- secondary device
- profile steel
- prefabricated cabin
- bedframe
- screen cabinet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model relates to secondary device prefabricated cabin and its pedestals, secondary device prefabricated cabin pedestal includes base body, the base body includes the bedframe being composed of main H profile steel, time H profile steel is equipped in the bedframe, bedframe is equipped with the screen cabinet supporting element for connecting main H profile steel and time H profile steel to support and fix secondary device screen cabinet, and screen cabinet supporting element and main H profile steel, secondary H profile steel constitute screen cabinet bracket.Since the intensity of H profile steel is higher, more much lower than channel steel H profile steel of height can be selected to combine to form bedframe, to reduce the height of secondary device prefabricated cabin pedestal, improve the space utilization rate of base body in height;The screen cabinet supporting element being arranged on bedframe simultaneously and main H profile steel, secondary H profile steel constitute screen cabinet bracket, convenient for the placement of secondary device screen cabinet.
Description
Technical field
The utility model relates to secondary device prefabricated cabin and its pedestals.
Background technique
As the improvement of people's living standards, demand of the people to electric power is also growing in life, it is increasingly tight in soil
In the case where, prefabricated cabin is used widely in transmission transformer station.If application publication number is CN107558766A, Shen Qing Publication
The Chinese invention patent application for day being 2018.01.09 discloses a kind of prefabricated cabin antistatic mounting seat and modularization cabin, should
Prefabricated cabin antistatic mounting seat includes cabin base body, and the two sides and middle part of cabin base body, which are equipped with, to be parallel to each other
Wire and cable cable tray, there are antistatic floor, cabin pedestal master in the top of cabin base body by connection structure tiling
Body is composed of the welding of a plurality of channel steel.Prefabricated cabin pedestal in the prior art uses larger ruler to reach lifting intensity
Very little channel steel causes the pedestal of prefabricated cabin higher to guarantee pedestal intensity, to make the space benefit of prefabricated cabin pedestal in height
It is lower with rate, while the whole height of C.G. of prefabricated cabin is improved, reduce the overall stability of prefabricated cabin.
Utility model content
The purpose of this utility model is to provide a kind of secondary device prefabricated cabin pedestals, to solve prefabricated cabin in the prior art
Pedestal it is higher, the problem for causing the space utilization rate of prefabricated cabin pedestal in height lower, the purpose of this utility model also exists
In providing a kind of secondary device prefabricated cabin using the secondary device prefabricated cabin pedestal.
To achieve the above object, the technical solution of the utility model secondary device prefabricated cabin pedestal is:
Secondary device prefabricated cabin pedestal includes base body, and the base body includes the bottom being composed of main H profile steel
Seat frame, is equipped with time H profile steel in the bedframe, and bedframe, which is equipped with, connects main H profile steel and time H profile steel to support and solid
Determine the screen cabinet supporting element of secondary device screen cabinet, screen cabinet supporting element and main H profile steel, secondary H profile steel constitute screen cabinet bracket.
The quantity of the secondary H profile steel is at least two, forms the line for being laid with cable between adjacent two H profile steels
Cable channel.
It is equipped with the standard cable slot box with full-length in the cable passage and is docked with standard cable slot box and is used for
Compensate the compensation cable trough box of passage length.
The standard cable slot box is arranged at intervals with two rows, two rows of standards along the length direction perpendicular to standard cable slot box
The switching cable trough box for being connected to two rows of standard cable slot boxes is equipped between cable trough box.
The screen cabinet supporting element is channel steel.
Two times adjacent H profile steels are equipped with two H profile steels of connection to support and fix the ground of anti-static movable floor
Plate support.
The floor support is rectangular tube.
The bedframe is equipped with hoisting structure, and the hoisting structure includes be separately positioned on main H profile steel opposite
Two lifting baffles at two notches, are equipped with axle sleeve hole on two lifting baffles and main H profile steel web, in the axle sleeve hole
Equipped with axle sleeve, suspension shaft is equipped in the axle sleeve, the suspension shaft is located at one end in bedframe and is equipped with to suspension shaft edge
The locating part of the axial limiting of hanging axis.
To achieve the above object, the technical solution of the utility model secondary device prefabricated cabin is:
Secondary device prefabricated cabin includes secondary device prefabricated cabin pedestal and the screen that is mounted on secondary device prefabricated cabin pedestal
Cabinet and anti-static movable floor, the secondary device prefabricated cabin pedestal includes base body, and the base body includes by main H-type
The bedframe that steel is composed, the bedframe is interior to be equipped with time H profile steel, and bedframe, which is equipped with, connects main H profile steel and time H
For fashioned iron to support and fix the screen cabinet supporting element of secondary device screen cabinet, screen cabinet supporting element and main H profile steel, secondary H profile steel constitute screen cabinet
Bracket.
The quantity of the secondary H profile steel is at least two, forms the line for being laid with cable between adjacent two H profile steels
Cable channel.Convenient for the laying of optical cable and cable.
It is equipped with the standard cable slot box with full-length in the cable passage and is docked with standard cable slot box and is used for
Compensate the compensation cable trough box of passage length.It can be according to the length of bedframe come the quantity of selection criteria cable trough box.
The standard cable slot box is arranged at intervals with two rows, two rows of standards along the length direction perpendicular to standard cable slot box
The switching cable trough box for being connected to two rows of standard cable slot boxes is equipped between cable trough box.Convenient for two sides in secondary device prefabricated cabin
Shield the connection of cabinet.
The screen cabinet supporting element is channel steel.Structure is simple, easy to support.
Two times adjacent H profile steels are equipped with two H profile steels of connection to support and fix the ground of anti-static movable floor
Plate support.
The floor support is rectangular tube.
The bedframe is equipped with hoisting structure, and the hoisting structure includes be separately positioned on main H profile steel opposite
Two lifting baffles at two notches, are equipped with axle sleeve hole on two lifting baffles and main H profile steel web, in the axle sleeve hole
Equipped with axle sleeve, suspension shaft is equipped in the axle sleeve, the suspension shaft is located at one end in bedframe and is equipped with to suspension shaft edge
The locating part of the axial limiting of hanging axis.
The beneficial effects of the utility model are: compared with channel steel in the prior art, since the intensity of H profile steel is higher, energy
More much lower than channel steel H profile steel of enough selection height combines the bedframe to form base body, so that it is pre- to reduce secondary device
The height of bilge seat processed improves the space utilization rate of base body in height;The screen cabinet being arranged on bedframe simultaneously
Supporting element and main H profile steel, secondary H profile steel constitute screen cabinet bracket, convenient for the placement of secondary device screen cabinet.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the secondary device prefabricated cabin pedestal of the utility model;
Fig. 2 is the cross-sectional view of Fig. 1;
Fig. 3 is the structural schematic diagram of the cable trough box of the secondary device prefabricated cabin pedestal of the utility model;
Fig. 4 is the structural schematic diagram of the hoisting structure of the secondary device prefabricated cabin pedestal of the utility model.
Specific embodiment
The embodiments of the present invention is described further with reference to the accompanying drawing.
The specific embodiment of the secondary device prefabricated cabin pedestal of the utility model, as shown in Figures 1 to 4, secondary device is pre-
Bilge seat processed includes base body, and base body includes the bedframe being composed of main H profile steel 1, is equipped in bedframe
Bottom plate 2, sets that there are two the secondary H profile steels 3 that the length direction along bedframe extends on bottom plate 2, in other embodiments, on bottom plate
Secondary H profile steel be equipped at least three and along the length direction of bedframe extend.Bedframe, which is equipped with, connects main 1 He of H profile steel
For secondary H profile steel 3 to support and fix the channel steel 4 of secondary device screen cabinet, channel steel 4 constitutes screen cabinet supporting element, channel steel 4 and main H profile steel 1
Screen cabinet bracket is constituted with secondary H profile steel 3.In other embodiments, screen cabinet supporting element is rectangular tube.In two times adjacent H profile steels 3
The rectangular tube 5 of anti-static movable floor is supported and fixed equipped with two H profile steels 3 of connection, and rectangular tube 5 constitutes floor support
Part, in other embodiments, floor support are channel steel.The length direction and edge of channel steel 4 and rectangular tube 5 perpendicular to bedframe
The length direction arranged for interval of bedframe has multiple.Compared with channel steel in the prior art, since the intensity of H profile steel is higher,
More much lower than channel steel H profile steel of height can be selected to combine the bedframe to form base body, to reduce secondary device
The height of prefabricated cabin pedestal improves the space utilization rate of base body in height;Simultaneously along the length direction of bedframe
Spaced apart screen cabinet supporting element and floor support are in order to shielding the placement of cabinet and anti-static movable floor.
As depicted in figs. 1 and 2, in the present embodiment, channel steel 4 is used to support and fixes secondary device screen cabinet, reserves screen cabinet position
It sets to be equipped with and reserves screen cabinet lid plate 10, when the more secondary device screen cabinet of needs, reserved screen cabinet lid plate 10 is dismantled, it is secondary to set
Standby screen cabinet is mounted at reserved screen cabinet position, convenient for adjusting the quantity of secondary screen cabinet.Two time H profile steels 3 is upper in bedframe
It is equipped with anti-static movable floor 9 on the rectangular tube 5 of side, forms the space of 240mm between bottom plate 2 and anti-static movable floor 9
For placing cable trough box 7, anti-static movable floor 9 and 5 releasable connection of rectangular tube, can be installed according to cabin, debugging needs
It opens at any time, convenient for the laying of cable and optical cable, the later period is facilitated to overhaul and repair;Also facilitate secondary in later period prefabricated cabin set simultaneously
Standby debugging and maintenance.The secondary electrical grounding copper bar 8 of head and the tail connection is installed between main H profile steel 1 and secondary H profile steel 3, is formed
Secondary electrical grounding net in cabin, the earthing bar shielded in cabinet are electrically connected using copper strips with secondary electrical grounding net, two inferior electricity
Position grounding copper bar 8 is electrically connected with cabin ground connection box 12.In the present embodiment, bottom plate 2 is steel plate, and the downside of bottom plate 2 is welded with the bottom of along
Pedestal is divided into upper layer and lower layer by the spaced multiple channel steels of the length direction of seat frame, bottom plate 2.As shown in Figure 1, prefabricated cabin
Cabin and contact two cable access 11 by base body out of my cabin, light in cabin and out of my cabin is contacted using prefabricated optical cable, cabin
The interior electrical communication with out of my cabin uses pre-fabricated electric cables, forms cable passage between two H profile steels 3, for be laid with prefabricated optical cable and
Pre-fabricated electric cables.
It is set in the present embodiment, in bedframe there are two time H profile steel 3, the web of secondary H profile steel 3 is equipped with the mistake of oblong
String holes, forms the cable passage for being laid with cable between two time H profile steels 3, equipped with for being laid with cable in cable passage
Cable trough box 7, bottom plate 2 are equipped with slot box supporting element 704, and cable trough box 7 is fixed on a base plate 2 by slot box supporting element 704.Such as
Shown in Fig. 3, cable trough box 7 includes entrance cable trough box 701, outlet cable trough box 705 and is arranged in 701 and of entrance cable trough box
Multiple standard cable slot boxes 702 between cable trough box 705 are exported, entrance cable trough box 701 and outlet cable trough box 705 are constituted
Compensation cable trough box, standard cable slot box 702 are arranged at intervals with two rows, Liang Paibiao along the length direction perpendicular to bedframe
The switching cable trough box 703 for being connected to two rows of standard cable slot boxes 702 is equipped between quasi- cable trough box 702, it can be according in cabin
Size arranges the quantity of standard cable slot box, and quantity and the position of flexible arrangement switching cable trough box can be needed according to cable switching
It sets.In the present embodiment, the box cover of cable trough box can be dismantled, convenient for the maintenance and maintenance of cable.
As shown in figure 4, the main H profile steel 1 on bedframe is equipped with multiple hoisting structures 6, hoisting structure in the present embodiment
6 are arranged symmetrically on bedframe, in order to slinging for prefabricated cabin pedestal.Hoisting structure 6 includes being separately positioned on main H profile steel 1
Two opposite notches at two lifting baffles 603, be equipped with axle sleeve on 1 web of two lifting baffles 603 and main H profile steel
Hole, axle sleeve hole are provided with axle sleeve 602, are equipped with suspension shaft 601 in axle sleeve 602, one end that suspension shaft 601 is located in bedframe is set
There is the limit stop ring 604 to suspension shaft 601 along the axial limiting of suspension shaft 601, limit stop ring 604 constitutes locating part.
The specific embodiment of the secondary device prefabricated cabin of the utility model, the secondary device prefabricated cabin in the present embodiment include
Secondary device prefabricated cabin pedestal and the screen cabinet and anti-static movable floor being mounted on secondary device prefabricated cabin pedestal, this is secondary to set
Secondary device prefabricated cabin pedestal described in the specific embodiment of standby prefabricated cabin pedestal and above-mentioned secondary device prefabricated cabin pedestal
Structure is identical, and it will not go into details.
Claims (9)
1. secondary device prefabricated cabin pedestal, including base body, it is characterised in that: the base body includes by main H profile steel group
Bedframe made of conjunction, the bedframe is interior to be equipped with time H profile steel, and bedframe, which is equipped with, connects main H profile steel and time H profile steel
To support and fix the screen cabinet supporting element of secondary device screen cabinet, screen cabinet supporting element and main H profile steel, secondary H profile steel constitute screen cabinet bracket.
2. secondary device prefabricated cabin pedestal according to claim 1, it is characterised in that: the quantity of the secondary H profile steel is extremely
It is two few, the cable passage for being laid with cable is formed between adjacent two H profile steels.
3. secondary device prefabricated cabin pedestal according to claim 2, it is characterised in that: being equipped in the cable passage has
The standard cable slot box of full-length and the compensation cable trough box for compensating passage length is docked with standard cable slot box.
4. secondary device prefabricated cabin pedestal according to claim 3, it is characterised in that: the standard cable slot box is along vertical
Two rows are arranged at intervals in the length direction of standard cable slot box, is equipped between two rows of standard cable slot boxes and is connected to two rows of normal lines
The switching cable trough box of cable slot box.
5. secondary device prefabricated cabin pedestal according to any one of claims 1-4, it is characterised in that: the screen cabinet support
Part is channel steel.
6. according to secondary device prefabricated cabin pedestal described in claim 2-4 any one, it is characterised in that: adjacent two times
H profile steel is equipped with two H profile steels of connection to support and fix the floor support of anti-static movable floor.
7. secondary device prefabricated cabin pedestal according to claim 6, it is characterised in that: the floor support is rectangle
Pipe.
8. secondary device prefabricated cabin pedestal according to any one of claims 1-4, it is characterised in that: the bedframe
It is equipped with hoisting structure, the hoisting structure includes two liftings being separately positioned at two opposite notches of main H profile steel
Baffle, is equipped with axle sleeve hole on two lifting baffles and main H profile steel web, and the axle sleeve hole is provided with axle sleeve, in the axle sleeve
Equipped with suspension shaft, the suspension shaft is located at one end in bedframe and is equipped with to suspension shaft along the limit of the axial limiting of suspension shaft
Part.
9. secondary device prefabricated cabin including secondary device prefabricated cabin pedestal and is mounted on secondary on secondary device prefabricated cabin pedestal
Equipment screen cabinet and anti-static movable floor, it is characterised in that: the secondary device prefabricated cabin pedestal is that claim 1-8 is any one
Secondary device prefabricated cabin pedestal described in.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821257488.6U CN208738612U (en) | 2018-08-06 | 2018-08-06 | Secondary device prefabricated cabin and its pedestal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821257488.6U CN208738612U (en) | 2018-08-06 | 2018-08-06 | Secondary device prefabricated cabin and its pedestal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208738612U true CN208738612U (en) | 2019-04-12 |
Family
ID=66028453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821257488.6U Active CN208738612U (en) | 2018-08-06 | 2018-08-06 | Secondary device prefabricated cabin and its pedestal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208738612U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110729636A (en) * | 2019-09-25 | 2020-01-24 | 许继电气股份有限公司 | Prefabricated cabin and base thereof |
-
2018
- 2018-08-06 CN CN201821257488.6U patent/CN208738612U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110729636A (en) * | 2019-09-25 | 2020-01-24 | 许继电气股份有限公司 | Prefabricated cabin and base thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208738612U (en) | Secondary device prefabricated cabin and its pedestal | |
CN105375391B (en) | Automatic-lifting type insulation temporary cross arm | |
CN205141390U (en) | Transformer substation's overhead wire outlet structure | |
CN206237000U (en) | A kind of site terminal box with lateral wall type support | |
CN108756428A (en) | It is a kind of to be used to make somebody a mere figurehead the bearing platform type narrow base tower under double-circuit line cable T joint draws | |
CN104242538A (en) | Motor terminal box mounted under locomotive | |
CN111049000B (en) | Sinking type prefabricated cabin base | |
CN216355901U (en) | Double-loop T-shaped connecting and guiding lower tower | |
CN105469955B (en) | A kind of dry reactor confluxes and supporting construction | |
CN208479134U (en) | A kind of cable for built single time anchor support draws lower facility | |
CN205646613U (en) | Gas -insulated metal enclosed switchgear and GIS power station of using this equipment | |
CN209448224U (en) | A kind of flexible direct current converter station transformer valve side bus collector-shoe gear | |
CN108766725B (en) | Supporting and shielding structure for dry type air-core reactor | |
CN208299375U (en) | A kind of house cable gantry | |
CN205376268U (en) | Dry -type reactor's converges and bearing structure | |
CN205791186U (en) | GIS power distribution equipment end outlet structure | |
CN208062496U (en) | A kind of bus structure | |
CN219718731U (en) | Wire harness support structure and power supply system | |
CN217240205U (en) | Combined ladder type cable bridge | |
CN207542568U (en) | The full overhead outlet structure of GIS double-layer frames | |
CN111049047B (en) | Prefabricated cabin | |
CN220022279U (en) | Pre-buried device of electric power ground net | |
CN216413516U (en) | Vertical bus outlet structure of HGIS equipment of transformer substation | |
CN204089436U (en) | The connection box for motor installed under a kind of locomotive | |
CN109546535B (en) | Lightning protection system for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |