CN208702263U - A kind of on-site maintenance structure of easy-to-mount geological disaster - Google Patents

A kind of on-site maintenance structure of easy-to-mount geological disaster Download PDF

Info

Publication number
CN208702263U
CN208702263U CN201821223653.6U CN201821223653U CN208702263U CN 208702263 U CN208702263 U CN 208702263U CN 201821223653 U CN201821223653 U CN 201821223653U CN 208702263 U CN208702263 U CN 208702263U
Authority
CN
China
Prior art keywords
groups
adjustable guardrail
mount
easy
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821223653.6U
Other languages
Chinese (zh)
Inventor
崔艳鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821223653.6U priority Critical patent/CN208702263U/en
Application granted granted Critical
Publication of CN208702263U publication Critical patent/CN208702263U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of on-site maintenance structures of easy-to-mount geological disaster, including bottom plate, the top of bottom plate is movably set with adjustable guardrail at the position at middle part, and the two sides of adjustable guardrail are located at bottom plate tip edges and are fixedly installed with support column, the front end of adjustable guardrail is fixedly installed with warning rail at the position at middle part, and the top and the bottom of warning rail are located on adjustable guardrail arrangement and offer three groups of ventilative through holes, adjustable guardrail two sides are movably set with three groups of telescopic props and two groups of telescopic props respectively, three groups of telescopic props positioned at adjustable guardrail side and between two groups of telescopic props positioned at the adjustable guardrail other side in being arranged alternately.A kind of on-site maintenance structure of easy-to-mount geological disaster described in the utility model is equipped with adjustable guardrail and counter weight base, can be user-friendly for quick disassembling operations, and can be improved the practical function of device, bring better prospect of the application.

Description

A kind of on-site maintenance structure of easy-to-mount geological disaster
Technical field
The utility model relates to a kind of enclosed structure, specially a kind of on-site maintenance knot of easy-to-mount geological disaster Structure.
Background technique
It after geological disaster occurs, generally requires an enclosed structure to protect to disaster field, is prevented with this Pedestrian enters into danger zone and something unexpected happened again.
Currently, geological disaster on-site maintenance structure has certain drawbacks when in use, overall structure is complex, It is not easy to quickly mount and dismount it when using or withdrawing, operates and be more troublesome, influence staff To the rate of disaster field maintenance, and bottom structure is simple, is not easy to staff by its quick transferring position and fixation, in fact It is poor with effect, certain influence is brought to user.Therefore we make improvement to this, propose one kind easy-to-mountly The on-site maintenance structure of matter disaster.
Utility model content
To solve defect of the existing technology, the utility model provides a kind of scene dimension of easy-to-mount geological disaster Protection structure.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solution:
A kind of on-site maintenance structure of easy-to-mount geological disaster of the utility model, including bottom plate, the top of the bottom plate It holds and is movably set with adjustable guardrail at the position at middle part, and the two sides of adjustable guardrail are located at bottom plate tip edges and fix Support column is installed, the front end of the adjustable guardrail is fixedly installed with warning rail at the position at middle part, and warning rail is upper Lower part is located on adjustable guardrail arrangement and offers three groups of ventilative through holes, and the adjustable guardrail two sides are movably set with three groups respectively Telescopic prop and two groups of telescopic props positioned at telescopic prop described in three groups of adjustable guardrail side and are located at the adjustable guardrail other side Two groups described between telescopic prop in being arranged alternately, one end of telescopic prop described in five groups with it is right on support column described in two groups The the first fluting grafting that should be opened up, the bottom end of the adjustable guardrail is inline to be provided with five groups of fastening screws, described in five groups The the second fluting grafting opened up corresponding on bottom plate of the bottom end of fastening screw, is provided with instruction at the top of the adjustable guardrail Board, the bottom end of the bottom plate is fixedly installed with connecting plug at both sides of the edge, and the bottom of connecting plug is provided with and matches Weight pedestal, the inside of the counter weight base are hollow structure, the top of the counter weight base fixed peace at the position at middle part Equipped with cohesive sleeve, and the inner wall of cohesive sleeve and connecting plug are socketed, and the top of the counter weight base is located at cohesive sleeve Feed pipe is fixedly installed at one side position, and there are two relatively and in same horizontal line for the outer wall setting of counter weight base Carrying handle, the bottom that the outer wall of the counter weight base is located at carrying handle are fixedly installed with drainage conduit, and the bottom of counter weight base End is fixedly installed with load-bearing chassis, and the bottom end on the load-bearing chassis is circumferentially equidistant to be provided with four groups of conical heads.
