CN208762881U - A kind of bridge construction support device - Google Patents

A kind of bridge construction support device Download PDF

Info

Publication number
CN208762881U
CN208762881U CN201821185424.XU CN201821185424U CN208762881U CN 208762881 U CN208762881 U CN 208762881U CN 201821185424 U CN201821185424 U CN 201821185424U CN 208762881 U CN208762881 U CN 208762881U
Authority
CN
China
Prior art keywords
plate
support device
hydraulic stem
welded
bridge construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821185424.XU
Other languages
Chinese (zh)
Inventor
武文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201821185424.XU priority Critical patent/CN208762881U/en
Application granted granted Critical
Publication of CN208762881U publication Critical patent/CN208762881U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of bridge construction support devices, including the first hydraulic stem, support plate is welded at the top of first hydraulic stem, and backup plate is welded with above support plate, the bottom of the support plate is provided with running-on, and the side of running-on is equipped with support rod, the bottom of first hydraulic stem is welded with pedestal, and the bottom of pedestal has been bolted to connection vertex of a cone plate, the bottom of the vertex of a cone plate is provided with base cone, plunger is installed at a side position of base cone on the vertex of a cone plate, clamping plate is welded at the top position of pedestal on first hydraulic stem, the utility model is provided with base cone, support device is solved when installing in soft ground, pedestal places unstable problem, the utility model is provided with mounting plate and pivoted housing, be conducive to support device and support force in more direction is provided for bridge, The support effect that ensure that support device improves the support force of support device.

Description

A kind of bridge construction support device
Technical field
The utility model relates to technical field of bridge construction, and in particular to a kind of bridge construction support device.
Background technique
Bridge construction builds the process of bridge according to design content, refers mainly to bridge Construction Technology and construction organization, construction The contents such as management, construction quality, when in use, when the bottom of support device is mounted on soft ground, pedestal is placed unstable It is fixed, in use, other fixed structures can not be installed in support device, the support force on other enough directions can not be provided.
Utility model content
(1) technical problems to be solved
In order to overcome the shortage of prior art, it is proposed that a kind of bridge construction support device solves support device soft When installing on quality face, pedestal places unstable problem, solves the support that can not be provided on other directions in support device The problem of power.
(2) technical solution
The utility model is achieved through the following technical solutions: the utility model proposes a kind of supports of bridge construction to fill It sets, including the first hydraulic stem, is welded with support plate at the top of first hydraulic stem, and be welded with backup plate above support plate, The bottom of the support plate is provided with running-on, and the side of running-on is equipped with support rod, the bottom welding of first hydraulic stem There is pedestal, and the bottom of pedestal has been bolted to connection vertex of a cone plate, the bottom of the vertex of a cone plate is provided with base cone, the cone Plunger is installed at a side position of base cone on top plate, is welded at the top position of pedestal on first hydraulic stem There is clamping plate, and the side of clamping plate is connected with connecting rod by fixed pin, one end of the connecting rod is equipped with the second hydraulic stem, institute The side for stating the first hydraulic stem is equipped with pivoted housing, and the side of pivoted housing offers the second screw hole, and the side of the pivoted housing is welded with Link block, and the side of link block is equipped with mounting plate, the inside of the mounting plate offers the first screw hole, and described first is hydraulic The side of bar is equipped with hydraulic tube, and one end of hydraulic tube is equipped with hydraulic pump, and the side of the hydraulic pump is equipped with switch, institute The input terminal and external power supply for stating switch are electrically connected, and the output end and hydraulic pump of the switch are electrically connected.
Further, the plunger is provided with three, and the three root cutting sticks bottom triangular in shape for being distributed in vertex of a cone plate altogether.
Further, there are two the mounting plate is arranged altogether, and two mounting plates are symmetrically mounted on the two sides of pivoted housing.
Further, rust-proof coating is provided on the pedestal.
Further, anti-skid bulge is provided on the backup plate.
Further, first screw hole is provided with eight altogether, and eight the first screw holes in distributed rectangular on a mounting board.
Further, the rotational angle range of the pivoted housing is 0 ° -360 °.
(3) beneficial effect
The utility model compared with the existing technology, has the advantages that
1), to solve support device when installing in soft ground, pedestal places unstable problem, and the utility model is set Base cone has been set, when the installation ground of support device is soft ground, base cone can be mounted by means of bolts on to the bottom of pedestal Portion is pre-fixed support device by the fixation of base cone and plunger, and specific fixed form is then taken to fill support again It sets installation on the ground, improves the stability of support device, avoid support device in Different Ground installation, take single Mounting means the problem of being not easy to the assembling of support device, be conducive to the installation of support device, used convenient for user.
2), in order to solve the problems, such as not providing the support force on other directions in support device, the utility model is arranged Mounting plate and pivoted housing, after hydraulic stem is installed, according to the support demand of bridge, user can pass through on a mounting board Bolt installs other support constructions, while can rotate pivoted housing to adjust the installation direction of mounting plate, determines the position of mounting plate It postpones, is fixed using bolt, be conducive to support device and support force in more direction is provided for bridge, ensure that support device Support effect, improve the support force of support device.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the utility model mounting plate;
Fig. 3 is the structural schematic diagram of the first hydraulic stem of the utility model;
1- hydraulic pump;2- hydraulic tube;3- support rod;4- running-on;5- backup plate;The first hydraulic stem of 6-;7- mounting plate;8- connection Bar;9- vertex of a cone plate;10- base cone;11- clamping plate;12- support plate;13- plunger;14- link block;The first screw hole of 15-;16- pedestal; The second screw hole of 17-;18- switch;19- pivoted housing;The second hydraulic stem of 20-;21- fixed pin.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
As shown in Figure 1-Figure 3, the utility model provides the following technical solutions: a kind of bridge construction support device, including First hydraulic stem 6, the top of the first hydraulic stem 6 is welded with support plate 12, and the top of support plate 12 is welded with backup plate 5, backup plate 5 The edge of bridge can be supported, edge is avoided to deform, the bottom of support plate 12 is provided with running-on 4, and the one of running-on 4 Side is equipped with support rod 3, and the bottom of the first hydraulic stem 6 is welded with pedestal 16, and the bottom of pedestal 16 is bolted to connection There is vertex of a cone plate 9, the bottom of vertex of a cone plate 9 is provided with base cone 10, is equipped with plunger at a side position of base cone 10 on vertex of a cone plate 9 13, clamping plate 11 is welded on the first hydraulic stem 6 at the top position of pedestal 16, and the side of clamping plate 11 passes through fixed pin 21 Be connected with connecting rod 8, connecting rod 8 can link together two hydraulic stems, convenient for formed between hydraulic stem one it is fixed away from From the installation for being conducive to hydraulic stem is fixed, and one end of connecting rod 8 is equipped with the second hydraulic stem 20, is also pacified on the second hydraulic stem 20 Equipped with hydraulic tube 2, another hydraulic pump 1 is connected, when work, multiple hydraulic pumps 1 are simultaneously operable offer pressure, the first hydraulic stem 6 side is equipped with pivoted housing 19, and the side of pivoted housing 19 offers the second screw hole 17, and the side of pivoted housing 19 is welded with link block 14, and the side of link block 14 is equipped with mounting plate 7, the inside of mounting plate 7 offers the first screw hole 15, the first hydraulic stem 6 Side is equipped with hydraulic tube 2, and one end of hydraulic tube 2 is equipped with hydraulic pump 1, and the side of hydraulic pump 1 is equipped with switch 18, switch 18 input terminal and external power supply is electrically connected, and the output end and hydraulic pump 1 of switch 18 are electrically connected.
Further, plunger 13 is provided with three, and the bottom triangular in shape for being distributed in vertex of a cone plate 9 of three root cutting stick 13 altogether.
Further, there are two mounting plate 7 is arranged altogether, and two mounting plates 7 are symmetrically mounted on the two sides of pivoted housing 19.
Further, rust-proof coating is provided on pedestal 16.
Further, anti-skid bulge is provided on backup plate 5.
Further, the first screw hole 15 is provided with eight altogether, and eight the first screw holes 15 are in distributed rectangular in mounting plate 7 On.
Further, the rotational angle range of pivoted housing 19 is 0 ° -360 °.
A kind of bridge construction support device that the utility model is mentioned connects external power supply when in use, by hydraulic pump 1, According to the attached subaerial geology of bridge, selection is mounted directly pedestal 16 and is still installed using base cone 10, is pacified using base cone 10 When dress, vertex of a cone plate 9 is attached to the bottom of pedestal 16 by user, is then fixed with bolt, and user starts switch 18, hydraulic Pump 1 powers on, and hydraulic pump 1 works, and hydraulic pump 1 extracts hydraulic oil from external fuel tank and conveys by hydraulic tube 2, then provides pressure Power is to hydraulic stem, the first hydraulic stem 6 and the second elongation upwards of hydraulic stem 20, when support plate 12 touches bridge bottom, selection Support rod 3 is inserted into running-on 4 by the support rod 3 of appropriate length, user, and on the ground by the support of support rod 3, user is installing Other support members are installed by bolt on plate 7, rotate the position of 19 adjustment and installation plate 7 of pivoted housing, then inject the with bolt Two screw holes 17 screw, and mounting plate 7 is fixed.
Embodiment described above is only that preferred embodiments of the present invention are described, not practical to this Novel conception and scope is defined.Without departing from the design concept of the present utility model, ordinary people in the field couple The all variations and modifications that the technical solution of the utility model is made, should fall within the protection scope of the present utility model, this reality With novel claimed technology contents, it is all described in the claims.

Claims (7)

1. a kind of bridge construction support device, including the first hydraulic stem (6), it is characterised in that: first hydraulic stem (6) Top is welded with support plate (12), and backup plate (5) are welded with above support plate (12), the bottom setting of the support plate (12) Have running-on (4), and the side of running-on (4) is equipped with support rod (3), the bottom of first hydraulic stem (6) is welded with pedestal (16), and the bottom of pedestal (16) has been bolted to connection vertex of a cone plate (9), and the bottom of the vertex of a cone plate (9) is provided with bottom It bores (10), is equipped with plunger (13) at a side position of base cone (10) on the vertex of a cone plate (9), first hydraulic stem (6) it is welded with clamping plate (11) at the top position of pedestal (16) on, and the side of clamping plate (11) is connected by fixed pin (21) It is connected to connecting rod (8), one end of the connecting rod (8) is equipped with the second hydraulic stem (20), the side of first hydraulic stem (6) It is equipped with pivoted housing (19), and the side of pivoted housing (19) offers the second screw hole (17), the side of the pivoted housing (19) is welded with company It connects block (14), and the side of link block (14) is equipped with mounting plate (7), the inside of the mounting plate (7) offers the first screw hole (15), the side of first hydraulic stem (6) is equipped with hydraulic tube (2), and one end of hydraulic tube (2) is equipped with hydraulic pump (1), The side of the hydraulic pump (1) is equipped with switch (18), and the input terminal and external power supply of the switch (18) are electrically connected, described The output end and hydraulic pump (1) for switching (18) are electrically connected.
2. a kind of bridge construction support device according to claim 1, it is characterised in that: the plunger (13) is arranged altogether There are three, and three root cutting stick (13) bottoms triangular in shape for being distributed in vertex of a cone plate (9).
3. a kind of bridge construction support device according to claim 1, it is characterised in that: the mounting plate (7) sets altogether There are two setting, and two mounting plates (7) are symmetrically mounted on the two sides of pivoted housing (19).
4. a kind of bridge construction support device according to claim 1, it is characterised in that: be arranged on the pedestal (16) There is rust-proof coating.
5. a kind of bridge construction support device according to claim 1, it is characterised in that: be arranged on the backup plate (5) There is anti-skid bulge.
6. a kind of bridge construction support device according to claim 1, it is characterised in that: first screw hole (15) is altogether Eight are provided with, and eight the first screw holes (15) are in distributed rectangular on mounting plate (7).
7. a kind of bridge construction support device according to claim 1, it is characterised in that: the rotation of the pivoted housing (19) Angular range is 0 ° -360 °.
CN201821185424.XU 2018-07-25 2018-07-25 A kind of bridge construction support device Expired - Fee Related CN208762881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821185424.XU CN208762881U (en) 2018-07-25 2018-07-25 A kind of bridge construction support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821185424.XU CN208762881U (en) 2018-07-25 2018-07-25 A kind of bridge construction support device

Publications (1)

Publication Number Publication Date
CN208762881U true CN208762881U (en) 2019-04-19

Family

ID=66129247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821185424.XU Expired - Fee Related CN208762881U (en) 2018-07-25 2018-07-25 A kind of bridge construction support device

Country Status (1)

Country Link
CN (1) CN208762881U (en)

Similar Documents

Publication Publication Date Title
CN207140500U (en) A kind of carrier film clamp system for being applicable four sides bending and bent screen make-up machine
CN208762881U (en) A kind of bridge construction support device
CN201999655U (en) Conversion device connecting tower crane and self-jacking construction platform
CN208981167U (en) Suspension type constructing tie beam device
CN203867265U (en) Special hold hoop for connecting terminal pole electric pole and jacking rod
CN2931240Y (en) Front axle split charging platform in automobile production loop
CN204474186U (en) A kind of telescopic attaching frame
CN209367674U (en) A kind of dedicated anchoring rod device of large-tonnage bridge floor crane
CN206957226U (en) A kind of model sheetinstallat workbench
CN207004140U (en) A kind of anchor ear pole
CN206913751U (en) A kind of hydraulic pressure press
CN204963997U (en) Foldable platform scale
CN207525955U (en) For the connection component of curtain wall panel installation
CN208843078U (en) Auxiliary hydraulic pressure support frame for electric cabinet installation
CN207211810U (en) A kind of working support meanss
CN106586488B (en) A kind of overturning attachment device for conveying lever
CN206429833U (en) A kind of supporting structure for stack product
CN205873650U (en) Flip structure that footboard is prevented in hand elevator
CN205770945U (en) Adjustable height wind power blade tip lightening storage rack
CN212420228U (en) Jig frame with good welding effect
CN212359105U (en) Combined supporting pile for civil engineering
CN205497291U (en) Generator stator pressure equipment limit clamp
CN208858138U (en) A kind of height-adjustable aluminum dipping form frame supporting foot structure in longitudinal direction
CN202829510U (en) Supporting seat of cantilevered beam
CN204916772U (en) A saddle support that is used for large -scale tower class container

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190419

Termination date: 20200725

CF01 Termination of patent right due to non-payment of annual fee