CN208740824U - Bathroom accepting rack - Google Patents

Bathroom accepting rack Download PDF

Info

Publication number
CN208740824U
CN208740824U CN201820208641.XU CN201820208641U CN208740824U CN 208740824 U CN208740824 U CN 208740824U CN 201820208641 U CN201820208641 U CN 201820208641U CN 208740824 U CN208740824 U CN 208740824U
Authority
CN
China
Prior art keywords
rod
pallet
pipe sleeve
support
accepting rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820208641.XU
Other languages
Chinese (zh)
Inventor
艾什莉·梅
大卫·埃文斯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
UMBRA HOUSEWARE (SHENZHEN) Co Ltd
Original Assignee
UMBRA HOUSEWARE (SHENZHEN) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by UMBRA HOUSEWARE (SHENZHEN) Co Ltd filed Critical UMBRA HOUSEWARE (SHENZHEN) Co Ltd
Priority to CN201820208641.XU priority Critical patent/CN208740824U/en
Application granted granted Critical
Publication of CN208740824U publication Critical patent/CN208740824U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pallets (AREA)

Abstract

The purpose of this utility model is to provide a kind of bathroom accepting rack, technical problems to be solved be can the position of any adjusting bracket ontology and the height of pallet, it is easy to use and without punching.The utility model is implemented with the following technical solutions: a kind of bathroom accepting rack, the first pallet including the body of rod and on the body of rod, the body of rod is equipped with for the first fixing piece that the body of rod and metope is fixed, the body of rod is equipped at least one first support being flexibly connected, first pallet is movably coupled in first support, and the body of rod is equipped with hook portion.Compared with prior art, by being equipped with the fixing piece for frame ontology to be fixed on to metope on frame ontology, frame ontology is equipped at least one bracket being flexibly connected, the pallet is movably coupled on bracket, to realize that the height of pallet and the position of frame ontology are arbitrarily adjusted, and without being punched to metope, it ensure that the beauty of metope, improve the convenience used.

Description

Bathroom accepting rack
Technical field
The utility model relates to a kind of household goods, in particular to a kind of bathroom accepting rack for bathroom.
Background technique
Currently, bathroom metope due to generally use ceramic tile veneer, in this way can not only waterproof but also easy cleaning, still Due to needing to place some such as shower creams or towel articles in bathroom, easy-offtaking is not allowed not only on the ground if being placed directly in, But also can be easy to be tripped, therefore, the articles such as more and more showers are placed on wall by the shelf being fixed on metope On face;This is also easy to damage metope, when replace shelf, understands since fixation hole position pair does not need to punch again, So that more holes occurs in metope, beautiful the problem of also will cause into water is influenced.
Summary of the invention
The purpose of this utility model is to provide a kind of bathroom accepting rack, technical problems to be solved are arbitrarily to adjust The position of frame ontology and the height of pallet, and without punching, it is easy to use.
To solve the above problems, the utility model is implemented with the following technical solutions: a kind of bathroom accepting rack, including the body of rod And the first pallet on the body of rod, the body of rod is equipped with for the first fixing piece that the body of rod and metope is fixed, described The body of rod is equipped at least one first support being flexibly connected, and first pallet is movably coupled in first support, described The body of rod is equipped with hook portion.
Further, the first support includes the first pipe sleeve and the first adjutage being laterally extended, first support Disk is equipped with downward opening slot, and the first pallet realizes the first pallet and the by the way that slot to be plugged on the first adjutage Fixation between one bracket;First pipe sleeve is sheathed on the body of rod and can slide on the body of rod.
Further, the body of rod is equipped at least one second pipe sleeve, and second pipe sleeve is equipped with flexible connection Second pallet, first fixing piece are set on the second pallet.
Further, the hook portion includes the second support set on the upper end end point of the body of rod, the two of second support End is respectively equipped with the limiting unit of one week protrusion, and the lower end of at least one of which limiting unit is equipped with extension in the limiting unit.
Further, the upper end end point of the body of rod is equipped with plastic parts, and through-hole, the axis of through-hole are equipped on plastic parts It is vertical with the axis of the body of rod, it is equipped with the embedded hole that is connected to through-hole on one end end face of the plastic parts far from the body of rod, described second Branch is set up in through-hole, and the nut cap being threadedly coupled is equipped on one end periphery wall of the plastic parts far from the body of rod.
Further, first pipe sleeve is equipped with the fastening machine for being fixed on the first pipe sleeve on body of rod any position Structure, the retention mechanism include the opening on the tube wall of the first pipe sleeve, the second extension set on opening both-side opening edge Arm and U-tube folder, the opening are connected to the pore of the first pipe sleeve and along the axial direction setting of the first pipe sleeve, the U-tubes It is clamped in the second adjutage two sides, one end of the U-tube folder is hinged by shaft and the side of the second adjutage.
Further, second adjutage and U-tube press from both sides an opposite side surface equipped with the first protrusion, and described first Protrusion is equipped with slope surface.
Further, it is convex to be equipped with second for a side surface opposite with the first protrusion in the two sides clamp arm of the U-tube folder It rises.
Further, second pipe sleeve is equipped with sliding slot, and the section of the sliding slot is T-shaped, the upper end of the sliding slot With opening, lower end is sealing surface, and second pallet is equipped with the cutting of T shape.
Further, first fixing piece include sucker, set on sucker rear end threaded post and with screw thread male screw The nut of connection is equipped with connecting hole in the rear end of the second pallet, and first fixing piece is inserted into connecting hole simultaneously by threaded post It is threadedly coupled by nut, realizes the fixation of the first fixing piece and the second pallet.
The utility model compared with prior art, by frame ontology be equipped with for frame ontology to be fixed on consolidating for metope Determine part, frame ontology is equipped at least one bracket being flexibly connected, and the pallet is movably coupled on bracket, to realize support The height of disk and the position of frame ontology are arbitrarily adjusted, and without punching to metope, be ensure that the beauty of metope, improved The convenience used.
Detailed description of the invention
Fig. 1 is the external structure schematic diagram of the utility model.
Fig. 2 is the cross-sectional view of the utility model the first pipe sleeve and the body of rod.
Fig. 3 is the cross-sectional view of the first pipe sleeve of the utility model and U-tube folder.
Fig. 4 is the structural schematic diagram of the first pallet of the utility model.
Fig. 5 is the rearview of the first pallet of the utility model.
Fig. 6 is the cross-sectional view of the first pallet of the utility model.
Fig. 7 is the cross-sectional view of the second pipe sleeve of the utility model.
Fig. 8 is the scheme of installation of the utility model the second pipe sleeve and the second pallet.
Fig. 9 is the utility model scheme of installation.
Figure 10 is the schematic diagram that the first pipe sleeve of the utility model adjusts height.
Figure 11 is the sectional view of the first fixing piece of the utility model.
Figure 12 is the structural schematic diagram of the utility model plastic parts.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
As shown in Figure 1, a kind of bathroom accepting rack of the utility model includes the body of rod 1 and the first support on the body of rod 1 Disk 2, the body of rod 1 are rod-like structure, and the first fixing piece 3 for the body of rod 1 to be fixed on to metope is equipped on the body of rod 1;In bar Body 1 is equipped at least one first support 4 being flexibly connected, and first pallet 2 is movably coupled in first support 4, The body of rod 1 is equipped with hook portion 11.
As depicted in figs. 1 and 2, first support 4 includes the first pipe sleeve 41 and the first adjutage 42 for being laterally extended, and first 41 sets of pipe sleeve on the body of rod 1, and can move along the axial direction of the body of rod 1, the length direction of the first adjutage 42 and the body of rod 1 Axis is vertical.
The retention mechanism for being fixed on the first pipe sleeve 41 on 1 any position of the body of rod can be equipped on the first pipe sleeve 41, The retention mechanism can realize that as shown in Figures 2 and 3, the retention mechanism includes being set to the first pipe sleeve using such as flowering structure Opening 411 on 41 tube wall, the second adjutage 412 set on 411 both-side opening edges of opening and U-tube folder 413, it is described Opening 411 is connected to the pore 414 of the first pipe sleeve 41 and along the axial direction setting of the first pipe sleeve 41, so that the first pipe sleeve 41 be divided Being cut into cross section is C font, and U-tube folder 413 is clamped in 412 two sides of the second adjutage, to make the first pipe sleeve 41 and the body of rod 1 It is in close contact;Certainly, in order to increase frictional force can also pore 414 table wall and/or the body of rod 1 surface setting it is coarse Face;
One end of the U-tube folder 413 is hinged (as shown in Figure 3) by the side of shaft 415 and the second adjutage 412, Shaft 415 extends transversely through the second adjutage 412 and U-tube folder 413, and specifically, hinged position is positioned at the second adjutage 412 and U-tube folder 413 upper end (shown in Fig. 1), in the present invention, shaft can for solid pin may be sky Heart pin shaft.
As shown in figs. 3 and 10, when pulling U-tube folder 413 upwards, U-tube folder 413 is lost to the second adjutage 412 Chucking power, so that the first pipe sleeve 41 unclamps on the body of rod 1, to adjust position of first pipe sleeve 41 on the body of rod 1;When downward U-tube folder 413 is pulled, U-tube folder 413 is clamped in 412 two sides of the second adjutage, so that the first pipe sleeve 41 clamps, thus firm Be fixed on the body of rod 1.
Hinged axle bed is respectively equipped at 413 hinged positions as shown in figure 3, pressing from both sides in the second adjutage 412 with U-tube 4123, correspondingly, corresponding with hinged 4123 position of axle bed in clamp arm 4131 to go out to be equipped with axle bed slot 4133, shaft 415 runs through Hinged axle bed 4123 and axle bed slot 4133.
As shown in Figure 1, being also provided with the pulling part 4134 convenient for pulling in the lower end of U-tube folder 413.
As shown in Fig. 1, Fig. 4, Fig. 5 and Fig. 6, downward opening slot 21, specifically, first are equipped on the first pallet 2 The rear end face of pallet 2 is equipped with a bulge-structure 22, and slot 21 is arranged on bulge-structure 22, and slot 21 runs through bulge-structure 22 both ends, the i.e. left and right sides in Fig. 1, the connection of the first pallet 2 are real by the way that slot 21 to be plugged on the first adjutage 42 Fixation between existing first pallet 2 and first support 4;Certainly it should also be understood that being that the one end of slot 21 far from the first pipe sleeve 41 is Sealing surface.
The cross sectional shape of the first support 4 is rectangle, correspondingly, the cross sectional shape of slot 21 and cutting for first support 4 Face shape is adapted, to guarantee that the bottom for the pallet 2 being mounted in first support 4 remains horizontal.
As depicted in figs. 1 and 2, it is convex that first is equipped on the first adjutage 42 surface opposite with the two sides cell wall of slot 21 Block 421 is correspondingly equipped with convex block slot 212, specifically, the first convex block with 421 position corresponding section of the first convex block on slot 21 421 setting position may be selected to be located at as shown in Figure 2 the one end of first support 4 far from the first pipe sleeve 41 close to end point;First The shape of convex block 421 can be the polygons such as rectangle, arc, herein preferably rectangle.By the way that the first convex block 421 and convex block is added Slot 212 can further avoid the state of the pallet 2 being mounted in first support 4 shaking or shakiness.
As shown in Fig. 2, the second convex block is equipped at least on the surface opposite with 21 cell wall of slot of side in the first convex block 421 422, specifically, the second convex block 422 is arranged on the first convex block 421 side surface opposite with first sleeve 41, the first convex block 421 be strip, and the short transverse along the first convex block 421 is arranged, and realizes the engagement for further increasing the first convex block 421 and slot 21 Tightness.
As shown in Fig. 2, being set on a side surface opposite with the second adjutage 412 in the two sides clamp arm 4131 of U-tube folder 413 There is the second protrusion 4132, correspondingly, presss from both sides the first protrusion on a 413 opposite side surfaces with U-tube in the second adjutage 412 4121, first protrusion 4121 is equipped with slope surface 4122, and clamp arm 4131 is enabled more easily to be clamped in the second adjutage On 412 and not readily disengage from;It specifically, is arc-shaped transitional surface close to the end face of the first pipe sleeve 41 in the second protrusion 4132, it is separate The end face of first sleeve 41 is slope surface, so that more easily U-tube folder 413 is clipped on the second adjutage 412.Preferably, institute Stating clamp arm 4131 is hollow structure, to increase the elasticity of clamp arm 4131.
