related CN208785840U (en) | 2018-07-11 | 2018-07-11 | A kind of sewage treatment tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208785840U (en) |
-
2018
- 2018-07-11 CN CN201821099389.XU patent/CN208785840U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105330072A (en) | Combined efficient high-difficulty wastewater treatment device | |
CN208785840U (en) | A kind of sewage treatment tower | |
CN103539255B (en) | Suspension haydite-active carbon double layer filter and apply it and process the method for former water | |
CN110078258A (en) | A kind of energy-saving and environment-friendly sewage-treatment plant | |
CN212741021U (en) | Livestock-raising sewage treatment equipment with purification performance can remove peculiar smell | |
CN210528675U (en) | Municipal sewage treatment system | |
CN105731698B (en) | Direct-drinking water purifier | |
CN203877962U (en) | Suspended haydite-activated carbon double-layer filter | |
CN210176661U (en) | Drinking water purifier | |
CN207699385U (en) | A kind of discarded sterilization cycles processing unit of energy-saving biochemical sewage | |
CN210438459U (en) | High-efficiency self-flow sewage purifier | |
CN212712972U (en) | High-efficient slime water purifier | |
CN211226810U (en) | Factory domestic sewage treatment system | |
CN204918141U (en) | Biological fluidized bed | |
CN108623048A (en) | A kind of liquor production wastewater treatment equipment | |
CN215161573U (en) | Simple device for purifying drinking water by domestic water purifying agent | |
CN110803805B (en) | Multi-level degree of depth water purification unit | |
CN209721785U (en) | A kind of chemical engineering sewage processing system | |
CN107162323A (en) | Treated sewage reusing sewage-treatment plant | |
CN213803317U (en) | Nanofiltration water purification device | |
CN218811260U (en) | Processing device of photo-kinetic energy composite multistage soil infiltration system | |
CN216073430U (en) | High-concentration organic wastewater treatment device | |
CN217398702U (en) | Multidirectional-circulation efficient denitrification sewage treatment equipment | |
CN211471035U (en) | Wastewater treatment system | |
CN212701005U (en) | Bag-type dust collector for flue gas recirculation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190426 Termination date: 20200711 |
|