CN208762887U - A kind of bent cap formula bridge is synchronous to be lifted girder construction of putting more energy into - Google Patents
A kind of bent cap formula bridge is synchronous to be lifted girder construction of putting more energy into Download PDFInfo
- Publication number
- CN208762887U CN208762887U CN201821440865.XU CN201821440865U CN208762887U CN 208762887 U CN208762887 U CN 208762887U CN 201821440865 U CN201821440865 U CN 201821440865U CN 208762887 U CN208762887 U CN 208762887U
- Authority
- CN
- China
- Prior art keywords
- bent cap
- putting
- energy
- shaped steel
- girder construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of synchronous lifting girder constructions of putting more energy into of bent cap formula bridge, it is characterized in that, including horizontal interval and two stiff girders disposed in parallel, the stiff girder is that horizontally disposed i shaped steel obtains, the i shaped steel intervening web portions are vertically arranged and lower end surface is made to form the face for connecting with jack upper end, upper surface is used for and bridge beam body lower surface is bonded the face to connect, there is the transversal connecting assembly being laterally fixedly connected, transversal connecting assembly length is greater than bent cap width between two stiff girders.The synchronization of jacking up to beam body can be better achieved in the utility model, and can be minimized the local stress at the shear stress and jack active position at hinge seam, guarantee the whole lifting equipment of the safety in work progress.
Description
Technical field
The utility model relates to a kind of bridge beam body lifting equipment being installed on bent cap more particularly to a kind of lid beam bridges
The synchronous lifting girder construction of putting more energy into of beam.
Background technique
Currently, China's overwhelming majority servicing bridges (especially continuous curved box girder bridges) will appear after using the several years
Different degrees of expansion joint breakoff phenomenon, such as: failure by shear, two sides bulging etc.;In addition a large amount of bridges are acted in various power
(such as: earthquake, car and boat collision) under certain vertically and horizontally displacement can occur, in addition some Static behaviors (such as: expansion joint card
Extremely, temperature action, bias of quiet dynamic load etc.) under can also generate the displacement of any direction, and gradually add up at any time.These occur
The bridge of beam body deviation has seriously threatened the safety of road operation, in addition, be highly desirable to carry out whole lift to it again
It rises, carry out bearing replacement or laterally resets, to tackle the problem at its root.
The research of equipment is integrally lifted for bridge, the method PLC synchronization of jacking up method that the country usually uses at present, but it is big
Amount engineering practice shows that this method still has some problems, e.g., during jacking, if instrument board reading is inaccurate, or
Some jack oil leak, damage etc., in this way caused by the result is that not construct according to synchronization of jacking up, often make in this way
At biggish stress, or even bridge is caused to ruin the accident that people dies.Therefore synchronization of jacking up, and energy can be better achieved by how designing one kind
It is enough to be minimized the local stress jacked at position, guarantee the safety in work progress, becoming has considered solve the problems, such as.
CN105735149A was once disclosed a kind of bridge jacking counterforce device suitable for small space between beam bottom and bent cap,
The counterforce device includes crossing two load crossbeams on bent cap, the platform structure that is installed on load crossbeam two sides, using
In high-strength bolt cuff, the cohesion device for fixing whole device and bent cap of connection load crossbeam and platform structure.It is described
Two load crossbeams cross the small gap between beam slab and bent cap, pass through high-strength bolt cuff and platform knot on load crossbeam
Structure is reliably connected, and entire counterforce device is reliably connected by cohesion device and bent cap, and jack is placed on the two sides platform
It can carry out bridge jacking operation.
The device of the patent has the advantages that device to be self-possessed, and small, bearing capacity is high, widely applicable, between beam bottom and bent cap
Application can save a large amount of man power and material in the jacking of small space blank board bridge.But still it has the following deficiencies: 1, pushing up
Rise during, there are excessive stress concentrations at jack active position, cause in the presence of by beam body partial top itself it is bad can
Can, jacking support effect is poor, and jacking synchronism is poor.2, the structure fixed for bent cap, reliability and stability are poor.
Utility model content
In view of the above shortcomings of the prior art, the technical problem to be solved by the utility model is to how to provide a kind of knot
Structure is simple, can be avoided that jacking position local stress is excessive, improves the synchronous lifting of bent cap formula bridge of jacking synchronism with putting more energy into
Girder construction.
