CN208733018U - Combustion chamber peephole structure in a kind of production of coking coal - Google Patents

Combustion chamber peephole structure in a kind of production of coking coal Download PDF

Info

Publication number
CN208733018U
CN208733018U CN201820915541.0U CN201820915541U CN208733018U CN 208733018 U CN208733018 U CN 208733018U CN 201820915541 U CN201820915541 U CN 201820915541U CN 208733018 U CN208733018 U CN 208733018U
Authority
CN
China
Prior art keywords
peephole
combustion chamber
receiver
coking coal
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820915541.0U
Other languages
Chinese (zh)
Inventor
张五洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yizhou Science And Technology Co Ltd
Original Assignee
Yizhou Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yizhou Science And Technology Co Ltd filed Critical Yizhou Science And Technology Co Ltd
Priority to CN201820915541.0U priority Critical patent/CN208733018U/en
Application granted granted Critical
Publication of CN208733018U publication Critical patent/CN208733018U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model relates to combustion chamber peephole structures in a kind of production of coking coal, including two combustion chambers (1) and carbonization chamber (2), two combustion chambers (1) are located at the two sides of carbonization chamber (2), air and coal gas in combustion chamber (1) are mixed and burned inside provides heat to carbonization chamber (2), peephole is equipped on the top of each combustion chamber (1), peephole seat (12) are equipped in the peephole, peephole seat (12) upper end is equipped with and sees fire cover (11);Peephole seat (12) lower end is connected with receiver (13), and the receiver (13), which is reduced pug and trickled down, mitigates radiation of the ascending air to human body in peephole with effective in combustion chamber (1).

Description

Combustion chamber peephole structure in a kind of production of coking coal
Technical field
The utility model relates to a kind of peephole structure, combustion chamber peephole structure in especially a kind of coking coal production.
Background technique
Using combustion chamber is arrived in coking coal production, the peephole on combustion chamber is seated combustion chamber top, for the ease of observation Combustion case causes peephole seat to have activity phenomenon, so existing for this due to often opening peephole lid observation temperature As repairing rectification;But when replacement peephole, pug is easy to trickle down in flue, and flue ascending air can be right Personnel cause the risk of burn.
Utility model content
The technical issues of the utility model devises combustion chamber peephole structure in a kind of production of coking coal, solves is tradition The problem of peephole structure causes pug to trickle down in flue and will appear radiation of the peephole air-flow to human body.
In order to solve above-mentioned technical problem, the utility model uses following scheme:
Combustion chamber peephole structure in a kind of production of coking coal, including two combustion chambers (1) and carbonization chamber (2), two burn Room (1) is located at the two sides of carbonization chamber (2), and the air and coal gas in combustion chamber (1) are mixed and burned provide heat to carbonization chamber (2) inside Amount, it is characterised in that:
It is equipped with peephole on the top of each combustion chamber (1), is equipped with peephole seat (12) in the peephole, it is described to see fire Hole seat (12) upper end is equipped with and sees fire cover (11);Peephole seat (12) lower end is connected with receiver (13), the receiver (13) it reduces pug and trickles down and mitigate radiation of the ascending air to human body in peephole with effective in combustion chamber (1).
Further, the receiver (13) includes receiver ontology (131) and T-bar (132), the T-bar (132) Vertical end is connect with the receiver ontology (131), and the horizontal ends of the T-bar (132) are connect with the peephole seat (12).
Further, described to see that fire cover (11) are equipped with handle.
Further, the diameter of the peephole is less than the diameter 5mm of receiver.
Further, the quantity of the peephole is multiple, is arranged in a linear.
Combustion chamber peephole structure has the advantages that in coking coal production
(1) for the utility model due to frequently opening peephole lid observation temperature, being repeatedly opened fire hole cover leads to peephole seat It loosens, and movable pedestal is taken away, pug can be generated when being repaired with high-temperature flame-proof mud, setting receiver can subtract Few pug is unrestrained in the combustion chamber.
(2) the utility model effectively mitigates radiation of the ascending air to human body in peephole since receiver is arranged.
(3) safety coefficient that the utility model can also improve personnel improves.
Detailed description of the invention
Fig. 1: the diagrammatic cross-section of combustion chamber peephole structure in the production of the utility model coking coal.
Fig. 2: receiver structural schematic diagram in the utility model.
Description of symbols:
1-combustion chamber;11-see fire cover;12-peephole seats;13-receivers;131-receiver ontologies;132-T-types Bar;2-carbonization chambers.
Specific embodiment
Below with reference to Fig. 1 and Fig. 2, the utility model is described further:
As shown in Figure 1, combustion chamber peephole structure in a kind of coking coal production, including two combustion chambers 1 and carbonization chamber 2, two A combustion chamber 1 is located at the two sides of carbonization chamber 2, and the air and coal gas in combustion chamber 1 are mixed and burned provide heat to carbonization chamber 2 inside Amount is equipped with peephole on the top of each combustion chamber 1, peephole seat 12 is equipped in peephole, 12 upper end of peephole seat is equipped with and sees Fire cover 11;12 lower end of peephole seat is connected with receiver 13, and receiver 13, which reduces pug and trickles down, to be mitigated in combustion chamber 1 with effective Radiation of the ascending air to human body in peephole.
See that fire cover 11 is equipped with handle.The diameter of peephole is less than the diameter 5mm of receiver.The quantity of peephole is multiple, It is arranged in a linear.
As shown in Fig. 2, receiver 13 includes receiver ontology 131 and T-bar 132, the vertical end and splicing of T-bar 132 Disk ontology 131 connects, and the horizontal ends of T-bar 132 are connect with peephole seat 12.
Combustion chamber peephole structure has the advantages that in coking coal production
(1) for the utility model due to frequently opening peephole lid observation temperature, being repeatedly opened fire hole cover leads to peephole seat It loosens, and movable pedestal is taken away, pug can be generated when being repaired with high-temperature flame-proof mud, setting receiver can subtract Few pug is unrestrained in the combustion chamber.
(2) the utility model effectively mitigates radiation of the ascending air to human body in peephole since receiver is arranged.
(3) safety coefficient that the utility model can also improve personnel improves.
Illustrative description has been carried out to the utility model above in conjunction with attached drawing, it is clear that the realization of the utility model not by The limitation of aforesaid way, if the method concept of the utility model and the various improvement of technical solution progress are used, or without It improves and the conception and technical scheme of the utility model is directly applied into other occasions, in the protection scope of the utility model It is interior.

Claims (5)

1. combustion chamber peephole structure in a kind of coking coal production, including two combustion chambers (1) and carbonization chamber (2), two combustion chambers (1) it is located at the two sides of carbonization chamber (2), the air and coal gas in combustion chamber (1) are mixed and burned inside provides heat to carbonization chamber (2) Amount, it is characterised in that:
It is equipped with peephole on the top of each combustion chamber (1), is equipped with peephole seat (12) in the peephole, the peephole seat (12) upper end is equipped with and sees fire cover (11);Peephole seat (12) lower end is connected with receiver (13), and the receiver (13) subtracts Few pug is trickled down in combustion chamber (1) and effectively radiation of the ascending air to human body in mitigation peephole.
2. combustion chamber peephole structure in coking coal production according to claim 1, it is characterised in that: receiver (13) packet Receiver ontology (131) and T-bar (132) are included, the vertical end of the T-bar (132) and the receiver ontology (131) are even It connects, the horizontal ends of the T-bar (132) are connect with the peephole seat (12).
3. combustion chamber peephole structure in coking coal production according to claim 2, it is characterised in that: described to see on fire cover (11) Equipped with handle.
4. combustion chamber peephole structure in coking coal production according to claim 2, it is characterised in that: the diameter of the peephole Less than the diameter 5mm of receiver.
5. combustion chamber peephole structure in the production of coking coal described in any one of -4 according to claim 1, it is characterised in that: described The quantity of peephole is multiple, is arranged in a linear.
CN201820915541.0U 2018-06-13 2018-06-13 Combustion chamber peephole structure in a kind of production of coking coal Active CN208733018U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820915541.0U CN208733018U (en) 2018-06-13 2018-06-13 Combustion chamber peephole structure in a kind of production of coking coal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820915541.0U CN208733018U (en) 2018-06-13 2018-06-13 Combustion chamber peephole structure in a kind of production of coking coal

Publications (1)

Publication Number Publication Date
CN208733018U true CN208733018U (en) 2019-04-12

Family

ID=66023754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820915541.0U Active CN208733018U (en) 2018-06-13 2018-06-13 Combustion chamber peephole structure in a kind of production of coking coal

Country Status (1)

Country Link
CN (1) CN208733018U (en)

Similar Documents

Publication Publication Date Title
JP2009073865A (en) Heat insulating box for hot repair work of coke oven
CN101878281A (en) But the mechanism that is used for door, door body or the doorframe of automatization ground locking horizontal coke oven chambers
CN208733018U (en) Combustion chamber peephole structure in a kind of production of coking coal
CN208579348U (en) A kind of combustion chamber that coking coal produces and uses
CN202660933U (en) Furnace inspection window capable of automatically blowing
CN108045542A (en) The ship ventilation head of turriform blast cap is installed
CN203608823U (en) Food toasting and baking device
CN109021985A (en) A kind of pair of dust excluding hood of coke oven has the riser structural and working method of protective effect
CN205825007U (en) A kind of air stove
CN204943493U (en) Cremation Machine explosion-protection equipment
CN208980640U (en) A kind of pair of dust excluding hood of coke oven has the riser structural of protective effect
CN208382296U (en) A kind of smoke clearing machine
CN210855987U (en) Light fire-resistant anti-heat-change smoke hole cover
CN206613505U (en) A kind of high low temperature cycles test case
CN209295677U (en) A kind of prefabricated block assembly of roasting furnace surface
CN212128255U (en) Quenching furnace slag notch structure and quenching furnace
CN209759378U (en) Improved water coke quenching device for test coke oven
CN204478062U (en) Cremation Machine explosion-protection equipment
JP3182195U (en) Heat insulation box for hot repair work of coke oven
CN204128366U (en) Anode roasting fire path wall boiler face burner hermetically-sealed construction
CN208748007U (en) A kind of clamp device of coking door
CN205979887U (en) Gas device for culinary art
CN206310529U (en) A kind of industrial coal powder boiler stove gate device
CN214198680U (en) Medical waste pyrolyzing furnace
CN209242993U (en) A kind of explosion-protection equipment of biomass pyrolysis furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant