CN208777345U - A kind of intelligence pit retaining monitoring system - Google Patents
A kind of intelligence pit retaining monitoring system Download PDFInfo
- Publication number
- CN208777345U CN208777345U CN201821240212.7U CN201821240212U CN208777345U CN 208777345 U CN208777345 U CN 208777345U CN 201821240212 U CN201821240212 U CN 201821240212U CN 208777345 U CN208777345 U CN 208777345U
- Authority
- CN
- China
- Prior art keywords
- module
- monitoring
- information
- information transmission
- modular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Arrangements For Transmission Of Measured Signals (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of intelligence pit retaining monitoring system, including information transmission with display unit, information acquisition unit and for the power module to information transmission and display unit power supply, information transmission includes input module, control module, display module and the information transmission system with display unit;Information acquisition unit includes collar tie beam horizontal displacement monitoring module, collar tie beam vertical displacement monitoring modular, water table measure module, trestle monitoring modular, foundation pit by-pass road settlement monitoring module, the deformation monitoring module of substation and the monitoring modular of refuse depot.The utility model is to avoid risk to the maximum extent, avoids casualties and environmental nuisance, reduces the loss of engineering economy and duration, and side slope top of the slope is displaced carry out system, lasting, high-precision monitoring during pattern foundation pit supporting structure.
Description
Technical field
The utility model relates to foundation pits to monitor field more particularly to a kind of intelligent pit retaining monitoring system automatically.
Background technique
Foundation Pit Construction is carried out inside stratum, inevitable disturbed strata of constructing, and caused stratum deformation can shadow
Ring road and existing pipeline facility safety.Therefore, foundation pit construction will consider the influence to urban environment.Stratum caused by constructing
Deformation, especially surface structures facility is intensive, heavy traffic, rich groundwater region in carry out foundation pit construction, for base
Hole digging process causes the rule of the mechanical response on stratum over time and space, and the different mechanics of different construction methods to be rung
It answers information that can obtain by construction monitoring, and predicts the development of stratum deformation in time, feedback construction controls underground engineering construction
To the influence degree of environment, during foundation pit construction, only to the soil body around foundation pit supporting construction, foundation pit and adjacent build
Build object comprehensively, the monitoring of system, safety to base pit engineering and the influence degree of ambient enviroment could be carried out comprehensive
Solution, just can guarantee going on smoothly for engineering, when an abnormal situation occurs can Embarrassing thing feedback, take if necessary engineering emergency arrange
It applies.
The information of acquisition is both needed to arrange in time, analyze, and reports relevant departments as early as possible, in this, as verifying or modification construction party
Case, the foundation for adjusting supporting parameter, reasonable arrangement construction speed, but current finish message, analysis are all made of artificial mode,
Mode is more traditional, is likely to occur after emergency caused large effect more slowly if arranging information, still not upper
Relevant departments are reported, therefore need a kind of pit retaining monitoring system that can quickly collect simultaneously feedback information.
Utility model content
The purpose of the utility model is to provide a kind of intelligent pit retaining monitoring systems, to solve the prior art and collect around foundation pit
Field condition is relatively slow, influences the technical issues of construction efficiency;And solve prior art foundation pit front end monitoring system it is too simple,
There is no the problem of systematization arrangement.
To achieve the above objectives, the present invention adopts the following technical solutions:
A kind of intelligence pit retaining monitoring system, it is characterised in that: including information transmission and display unit, information acquisition unit and
Power module for powering to information transmission with display unit,
The information is transmitted with display unit
Input module is connected with control module, is used for the instruction of control module input control and default monitoring plan;
Control module carries out information collection for controlling information acquisition unit, the information of acquisition is stored, and will adopt
Collection information is shown on the display module;
Display module is connected with control module, for showing the information of information acquisition unit acquisition;
The information transmission system, including several information transmission modulars, each information transmission modular simultaneously and information collection
Unit is connected with control module, and the information for acquiring information acquisition unit is transferred to control module;
The information acquisition unit includes:
Collar tie beam horizontal displacement monitoring module, is connected with information transmission modular, including total station and measuring point, buries in the collar tie beam
If at least 40 measuring points, the measuring point be the surveys nail hammer with crosshair is hit collar tie beam concrete formed, between adjacent survey is followed closely
Away from 20m;
Collar tie beam vertical displacement monitoring modular, is connected with information transmission modular, including level and in separate foundation pit position
The datum mark being arranged on permanent building;
Water table measure module, is connected with information transmission modular, including water-level gauge and water level measuring point, the water level measuring point
For at least 40 inspection wells laid along water-stop curtain interval 20-25m;
Trestle monitoring modular, is connected with information transmission modular, including total station and trestle measuring point, the adjacent trestle measuring point
Spacing is not more than 40m;
Foundation pit by-pass road settlement monitoring module, is connected, including level and subsidence survey point with information transmission modular, described heavy
The temporary road for dropping measuring point along foundation pit range is arranged every 25m;
The deformation monitoring module of substation, is connected with information transmission modular, including total station, level and substation survey
Point, substation's measuring point are arranged along the side of substation's closing foundation ditch every 25m;
The monitoring modular of refuse depot, is connected with information transmission modular, including total station, level refuse depot measuring point, described
Refuse depot measuring point is arranged along the side of refuse depot closing foundation ditch every 25m.
It is further preferred that the control module also uploads to information on internet in real time, monitoring personnel can be from shifting
The information of real-time monitoring information acquisition unit acquisition in equipment is moved, passes through internet real-time monitoring in monitoring personnel's slave mobile device
The information of information acquisition unit acquisition.
Further, the mobile device is monitoring plate.
Further, each information transmission modular includes the wireless information collection dress on information acquisition unit
The wireless messages reception device set and be electrical connected with control module.
Further, using touching, the mode of mouse or key instructs the input module to control module input control,
And default monitoring plan.
Further, the wireless information collection device is set on the total station of collar tie beam horizontal displacement monitoring module.
Further, the wireless information collection device is set on the level of collar tie beam vertical displacement monitoring modular.
Further, the wireless information collection device is set on the water-level gauge of water table measure module.
In addition, the wireless information collection device is set on the level of foundation pit by-pass road settlement monitoring module.
It is further preferred that the wireless information collection device is set to the total station and level of the deformation monitoring module of substation
On instrument.
Compared with prior art the utility model have the characteristics that and the utility model has the advantages that
This test it is novel can it is long-acting monitoring foundation pit collar tie beam level and vertical displacement situation, level of ground water implement dynamic,
Trestle implements dynamic, the real-time dynamic for implementing dynamic, the real-time dynamic and refuse depot of substation of temporary road, reduces people
Work cost reduces a possibility that error generates, and provides the hidden danger for jeopardizing Environmental security or accident that may occur timely, quasi-
True forecast avoids the generation of accident to adopt an effective measure in time, to avoid risk to the maximum extent, personnel is avoided to hurt
It dies and environmental nuisance, reduces the loss of engineering economy and duration, side slope top of the slope is displaced carry out system during pattern foundation pit supporting structure
, lasting, high-precision monitoring.
The utility model has the characteristics that safety, is applicable in, and has good promotion and practical value, after extensive popularization and application
Good economic benefit can be generated.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of intelligent pit retaining monitoring system of the utility model;
Fig. 2 be the utility model relates to collar tie beam on measuring point structural schematic diagram.
Appended drawing reference: 1- control module;2- input module;3- power module;The internet 4-;5- display module;6- information
Transmission module;7- collar tie beam horizontal displacement monitoring module;8- measuring point;9- collar tie beam;10- surveys nail;11- collar tie beam vertical displacement monitors mould
Block;12- water table measure module;13- trestle monitoring modular;14- foundation pit by-pass road settlement monitoring module;15- substation
Deformation monitoring module;16- monitors plate;The refuse depot 17- monitoring modular.
Specific embodiment
To make technological means of the utility model, character of innovation, reaching purpose and effect is easy to understand, below
The present invention will be further described.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model
Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model
System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute
For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein
The technical solution of any obvious substitutions and modifications out.
A kind of intelligence pit retaining monitoring system, as shown in Figure 1, include information transmission with display unit, information acquisition unit and
Power module 3 for powering to information transmission with display unit,
Information is transmitted with display unit
Input module 2 is connected with control module 1, is used for the instruction of 1 input control of control module and default monitoring plan,
Control instruction indicates that information transmission modular 6 carries out information transmission, such as indicates that trestle monitoring modular 13 is transmitted to control module 1 and believes
Breath, this is the information that operator can observe trestle monitoring modular 13 by display module 5, while can be by the stack of observation
The information of bridge monitoring modular 13 is compared with preset monitoring plan, is adjusted in time when not meeting default plan, defeated
Enter module 2 using touching, the mode of mouse or key is instructed to 1 input control of control module and default monitoring plan.
Control module 1 carries out information collection for controlling information acquisition unit, the information of acquisition is stored, and will
Acquisition information is shown on display module 5, and control module 1 also uploads to information on internet 4 in real time, and monitoring personnel can be from
The information that real-time monitoring information acquisition unit acquires in mobile device, mobile device are monitoring plate 16.
Display module 5 is connected with control module 1, for showing the information of information acquisition unit acquisition, 2 He of input module
Display module 5 can be integrated device, namely input module 2 is the touch screen of display module 5 at this time.
The information transmission system, including several information transmission modulars 6, each information transmission modular 6 are adopted with information simultaneously
Collection unit is connected with control module 1, and the information for acquiring information acquisition unit is transferred to control module 1, and each information passes
Defeated module 6 includes the wireless information collection device on information acquisition unit and is electrical connected with control module 1 wireless
Information receiver.
Information acquisition unit includes:
Collar tie beam horizontal displacement monitoring module 7, is connected with information transmission modular 6, including total station and measuring point 8, buries in collar tie beam 9
If at least 40 measuring points 8, as shown in Fig. 2, measuring point 8 be by with crosshair survey nail 10 hammering 9 concrete of collar tie beam formed,
10 spacing 20m are followed closely in adjacent survey, and wireless information collection device is set on the total station of collar tie beam horizontal displacement monitoring module 7, in measuring point 8
Small red flag, the eye-catching mark monitoring project of crimson paint and point number are inserted in position, and each construction relevant person in charge in work scene is linked up, usually needed
It covers, prevents from being destroyed, assist monitoring for protection point;Implement whose responsible principle who destroys.
Collar tie beam vertical displacement monitoring modular 11, is connected with information transmission modular 6, including level and far from foundation pit position
Permanent building on the datum mark that is arranged, wireless information collection device is set to the level of collar tie beam vertical displacement monitoring modular 11
On, small red flag, the eye-catching mark monitoring project of crimson paint and point number are inserted in reference point location;It respectively constructs to construction site related
Responsible person links up, and usually needs to cover, prevents from being destroyed, and assists monitoring for protection point;Implement whose responsible principle who destroys.
Water table measure module 12 is connected with information transmission modular 6, including water-level gauge and water level measuring point, water level measuring point
For at least 40 inspection wells laid along water-stop curtain interval 20-25m, wireless information collection device is set to water table measure mould
On the water-level gauge of block 12, small red flag, the eye-catching mark monitoring project of crimson paint and point number are inserted in inspection well position;It is existing with construction
Each construction relevant person in charge in field is linked up, and is usually needed to cover, is prevented from being destroyed, and assists to protect inspection well;Whom is implemented, and that whom is destroyed is negative
The principle of duty.
Trestle monitoring modular 13 is connected with information transmission modular 6, including total station and trestle measuring point, adjacent trestle measuring point
Spacing makees eye-catching mark, monitoring project and point number is had in mark no more than 40m in the crimson paint of trestle point position;With
Construction site respectively construct relevant person in charge communication, usually need to cover, prevent from being destroyed, assist monitoring for protection point;It is broken whom is implemented
Whose bad responsible principle.
Foundation pit by-pass road settlement monitoring module 14, is connected, including level and subsidence survey point with information transmission modular 6, sinks
The temporary road for dropping measuring point along foundation pit range is arranged every 25m, and wireless information collection device is set to foundation pit by-pass road settlement monitoring
On the level of module 14, in the crimson paint in subsidence survey point position, makees eye-catching mark, monitoring project and point number are had in mark;
Relevant person in charge of respectively constructing with construction site is linked up, and is usually needed to cover, is prevented from being destroyed, and monitoring for protection point is assisted;Whom is implemented
Whose responsible principle destroyed.
The deformation monitoring module 15 in power station, is connected with information transmission modular 6, including total station, level and substation survey
Point, substation's measuring point are arranged along the side of substation's closing foundation ditch every 25m, and wireless information collection device is set to substation
Deformation monitoring module 15 total station and level on, in the crimson paint of substation's point position, make eye-catching mark, in mark
Have monitoring project and point number, relevant person in charge of respectively constructing with construction site is linked up, and is usually needed to cover, is prevented from being destroyed, and is assisted
Monitoring for protection point is helped, implements whose responsible principle who destroys.
The monitoring modular 17 of refuse depot, is connected with information transmission modular 6, including total station, level refuse depot measuring point, institute
It states refuse depot measuring point and is arranged along the side of refuse depot closing foundation ditch every 25m, the crimson paint of point position in refuse depot is made eye-catching
It identifies, has monitoring project and point number in mark, relevant person in charge of respectively constructing with construction site is linked up, and usually needs to cover, and is prevented
It is only destroyed, assists monitoring for protection point;Implement whose responsible principle who destroys.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (10)
1. a kind of intelligence pit retaining monitoring system, it is characterised in that: including information transmission and display unit, information acquisition unit and use
In to information transmission with display unit power power module (3),
The information is transmitted with display unit
Input module (2) is connected with control module (1), for counting to the instruction of control module (1) input control, and default monitoring
It draws;
Control module (1) carries out information collection for controlling information acquisition unit, the information of acquisition is stored, and will adopt
Collection information is shown on display module (5);
Display module (5) is connected with control module (1), for showing the information of information acquisition unit acquisition;
The information transmission system, including several information transmission modulars (6), each information transmission modular (6) are adopted with information simultaneously
Collection unit is connected with control module (1), and the information for acquiring information acquisition unit is transferred to control module (1);
The information acquisition unit includes:
Collar tie beam horizontal displacement monitoring module (7) is connected with information transmission modular (6), including total station and measuring point (8), described
Collar tie beam (9) buries at least 40 measuring points (8), the measuring point (8) be the survey with crosshair is followed closely (10) hammering collar tie beam (9)
Concrete is formed, and (10) spacing 20m is followed closely in adjacent survey;
Collar tie beam vertical displacement monitoring modular (11) is connected with information transmission modular (6), including level and far from foundation pit position
Permanent building on the datum mark that is arranged;
Water table measure module (12) is connected with information transmission modular (6), including water-level gauge and water level measuring point, the water level
Measuring point is at least 40 inspection wells laid along water-stop curtain interval 20-25m;
Trestle monitoring modular (13) is connected with information transmission modular (6), including total station and trestle measuring point, the adjacent trestle
Measuring point spacing is not more than 40m;
Foundation pit by-pass road settlement monitoring module (14) is connected with information transmission modular (6), including level and subsidence survey point, institute
The temporary road that subsidence survey point is stated along foundation pit range is arranged every 25m;
The deformation monitoring module (15) of substation, is connected, including total station, level and substation with information transmission modular (6)
Measuring point, substation's measuring point are arranged along the side of substation's closing foundation ditch every 25m;
The monitoring modular (17) of refuse depot, is connected with information transmission modular (6), including total station, level refuse depot measuring point, institute
It states refuse depot measuring point and is arranged along the side of refuse depot closing foundation ditch every 25m.
2. a kind of intelligent pit retaining monitoring system as described in claim 1, it is characterised in that: the control module (1) will also letter
Breath uploads on internet (4) in real time, passes through internet (4) real-time monitoring information acquisition unit in monitoring personnel's slave mobile device
The information of acquisition.
3. a kind of intelligent pit retaining monitoring system as claimed in claim 2, it is characterised in that: the mobile device is monitoring plate
(16).
4. a kind of intelligent pit retaining monitoring system as described in claim 1, it is characterised in that: each information transmission modular
(6) wireless communication for including the wireless information collection device on information acquisition unit and being electrical connected with control module (1)
Cease reception device.
5. a kind of intelligent pit retaining monitoring system as described in claim 1, it is characterised in that: the input module (2) is using touching
It touches, the mode of mouse or key is instructed to control module (1) input control and default monitoring plan.
6. a kind of intelligent pit retaining monitoring system as claimed in claim 4, it is characterised in that: the wireless information collection device is set
In on the total station of collar tie beam horizontal displacement monitoring module (7).
7. a kind of intelligent pit retaining monitoring system as claimed in claim 4, it is characterised in that: the wireless information collection device is set
In on the level of collar tie beam vertical displacement monitoring modular (11).
8. a kind of intelligent pit retaining monitoring system as claimed in claim 4, it is characterised in that: the wireless information collection device is set
In on the water-level gauge of water table measure module (12).
9. a kind of intelligent pit retaining monitoring system as claimed in claim 4, it is characterised in that: the wireless information collection device is set
In on the level of foundation pit by-pass road settlement monitoring module (14).
10. a kind of intelligent pit retaining monitoring system as claimed in claim 4, it is characterised in that: the wireless information collection device
On the total station and level of the deformation monitoring module (15) of substation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821240212.7U CN208777345U (en) | 2018-08-02 | 2018-08-02 | A kind of intelligence pit retaining monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821240212.7U CN208777345U (en) | 2018-08-02 | 2018-08-02 | A kind of intelligence pit retaining monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208777345U true CN208777345U (en) | 2019-04-23 |
Family
ID=66155620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821240212.7U Expired - Fee Related CN208777345U (en) | 2018-08-02 | 2018-08-02 | A kind of intelligence pit retaining monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208777345U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112068219A (en) * | 2020-08-21 | 2020-12-11 | 国网山东省电力公司昌邑市供电公司 | Monitoring and early warning device, system and method for preventing external damage of underground cable |
-
2018
- 2018-08-02 CN CN201821240212.7U patent/CN208777345U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112068219A (en) * | 2020-08-21 | 2020-12-11 | 国网山东省电力公司昌邑市供电公司 | Monitoring and early warning device, system and method for preventing external damage of underground cable |
CN112068219B (en) * | 2020-08-21 | 2023-04-25 | 国网山东省电力公司昌邑市供电公司 | Buried cable external damage prevention monitoring and early warning device, system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104179194A (en) | Integrated pipe trench in soft soil stratum and construction method of integrated pipe trench | |
CN105203158A (en) | Automatic horizontal displacement and sedimentation monitoring system based on GPRS | |
CN102979071B (en) | Remote intelligent monitoring and three-dimensional early warning method and system for stress stability of deep foundation pit | |
CN112195927B (en) | Deep foundation pit pile anchor support construction method adopting foundation pit deformation monitoring | |
CN111156006A (en) | Construction method for shield underpass of dangerous pipeline | |
CN105354653A (en) | Intelligent management system for engineering construction project | |
CN108256213A (en) | Depot of urban railway transit vehicles modular construction analogy method based on VR and BIM | |
CN103031862A (en) | Three-dimensional digital prewarning method and facility for remote intelligent monitoring of deep foundation pit deformation stability | |
CN208777345U (en) | A kind of intelligence pit retaining monitoring system | |
CN102880918B (en) | Based on the deep excavation risk evaluation method that data fusion is analyzed | |
CN107940099B (en) | Environmental protection segmentation long range mechanical jacking construction method | |
Ye et al. | Intelligent Risk Assessment for Dewatering of Metro‐Tunnel Deep Excavations | |
CN103046526A (en) | Method and system for remote intelligent monitoring and three-dimensional digital early warning of deep foundation pit bottom surface upheavals | |
CN110241870A (en) | A kind of method for arranging and excavation of foundation pit monitoring system of excavation of foundation pit monitoring system | |
CN117294556A (en) | AI (automatic identification) recognition edge computing intelligent gateway and method for safety management and standardized construction of intelligent construction site | |
CN202214741U (en) | Wireless self-networked steel support stress monitoring system | |
CN207923112U (en) | Ground Settlement Induced by Shield Tunnel Construction point intelligent integral auxiliary monitoring device | |
CN208172969U (en) | A kind of high slope surface deformation monitoring and warning system | |
CN110264058A (en) | A kind of method for early warning and system of the geological disaster based on gas ductwork | |
CN115369885A (en) | BIM and unmanned aerial vehicle-based dynamic monitoring method for deep foundation pit construction | |
CN203452085U (en) | Remote intelligent monitoring three-dimensional digital pre-warning facility for deformation stability of deep foundation pit | |
CN203546695U (en) | Remote and intelligent monitoring and three-dimensional digital early warning system of undersurface projection of deep foundation pit | |
CN110756570A (en) | Subsurface excavation remediation method for deep polluted soil | |
CN201892862U (en) | Safe operation monitor for electric power tunnel | |
Peng et al. | Design and construction of the new library at China agricultural university |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190423 |