CN208718099U - A kind of full-prefabricated assembled concrete structure - Google Patents

A kind of full-prefabricated assembled concrete structure Download PDF

Info

Publication number
CN208718099U
CN208718099U CN201821351318.4U CN201821351318U CN208718099U CN 208718099 U CN208718099 U CN 208718099U CN 201821351318 U CN201821351318 U CN 201821351318U CN 208718099 U CN208718099 U CN 208718099U
Authority
CN
China
Prior art keywords
manufactured steel
steel concrete
concrete
steel
manufactured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821351318.4U
Other languages
Chinese (zh)
Inventor
薛海明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Mengjian Construction Engineering Co Ltd
Original Assignee
Inner Mongolia Mengjian Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Mengjian Construction Engineering Co Ltd filed Critical Inner Mongolia Mengjian Construction Engineering Co Ltd
Priority to CN201821351318.4U priority Critical patent/CN208718099U/en
Application granted granted Critical
Publication of CN208718099U publication Critical patent/CN208718099U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of full-prefabricated assembled concrete structures, including pre-manufactured steel concrete combination column, pre-manufactured steel concrete bearing wall, prefabricated light steel partition wall, pre-manufactured steel concrete roof and pre-manufactured steel concrete staircase, the pre-manufactured steel concrete combination column is internally provided with cross-shaped steel and principal rod, the cross-shaped steel and the inside and outside of the principal rod are filled with concrete one, the pre-manufactured steel concrete bearing wall is provided with the junction of the pre-manufactured steel concrete combination column and connect steel one, side inside the pre-manufactured steel concrete bearing wall is provided with connection steel two, the both ends of the pre-manufactured steel concrete staircase are provided with several screw holes three and the nut mounting groove three positioned at three top of screw hole respectively, the both ends of the pre-manufactured steel concrete staircase are provided with L-type landing beam respectively, the L-type landing beam Top is provided with several and matched bolt three of the screw hole three-phase.The utility model has the advantages that saving manpower, short time limit, high-efficient.

