CN208748816U - The cleaning plant of mud in pipeline - Google Patents

The cleaning plant of mud in pipeline Download PDF

Info

Publication number
CN208748816U
CN208748816U CN201821317771.3U CN201821317771U CN208748816U CN 208748816 U CN208748816 U CN 208748816U CN 201821317771 U CN201821317771 U CN 201821317771U CN 208748816 U CN208748816 U CN 208748816U
Authority
CN
China
Prior art keywords
mud
pipe
scraper bowl
pipeline
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821317771.3U
Other languages
Chinese (zh)
Inventor
高齐飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Yizhongtian Communication Engineering Co Ltd
Original Assignee
Nanjing Yizhongtian Communication Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Yizhongtian Communication Engineering Co Ltd filed Critical Nanjing Yizhongtian Communication Engineering Co Ltd
Priority to CN201821317771.3U priority Critical patent/CN208748816U/en
Application granted granted Critical
Publication of CN208748816U publication Critical patent/CN208748816U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of cleaning plants of mud in pipeline, it applies in pipe dredging apparatus field, its key points of the technical solution are that: including the scraper bowl being located in pipeline, pull rod, right-angle elbow pipe and the water-supply-pipe being connect with high-pressure sewer flushing vehicle water outlet, the quarrel side of scraper bowl is arranged in pull rod, right-angle elbow pipe is fixed in bucket sidewalls by connector, one end of right-angle elbow pipe is connect with water-supply-pipe, the other end is located at the back side of scraper bowl and towards mud face, its advantage is that: when silt depth is larger in pipeline, operator clears up the mud in pipeline using scraper bowl, while manual cleaning mud, the water of high-pressure wash car is rinsed pipeline by water-supply-pipe, the two combines, reduce directly using high pressure water to mud when flushing needed for water consumption.

Description

The cleaning plant of mud in pipeline
Technical field
The utility model relates to pipe dredging apparatus field, in particular to the cleaning plant of mud in a kind of pipeline.
Background technique
Pipe dredging, which refers to, dredges pipeline, clears up the wastes such as the mud inside pipeline, keeps long-term unimpeded, to prevent Only waterlogging occurs for city, and pipeline does not have regular dredging to will cause sewage to flow excessively, pollutes environment, makes troubles to people's lives.
Existing dredging method is usually the length according to pipeline, and pipeline is disassembled into multistage, then utilizes high-pressure wash Mud is cleaned to outside pipeline in handlebar pipeline, then transports to appointed place, but this method purely relies on high pressure water flow to pipeline The scouring force of interior mud just needs washing away repeatedly, could clean out mud when silt depth is larger in pipeline, from And cause water consumption larger.
Utility model content
The purpose of the utility model is to provide a kind of cleaning plants of mud in pipeline, its advantage is that: when mud in pipeline When thickness is larger, operator clears up the mud in pipeline using scraper bowl, while manual cleaning mud, high-pressure sewer flushing vehicle Interior water is rinsed pipeline by water-supply-pipe, and the two combines, and reduces and is directly washed away using high pressure water to mud The water consumption of Shi Suoxu.
The above-mentioned technical purpose of the utility model has the technical scheme that mud in a kind of pipeline Cleaning plant, including be located at pipeline in scraper bowl, pull rod, right-angle elbow pipe and the water-supply-pipe being connect with high-pressure sewer flushing vehicle water outlet, The quarrel side of scraper bowl is arranged in the pull rod, and the right-angle elbow pipe is fixed in bucket sidewalls by connector, the right angle One end of bend pipe is connect with water-supply-pipe, and the other end is located at the back side of scraper bowl and towards mud face.
Through the above technical solutions, operator is protruded into scraper bowl in pipeline by pull rod, then make in scraper bowl insertion mud, Pull rod is firmly pulled to outside pipeline, to clean out most of mud in pipeline outside pipeline by scraper bowl, reduces high pressure Water washes away the difficulty of mud;When operator pulls pull rod to pull out scraper bowl outside pipeline, the high pressure water of high-pressure wash car is through water delivery Pipe, elbow bend spray, and carry out cleaning to pipeline, and both high pressure water and scraper bowl complement each other, and both accelerate pipe dredging Speed, in turn avoid to pipeline directly washing away repeatedly, to reduce the water consumption of high pressure water;The connector of setting is then square Installation and removal of the operator to elbow bend, but also operator can choose whether to need high pressure water according to the actual situation Auxiliary, flexibility is high.
The utility model is further arranged to: the connector includes being arranged on scraper bowl and passing through for right-angle elbow pipe one end U-frame and the fixing sleeve that is arranged in U-frame opposed inner walls, sliding block is slidably connected in the fixing sleeve, on the sliding block Equipped with snap ring compatible with right-angle elbow pipe outer profile, the U-frame sidewall thread is connected with adjusting screw, the adjusting screw One end pierce into fixing sleeve and be rotatablely connected with sliding block.
Through the above technical solutions, one end of elbow bend is placed in U-frame by operator, so when fixed elbow bend After turn adjusting screw, band movable slider is to mobile close to elbow bend direction, to be clamped elbow bend by two snap rings It is fixed, it is convenient and efficient.
The utility model is further arranged to: the water outlet end of the right-angle elbow pipe is connected with duckbilled spray head.
Through the above technical solutions, the duckbilled spray head of setting increases the range of scatter of elbow bend water spray, to increase The area that scraper bowl can be cleaned in a moving process mesohigh water reduces the number that pipeline needs to wash away, further drops Water consumption needed for low dredging.
The utility model is further arranged to: the pull rod is spliced by several hollow pipes, two neighboring described hollow It manages competing one end and is respectively equipped with swivel nut and threaded post, the swivel nut and threaded post are arranged on hollow inside pipe wall.
Through the above technical solutions, operator's turn hollow pipe, in the thread bush for making another hollow pipe of threaded post precession, Two hollow pipes can be made to link together, operator is facilitated and pull rod is adjusted according to the length of practical pipeline, improved The applicability and flexibility of cleaning plant.
The utility model is further arranged to: the scraper bowl is equipped with several bucket tooths.
Scraper bowl is inserted into mud through the above technical solutions, the bucket tooth of setting facilitates operator.
The utility model is further arranged to: each bucket tooth scrapes hook far from what one end of bucket was equipped with arc.
Through the above technical solutions, being facilitated by scraping hook to iron wire, waste woven bag etc waste similar in mud Cleaning, while scraping hook and also reducing directly contacting for bucket tooth and inner wall of the pipe, reduce scraper bowl in moving process, bucket tooth will A possibility that inner wall of the pipe is scratched, is scratched.
The utility model is further arranged to: several drainage holes is offered on the scraper bowl, the scraper bowl passes through fastening spiral shell Nail is connected with the filter screen for covering drainage hole, is equipped with rubber sheet gasket on the fastening screw, the rubber sheet gasket is located at Between the head and filter screen of fastening screw.
Through the above technical solutions, facilitating the discharge of sewage in scraper bowl by filter screen, alleviates scraper bowl and be moved through Suffered resistance in journey, so that storing mud in scraper bowl as far as possible.
The utility model is further arranged to: the snap ring inner wall is equipped with non-slip mat.
Through the above technical solutions, increasing the frictional force between snap ring and elbow bend by non-slip mat, connection is improved The part stability fixed to elbow bend.
In conclusion the utility model has the following beneficial effects:
1. improving the speed of pipeline sludge cleaning by the mutual cooperation manually washed away using scraper bowl cleaning and high pressure water Degree, reduces the number for needing high pressure water to wash away, to reduce water consumption needed for dredging;
2. installation and removal of the operator to elbow bend had both been facilitated by connector, but also operator can be according to reality Border operating condition chooses whether to need to add high pressure water, flexibly side;The drainage hole and filter screen of setting then alleviate operator and are pulling Suffered resistance when scraper bowl.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the present embodiment;
Fig. 2 is the structural schematic diagram that the present embodiment is used to embody scraper bowl and pull rod;
Fig. 3 is enlarged drawing at A in Fig. 2;
Fig. 4 is enlarged drawing at B in Fig. 2;
Fig. 5 is the structural schematic diagram that the present embodiment is used to embody drainage hole;
Fig. 6 is the structural schematic diagram that the present embodiment is used to embody hollow pipe connection;
Fig. 7 is enlarged drawing at C in Fig. 6.
Appended drawing reference: 1, scraper bowl;11, pull rod;12, right-angle elbow pipe;121, duckbilled spray head;13, high-pressure sewer flushing vehicle;131, defeated Water pipe;14, pipeline;2, connector;21, U-frame;22, fixing sleeve;23, sliding block;24, snap ring;241, non-slip mat;25, spiral shell is adjusted Nail;3, hollow pipe;31, swivel nut;32, threaded post;33, bucket tooth;331, hook is scraped;34, drainage hole;35, fastening screw;351, rubber Gasket;36, filter screen.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment: the cleaning plant of mud in a kind of pipeline, as depicted in figs. 1 and 2, including the scraper bowl being located in pipeline 14 1, pull rod 11, right-angle elbow pipe 12 and the water-supply-pipe 131 connecting with 13 water outlet of high-pressure sewer flushing vehicle, scraper bowl 1 are equipped with several along straight The bucket tooth 33 that line is equally spaced, in order to which scraper bowl 1 is inserted into mud by operator;12 connector 2 of right-angle elbow pipe is fixed on scraper bowl 1 On side wall, and one end of right-angle elbow pipe 12 is connect with water-supply-pipe 131, and the other end is located at the back side of scraper bowl 1 and towards mud face.
As shown in Fig. 2, scraper bowl 1 is pushed into pipeline 14 by operator by pull rod 11 when dredging, then scraper bowl 1 is inserted into In mud in pipeline 14, start high-pressure sewer flushing vehicle 13(such as Fig. 1), make high pressure water by water-supply-pipe 131 from right-angle elbow pipe 12 It spraying, operator pulls pull rod 11 to outside pipeline 14 at this time, the mud in pipeline 14 is cleared up to outside pipeline 14 by scraper bowl 1, At the same time, high pressure water carries out flush clean to region of the scraper bowl 1 after mobile, and when the removal pipeline 14 of scraper bowl 1 is outer, high pressure water is also Mud is gone out outside pipeline 14 simultaneously.
As shown in Fig. 2, since most of mud is directly taken out of by scraper bowl 1, alleviate when high pressure water washes away remaining mud Difficulty, the two cooperate jointly, accelerate the speed of mud cleaning, so that reduced using the number that high pressure water washes away, and High pressure water conveying is just opened when only scraper bowl 1 is moved to outside pipeline 14, and then is reduced required when directly being washed away by high pressure water Water consumption.
As shown in figure 5, the water outlet end of right-angle elbow pipe 12 is connected with duckbilled spray head 121, to expand the model of high pressure water sprinkling It encloses, the area that high pressure water is washed away when increasing the movement of 1 single of scraper bowl improves cleaning efficiency, to further reduce punching Brush number has achieved the purpose that conserve water.
As shown in Figures 2 and 3, connector 2 includes the U-frame for being arranged on scraper bowl 1 and passing through for 12 one end of right-angle elbow pipe 21, be equipped with fixing sleeve 22 on opposite two inner walls of U-frame 21, the running-on of two fixing sleeves 22 is opposite and two fixing sleeves 22 in Slidably connect sliding block 23,22 running-on of fixing sleeve is stretched out in one end of sliding block 23, and is equipped with and right-angle elbow pipe in one end of stretching The compatible snap ring 24 of 12 outer profiles, 24 inner wall of snap ring is equipped with non-slip mat 241, to increase between snap ring 24 and right-angle elbow pipe 12 Frictional force;21 sidewall thread of U-frame, which is connected with, simultaneously adjusts screw 25, and the one end for adjusting screw 25 is pierced into fixing sleeve 22 simultaneously It is rotatablely connected with sliding block 23.
As shown in figure 3, operator, which turns, adjusts screw 25, and band movable slider 23 is along fixing sleeve 22 when fixed right-angle elbow pipe 12 To close to the movement of 12 direction of right-angle elbow pipe, after snap ring 24 and the conflict of right-angle elbow pipe 12, operator, which tightens, adjusts screw 25, thus Fix two snap rings 24 by right-angle elbow pipe 12, it is simple and fast, operator is facilitated according to actual condition to right-angle elbow pipe 12 It is installed or removed, flexibility is high.
As shown in figure 4, offering several drainage hole 34(such as Fig. 5 on scraper bowl 1), scraper bowl 1 is connected with by fastening screw 35 For covering the filter screen 36 of drainage hole 34, rubber sheet gasket 351 is equipped on fastening screw 35, rubber sheet gasket 351 is located at fastening Between the head and filter screen 36 of screw 35, to reduce the case where filter screen 36 is damaged by pressure by fastening screw 35.Work as operator When dragging scraper bowl 1 by pull rod 11, the water in scraper bowl 1 is smoothly flowed out by filter screen 36 and drainage hole 34, and sundries is then filtered Net 36 intercepts, and reduces the resistance of the water suffered in moving process of scraper bowl 1, leaves enough storages as far as possible to mud Space is deposited, to improve the efficiency of dredging.
As shown in figure 4, bucket tooth 33 scrapes hook 331 far from what one end of bucket was equipped with arc, hook 331 is scraped to far from bucket tooth 33 Direction extends, and contacts conducive to bucket tooth 33 is reduced with the direct of 14 inner wall of pipeline, plays the protective effect to 14 inner wall of pipeline.
As shown in Figure 6 and Figure 7, pull rod 11 is spliced by several hollow pipes 3, conducive to mitigate pull rod 11 own wt, Reduce the labor intensity of operator;The competing one end of two neighboring hollow pipe 3 is respectively equipped with swivel nut 31 and threaded post 32, spiral shell Set 31 and threaded post 32 are arranged on 3 inner wall of hollow pipe;When needing to lengthen pull rod 11, operator is by the spiral shell of an air hose Line column 32 screws in the swivel nut 31 of another hollow pipe 3, easy to connect, and the installation used time is short.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but As long as all by the protection of Patent Law in the scope of the claims of the utility model.

Claims (8)

1. the cleaning plant of mud in a kind of pipeline, it is characterised in that: including scraper bowl (1), the pull rod being located in pipeline (14) (11), right-angle elbow pipe (12) and the water-supply-pipe (131) connecting with high-pressure sewer flushing vehicle (13) water outlet, pull rod (11) setting exist The quarrel side of scraper bowl (1), the right-angle elbow pipe (12) are fixed on scraper bowl (1) side wall by connector (2), the quarter bend One end of pipe (12) is connect with water-supply-pipe (131), and the other end is located at the back side of scraper bowl (1) and towards mud face.
2. the cleaning plant of mud in pipeline according to claim 1, it is characterised in that: the connector (2) includes setting It sets on scraper bowl (1) and the U-frame (21) that passes through for right-angle elbow pipe (12) one end and is arranged in U-frame (21) opposed inner walls Fixing sleeve (22), the fixing sleeve (22) is interior to be slidably connected sliding block (23), and the sliding block (23) is equipped with and right-angle elbow pipe (12) the compatible snap ring of outer profile (24), U-frame (21) sidewall thread, which is connected with, adjusts screw (25), the adjusting spiral shell One end of nail (25) is pierced into fixing sleeve (22) and is rotatablely connected with sliding block (23).
3. the cleaning plant of mud in pipeline according to claim 2, it is characterised in that: the right-angle elbow pipe (12) goes out Mouth of a river end is connected with duckbilled spray head (121).
4. the cleaning plant of mud in pipeline according to claim 3, it is characterised in that: the pull rod (11) is by several skies Heart pipe (3) is spliced, and the competing one end of the two neighboring hollow pipe (3) is respectively equipped with swivel nut (31) and threaded post (32), the swivel nut (31) and threaded post (32) are arranged on hollow pipe (3) inner wall.
5. the cleaning plant of mud in pipeline according to claim 1, it is characterised in that: the scraper bowl (1) is if be equipped with Dry bucket tooth (33).
6. the cleaning plant of mud in pipeline according to claim 5, it is characterised in that: each bucket tooth (33) is separate What one end of bucket was equipped with arc scrapes hook (331).
7. the cleaning plant of mud in pipeline according to claim 1, it is characterised in that: offered on the scraper bowl (1) Several drainage holes (34), the scraper bowl (1) are connected with the filter screen for covering drainage hole (34) by fastening screw (35) (36), it is equipped with rubber sheet gasket (351) on the fastening screw (35), the rubber sheet gasket (351) is located at fastening screw (35) Head and filter screen (36) between.
8. the cleaning plant of mud in pipeline according to claim 2, it is characterised in that: set on snap ring (24) inner wall There are non-slip mat (241).
CN201821317771.3U 2018-08-15 2018-08-15 The cleaning plant of mud in pipeline Expired - Fee Related CN208748816U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821317771.3U CN208748816U (en) 2018-08-15 2018-08-15 The cleaning plant of mud in pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821317771.3U CN208748816U (en) 2018-08-15 2018-08-15 The cleaning plant of mud in pipeline

Publications (1)

Publication Number Publication Date
CN208748816U true CN208748816U (en) 2019-04-16

Family

ID=66080432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821317771.3U Expired - Fee Related CN208748816U (en) 2018-08-15 2018-08-15 The cleaning plant of mud in pipeline

Country Status (1)

Country Link
CN (1) CN208748816U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997180A (en) * 2020-08-27 2020-11-27 湖南三五二环保科技有限公司 Dredging device for hydraulic engineering
CN113323060A (en) * 2021-06-09 2021-08-31 中国水利水电第一工程局有限公司 Floating dock type dredging platform and dredging method for narrow space
CN113529922A (en) * 2021-08-21 2021-10-22 许淦超 Combined sludge removal device and sludge removal method
CN113622507A (en) * 2021-09-16 2021-11-09 许淦超 Pipeline silt clearing device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111997180A (en) * 2020-08-27 2020-11-27 湖南三五二环保科技有限公司 Dredging device for hydraulic engineering
CN113323060A (en) * 2021-06-09 2021-08-31 中国水利水电第一工程局有限公司 Floating dock type dredging platform and dredging method for narrow space
CN113529922A (en) * 2021-08-21 2021-10-22 许淦超 Combined sludge removal device and sludge removal method
CN113622507A (en) * 2021-09-16 2021-11-09 许淦超 Pipeline silt clearing device

Similar Documents

Publication Publication Date Title
CN208748816U (en) The cleaning plant of mud in pipeline
KR101894875B1 (en) Pipe cleaning apparatus and pipe cleaning method
CN201744213U (en) Pipe type filtering device
CN203678029U (en) Dredging and cleaning device for perforated mud discharge pipe
CN207608988U (en) A kind of building anti-clogging drainage arrangement
CN208004404U (en) Radix Notoginseng cleaning machine cleans hair root reception device
CN207331916U (en) A kind of sanitary sewage disposal backwash dreg removing system
CN205088761U (en) Inside is equipped with automatic downcomer belt cleaning device of structure that clears up
CN108126390A (en) A kind of fore filter with helicoidal structure
CN209596636U (en) A kind of pipeline desilts mechanism
CN203803189U (en) Filter with pipeline sewage cleaning function
CN208032015U (en) A kind of household sewage processing transport device
CN207919702U (en) One kind can anticlogging municipal drain
CN207680174U (en) A kind of city anti-clogging sewage disposal system
CN108939638A (en) A kind of waste water treater
CN110939188A (en) Sewer pipe convenient to dredge
CN206597358U (en) A kind of cartridge type grid device
CN105129373A (en) Novel belt sweeper using water
CN206090810U (en) Integration blowdown equipment
CN105780916B (en) A kind of anti-block apparatus of the pre-buried pipeline of water conservancy
CN205822328U (en) A kind of making use of rain and flood device
CN220336046U (en) Sewage pipeline supercharging dredging facility and sewage discharge system
CN216340049U (en) Grapple is used in sewer line clearance
CN219548915U (en) Tunnel construction drainage device
CN212237947U (en) Landscape fountain convenient for cleaning garbage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190416

Termination date: 20200815

CF01 Termination of patent right due to non-payment of annual fee