CN208703421U - A kind of heat preservation pipe prefabricated direct-connected connector of foaming - Google Patents

A kind of heat preservation pipe prefabricated direct-connected connector of foaming Download PDF

Info

Publication number
CN208703421U
CN208703421U CN201821519852.1U CN201821519852U CN208703421U CN 208703421 U CN208703421 U CN 208703421U CN 201821519852 U CN201821519852 U CN 201821519852U CN 208703421 U CN208703421 U CN 208703421U
Authority
CN
China
Prior art keywords
direct
halfpipe
connected connector
heat preservation
foaming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821519852.1U
Other languages
Chinese (zh)
Inventor
徐吉义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Yuntongda New Energy Technology Co Ltd
Original Assignee
Qingdao Yuntongda New Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Yuntongda New Energy Technology Co Ltd filed Critical Qingdao Yuntongda New Energy Technology Co Ltd
Priority to CN201821519852.1U priority Critical patent/CN208703421U/en
Application granted granted Critical
Publication of CN208703421U publication Critical patent/CN208703421U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to utilidor technical fields, specifically, being related to a kind of heat preservation pipe prefabricated direct-connected connector of foaming.The direct-connected connector is integrally cylindrical, is fastened and is constituted by two halfpipe body docking;The halfpipe body is respectively arranged with engaging lug at the top and bottom of both ends;When two halfpipe bodies are mutually butted fastening, two engaging lugs in corresponding position are mutually close to, and are locked by fastening bolt;Foam hole is reserved on the tube wall of one of halfpipe body.The utility model can be used for two connection constructions with the direct-connected insulating tube of diameter, when construction, first by the internal layer core pipe of two insulating tubes is direct-connected be integrally formed after, two halfpipe bodies are wrapped in the outside of two insulating tube connecting pins again, and after being locked by fastening bolt, the pipette tips of foam gun reach in direct-connected connector from foam hole to be foamed, and pipeline construction is both facilitated, it is time saving and energy saving, and it is avoided that pipeline enclosure connection is not close and weeping occurs.

Description

A kind of heat preservation pipe prefabricated direct-connected connector of foaming
Technical field
The utility model relates to utilidor technical fields, specifically, being related to a kind of heat preservation pipe prefabricated direct-connected connect of foaming Head.
Background technique
Insulating tube is the abbreviation of insulated piping, and insulating tube is used for the conveying of liquid, gas and other media, in petroleum, is changed It is commonly used in the adiabatic heat-insulation engineering of the pipelines such as work, space flight, military affairs, central heating, central air-conditioning, municipal administration.
Current insulating tube majority construction is identical, is to be connected to one by multistage, a conveyance conduit is formed, in insulating tube Insulating tube both ends need to be usually soldered to one by junction, then complete to seal by outside cladding polyurethane and polyethylene, But such connection type is both not easy to pipeline construction, it is time-consuming and laborious, and it be easy to cause pipeline enclosure connection not close, it is easy Existing weeping.
Utility model content
The purpose of the utility model is to provide a kind of heat preservation pipe prefabricated direct-connected connectors of foaming, to solve above-mentioned technology Problem.
To solve the above problems, the technical scheme adopted by the utility model is
A kind of heat preservation pipe prefabricated direct-connected connector of foaming, it is characterised in that: the direct-connected connector is integrally cylindrical, by two The halfpipe body docking of section semicircular in shape, which fastens, to be constituted;The halfpipe body is respectively arranged with connection at the top and bottom of both ends Ear is equipped with connecting hole on each engaging lug;Two engaging lugs when two halfpipe bodies are mutually butted fastening, in corresponding position Mutually it is close to, and is locked by fastening bolt;Foam hole is reserved on the tube wall of one of halfpipe body.
Preferred: the foam hole is located at the centre of the tube wall of halfpipe body.
The utility model has the advantages that compared with prior art, the utility model, which can be used for two connections with the direct-connected insulating tube of diameter, to be applied Work, when construction, first by the internal layer core pipe of two insulating tubes is direct-connected be integrally formed after, then two halfpipe bodies are wrapped in two guarantors The outside of warm pipe connecting pin, and after being locked by fastening bolt, the pipette tips of foam gun reach direct-connected connect from foam hole It is foamed in head, both facilitates pipeline construction, it is time saving and energy saving, and it is avoided that pipeline enclosure connection is not close and it is existing water clock occur As.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of embodiment of the utility model;
Fig. 2 is the right view of Fig. 1.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Embodiment:
Referring to Fig.1, Fig. 2, the heat preservation pipe prefabricated direct-connected connector of foaming described in the present embodiment is cylindrical, is in by two sections The semicircular docking of halfpipe body 1, which fastens, to be constituted;It is respectively arranged with engaging lug 2 at the top and bottom of 1 both ends of halfpipe body, Connecting hole is equipped on each engaging lug 2;Two engaging lugs 2 when two halfpipe bodies 1 are mutually butted fastening, in corresponding position Mutually it is close to, and is locked by fastening bolt 3;It is reserved with foam hole 4 on the tube wall of one of halfpipe body, as one Preferably, in the present embodiment, the foam hole 4 is located at the centre of the tube wall of halfpipe body 1 to kind, is conducive to foam more when construction It is uniform.
When construction, after being first connected as one the internal layer core pipe of two insulating tubes, the outer diameter with two insulating tubes is reused Two insulating tubes are carried out heat preservation airtight connection by the direct-connected connector to match, concrete operation method: first will be in two insulating tubes Layer core pipe is direct-connected be integrally formed after, then two halfpipe bodies 1 of direct-connected connector are wrapped in the outside of two insulating tube connecting pins, And after being locked by fastening bolt 3, the pipette tips of foam gun reach in direct-connected connector from foam hole 4 to be foamed i.e. Can, both facilitate pipeline construction, it is time saving and energy saving, and it is avoided that pipeline enclosure connection is not close and weeping occurs.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (2)

1. a kind of heat preservation pipe prefabricated direct-connected connector of foaming, it is characterised in that: the direct-connected connector is integrally cylindrical, is cut by two Halfpipe body (1) docking of face semicircular in shape, which fastens, to be constituted;It is respectively arranged at the top and bottom of halfpipe body (1) both ends Engaging lug (2) is equipped with connecting hole on each engaging lug (2);When two halfpipe bodies (1) are mutually butted fastening, in corresponding positions Two engaging lugs (2) set mutually are close to, and are locked by fastening bolt (3);On the tube wall of one of halfpipe body It is reserved with foam hole (4).
2. the heat preservation pipe prefabricated direct-connected connector of foaming according to claim 1, it is characterised in that: the foam hole (4) is located at The centre of the tube wall of halfpipe body (1).
CN201821519852.1U 2018-09-18 2018-09-18 A kind of heat preservation pipe prefabricated direct-connected connector of foaming Expired - Fee Related CN208703421U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821519852.1U CN208703421U (en) 2018-09-18 2018-09-18 A kind of heat preservation pipe prefabricated direct-connected connector of foaming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821519852.1U CN208703421U (en) 2018-09-18 2018-09-18 A kind of heat preservation pipe prefabricated direct-connected connector of foaming

Publications (1)

Publication Number Publication Date
CN208703421U true CN208703421U (en) 2019-04-05

Family

ID=65946940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821519852.1U Expired - Fee Related CN208703421U (en) 2018-09-18 2018-09-18 A kind of heat preservation pipe prefabricated direct-connected connector of foaming

Country Status (1)

Country Link
CN (1) CN208703421U (en)

Similar Documents

Publication Publication Date Title
CN107300085B (en) Equipment and method are connected for smart city industrial building frost-cracking-preventing intelligent pipeline
CN104373759A (en) Long-distance vacuum insulation conveying pipeline
CN101994880A (en) Double-layer pipe
CN203784566U (en) High-efficiency thermal insulation pipe
CN208703421U (en) A kind of heat preservation pipe prefabricated direct-connected connector of foaming
CN104791569A (en) Automatic centering and quick connecting device for vacuum insulation pipeline
CN204226958U (en) Lng vacuum tube
CN208687182U (en) A kind of heat preservation pipe prefabricated foaming reducer union
CN208703377U (en) A kind of heat preservation pipe prefabricated foaming three-way connection
CN208687206U (en) A kind of heat preservation pipe prefabricated foaming steering knuckle
CN205001767U (en) Integration vacuum transmission pipe
CN201645738U (en) Die type limit clamp for filling foam materials
CN203671145U (en) Right-angle elbow pipe internal fixing joint structure
CN201535411U (en) Ever frozen soil anti-corrosion heat-insulating pipeline joint coating
CN207796342U (en) It is easily installed the feed pipe of docking
CN106764255B (en) A kind of cold insulation of LNG pipeline
CN207080727U (en) A kind of attachment means of PFF insulating tubes
CN203273161U (en) Multi-angle electric smelting sleeve
CN212804653U (en) Insulating tube connecting device for oil well
CN210014115U (en) Liquid conveying heat insulation pipeline convenient to connect
CN205781471U (en) A kind of high-pressure composite pipe
CN204611199U (en) Thermal insulation pipe heater
CN218326623U (en) Prefabricated built on stilts insulating tube
CN204187189U (en) A kind of new gas feedway
CN215721446U (en) Steel bushing steel insulating tube connects butt joint piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190405

Termination date: 20200918