Description

A kind of full-prefabricated assembled concrete structure
Technical field
The utility model relates to building fields, it particularly relates to a kind of full-prefabricated assembled concrete structure.
Background technique
In traditional architecture construction technology, the technique that beam, column, the floor of building mostly use live formwork to pour, after build a wall The method that body mostly uses the scene such as clay brick, air parcel brick to build.Above-mentioned cast in place process need to make template, set up scaffold, Employment is more, it is long in time limit, influenced vulnerable to weather, need biggish construction site, the support of a large amount of template steelframes, while can generate a large amount of Building waste.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Utility model content
For the problems in the relevant technologies, the utility model proposes a kind of full-prefabricated assembled concrete structures, to overcome Above-mentioned technical problem present in existing the relevant technologies.
The technical solution of the utility model is achieved in that
A kind of full-prefabricated assembled concrete structure, including pre-manufactured steel concrete combination column, pre-manufactured steel concrete bearing wall, Prefabricated light steel partition wall, pre-manufactured steel concrete roof and pre-manufactured steel concrete staircase, the inside of the pre-manufactured steel concrete combination column It is provided with cross-shaped steel and principal rod, the cross-shaped steel and the inside and outside of the principal rod are filled with concrete one, Several bolts one through the concrete one, the inside of the pre-manufactured steel concrete bearing wall are provided on the cross-shaped steel Several stress transverse bars are provided with, also, the both ends of the stress transverse bar extend to the outside of the pre-manufactured steel concrete bearing wall, It is provided with several stirrups on the outside of the stress transverse bar, the inside and outside difference of the stress transverse bar and the stirrup is filled There is concrete two, the junction of the pre-manufactured steel concrete bearing wall and the pre-manufactured steel concrete combination column is provided with connection steel One, the connection steel one is provided with what several and bolt one matched far from one end of the pre-manufactured steel concrete bearing wall Screw hole one is provided with nut mounting groove one, the pre-manufactured steel between the connection steel one and the pre-manufactured steel concrete bearing wall Side inside concrete bearing wall is provided with connection steel two, is provided on the connection steel two through the prefabricated steel concrete The bolt two of load bearing wall, the both ends of the prefabricated light steel partition wall be provided with respectively with the matched screw hole two of the bolt two-phase, The both ends of the prefabricated light steel partition wall are provided with and the matched nut mounting groove two of the screw hole two-phase, the pre-manufactured steel respectively The both ends of concrete staircase are provided with several screw holes three and the nut mounting groove three positioned at three top of screw hole respectively, described The both ends of pre-manufactured steel concrete staircase are provided with L-type landing beam respectively, and the top of the L-type landing beam is provided with several and institute State the matched bolt three of screw hole three-phase.
Further, the pre-manufactured steel concrete combination column, the pre-manufactured steel concrete bearing wall, the prefabricated light steel every Steel junction between wall, the pre-manufactured steel concrete roof and the pre-manufactured steel concrete staircase is provided with buffering respectively Pad.
Further, the junction and institute of the pre-manufactured steel concrete combination column and the pre-manufactured steel concrete bearing wall State pre-manufactured steel concrete bearing wall and the pre-manufactured steel concrete roof junction is prefabricated or in-site installation or brushes anti- Fire bed.
Further, connect between the pre-manufactured steel concrete roof and the pre-manufactured steel concrete combination column for cast in situs Binding structure is bolt-nut connecting structure between the pre-manufactured steel concrete roof and the pre-manufactured steel concrete bearing wall.
Further, the unilateral, double of the pre-manufactured steel concrete combination column are arranged in the bolt one according to the actual situation Side, three sides and four sides.
Further, the pre-manufactured steel concrete roof and the pre-manufactured steel concrete combination column and the pre-manufactured steel coagulation Respectively by on-site concrete casting connection between native load bearing wall, the pre-manufactured steel concrete roof and the prefabricated light steel every It is attached between wall by steel connection type.
The utility model has the following beneficial effects: by setting bolt one, connection steel one and screw hole one, so as to will be prefabricated Steel concrete coupled column and pre-manufactured steel concrete bearing wall carry out assembly connection, connect steel two, bolt two, screw hole two by setting With nut mounting groove two, so as to which pre-manufactured steel concrete bearing wall and prefabricated light steel partition wall are carried out assembly connection, by setting Screw hole three, nut mounting groove three and bolt three are set, so as to which pre-manufactured steel concrete staircase and L-type landing beam are carried out assembly company It connects.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only the utility model Some embodiments for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other attached drawings.
Fig. 1 is the pre-manufactured steel coagulation local soil type according to a kind of full-prefabricated assembled concrete structure of the utility model embodiment The structure and connection diagram of zygostyle and pre-manufactured steel concrete bearing wall;
Fig. 2 is held according to a kind of prefabricated steel concrete of full-prefabricated assembled concrete structure of the utility model embodiment The connection schematic diagram of weight wall;
Fig. 3 is the prefabricated steel concrete top according to a kind of full-prefabricated assembled concrete structure of the utility model embodiment The structural schematic diagram of plate;
Fig. 4 is held according to a kind of prefabricated steel concrete of full-prefabricated assembled concrete structure of the utility model embodiment The structure and connection diagram of weight wall and prefabricated light steel partition wall;
Fig. 5 is the pre-manufactured steel concrete building according to a kind of full-prefabricated assembled concrete structure of the utility model embodiment The connection schematic diagram of ladder.
In figure:
1, pre-manufactured steel concrete combination column;2, pre-manufactured steel concrete bearing wall;3, prefabricated light steel partition wall;4, pre-manufactured steel coagulation Native top plate;5, pre-manufactured steel concrete staircase;6, cross-shaped steel;7, principal rod;8, concrete one;9, bolt one;10, stress is horizontal Muscle;11, stirrup;12, concrete two;13, steel one is connected;14, screw hole one;15, nut mounting groove one;16, steel two is connected;17, Bolt two;18, screw hole two;19, nut mounting groove two;20, screw hole three;21, nut mounting groove three;22, L-type landing beam;23, spiral shell Bolt three;24, cushion;25, fireprotection layer.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art's every other embodiment obtained, all belongs to In the range of the utility model protection.
Embodiment according to the present utility model provides a kind of full-prefabricated assembled concrete structure.
As shown in Figs. 1-5, according to the full-prefabricated assembled concrete structure of the utility model embodiment, including prefabricated steel reinforced concrete Solidifying local soil type's zygostyle 1, pre-manufactured steel concrete bearing wall 2, prefabricated light steel partition wall 3, pre-manufactured steel concrete roof 4 and prefabricated steel concrete Stair 5, the pre-manufactured steel concrete combination column 1 are internally provided with cross-shaped steel 6 and principal rod 7, the cross-shaped steel 6 and institute It states the inside and outside of principal rod 7 and is filled with concrete 1, be provided on the cross-shaped steel 6 several through the coagulation The bolt 1 of soil 1, the pre-manufactured steel concrete bearing wall 2 are internally provided with several stress transverse bars 10, also, it is described by The both ends of power transverse bar 10 extend to the outside of the pre-manufactured steel concrete bearing wall 2, and the outside of the stress transverse bar 10 is provided with The inside and outside difference of several stirrups 11, the stress transverse bar 10 and the stirrup 11 is filled with concrete 2 12, described Pre-manufactured steel concrete bearing wall 2 is provided with the junction of the pre-manufactured steel concrete combination column 1 and connect steel 1, the connection Steel 1 is provided with several screw holes one to match with the bolt 1 far from one end of the pre-manufactured steel concrete bearing wall 2 14, nut mounting groove 1, the pre-manufactured steel are provided between the connection steel 1 and the pre-manufactured steel concrete bearing wall 2 Side inside concrete bearing wall 2 is provided with connection steel 2 16, is provided on the connection steel 2 16 through the pre-manufactured steel The bolt 2 17 of concrete bearing wall 2, the both ends of the prefabricated light steel partition wall 3 are provided with and 2 17 phase of bolt respectively The screw hole 2 18 matched, the both ends of the prefabricated light steel partition wall 3 are provided with the nut to match with the screw hole 2 18 respectively and pacify Tankage 2 19, the both ends of the pre-manufactured steel concrete staircase 5 are provided with several screw holes 3 20 respectively and are located at the screw hole three The nut mounting groove 3 21 on 20 tops, the both ends of the pre-manufactured steel concrete staircase 5 are provided with L-type landing beam 22, institute respectively The top for stating L-type landing beam 22 is provided with several bolts 3 23 to match with the screw hole 3 20.
With the aid of the technical scheme, by setting bolt 1, connection steel 1 and screw hole 1, so as to will be pre- Steel concrete coupled column 1 and pre-manufactured steel concrete bearing wall 2 processed carry out assembly connection, connect steel 2 16, bolt two by setting 17, screw hole 2 18 and nut mounting groove 2 19, so as to carry out pre-manufactured steel concrete bearing wall 2 and prefabricated light steel partition wall 3 Assembly connection, by setting screw hole 3 20, nut mounting groove 3 21 and bolt 3 23, so as to by pre-manufactured steel concrete staircase 5 carry out assembly connection with L-type landing beam 22.
In one embodiment, for above-mentioned pre-manufactured steel concrete combination column 1, pre-manufactured steel concrete bearing wall 2, prefabricated light It is the pre-manufactured steel concrete combination column 1, described for steel partition wall 3, pre-manufactured steel concrete roof 4 and pre-manufactured steel concrete staircase 5 Pre-manufactured steel concrete bearing wall 2, the prefabricated light steel partition wall 3, the pre-manufactured steel concrete roof 4 and the prefabricated steel concrete Steel junction between stair 5 is provided with cushion 24 respectively.So as to increase the stability of connection.In addition, specifically answering Used time, above-mentioned cushion 24 are rubber material.
In one embodiment, for above-mentioned pre-manufactured steel concrete combination column 1, pre-manufactured steel concrete bearing wall 2 and prefabricated For steel concrete top plate 4, the junction of the pre-manufactured steel concrete combination column 1 and the pre-manufactured steel concrete bearing wall 2 with And the pre-manufactured steel concrete bearing wall 2 and the pre-manufactured steel concrete roof 4 junction is prefabricated or in-site installation or Brushing fireprotection layer 25, so as to play the role of fireproof.In addition, above-mentioned fireprotection layer 25 is PP material when concrete application.
In one embodiment, for above-mentioned pre-manufactured steel concrete roof 4, pre-manufactured steel concrete combination column 1 and pre-manufactured steel It is that scene is poured between the pre-manufactured steel concrete roof 4 and the pre-manufactured steel concrete combination column 1 for concrete bearing wall 2 Connection structure is built, is bolt and nut connection knot between the pre-manufactured steel concrete roof 4 and the pre-manufactured steel concrete bearing wall 2 Structure, consequently facilitating assembly and connection, improves efficiency.
In one embodiment, the pre-manufactured steel concrete combination column 1 is arranged in the bolt 1 according to the actual situation Unilateral side, bilateral, three sides and four sides.
In one embodiment, for above-mentioned pre-manufactured steel concrete roof 4, the pre-manufactured steel concrete roof 4 with It is poured respectively by on-site concrete between the pre-manufactured steel concrete combination column 1 and the pre-manufactured steel concrete bearing wall 2 Connection, is attached between the pre-manufactured steel concrete roof 4 and the prefabricated light steel partition wall 3 by steel connection type, thus It can be improved the connection between pre-manufactured steel concrete roof 4 and pre-manufactured steel concrete combination column 1 and pre-manufactured steel concrete bearing wall 2 Stability, and then improve service life.
Working principle: when installation, pre-manufactured steel concrete combination column 1 and pre-manufactured steel concrete bearing wall 2 by bolt 1, It connects steel 1 and screw hole 1 carries out assembly connection, pre-manufactured steel concrete bearing wall 2 and prefabricated light steel partition wall 3 and passes through connection steel 2 16, bolt 2 17, screw hole 2 18 and nut mounting groove 2 19 carry out assembly connection, pre-manufactured steel concrete staircase 5 and L-type platform Beam 22 carries out assembly connection by screw hole 3 20, nut mounting groove 3 21 and bolt 3 23.
In conclusion passing through setting bolt 1, connection one 13 and of steel by means of the above-mentioned technical proposal of the utility model Screw hole 1 passes through so as to which pre-manufactured steel concrete combination column 1 and pre-manufactured steel concrete bearing wall 2 are carried out assembly connection Setting connection steel 2 16, bolt 2 17, screw hole 2 18 and nut mounting groove 2 19, so as to by pre-manufactured steel concrete bearing wall 2 carry out assembly connection with prefabricated light steel partition wall 3, by the way that screw hole 3 20, nut mounting groove 3 21 and bolt 3 23 is arranged, so as to It is enough that pre-manufactured steel concrete staircase 5 and L-type landing beam 22 are subjected to assembly connection.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (6)

1. a kind of full-prefabricated assembled concrete structure, which is characterized in that including pre-manufactured steel concrete combination column (1), pre-manufactured steel Concrete bearing wall (2), prefabricated light steel partition wall (3), pre-manufactured steel concrete roof (4) and pre-manufactured steel concrete staircase (5), it is described Pre-manufactured steel concrete combination column (1) is internally provided with cross-shaped steel (6) and principal rod (7), the cross-shaped steel (6) and described The inside and outside of principal rod (7) is filled with concrete one (8), is provided on the cross-shaped steel (6) several through described The bolt one (9) of concrete one (8), the pre-manufactured steel concrete bearing wall (2) are internally provided with several stress transverse bars (10), Also, the both ends of the stress transverse bar (10) extend to the outside of the pre-manufactured steel concrete bearing wall (2), the stress transverse bar (10) it is provided on the outside of several stirrups (11), the inside and outside difference of the stress transverse bar (10) and the stirrup (11) is equal Filled with concrete two (12), the connection of the pre-manufactured steel concrete bearing wall (2) and the pre-manufactured steel concrete combination column (1) Place is provided with connection steel one (13), and connection steel one (13) is arranged far from one end of the pre-manufactured steel concrete bearing wall (2) There are several screw holes one (14) to match with the bolt one (9), the connection steel one (13) is held with the prefabricated steel concrete Nut mounting groove one (15) is provided between weight wall (2), the internal side of the pre-manufactured steel concrete bearing wall (2) is provided with company Steel two (16) is connect, is provided with the bolt two (17) through the pre-manufactured steel concrete bearing wall (2) on connection steel two (16), The both ends of the prefabricated light steel partition wall (3) are provided with the screw hole two (18) to match with the bolt two (17) respectively, described The both ends of prefabricated light steel partition wall (3) are provided with the nut mounting groove two (19) to match with the screw hole two (18), institute respectively The both ends for stating pre-manufactured steel concrete staircase (5) are provided with several screw holes three (20) respectively and are located at screw hole three (20) top Nut mounting groove three (21), the both ends of the pre-manufactured steel concrete staircase (5) are provided with L-type landing beam (22), institute respectively The top for stating L-type landing beam (22) is provided with several bolts three (23) to match with the screw hole three (20).
2. a kind of full-prefabricated assembled concrete structure according to claim 1, which is characterized in that the pre-manufactured steel coagulation Local soil type's zygostyle (1), the pre-manufactured steel concrete bearing wall (2), the prefabricated light steel partition wall (3), the prefabricated steel concrete top Steel junction between plate (4) and the pre-manufactured steel concrete staircase (5) is provided with cushion (24) respectively.
3. a kind of full-prefabricated assembled concrete structure according to claim 1, which is characterized in that the pre-manufactured steel coagulation The junction of local soil type's zygostyle (1) and the pre-manufactured steel concrete bearing wall (2) and the pre-manufactured steel concrete bearing wall (2) with The junction of the pre-manufactured steel concrete roof (4) is prefabricated or in-site installation or brushing fireprotection layer (25).
4. a kind of full-prefabricated assembled concrete structure according to claim 1, which is characterized in that the pre-manufactured steel coagulation It is cast in situs connection structure, the prefabricated steel concrete top between native top plate (4) and the pre-manufactured steel concrete combination column (1) It is bolt-nut connecting structure between plate (4) and the pre-manufactured steel concrete bearing wall (2).
5. a kind of full-prefabricated assembled concrete structure according to claim 1, which is characterized in that the bolt one (9) Unilateral side, bilateral, three sides and four sides of the pre-manufactured steel concrete combination column (1) are set according to the actual situation.
6. a kind of full-prefabricated assembled concrete structure according to claim 1, which is characterized in that the pre-manufactured steel coagulation Pass through respectively between native top plate (4) and the pre-manufactured steel concrete combination column (1) and the pre-manufactured steel concrete bearing wall (2) On-site concrete casting connection, is connect between the pre-manufactured steel concrete roof (4) and the prefabricated light steel partition wall (3) by steel Mode is attached.
CN201821351318.4U 2018-08-20 2018-08-20 A kind of full-prefabricated assembled concrete structure Active CN208718099U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821351318.4U CN208718099U (en) 2018-08-20 2018-08-20 A kind of full-prefabricated assembled concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821351318.4U CN208718099U (en) 2018-08-20 2018-08-20 A kind of full-prefabricated assembled concrete structure

Publications (1)

Publication Number Publication Date
CN208718099U true CN208718099U (en) 2019-04-09

Family

ID=65978856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821351318.4U Active CN208718099U (en) 2018-08-20 2018-08-20 A kind of full-prefabricated assembled concrete structure

Country Status (1)

Country Link
CN (1) CN208718099U (en)

Similar Documents

Publication Publication Date Title
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN105625566B (en) Assembly concrete orthogonal-diagonal lattice space lattice box structure tube-in-tube structure
CN105839836B (en) A kind of precast concrete shear wall component and its construction method
CN206053131U (en) Precast floor slab steel reinforcement cage component and floor
CN201395769Y (en) Tie bar arch type bracket used for building bridge pylon concrete upper cross beam
CN108149819B (en) Integrated superposed outer wall of building bottom reinforcing area and production and construction method thereof
CN111677107B (en) Assembled connected node
CN107989238A (en) A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method
CN115233960B (en) Integral construction platform structure and method for adding core tube wall in air
CN112900764A (en) Light assembled stair with steel bar truss
CN108775084A (en) Steel-concrete combines precast beam and prefabricated post connection structure and construction method
CN105064759B (en) A kind of GFRP pipes reinforced concrete combined structure member multiloop power transmission rod
CN109469204A (en) Fabricated steel reinforced concrete mixed frame structure based on superposed beams and construction method
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN206428805U (en) A kind of concrete prefabricated balcony of assembled steel
CN206220321U (en) A kind of SC systems stiffness hollow core laminated slab
CN208718099U (en) A kind of full-prefabricated assembled concrete structure
CN211898502U (en) High-position conversion foundation of construction elevator
CN107938499A (en) A kind of prefabricated assembled bridge pier
CN107313551A (en) A kind of concrete prefabricated wallboard of steel bar girder and structural system and its construction method
CN208202224U (en) A kind of prefabricated steel reinforced concrete shear wall structure of multilayer
CN108716257A (en) A kind of reinforced beam and its construction method for building industrialization
CN207296399U (en) Continuous placing is molded overall assembled stair template system
CN214783354U (en) Road and bridge crack reinforced structure
CN109680833A (en) The prefabricated reinforcing bar concrete panel component of self-bearing type, wall, structural system and production method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant