CN208711667U - A kind of hot melt gage mark coating melting plant - Google Patents

A kind of hot melt gage mark coating melting plant Download PDF

Info

Publication number
CN208711667U
CN208711667U CN201821281127.5U CN201821281127U CN208711667U CN 208711667 U CN208711667 U CN 208711667U CN 201821281127 U CN201821281127 U CN 201821281127U CN 208711667 U CN208711667 U CN 208711667U
Authority
CN
China
Prior art keywords
melter
fixedly installed
drainer
hot melt
dynamic control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821281127.5U
Other languages
Chinese (zh)
Inventor
顿孟旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bole Road Sign Technology Co.,Ltd.
Original Assignee
Guangzhou Bole Transportation Facilities Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Bole Transportation Facilities Co Ltd filed Critical Guangzhou Bole Transportation Facilities Co Ltd
Priority to CN201821281127.5U priority Critical patent/CN208711667U/en
Application granted granted Critical
Publication of CN208711667U publication Critical patent/CN208711667U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mixers Of The Rotary Stirring Type (AREA)

Abstract

The utility model discloses a kind of hot melt gage mark coating melting plants, including dynamic Control room, hydraulic pump, teeter chamber, drainer, motor, helical axis, melter, hair dryer, the dynamic Control outdoor face is fixedly installed with control panel, dynamic Control chamber interior is fixedly installed with motor by pillar, motor is engaged by gear with helical axis, dynamic Control chamber lower surface is connected with hydraulic pump, the hydraulic pump other end is fixedly mounted at the top of teeter chamber, teeter chamber bottom is fixedly connected with melter, the right top of melter is fixedly connected by gas-guide tube with hair dryer, melter bottom is fixedly connected by valve with drainer, the utility model is separated with melting by that will stir so that device is unlikely to will clean after each melting, and waste of resource is cleaned after reducing adherency, the presence of hydraulic pump can it is appropriate on move down Dynamic dynamic Control room and then control moving propeller make stirring, melt and neglect neither, and save the time, improve efficiency.

Description

A kind of hot melt gage mark coating melting plant
Technical field
The utility model relates to coating to melt field, specifically a kind of hot melt gage mark coating melting plant.
Background technique
In melting, a certain amount of raw material is put into canister, is melted under stirring, makes substantially uniformity up and down Unanimously, and bubble-free generates, and currently, none professional device for being specifically used to melt hot-melt coating on the market, each examination Test room and be substantially in canister and manually stir, heating method be also it is varied, this melting one comes cannot be complete The member of isolation staff's sucking pernicious gas, two finished products melted and preparation cannot comply fully with requirement, to result It has a certain impact.
Therefore, it is imperative to study a convenient, fast, safe hot-melt coating melting plant, a kind of hot melt is now provided Gage mark coating melting plant, it can effectively solve that work at present personnel easily draw pernicious gas, and the equal machine of overall process is automatic It completes, requirement needed for the finished product that it is completed is more in line with people now.
Utility model content
The purpose of this utility model is to provide a kind of hot melt gage mark coating melting plants, to solve in the prior art ask Topic.
To achieve the above object, the utility model provides the following technical solutions: a kind of hot melt gage mark coating melting plant, packet Dynamic Control room, hydraulic pump, teeter chamber, drainer, motor, helical axis, melter, hair dryer are included, outside the dynamic Control room Surface is fixedly installed with control panel, and dynamic Control chamber interior is fixedly installed with motor by pillar, and motor passes through gear and spiral Axis engagement, dynamic Control chamber lower surface are connected with hydraulic pump, and the hydraulic pump other end is fixedly mounted at the top of teeter chamber, stirring Room bottom is fixedly connected with melter, and the right top of melter is fixedly connected by gas-guide tube with hair dryer, and melter bottom passes through Valve is fixedly connected with drainer.
Preferably, the control panel is fixedly connected with hydraulic pump, motor and valve by conducting wire.
Preferably, the left top in the teeter chamber is fixedly installed with feeding inlet.
Preferably, the helical axis is located at teeter chamber part and is fixedly installed with prismatic blade, is located at the fixed peace in melter part Equipped with being fixedly installed with barrier plate on the helical axis between helical blade and two blades.
Preferably, the melting outdoor face is fixedly installed with electric hot plate, and electric hot plate outer surface is fixedly installed with thermal insulation board.
Preferably, the condensation pot bottom is connected with storage seat, and drainer outer surface is fixedly installed with water inlet, goes out The mouth of a river, several memotrons are fixedly mounted on storage seat upper surface, water chamber are formed between memotron and drainer.
Compared with prior art, the utility model has the beneficial effects that the utility model division of labor is clear, time saving and energy saving, protects Retaining ring border, economizes on resources, and is separated with melting by that will stir so that device is unlikely to will clean after each melting, and Waste of resource is cleaned after reducing adherency, the presence of hydraulic pump appropriate can move up and down dynamic Control room and then control movement Propeller makes stirring, melting neglect neither, and saves the time, improves efficiency, after the combination of drainer and memotron makes melting Liquid can condense preservation faster, be prepared for urgent need and be used.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the utility model drainer perspective view.
Fig. 3 is that the utility model stores seat explosion views.
In figure: 1- dynamic Control room, 2- hydraulic pump, the teeter chamber 3-, 4- thermal insulation board, 5- drainer, 6- control panel, 7- electricity Machine, 8- pillar, 9- gear, 10- helical axis, 11- electric hot plate, 12- melter, 13- valve, 14- hair dryer, 15- gas-guide tube, 16- feeding inlet, 17- prismatic blade, 18- helical blade, 19- store seat, 20- memotron, 21- water inlet, 22- water outlet, 23- water Room, 24- barrier plate
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1~3, in the utility model embodiment, a kind of hot melt gage mark coating melting plant, including dynamic Control Room 1, hydraulic pump 2, teeter chamber 3, drainer 5, motor 7, helical axis 10, melter 12, hair dryer 14,1 appearance of dynamic Control room Face is fixedly installed with control panel 6, control panel 6 control the revolving speed of motor 7, hydraulic pump 2 move up and down and the folding of valve 13, Motor 7 is fixedly installed with by pillar 8 inside dynamic Control room 1, motor 7 provides power, and motor 7 passes through gear 9 and helical axis 10 engagements, 1 lower surface of dynamic Control room are connected with hydraulic pump 2, and hydraulic pump 2 controls dynamic Control room 1 and moves up and down in turn The movement of helical axis 10 is controlled, 2 other end of hydraulic pump is fixedly mounted on 3 top of teeter chamber, and teeter chamber 3 mixes immixture, 3 bottom of teeter chamber is fixedly connected with melter 12, and solid is melted into liquid by melter 12, and the right top of melter 12 passes through air guide Pipe 15 is fixedly connected with hair dryer 14, and pernicious gas is sucked out in hair dryer, and 12 bottom of melter is fixed by valve 13 and drainer 5 Connection, drainer 5 condense storage effect, and control panel 6 is fixedly connected with hydraulic pump 2, motor 7 and valve 13 by conducting wire, stir The left top in room 3 is fixedly installed with feeding inlet 16, and helical axis 10 is located at 3 part of teeter chamber and is fixedly installed with prismatic blade 17, is located at molten Melt 12 part of room and be fixedly installed on the helical axis between helical blade 18 and two blades and is fixedly installed with barrier plate 24, barrier plate 24, which are at teeter chamber 3 with melter 12, is connected to blocking effect, and 12 outer surface of melter is fixedly installed with electric hot plate 11, 11 heat effect of electric hot plate, 11 outer surface of electric hot plate are fixedly installed with thermal insulation board 4,4 heat-blocking action of thermal insulation board, 5 bottom of drainer It is connected with storage seat 19,5 outer surface of drainer is fixedly installed with water inlet 21, water outlet 22, and several memotrons 20 are fixed It is mounted on storage 19 upper surface of seat, the storage of memotron 20 forms water chamber 23, water chamber 23 at material between memotron 20 and drainer 5 It is acted on for rapid condensation.
The working principle of the utility model is: being stirred when needing melting operation by entering material by feeding inlet 16 Room 3, after selecting the high speed rotation button in control panel 6 that the prismatic blade 17 in helical axis 10 is driven to be thoroughly mixed by motor 7, The low speed rotation button in control panel 6 is opened, then presses control hydraulic pump 2 and moves up and down button and make dynamic Control room 1 mobile And then displaced spirals axis 10 makes the material being sufficiently stirred enter heating melting in melter 12, melts the gas of generation by hair dryer 14 be sucked out, finally open valve 13 by after melting liquid flow into drainer 5, open water inlet 21, water outlet 22 switch at It is saved after product cooling condensation in case next time uses.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.

Claims (6)

1. a kind of hot melt gage mark coating melting plant, including dynamic Control room (1), hydraulic pump (2), teeter chamber (3), drainer (5), motor (7), helical axis (10), melter (12), hair dryer (14), it is characterised in that: dynamic Control room (1) appearance Face is fixedly installed with control panel (6), is fixedly installed with motor (7), the motor by pillar (8) inside dynamic Control room (1) (7) it is engaged by gear (9) with helical axis (10), dynamic Control room (1) lower surface is connected with hydraulic pump (2), liquid Press pump (2) other end is fixedly mounted at the top of teeter chamber (3), and teeter chamber (3) bottom is fixedly connected with melter (12), institute It states melter (12) right top to be fixedly connected by gas-guide tube (15) with hair dryer (14), melter (12) bottom passes through valve Door (13) is fixedly connected with drainer (5).
2. a kind of hot melt gage mark coating melting plant according to claim 1, it is characterised in that: the control panel (6) is logical It crosses conducting wire and is fixedly connected with hydraulic pump (2), motor (7) and valve (13).
3. a kind of hot melt gage mark coating melting plant according to claim 1, it is characterised in that: the teeter chamber (3) is left Top is fixedly installed with feeding inlet (16).
4. a kind of hot melt gage mark coating melting plant according to claim 1, it is characterised in that: helical axis (10) position Prismatic blade (17) are partially fixedly installed in teeter chamber (3), is located at melter (12) and is partially fixedly installed with helical blade (18) And barrier plate (24) are fixedly installed on two helical axis between blade.
5. a kind of hot melt gage mark coating melting plant according to claim 1, it is characterised in that: the melter (12) is outside Surface is fixedly installed with electric hot plate (11), and electric hot plate (11) outer surface is fixedly installed with thermal insulation board (4).
6. a kind of hot melt gage mark coating melting plant according to claim 1, it is characterised in that: drainer (5) bottom Portion is connected with storage seat (19), and drainer (5) outer surface is fixedly installed with water inlet (21), water outlet (22), several storages It deposits pipe (20) and is fixedly mounted on storage seat (19) upper surface, form water chamber (23) between memotron (20) and drainer (5).
CN201821281127.5U 2018-08-09 2018-08-09 A kind of hot melt gage mark coating melting plant Active CN208711667U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821281127.5U CN208711667U (en) 2018-08-09 2018-08-09 A kind of hot melt gage mark coating melting plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821281127.5U CN208711667U (en) 2018-08-09 2018-08-09 A kind of hot melt gage mark coating melting plant

Publications (1)

Publication Number Publication Date
CN208711667U true CN208711667U (en) 2019-04-09

Family

ID=65976858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821281127.5U Active CN208711667U (en) 2018-08-09 2018-08-09 A kind of hot melt gage mark coating melting plant

Country Status (1)

Country Link
CN (1) CN208711667U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112705094A (en) * 2020-12-17 2021-04-27 河北北方学院 Mixing device for electronic packaging high-heat-conduction material
CN113522088A (en) * 2021-06-07 2021-10-22 何香莲 Equipment and process for improving use of flame-retardant material

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112705094A (en) * 2020-12-17 2021-04-27 河北北方学院 Mixing device for electronic packaging high-heat-conduction material
CN112705094B (en) * 2020-12-17 2023-02-17 河北北方学院 Mixing device for electronic packaging high-heat-conduction material
CN113522088A (en) * 2021-06-07 2021-10-22 何香莲 Equipment and process for improving use of flame-retardant material
CN113522088B (en) * 2021-06-07 2024-06-07 东莞市杰夫阻燃材料有限公司 Equipment and process for improving use of flame retardant material

Similar Documents

Publication Publication Date Title
CN208711667U (en) A kind of hot melt gage mark coating melting plant
CN105536613B (en) A kind of chemical material mixing arrangement
CN203776719U (en) Air fryer used for manufacturing food
CN204482901U (en) A kind of tea leaf water-removing device
CN105662107B (en) One kind closing fume-exhausting auto dish frying device
CN109169977A (en) A kind of production technology of green tea
CN106422933A (en) Producing and processing equipment for organic fertilizer
CN207214174U (en) A kind of L-type lampblack absorber
CN204317408U (en) A kind of intelligent tea leaf water-removing device
CN206196804U (en) Thermostatic type intelligence flour fermentation machine
CN201996282U (en) Multifunctional cooking device
CN106826958A (en) A kind of serialization family expenses vegetable cutter
CN207581772U (en) A kind of complete Brewing equipment of automation
CN111621922A (en) Production process of cotton quilt by hot melting method
CN211636219U (en) Energy-concerving and environment-protective cosmetics raw and other materials mixing arrangement
CN109673800B (en) Ginger sugar production turns over stir-fry device with design function
CN113758298A (en) Energy-concerving and environment-protective type nitrile rubber recovery plant of high-efficient heat recovery
CN208124484U (en) Air fragrance extracting machine
CN202496367U (en) Domestic portable cotton candy making machine
CN203857610U (en) Fresh air supply linkage system of house air conditioner
CN208618597U (en) A kind of energy-saving wall
CN211602653U (en) Nitrogen blowing instrument for preparing monoclonal antibody Tween 80 sample
CN209415575U (en) A kind of novel integrated super bath
CN204898068U (en) Preparation facilities of colloid palladium
CN202376932U (en) Pitch shearing machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 202, building B, No. 2, Nanguang Road, Nancun Town, Panyu District, Guangzhou City, Guangdong Province

Patentee after: Guangdong Bole Road Sign Technology Co.,Ltd.

Address before: 510000 Room 202, building B, No. 2, Nanguang Road, Nancun Town, Panyu District, Guangzhou City, Guangdong Province

Patentee before: GUANGZHOU BOLE TRAFFIC FACILITIES Co.,Ltd.