As shown in figs. 1,7 and 8, the body of rod 1 is equipped at least one second pipe sleeve 5, and the second pipe sleeve 5 is equipped with activity Second pallet 6 of connection, the first fixing piece 3 are connected on the second pallet 6;Specifically, the second pipe sleeve 5 is equipped with sliding slot 51, institute The upper end for stating sliding slot 51 has opening, and lower end is sealing surface, and the sliding slot 51 includes first sliding groove 511 and second sliding slot 512, The width of second sliding slot 512 is less than the width of first sliding groove 511, and first sliding groove 511 is set to second sliding slot 512 and the second pipe sleeve 5 Between, the second sliding slot 512 is connected to first sliding groove 511, second sliding slot 512 combined with first sliding groove 511 to be formed it is T-shaped Slot, the rear end of second pallet 6 are equipped with the cutting 61 of T shape, are inserted into sliding slot 51 by cutting 61, thus by the second pallet 6 With the fixation of the second pipe sleeve 5;Specifically, the cross section of the second pipe sleeve 5 is C font, to be stuck on the body of rod 1;Second pipe The pore wall of set 5 is rough surface, can increase the frictional force between the second pipe sleeve 5 and the body of rod 1;Cutting 61 is preferably disposed to the second pallet The left or right side of 6 rear ends.
As shown in Figure 1, Figure 2, it shown in Fig. 4, Fig. 5 and Fig. 6, is equipped on the surface of the rear end face of bulge-structure 22 along the first pallet The guide groove 23 of the bar shaped of 2 length direction setting, the section of the guide groove 23 be it is T-shaped, specifically, guide groove 23 includes the first hole 24, the second hole 25, the size in first hole 24 are greater than the size in the second hole 25, and it is solid to be additionally provided with second on first pallet 2 Determine part 8, the second sucker of fixing piece 8 is equipped with T-shaped interconnecting piece 81 in the rear end of the second fixing piece 8, is equipped on guide groove 23 The circular hole 26 equal with 811 diameter of end of interconnecting piece 81, when connection, by the way that the interconnecting piece 81 of the second fixing piece 8 is passed through circle Hole 26 is inserted into guide groove 23, and is moved in guide groove 23, makes interconnecting piece 81 far from circular hole 26, thus make the second fixing piece 8 with it is convex Structure 22 is played to connect.
As shown in Figure 4 and Figure 5, it can be equipped with elastic strip 27 in the front end of pallet 2, the two ends of elastic strip 27 extend to first On the end face of the left and right sides of pallet 2, it is respectively equipped with T-shaped pullover 28 on the end face of 2 left and right sides of the first pallet, accordingly Ground is equipped with third hole 29 at the both ends of elastic strip 27, and elastic strip 27 is covered on pullover 28 with being stretched by third hole 29, from And form elastic fence.
As shown in figure 11, first fixing piece 3 include sucker 31, set on 31 rear end of sucker threaded post 32 and with The nut 33 that threaded post 32 is threadedly coupled is equipped with connecting hole 62 (shown in Fig. 8) in the rear end of the second pallet 6, and described first is fixed Part 3 is inserted into connecting hole 62 by threaded post 32 and is threadedly coupled by nut 33, realizes the first fixing piece 3 and the second pallet 6 Fixation.
As shown in Figure 1, the hook portion 11 includes the second support 12 set on the upper end end point of the body of rod 1, at second The both ends of frame 12 are respectively equipped with the limiting unit 52 of one week protrusion, the lower end of at least one of which limiting unit 52 in the limiting unit 52 Equipped with extension 53, so as to be hooked, specifically, extension 53 is equipped with one.
As shown in figs. 1 and 12, it is equipped with plastic parts 7 in the upper end end point of the body of rod 1, through-hole 71 is equipped on plastic parts 7, The axis of through-hole 71 is vertical with the axis of the body of rod 1, is equipped on one end end face of the plastic parts 7 far from the body of rod 1 and is connected to through-hole 71 Embedded hole 72, the upper end of plastic parts 7 is divided into two halves by embedded hole 27, and the second support 12 is set in through-hole 71, and can Move back and forth in through-hole 71, the nut cap 9 being threadedly coupled is equipped on one end periphery wall of the plastic parts 7 far from the body of rod 1, is passed through Nut cap 9 is tightened, second support 12 is stepped up and fixed by realization.
As shown in Figure 1, hook 10 is additionally provided in the lower end of the body of rod 1, thus the hook of convenient towel and other items.
As a preferred embodiment of the present invention, first support 4 is provided with two or more, and the first pallet 2 is respectively arranged on two In a first support 4, the first fixing piece 3 is located on the second pallet 6.
As shown in Fig. 1, Fig. 8 and Fig. 9, before installation, after the second pallet 6 is first plugged on the second casing 5, nut cap 9 is unscrewed, Nut cap 9 is tightened after adjustment the distance between extension 53 and the body of rod 1, then 53 one end of extension of hook portion 11 is hung over and is drenched with rain On the support frame of facility, the first fixing piece 3 being located on the second pallet 6 is adsorbed on ceramic tile metope, tightening nuts 33, is realized The installation of bathroom accepting rack adjusts the first pallet of height and installation of first support 4 after installation is complete according to actual needs 2, the second fixing piece 8 on the first pallet 2 is adsorbed in ceramic tile metope, to further increase the stability of installation.
The utility model have it is convenient for disassembly and assembly, and without punching, and the position of the height of existing pallet and frame ontology It is any to adjust, and without being punched to metope, it ensure that the beauty of metope, improve the convenience used.

Claims (10)

1. a kind of bathroom accepting rack, including the body of rod (1) and the first pallet (2) being set on the body of rod (1), it is characterised in that: institute It states the body of rod (1) to be equipped with for the first fixing piece (3) that the body of rod (1) and metope is fixed, the body of rod (1) is equipped at least one The first support (4) of a flexible connection, first pallet (2) are movably coupled on first support (4), the body of rod (1) It is equipped with hook portion (11).
2. bathroom accepting rack according to claim 1, it is characterised in that: the first support (4) includes the first pipe sleeve (41) and the first adjutage (42) for being laterally extended, first pallet (2) are equipped with downward opening slot (21), and first Pallet (2) is realized between the first pallet (2) and first support (4) by the way that slot (21) to be plugged on the first adjutage (42) Fixation;First pipe sleeve (41) is sheathed on the body of rod (1) and can slide on the body of rod (1).
3. bathroom accepting rack according to claim 1, it is characterised in that: the body of rod (1) be equipped at least one second Pipe sleeve (5), second pipe sleeve (5) are equipped with the second pallet (6) being flexibly connected, and first fixing piece (3) is set to second On pallet (6).
4. bathroom accepting rack according to claim 1, it is characterised in that: the hook portion (11) includes being set to the body of rod (1) Upper end end point second support (12), the both ends of second support (12) be respectively equipped with one week protrusion limiting unit (52), The lower end of at least one of which limiting unit (52) is equipped with extension (53) in the limiting unit (52).
5. bathroom accepting rack according to claim 4, it is characterised in that: the upper end end point of the body of rod (1) is equipped with modeling Glue part (7) is equipped with through-hole (71) on plastic parts (7), and the axis of through-hole (71) is vertical with the axis of the body of rod (1), in plastic parts (7) one end end face far from the body of rod (1) is equipped with the embedded hole (72) being connected to through-hole (71), and the second support (12) is set to In through-hole (71), the nut cap (8) being threadedly coupled is equipped on one end periphery wall of plastic parts (7) far from the body of rod (1).
6. bathroom accepting rack according to claim 2, it is characterised in that: first pipe sleeve (41) is equipped with for by the One pipe sleeve (41) is fixed on the retention mechanism on the body of rod (1) any position, and the retention mechanism includes being set to the first pipe sleeve (41) Tube wall on opening (411), be set to opening (411) both-side opening edge the second adjutage (412) and U-tube folder (413), the opening (411) is connected to the pore (414) of the first pipe sleeve (41) and is arranged along the axial direction of the first pipe sleeve (41), U-tube folder (413) is clamped in the second adjutage (412) two sides, and one end of the U-tube folder (413) passes through shaft and the The side of two adjutages (412) is hinged.
7. bathroom accepting rack according to claim 6, it is characterised in that: second adjutage (412) and U-tube press from both sides (413) an opposite side surface is equipped with first raised (4121), and described first raised (4121) are equipped with slope surface (4122).
8. bathroom accepting rack according to claim 7, it is characterised in that: the two sides clamp arm of the U-tube folder (413) (4131) side surface opposite with first raised (4121) is equipped with second raised (4132) on.
9. bathroom accepting rack according to claim 3, it is characterised in that: second pipe sleeve (5) is equipped with sliding slot (51), The section of the sliding slot (51) be it is T-shaped, the upper end of the sliding slot (51) has opening, and lower end is sealing surface, second support Disk (6) is equipped with the cutting (61) of T shape.
10. according to the bathroom accepting rack of claim 3 or 9, it is characterised in that: first fixing piece (3) include sucker (31), Threaded post (32) set on sucker (31) rear end and the nut (33) that is threadedly coupled with threaded post (32), in the second pallet (6) Rear end be equipped with connecting hole (62), first fixing piece (3) by threaded post (32) insertion connecting hole (62) in and pass through spiral shell Cap (33) is threadedly coupled, and realizes the fixation of the first fixing piece (3) and the second pallet (6).
CN201820208641.XU 2018-02-07 2018-02-07 Bathroom accepting rack Expired - Fee Related CN208740824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820208641.XU CN208740824U (en) 2018-02-07 2018-02-07 Bathroom accepting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820208641.XU CN208740824U (en) 2018-02-07 2018-02-07 Bathroom accepting rack

Publications (1)

Publication Number Publication Date
CN208740824U true CN208740824U (en) 2019-04-16

Family

ID=66050404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820208641.XU Expired - Fee Related CN208740824U (en) 2018-02-07 2018-02-07 Bathroom accepting rack

Country Status (1)

Country Link
CN (1) CN208740824U (en)

Similar Documents

Publication Publication Date Title
CN209881263U (en) Novel combined wire harness clip
CN208740824U (en) Bathroom accepting rack
CN209435752U (en) A kind of suction nozzle adsorption mechanism adjustable in pitch
CN208366160U (en) The regulating mechanism of small-bore firing box guide rail
CN205347819U (en) Telescopic laundry rack pole
CN208863748U (en) A kind of supporter for exempting to punch fast demountable
CN209082887U (en) A kind of indoor and outdoor heat-preserving decorative wall board mounting structure
CN207777975U (en) The magnetic-type holder of vertical socket
CN208473211U (en) Heat insulating decorative board installation is fixed to use back buckle formula component
CN206870728U (en) A kind of Collapsible mobile fine arts drawing board
CN201486988U (en) Screw
CN208901031U (en) Flat panel TV hangers formula hanging structure
CN204756162U (en) Table back ply -yarn drill formula fastener
CN205126079U (en) Multifunctional towels racks
CN204950184U (en) Bed feet connecting structure
CN221599624U (en) Work show frame connecting piece
CN210206916U (en) Instrument placing frame convenient to clean for laboratory
CN204970519U (en) Tea biscuit frame
CN203354438U (en) Multifunctional airing frame
CN207874107U (en) A kind of Novel card sleeve steel pipe push-and-pull tooling
CN203762642U (en) Guide rail movable limiting block
CN217471827U (en) Towel rack
CN212912443U (en) Novel furniture screw-free connecting device
CN210669766U (en) Fixing structure of direct current electric push rod
CN211459442U (en) Fast-assembling drawer holds up pole

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190416

Termination date: 20210207

CF01 Termination of patent right due to non-payment of annual fee