CN208733475U - A kind of bridge construction platform of fast construction - Google Patents

A kind of bridge construction platform of fast construction Download PDF

Info

Publication number
CN208733475U
CN208733475U CN201821299965.5U CN201821299965U CN208733475U CN 208733475 U CN208733475 U CN 208733475U CN 201821299965 U CN201821299965 U CN 201821299965U CN 208733475 U CN208733475 U CN 208733475U
Authority
CN
China
Prior art keywords
block
fixedly connected
side wall
sidewalls
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821299965.5U
Other languages
Chinese (zh)
Inventor
林晓峰
何小梅
刘惠敏
郑洪锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Changhong Construction Group Co ltd
Original Assignee
Guangdong Changhong Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Changhong Highway Engineering Co Ltd filed Critical Guangdong Changhong Highway Engineering Co Ltd
Priority to CN201821299965.5U priority Critical patent/CN208733475U/en
Application granted granted Critical
Publication of CN208733475U publication Critical patent/CN208733475U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of bridge construction platforms of fast construction, including two frames and middle frame, middle frame is arranged between two frames, the two sidewalls of middle frame are symmetrically fixedly connected with multiple support rods, the side wall of two frames frame side middle in opposite directions offers multiple grooves to match with support rod, the two sidewalls of middle frame are fixedly connected to connecting rod, two connecting rods, which are located at the center of middle frame side wall, to be arranged, the side wall of two frames frame side middle in opposite directions offers the card slot to match with connecting rod, the two sidewalls of card slot offer the first square groove, fixture block is equipped in first square groove, the side wall that fixture block is away from each other connecting rod side is fixedly connected by the first spring with the slot bottom of the first square groove, the two sidewalls of fixture block are fixedly connected to limited block.The utility model can rapidly assemble hanging basket, convenient for the transport and use of hanging basket, improve work efficiency.

Description

A kind of bridge construction platform of fast construction
Technical field
The utility model relates to technical field of bridge construction more particularly to a kind of bridge construction platforms of fast construction.
Background technique
Bridge construction platform, refers in bridge construction, when the beam between two pier studs uses integral cast-in-situ, by one A pier stud connects the construction machinery of another pier stud.
Currently, be usually all that bridge construction is carried out on construction hanging basket when science of bridge building is constructed, but existing skill In art, since bridge cross section is larger, whole hanging basket is not readily transportable, and when being installed or removed, is inconvenient, shadow Ring working efficiency.
Utility model content
Purpose of the utility model is to solve in the prior art since bridge cross section is larger, whole hanging basket is inconvenient A kind of fast construction in transport, and when being installed or removed, being inconvenient, influencing working efficiency problem, and propose Bridge construction platform.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of bridge construction platform of fast construction, including two frames and middle frame, the middle frame are located at two It is arranged between frame, the two sidewalls of the middle frame are symmetrically fixedly connected with multiple support rods, and two frames are opposite The side wall of middle frame side offers multiple grooves to match with support rod, and the two sidewalls of the middle frame are fixedly connected to Connecting rod, two connecting rods, which are located at the center of middle frame side wall, to be arranged, two frames frame side middle in opposite directions Side wall offer the card slot to match with connecting rod, the two sidewalls of the card slot offer the first square groove, described first Fixture block is equipped in square groove, the side wall that the fixture block is away from each other connecting rod side is fixed by the slot bottom of the first spring and the first square groove Connection, the two sidewalls of the fixture block are fixedly connected to limited block, and the two sidewalls of first square groove offer and limited block The limiting slot to match, the connecting rod side wall offer the card hole to match with two fixture blocks, the side wall of multiple fixture blocks It is fixedly connected to l-shaped rod, the rear wall of two frames offers the strip-shaped hole being connected with multiple first square grooves, Multiple l-shaped rods both pass through strip-shaped hole and extend to outside, and the rear wall of two frames is fixedly connected with fixed block, And fixed block is arranged between two l-shaped rods, the side wall of the fixed block offers limit hole, two equal positions of l-shaped rod In being arranged in limit hole, the top of two l-shaped rods offers first through hole, opened up at the top of the fixed block there are two The second through-hole being connected with first through hole is equipped with kelly in two second through-holes, and the both ends of kelly both pass through Two through-holes and the setting that extends outwardly, one end that two kellies extend to outside fixed block are fixedly connected with pull rod jointly, and two Limited position mechanism is all provided in second through-hole.
Preferably, the position-limit mechanism includes the second through-hole, and the two sidewalls of second through-hole offer the second square groove, Wedge block is equipped in second square groove, the side wall that the wedge block is away from each other kelly side passes through second spring and the second square groove Slot bottom be fixedly connected, the two sidewalls of the wedge block are fixedly connected to sliding block, and the two sidewalls of second square groove open up There is a sliding slot to match with sliding block, the two sidewalls of the kelly symmetrically open up that there are four the wedge grooves to match with wedge block.
Preferably, the side wall that two frames are away from each other side is fixedly connected to hanging ring.
Preferably, the side wall of two card slots is fixedly connected to damping block, and the surface of damping block offer it is anti-skidding Line.
Preferably, the bottom of the limit hole is opened up there are two there is the corresponding third square groove in kelly position, described in two Kelly all extends to setting in third square groove.
Preferably, one end of multiple opposite connecting rods of the fixture block offers inclination angle.
Compared with prior art, the utility model provides a kind of bridge construction platform of fast construction, and having following has Beneficial effect:
1, the bridge construction platform of the fast construction can be convenient for by two frames and middle frame by being equipped with The transport of hanging basket, then the connecting rod by being equipped with and support rod, connecting rod and support rod are inserted into card slot and groove respectively, then Fixture block is caused to squeeze, fixture block is contracted in the first square groove, works as card when connecting rod is inserted into card slot by the fixture block being equipped with It when hole is moved to position corresponding with fixture block, drives fixture block mobile by the elastic force of the first spring, makes fixture block card and to card hole It is interior, so that middle frame and frame be made to be connected together, mentioned convenient for the quick assembling of hanging basket convenient for the transport and use of hanging basket High working efficiency.
2, the bridge construction platform of the fast construction, by the l-shaped rod being equipped with, fixture block is mobile to drive l-shaped rod mobile, makes two A l-shaped rod is moved in limit hole, then the pull rod by being equipped with, and presses pull rod, and pull rod is mobile to drive two kellies to move down, It is inserted into kelly in first through hole, the position of l-shaped rod is fixed, so that the position to fixture block is fixed, the company of raising Stability when connecing, then the wedge block by being equipped with pass through second spring when wedge block is corresponding with the position of wedge groove Elastic force drives wedge block mobile, makes wedge block card and in wedge groove, is defined to the position of kelly, prevents kelly mobile.
It is not directed to part in the device to be the same as those in the prior art or can be realized by using the prior art, the utility model Rapidly hanging basket can be assembled, convenient for the transport and use of hanging basket, be improved work efficiency.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of fast construction bridge construction platform structural schematic diagram;
Fig. 2 is the part A schematic enlarged-scale view of Fig. 1;
Fig. 3 be the utility model proposes a kind of fast construction bridge construction platform frame bottom view;
Fig. 4 is the part B schematic enlarged-scale view of Fig. 3.
In figure: 1 frame, frame in 2,3 support rods, 4 connecting rods, 5 fixture blocks, 6 first springs, 7 limited blocks, 8 l-shaped rods, 9 fixed blocks, 10 kellies, 11 pull rods, 12 wedge blocks, 13 second springs, 14 sliding blocks, 15 hanging rings, 16 damping blocks.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as "top", "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.
Referring to Fig.1-4, a kind of bridge construction platform of fast construction, including two frames 1 and middle frame 2, Neng Goubian In the transport of hanging basket, and the side wall of two frames 1 and middle frame 2 is equipped with protective fence, and middle frame 2 is located at two frames 1 Between be arranged, the two sidewalls of middle frame 2 are symmetrically fixedly connected with multiple support rods 3,2 side of frame during two frames 1 are opposite Side wall offer multiple grooves to match with support rod 3, be inserted into support peace 3 in groove, it is steady when improving clamping Qualitative, the two sidewalls of middle frame 2 are fixedly connected to connecting rod 4, and two connecting rods 4, which are located at the center of middle 2 side wall of frame, to be set It sets, the side wall of opposite middle 2 side of frame of two frames 1 offers the card slot to match with connecting rod 4, enables connecting rod 4 It is enough inserted into card slot, the two sidewalls of card slot offer the first square groove, are equipped with fixture block 5,5 company of being away from each other of fixture block in the first square groove The side wall of 4 side of extension bar is fixedly connected by the first spring 6 with the slot bottom of the first square groove, and the two sidewalls of fixture block 5 are fixedly connected with There is limited block 7, the two sidewalls of the first square groove offer the limiting slot to match with limited block 7, can be to the position of fixture block 5 It is defined, prevents fixture block 5 to be detached from the first square groove, 4 side wall of connecting rod offers the card hole to match with two fixture blocks 5, multiple The side wall of fixture block 5 is fixedly connected to l-shaped rod 8, and the rear wall of two frames 1 is offered to be connected with multiple first square grooves Logical strip-shaped hole, multiple l-shaped rods 8 both pass through strip-shaped hole and extend to outside, and the rear wall of two frames 1 is fixedly connected with Determine block 9, and fixed block 9 is arranged between two l-shaped rods 8, the side wall of fixed block 9 offers limit hole, and two l-shaped rods 8 are equal Be arranged in limit hole, the top of two L type bars 8 offers first through hole, the top of fixed block 9 open up there are two with The second through-hole that first through hole is connected is equipped with kelly 10 in two the second through-holes, and the both ends of kelly 10 both pass through second Through-hole and the setting that extends outwardly, one end that two kellies 10 extend to outside fixed block 9 are fixedly connected with pull rod 11 jointly, pull Pull rod 11 is able to drive two movements of kellies 10, and limited position mechanism is all provided in two the second through-holes, and position-limit mechanism includes second logical Hole, the two sidewalls of the second through-hole offer the second square groove, are equipped with wedge block 12 in the second square groove, wedge block 12 is away from each other kelly The side wall of 10 sides is fixedly connected by second spring 13 with the slot bottom of the second square groove, and the two sidewalls of wedge block 12 are fixedly connected with There is sliding block 14, the two sidewalls of the second square groove offer the sliding slot to match with sliding block 14, can be right by sliding block 14 and sliding slot The position of wedge block 12 is defined, and prevents wedge block 12 to be detached from the second square groove, there are four the two sidewalls of kelly 10 symmetrically open up The wedge groove to match with wedge block 12 drives wedge block 12 mobile by the elastic force of second spring 13, make the card of wedge block 12 and To wedge groove, the position of bar 10 is defined, prevents kelly 10 mobile, the side wall that two frames 1 are away from each other side is equal It is fixedly connected with hanging ring 15, two frames 1 are lifted by crane convenient for machine, the side wall of two card slots is fixedly connected to damping Block 16, and the surface of damping block 16 offers anti-skid chequer, damping block 16 is existing structure, be capable of increasing card slot and connecting rod 4 it Between frictional force, the bottom of limit hole opens up there are two there is the corresponding third square groove in 10 position of kelly, and two kellies 10 prolong Setting in third square groove is extended to, stability when 8 position of l-shaped rod is fixed in kelly 10, the opposite connecting rod of multiple fixture blocks 5 are improved 4 one end offers inclination angle, squeezes fixture block 5 by connecting rod 4, fixture block 5 can be made to automatically contract in the first square groove.
In the utility model, in use, hanging basket can be convenient for by two frames 1 and middle frame 2 by being equipped with Transport, then by the connecting rod 4 that is equipped with and support rod 3, connecting rod 4 and support rod 3 are inserted into card slot and groove respectively, then Fixture block 5 is caused to squeeze, is contracted to fixture block 5 in first square groove when connecting rod 4 is inserted into card slot by the fixture block 5 being equipped with, When card hole is moved to 5 corresponding position of fixture block, drives fixture block 5 mobile by the elastic force of the first spring 6, block fixture block 5 With in card hole, to make middle frame 2 and frame 1 be connected together, convenient for the quick assembling of hanging basket, convenient for the fortune of hanging basket Defeated and use, improves work efficiency, and by the l-shaped rod 8 being equipped with, fixture block 5 is mobile to drive l-shaped rod 8 mobile, makes two l-shaped rods 8 It is moved in limit hole, then by the pull rod 11 that is equipped with, presses pull rod 11, pull rod 11 is mobile to drive two kellies 10 to moving down It is dynamic, it is inserted into kelly 10 in first through hole, the position of l-shaped rod 8 is fixed, so that the position of fixture block 5 is fixed, Stability when connection is improved, then the wedge block 12 by being equipped with passes through when wedge block 12 is corresponding with the position of wedge groove The elastic force of second spring 13 drives wedge block 12 mobile, and wedge block 12 is made to block and in wedge groove, carry out to the position of kelly 10 It limits, prevents kelly 10 mobile.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of bridge construction platform of fast construction, including two frames (1) and middle frame (2), which is characterized in that described Middle frame (2) is arranged between two frames (1), and the two sidewalls of the middle frame (2) are symmetrically fixedly connected with multiple Strut (3), the side wall of frame (2) side offers during two frames (1) are opposite multiple matches with support rod (3) The two sidewalls of groove, the middle frame (2) are fixedly connected to connecting rod (4), and two connecting rods (4) are located at middle frame (2) it is arranged at the center of side wall, the side wall of opposite middle frame (2) side of two frames (1) offers and connecting rod (4) card slot to match, the two sidewalls of the card slot offer the first square groove, are equipped with fixture block (5) in first square groove, institute It states fixture block (5) and is away from each other the side wall of connecting rod (4) side and be fixedly connected by the first spring (6) with the slot bottom of the first square groove, institute The two sidewalls for stating fixture block (5) are fixedly connected to limited block (7), and the two sidewalls of first square groove offer and limited block (7) limiting slot to match, connecting rod (4) side wall offer the card hole to match with two fixture blocks (5), multiple cards The side wall of block (5) is fixedly connected to l-shaped rod (8), and the rear wall of two frames (1) offers and multiple first party The strip-shaped hole that slot is connected, multiple l-shaped rods (8) both pass through strip-shaped hole and extend to outside, two frames (1) Rear wall is fixedly connected with fixed block (9), and fixed block (9) is arranged between two l-shaped rods (8), the fixed block (9) Side wall offers limit hole, and it is equal that two l-shaped rods (8) are respectively positioned on setting, the top of two l-shaped rods (8) in limit hole First through hole is offered, opens up that there are two the second through-hole for being connected with first through hole, two institutes at the top of the fixed block (9) It states and is equipped in the second through-hole kelly (10), and the both ends of kelly (10) both pass through the second through-hole and the setting that extends outwardly, two The kelly (10) extends to the one end of fixed block (9) outside and is fixedly connected with jointly pull rod (11), in two second through-holes It is all provided with limited position mechanism.
2. a kind of bridge construction platform of fast construction according to claim 1, which is characterized in that the position-limit mechanism packet The second through-hole is included, the two sidewalls of second through-hole offer the second square groove, are equipped with wedge block (12) in second square groove, The side wall that the wedge block (12) is away from each other kelly (10) side connects by the way that the slot bottom of second spring (13) and the second square groove is fixed Connect, the two sidewalls of the wedge block (12) are fixedly connected to sliding block (14), the two sidewalls of second square groove offer with The sliding slot that sliding block (14) matches, the two sidewalls of the kelly (10) symmetrically open up that there are four the wedges that match with wedge block (12) Shape slot.
3. a kind of bridge construction platform of fast construction according to claim 1, which is characterized in that two frames (1) side wall for being away from each other side is fixedly connected to hanging ring (15).
4. a kind of bridge construction platform of fast construction according to claim 1, which is characterized in that two card slots Side wall is fixedly connected to damping block (16), and the surface of damping block (16) offers anti-skid chequer.
5. a kind of bridge construction platform of fast construction according to claim 1, which is characterized in that the bottom of the limit hole Portion is opened up there are two there is the corresponding third square groove in kelly (10) position, and two kellies (10) all extend in third square groove Setting.
6. a kind of bridge construction platform of fast construction according to claim 1, which is characterized in that multiple fixture blocks (5) one end of opposite connecting rod (4) offers inclination angle.
CN201821299965.5U 2018-08-13 2018-08-13 A kind of bridge construction platform of fast construction Expired - Fee Related CN208733475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821299965.5U CN208733475U (en) 2018-08-13 2018-08-13 A kind of bridge construction platform of fast construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821299965.5U CN208733475U (en) 2018-08-13 2018-08-13 A kind of bridge construction platform of fast construction

Publications (1)

Publication Number Publication Date
CN208733475U true CN208733475U (en) 2019-04-12

Family

ID=66030477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821299965.5U Expired - Fee Related CN208733475U (en) 2018-08-13 2018-08-13 A kind of bridge construction platform of fast construction

Country Status (1)

Country Link
CN (1) CN208733475U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112619783A (en) * 2021-01-18 2021-04-09 熊娣红 Endocrine medicine reducing mechanism

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112619783A (en) * 2021-01-18 2021-04-09 熊娣红 Endocrine medicine reducing mechanism
CN112619783B (en) * 2021-01-18 2022-07-01 熊娣红 Endocrine medicine reducing mechanism

Similar Documents

Publication Publication Date Title
CN206644772U (en) A kind of good automobile using collision prevention girders of anti-collision effect
CN211092811U (en) Telescopic supporting structure
CN211078195U (en) Hoist for construction
CN208733475U (en) A kind of bridge construction platform of fast construction
CN208266881U (en) A kind of reinforcement support hanging plate
CN113479546B (en) Brick carrying device for construction site
CN211848937U (en) Bridge floor is decorated construction and is used hanging cage with protective structure
CN214006475U (en) Novel aerial working platform
CN213038816U (en) Cantilever platform for building construction
CN211524026U (en) Casting construction hanging cage
CN208246154U (en) A kind of quickly mold changing rotary system
CN108750913A (en) One kind being based on lifting high-tensile round-link chain
CN209025071U (en) The solid pile and its manufacturing line of embedded hanging ring
CN217054224U (en) Construction lifting device for security engineering
CN205742964U (en) A kind of attaching scaffold main frame track structure device
CN208790140U (en) A kind of easy-to-dismount wooden case connection structure
CN106044603B (en) One kind being used for power-equipment lifting machine
CN104925663A (en) Self-stabilizing type hydraulic grab bucket mechanism
CN212561192U (en) Hanging basket for efficient construction
CN207738204U (en) It is a kind of can damping weaving rack
CN211143832U (en) Energy-saving steel structure support frame
CN217036625U (en) Large-span crane span structure convenient to installation
CN208773544U (en) A kind of detection rack of processing of stone finished product
CN209958730U (en) Scaffold
CN217172961U (en) Tower crane lifting hook maintenance structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510000 Sanjiang, Guangdong, Guangzhou, Zengcheng, Sanjiang four Feng Guang Shan Road 153

Patentee after: Guangdong Changhong Construction Group Co.,Ltd.

Address before: 510000 Sanjiang, Guangdong, Guangzhou, Zengcheng, Sanjiang four Feng Guang Shan Road 153

Patentee before: GUANGDONG CHANGHONG HIGHWAY ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190412