In order to solve the above-mentioned technical problem, the utility model uses the following technical solution:
A kind of bent cap formula bridge is synchronous to be lifted girder construction of putting more energy into, which is characterized in that including horizontal interval and is arranged in parallel
Two stiff girders, the stiff girder is that horizontally disposed i shaped steel obtains, and the i shaped steel intervening web portions are perpendicular
To being arranged and lower end surface being made to form the face for connecting with jack upper end, upper surface is used for and the fitting of bridge beam body lower surface
The face to connect, has the transversal connecting assembly being laterally fixedly connected between two stiff girders, and transversal connecting assembly length is greater than lid
Beam width.
This, the girder construction of putting more energy into of this programme can be used for CN105735149A described in background technique and once be disclosed one kind
Between beam bottom and bent cap the bridge jacking counterforce device of small space.Stiff girder is placed in the thousand of counterforce device when use
On jin top, jacking is realized so that synchronizing between each jack and forcing in beam body.Therefore the setting of stiff girder, can both prevent due to
Asynchronous jacking phenomenon caused by the accidents such as jacking equipment damage, oil leak, and can reduce the shear stress and thousand at hinge seam
Local stress at the active position of jin top, improves the intensity of bent cap in the construction process.It is put more energy into simultaneously using i shaped steel
Beam, i shaped steel are standard element, facilitate production installation to reduce construction cost, and i shaped steel self structure has upper and lower two
A load-carrying surface is suitble to force structure herein, can be improved stability of strutting system.Affixed between two stiff girders to be one simultaneously
The globality that entirety, preferably raising bent cap two sides put more energy into beam stress.
Further, metal caul is additionally provided between i shaped steel and jack upper end.Preferably to transmit gravity, mention
High stability of strutting system.
Further, the stiff girder is connected by the docking of more piece i shaped steel end and is obtained.
In this way, can preferably length of the extending structure on bridge width direction, preferably be conducive to realize to Bridge Beam
The support of body jacks.
Further, two pieces of buttcover plates are folded at every section i shaped steel docking, buttcover plate is fitted among i shaped steel
The two sides of connecting plate part are simultaneously fixedly connected by bolt to wearing.
This spline structure is simple, and stable connection is reliable, and the extension for realizing i shaped steel is facilitated to connect to form stiff girder.
Further, the transversal connecting assembly includes the connecting rod of horizontal scalable setting, and connecting rod can phase for two
Mutually be slidably matched the casing composition being arranged, and connecting rod both ends are fixed on stiff girder.
It in this way, connecting rod does not influence the load transmitting of up and down direction, and can be realized the free extension of horizontal direction, make it
Flexible adjustment can be realized according to bent cap size and jack installation site, it is more convenient to use.
Further, in connecting rod at two casing cooperations, external sleeve surface is provided through fastening thread hole, tightly
It is combined with fastening bolt Gu being screwed in threaded hole, fastening bolt inner end and internal casing offset realization to the opposite position of two casings
The fixation set.
In this way, casing elongates or shortens, it after reaching target length, can be tightened by fastening bolt, keep its non-telescoping,
Play the role of improving lateral stability.
Further, the fastening thread hole on casing and corresponding fastening bolt are provided with two groups, and along same straight line side
To setting.
It is adjusted in place and after fixing in this way, can better ensure that in casing, connecting rod globality in the horizontal direction.
Further, connection boom end is welded with vertical link block, and link block connects by the way that horizontal bolt is fixed
It connects on the middle connecting plate of stiff girder i shaped steel.
In this way, facilitating being connected and fixed for connecting rod, whole load stability and reliability are improved.
Further, link block is rectangle, and connection among the bolt by being set to four corners and i shaped steel
Plate is connected.
In this way, improving the fixed reliability of connection boom end.
Further, two bar connecting rods are at least connected on every section i shaped steel.The direction that can preferably improve the standard is held
The globality of power.
In conclusion the synchronization of jacking up to beam body can be better achieved in the utility model, and it can will cut with scissors cutting at seam
Local stress at shearing stress and jack active position is minimized, and guarantees that the whole lifting of the safety in work progress is set
It is standby.
Detailed description of the invention
Fig. 1 is the overall structure after a kind of bridge lifting equipment installation based on bent cap using the utility model structure
Schematic diagram.
Fig. 2 is the top view of independent bridge lifting equipment part in Fig. 1.
Fig. 3 is the side view of independent one group of bent cap fixed device and lifting component in Fig. 1.
Specific embodiment
Below with reference to a kind of bridge lifting equipment embodiment using the utility model structure based on bent cap and its attached
The utility model is described in further detail for figure.
Optimum embodiment: as shown in Figure 1 to Figure 3, a kind of bridge lifting equipment based on bent cap, including the fixed device of bent cap
With lifting component, the fixed device of the bent cap is fixed on bent cap 1, and has two for being formed in 1 width direction two sides of bent cap
Support platform, the lifting component includes the jack 2 being arranged in support platform, wherein the jack 2 is multiple and edge
Bent cap length direction, which is arranged in two support platforms, constitutes two column, and 2 top of each column jack is by one along bridge lateral
The stiff girder and bridge beam body 3 of setting connect.
In this way, the setting of stiff girder, can both prevent asynchronous as caused by the accidents such as jacking equipment damage, oil leak
Phenomenon is jacked, and can reduce the local stress at the shear stress and jack active position at hinge seam, bent cap is improved and is applying
Intensity during work.
Wherein, the fixed device of the bent cap, including two fixed plates 4, the fitting of fixed plate 4 are arranged at left and right sides of bent cap,
4 upper end of two fixed plates along bent cap upper surface is folded to portion to the level that middle position extends after there is a relative level to be folded to,
The level of two fixed plates 4 is folded between portion end there are the gap for tension, and the level of two fixed plates 4 is folded to portion end also
With the docking section upwardly extended, it is provided with turnbuckle 5 between docking section and is connected, two 4 lower ends of fixed plate exceed downwards
Bent cap lower surface is simultaneously provided with horizontal lower turnbuckle 6 and is connected, and has the edge of a wing extended horizontally outward on the outside of two fixed plates
Plate 7,7 upper surface of flange plate constitute support platform.
In this way, snapped at left and right sides of bent cap in the fixed device of this bent cap using the fixed plate of two inverted L-shapeds, then according to
By upper and lower turnbuckle fixed strain, block structure and bent cap tightly, realization is fixedly connected with and is adjacent to load with bent cap,
Guarantee support platform stability.It is compared with bent cap fixed structure disclosed in CN105735149A patent, without vertically arranged
Bolt is connected, less using component, structure is simpler, and installation is more convenient, and structural integrity is more preferable, and stability is higher.
Wherein, the fixed plate 4 is the steel plate structure of monoblock cast forming.In this way, improving structural integrity and intensity, mention
The fixed reliability of height.
Wherein, 8 shape of skewed horizontal load component is further fixedly arranged between 7 lower surface of flange plate and the fixed plate lateral surface of lower section
At triangle inclined strut structure.
In this way, the structural strength of support platform can be improved preferably, support reliability is improved, guarantees construction safety.
Wherein, skewed horizontal load component 8 is welded and fixed to obtain using angle steel.Simple with structure, intensity is reliable, easy for construction
The advantages of.
Wherein, the upper turnbuckle 5 and lower turnbuckle 6 are high-strength bolt.Can preferably bearing load, improve
Stability.
Wherein, horizontal force bearing plate 9, horizontal force bearing plate 9 or so two are additionally provided between 1 lower surface of bent cap and lower turnbuckle
End and fixed plate medial surface are affixed setting.
In this way, horizontal force bearing plate makes the downward reaction force generated when jack works in support platform, by oblique
When being applied to fixed plate lower end to supporting member and be decomposed into inward pressure, which first acts on horizontal force bearing plate, and energy
It is enough to be offset by horizontal force bearing plate and be converted into the internal stress of horizontal force bearing plate, and then avoid bent cap two sides (especially two sides lower end
Position) by the excessive deformation for causing bent cap itself of inward pressure or breakage influenced device stability of strutting system.
In present embodiment, horizontal force bearing plate 9 is the convex arc-shaped spring steel plate in middle part and middle part upper surface and bent cap
Lower surface is affixed.
It is in this way because when jack is installed, it is ensured that the installation of fixed plate is fixed, and jack installation site is wide in bridge
It is on degree direction and the support being connected between bent cap and bridge beam body is supported to shift to install.It is equal to jack in this way to work
When, can change bent cap part by bridge downward pressure forced position, be likely to cause in this way bent cap local compression power it is excessive and
Generate downward flexing deformation.Therefore after using the horizontal force bearing plate of this structure, when horizontal force bearing plate two sides are pressurized, production will lead to
Raw upward deformation, converts two sides pressure to the upward top power applied to bent cap, so that the top power and bent cap
Because the downward pressure in part that jack effect generates offsets, bent cap is avoided to be generated by jack active position excessive downward
It deforms and influences device stability of strutting system.In other embodiment, horizontal force bearing plate can also be horizontally disposed steel plate, make
Its support strength it is higher, load changing effect is more preferable.
Wherein, horizontal 9 left and right ends position of force bearing plate and the setting of 8 lower end position face of skewed horizontal load component.So that above-mentioned
Effect reaches best.
Wherein, the stiff girder is that horizontally disposed i shaped steel 10 obtains, the 10 middle connecting plate portion of i shaped steel
Divide vertically arranged and lower end surface and 2 upper end of jack are connected, upper surface and the fitting of 3 lower surface of bridge beam body connect.
In this way, obtaining stiff girder using i shaped steel 10, i shaped steel is standard element, and production installation is facilitated to reduce construction
Cost, and i shaped steel self structure has upper and lower two load-carrying surfaces, is suitble to force structure herein, can be improved supporting & stablizing
Property.
Wherein, metal caul 11 is additionally provided between 2 upper end of i shaped steel 10 and jack.Preferably to transmit gravity,
Improve stability of strutting system.
Wherein, the fixed device of the bent cap is that support is spaced apart multiple above bent cap, the fixed device of multiple bent caps
Jack integral arrangement at two column, the stiff girder by more piece i shaped steel end docking be connected obtains.
In this way, the installation of the fixed device of the more convenient bent cap of the support position that is staggered.Can preferably extending structure in bridge
Length in width direction is preferably conducive to realize that the support to bridge beam body jacks.
Wherein, two pieces of buttcover plates 12 are folded at every 10 docking of section i shaped steel, buttcover plate 12 is fitted in i shaped steel
Between connecting plate part two sides and be fixedly connected by bolt to wearing.
This spline structure is simple, and stable connection is reliable, and the extension for realizing i shaped steel is facilitated to connect to form stiff girder.
Wherein, there is the transversal connecting assembly being laterally fixedly connected between two stiff girders.
In this way, affixed between two stiff girders to be an entirety, preferably raising bent cap two sides are put more energy into beam stress
Globality.
Wherein, the transversal connecting assembly includes the connecting rod 13 of horizontal scalable setting, and connecting rod 13 can phase for two
Mutually be slidably matched the casing composition being arranged, and 13 both ends of connecting rod are fixed on stiff girder.
It in this way, connecting rod does not influence the load transmitting of up and down direction, and can be realized the free extension of horizontal direction, make it
Flexible adjustment can be realized according to bent cap size and jack installation site, it is more convenient to use.
Wherein, in connecting rod 13 at two casing cooperations, external sleeve surface is provided through fastening thread hole, fastening
Be screwed in threaded hole and be combined with fastening bolt 14,14 inner end of fastening bolt offset with internal casing realize it is opposite to two casings
The fixation of position.
In this way, casing elongates or shortens, it after reaching target length, can be tightened by fastening bolt, keep its non-telescoping,
Play the role of improving lateral stability.
Wherein, the fastening thread hole on casing and corresponding fastening bolt 14 are provided with two groups, and along same rectilinear direction
Setting.
It is adjusted in place and after fixing in this way, can better ensure that in casing, connecting rod globality in the horizontal direction.
Wherein, 13 end of connecting rod is welded with vertical link block 15, and link block 15 is fixed by horizontal bolt
It is connected on the middle connecting plate of stiff girder i shaped steel.
In this way, facilitating being connected and fixed for connecting rod, whole load stability and reliability are improved.
Wherein, link block 15 is rectangle, and bolt and i shaped steel middle connecting plate by being set to four corners
It is connected.
In this way, improving the fixed reliability of connection boom end.
Wherein, two bar connecting rods 13 are at least connected on every section i shaped steel 10.The direction that can preferably improve the standard is held
The globality of power.
Claims (10)
1. a kind of synchronous lifting girder construction of putting more energy into of bent cap formula bridge, which is characterized in that including horizontal interval and disposed in parallel
Two stiff girders, the stiff girder are that horizontally disposed i shaped steel obtains, and the i shaped steel intervening web portions are vertical
It is arranged and lower end surface is made to form the face for connecting with jack upper end, upper surface is used for and bridge beam body lower surface is bonded phase
The face connect, has the transversal connecting assembly being laterally fixedly connected between two stiff girders, and transversal connecting assembly length is greater than bent cap
Width.
2. the synchronous lifting girder construction of putting more energy into of bent cap formula bridge as described in claim 1, which is characterized in that i shaped steel and thousand
Jin top is additionally provided with metal caul between upper end.
3. the synchronous lifting girder construction of putting more energy into of bent cap formula bridge as described in claim 1, which is characterized in that the stiff girder by
The docking of more piece i shaped steel end, which is connected, to be obtained.
4. the synchronous lifting girder construction of putting more energy into of bent cap formula bridge as claimed in claim 3, which is characterized in that every section i shaped steel
It is folded with two pieces of buttcover plates at docking, buttcover plate is fitted in the two sides of i shaped steel intervening web portions and by bolt to wearing
It is fixedly connected.
5. the synchronous lifting girder construction of putting more energy into of bent cap formula bridge as described in claim 1, which is characterized in that the lateral connection
Component includes the connecting rod of horizontal scalable setting, and connecting rod is two casing compositions being arranged that can mutually be slidably matched, connection
Bar both ends are fixed on stiff girder.
6. the synchronous lifting girder construction of putting more energy into of bent cap formula bridge as claimed in claim 5, which is characterized in that two in connecting rod
At casing cooperation, external sleeve surface is provided through fastening thread hole, is screwed in fastening thread hole and is combined with fastening bolt,
Fastening bolt inner end and internal casing offset the fixation realized to two casing relative positions.
7. the synchronous lifting girder construction of putting more energy into of bent cap formula bridge as claimed in claim 6, which is characterized in that the fastening on casing
Threaded hole and corresponding fastening bolt are provided with two groups, and are arranged along same rectilinear direction.
8. the synchronous lifting girder construction of putting more energy into of bent cap formula bridge as claimed in claim 5, which is characterized in that connection boom end weldering
It connects and is fixed with vertical link block, link block is fixedly connected on the middle connecting plate of stiff girder i shaped steel by horizontal bolt
On.
9. the synchronous lifting girder construction of putting more energy into of bent cap formula bridge as claimed in claim 8, which is characterized in that link block is square
Shape, and the bolt by being set to four corners is connected with i shaped steel middle connecting plate.
10. the synchronous lifting girder construction of putting more energy into of bent cap formula bridge as claimed in claim 5, which is characterized in that every section is I-shaped
Two bar connecting rods are at least connected on steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821440865.XU CN208762887U (en) | 2018-09-04 | 2018-09-04 | A kind of bent cap formula bridge is synchronous to be lifted girder construction of putting more energy into |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821440865.XU CN208762887U (en) | 2018-09-04 | 2018-09-04 | A kind of bent cap formula bridge is synchronous to be lifted girder construction of putting more energy into |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208762887U true CN208762887U (en) | 2019-04-19 |
Family
ID=66135196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821440865.XU Expired - Fee Related CN208762887U (en) | 2018-09-04 | 2018-09-04 | A kind of bent cap formula bridge is synchronous to be lifted girder construction of putting more energy into |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208762887U (en) |
-
2018
- 2018-09-04 CN CN201821440865.XU patent/CN208762887U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107143145B (en) | A kind of steel truss structure segmentation overhead connection and synchronous discharging method | |
CN208762888U (en) | A kind of bridge jacking work platform structure being installed on bent cap | |
CN103437300A (en) | Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket | |
CN110205933A (en) | A kind of arch rib of long-span steel arch bridge assembly falsework | |
CN208844445U (en) | A kind of bridge lifting equipment based on bent cap | |
CN203173749U (en) | Assembled integral type vertical self-jacking device of hydraulic double-type crane tower | |
CN103469725B (en) | Bridge construction breaking joint dislocation expansion joint structure | |
CN208762887U (en) | A kind of bent cap formula bridge is synchronous to be lifted girder construction of putting more energy into | |
CN109056559A (en) | A kind of bridge beam body lifting method based on bent cap | |
CN109024316A (en) | A kind of bridge beam body lifting system being mounted on bridge pier | |
CN107419916B (en) | Internal moment reinforcing and correcting device for beam structure | |
CN202627327U (en) | Haunching double-hinge straight arch beam | |
CN202785388U (en) | Tower crane suspended connection stabilizing mechanism emergently used in tower crane up-lifting process | |
CN207844882U (en) | Steel column and crane girder connecting structure | |
CN109024315A (en) | The bridge beam body lifting equipment being installed on bent cap | |
CN208250889U (en) | A kind of arch bridge suspender structure | |
CN109797964A (en) | A kind of lifting platform system of integrated tower crane | |
CN208685469U (en) | A kind of bridge jacking work platform structure being installed in pier top | |
CN210066473U (en) | Bridge seismic isolation and reduction system | |
CN209381056U (en) | Wind-force tower planar plate members assist turnover device | |
CN112049017A (en) | Bailey frame integral frame falling device for cast-in-place box girder and construction process | |
CN214993177U (en) | Bearing structure is used in bent cap construction | |
CN205369292U (en) | Control framing formula bridge steel structure tower crane basis | |
CN220789395U (en) | High-altitude steel supporting structure for cable-stayed bridge cable tower cross beam | |
CN216338996U (en) | Bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190419 Termination date: 20190904 |
|