As a kind of optimal technical scheme of the utility model, the two sides correspondence of the adjustable guardrail is offered for accommodating The column slot of telescopic prop, and the size for the telescopic prop end being placed in column slot is greater than the notch size of column slot.
As a kind of optimal technical scheme of the utility model, the position of the front end of support column described in two groups close to top and the bottom Place is fixedly installed with reflective strip, and one end of support column described in two groups is provided with two groups of hooks.
As a kind of optimal technical scheme of the utility model, the bottom end of the direction board passes through at both sides of the edge Link block is fixedly connected with adjustable guardrail.
As a kind of optimal technical scheme of the utility model, the inner wall of the cohesive sleeve is provided with anti-Leave out thread.
As a kind of optimal technical scheme of the utility model, one end of the feed pipe and drainage conduit is threaded with Sealing cover.
The beneficial effects of the utility model are: the on-site maintenance structure of this kind of easy-to-mount geological disaster,
1, by being provided with adjustable guardrail, sustentacula can be stretched by outside side-pulling, and by opening on itself and support column Slot connection engaging, can quickly finish the assembling of apparatus main body, and then improve the speed that staff safeguards disaster field Rate, and it is more simple and convenient to operate, while being stowed in inside guardrail when not in use, can reduce to external empty Between occupancy, it is more practical.
2, by being provided with counter weight base, the filler materials such as water source can be being injected to chassis interior using by feed pipe, And conical head is combined with to increase the weight and structural stability of device entirety, finally water body is discharged from pedestal when moving Out, make the reduction of its weight, hold carrying handle and staff is facilitated quickly to carry and shift, it is more practical.
Whole device is simple, easy to operate, and the effect used is more preferable relative to traditional approach.
Detailed description of the invention
Attached drawing is used to provide a further understanding of the present invention, and constitutes part of specification, practical with this Novel embodiment is used to explain the utility model together, does not constitute limitations of the present invention.In the accompanying drawings:
Fig. 1 is a kind of structural schematic diagram of the on-site maintenance structure of easy-to-mount geological disaster of the utility model;
Fig. 2 is that a kind of structure of the adjustable guardrail of the on-site maintenance structure of easy-to-mount geological disaster of the utility model is shown It is intended to;
Fig. 3 is that a kind of structure of the counter weight base of the on-site maintenance structure of easy-to-mount geological disaster of the utility model is shown It is intended to.
In figure: 1, bottom plate;2, adjustable guardrail;3, support column;4, warning rail;5, ventilative through hole;6, telescopic prop;7, it positions Bolt;8, direction board;9, connecting plug;10, counter weight base;11, cohesive sleeve;12, feed pipe;13, carrying handle;14, it arranges Expects pipe;15, load-bearing chassis;16, conical head;17, reflective strip;18, it links up with.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
Embodiment: as shown in Figure 1, Figure 2 and Figure 3, a kind of on-site maintenance of easy-to-mount geological disaster of the utility model Structure, including bottom plate 1, the top of bottom plate 1 are movably set with adjustable guardrail 2, and the two of adjustable guardrail 2 at the position at middle part Side is located at 1 tip edges of bottom plate and is fixedly installed with support column 3, and the front end of adjustable guardrail 2 is fixed at the position at middle part Warning rail 4 is installed, some warning bulletins etc. can be puted up on warning rail 4, and the top and the bottom of warning rail 4 are located at adjustable guardrail 2 On arrangement offer three groups of ventilative through holes 5, ventilative through hole 5 can be improved the wind resistance of device entirety, adjustable 2 two sides of guardrail Be movably set with three groups of telescopic props 6 and two groups of telescopic props 6 respectively, positioned at adjustable 2 side of guardrail three groups of telescopic props 6 with In being arranged alternately between two groups of telescopic props 6 of adjustable 2 other side of guardrail, one end of five groups of telescopic props 6 with two groups Corresponding the first fluting grafting opened up on support column 3, the bottom end of adjustable guardrail 2 is inline to be provided with five groups of fastening screws 7, The the second fluting grafting opened up corresponding on bottom plate 1 of the bottom end of five groups of fastening screws 7, the top of adjustable guardrail 2 is provided with Direction board 8, the bottom end of bottom plate 1 are fixedly installed with connecting plug 9, and the bottom setting of connecting plug 9 at both sides of the edge There is counter weight base 10, the inside of counter weight base 10 is hollow structure, and the top of counter weight base 10 is fixed at the position at middle part Cohesive sleeve 11 is installed, and the inner wall of cohesive sleeve 11 and connecting plug 9 are socketed, the top of counter weight base 10 is located at convergence set Feed pipe 12 is fixedly installed at one side position of cylinder 11, and there are two relatively and in same for the outer wall setting of counter weight base 10 Carrying handle 13 on horizontal line, the bottom that the outer wall of counter weight base 10 is located at carrying handle 13 are fixedly installed with drainage conduit 14, And the bottom end of counter weight base 10 is fixedly installed with load-bearing chassis 15, the bottom end on load-bearing chassis 15 is circumferentially equidistant to be provided with four groups of tapers First 16.
The on-site maintenance structure of the easy-to-mount geological disaster of the present embodiment according to claim 1, adjustable guardrail 2 The corresponding column slot offered for accommodating telescopic prop 6 in two sides, and the size for 6 end of telescopic prop being placed in column slot is greater than column The notch size of slot can also store telescopic prop 6 by column slot.
The on-site maintenance structure of the easy-to-mount geological disaster of the present embodiment according to claim 1, two groups of support columns 3 Front end reflective strip 17 is fixedly installed at the position of top and the bottom, one end of two groups of support columns 3 is provided with two groups of extensions Hook 18, reflective strip 17 play warning function at night, and 18 connection rope of hook is convenient and multiple groups building enclosure is connected.
The on-site maintenance structure of the easy-to-mount geological disaster of the present embodiment according to claim 1, the bottom of direction board 8 End passes through link block at both sides of the edge and is fixedly connected with adjustable guardrail 2, and link block plays installation to direction board 8 and fixes Effect.
The on-site maintenance structure of the easy-to-mount geological disaster of the present embodiment according to claim 1, cohesive sleeve 11 Inner wall be provided with anti-Leave out thread, anti-Leave out thread is capable of increasing the frictional force of joining place, keeps its not easily to fall off.
The on-site maintenance structure of the easy-to-mount geological disaster of the present embodiment according to claim 1,12 He of feed pipe One end of drainage conduit 14 is threaded with sealing cover, and sealing cover can place the leakage of 10 inside water body of counter weight base.
When work, two groups of support columns 3 and bottom plate 1 are connected and fixed first, have collectively constituted the frame of device, multiple groups counterweight Pedestal 10 is placed in ground, and the conical head 16 on load-bearing chassis 15 is inserted into ground and fixes, then the frame of composition is passed through rank Plug 9 injects in the cohesive sleeve 11 on counter weight base 10, it is vertical, and the fastening screw 7 of adjustable guardrail 2 is plugged on In the corresponding fluting of bottom plate 1, while pull telescopic prop 6 is distinguished outward, extract it from the column slot inside adjustable guardrail 2 Out, and to two Slideslips with the fluting of 3 inside of support column engaging is connected, the assembling of apparatus main body can be quickly finished, in turn The rate that staff safeguards disaster field is improved, and it is more simple and convenient to operate, while when not in use Be stowed in inside guardrail, can reduce the occupancy to exterior space, it is more practical, splicing after the completion of by feed pipe 12 to The filler materials such as injection water source inside counter weight base 10, the weight and structural stability of Lai Zengjia device entirety, finally when moving Water body is given off from pedestal by drainage conduit 14, makes the reduction of its weight, holds carrying handle 13 and facilitate staff quick Carrying and transfer, it is more practical, by connecting cord outside on hook 18, and mutually held in the mouth by rope with other enclosed structures It connects, has collectively constituted the maintenance area of a disaster field, and mark path direction on direction board 8 and guided, warning rail 4 On warning bulletin is puted up, inform the risk of masses' disaster field with this, at the same when placing ventilative through hole 5 to wind Power is discharged, and anti-locking apparatus collapses, and reflective strip 17 is warned in illuminating at night together, more practical.
Finally, it should be noted that the above descriptions are merely preferred embodiments of the present invention, it is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it is still possible to modify the technical solutions described in the foregoing embodiments, or to part of technical characteristic It is equivalently replaced.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (6)

1. a kind of on-site maintenance structure of easy-to-mount geological disaster, which is characterized in that including bottom plate (1), the bottom plate (1) Top be movably set at the position at middle part adjustable guardrail (2), and the two sides of adjustable guardrail (2) be located at bottom plate (1) top It is fixedly installed at end margin support column (3), the front end of the adjustable guardrail (2) is fixedly installed at the position at middle part Warning rail (4), and the top and the bottom of warning rail (4) are located on adjustable guardrail (2) arrangement and offer three groups of ventilative through holes (5), institute It states adjustable guardrail (2) two sides and is movably set with three groups of telescopic props (6) and two groups of telescopic props (6) respectively, be located at adjustable guardrail (2) between telescopic prop (6) described in three groups of side and telescopic prop (6) described in being located at two groups of adjustable guardrail (2) other side In being arranged alternately, one end of telescopic prop described in five groups (6) first opened up corresponding on support column (3) described in two groups is slotted Grafting, the bottom end of the adjustable guardrail (2) is inline to be provided with five groups of fastening screws (7), fastening screw described in five groups (7) Bottom end the second fluting grafting opened up corresponding on bottom plate (1), be provided with direction board at the top of the adjustable guardrail (2) (8), the bottom end of the bottom plate (1) is fixedly installed with connecting plug (9) at both sides of the edge, and the bottom of connecting plug (9) Portion is provided with counter weight base (10), and the inside of the counter weight base (10) is hollow structure, the top of the counter weight base (10) It is fixedly installed with cohesive sleeve (11) at the position at middle part, and the inner wall of cohesive sleeve (11) and connecting plug (9) are socketed, The top of the counter weight base (10), which is located at a side position of cohesive sleeve (11), to be fixedly installed with feed pipe (12), and counterweight There are two carrying handle (13) opposite and in same horizontal line, the counter weight bases (10) for the outer wall setting of pedestal (10) Outer wall be located at the bottom of carrying handle (13) and be fixedly installed with drainage conduit (14), and the bottom end of counter weight base (10) is fixedly mounted Have load-bearing chassis (15), the bottom end of the load-bearing chassis (15) is circumferentially equidistant to be provided with four groups of conical heads (16).
2. a kind of on-site maintenance structure of easy-to-mount geological disaster according to claim 1, which is characterized in that described The corresponding column slot offered for accommodating telescopic prop (6) in the two sides of adjustable guardrail (2), and the telescopic prop being placed in column slot (6) size of end is greater than the notch size of column slot.
3. a kind of on-site maintenance structure of easy-to-mount geological disaster according to claim 1, which is characterized in that two groups The front end of the support column (3) is fixedly installed with reflective strip (17) at the position of top and the bottom, support column described in two groups (3) One end be provided with two groups of hooks (18).
4. a kind of on-site maintenance structure of easy-to-mount geological disaster according to claim 1, which is characterized in that described The bottom end of direction board (8) passes through link block at both sides of the edge and is fixedly connected with adjustable guardrail (2).
5. a kind of on-site maintenance structure of easy-to-mount geological disaster according to claim 1, which is characterized in that described The inner wall of cohesive sleeve (11) is provided with anti-Leave out thread.
6. a kind of on-site maintenance structure of easy-to-mount geological disaster according to claim 1, which is characterized in that described One end of feed pipe (12) and drainage conduit (14) is threaded with sealing cover.
CN201821223653.6U 2018-08-01 2018-08-01 A kind of on-site maintenance structure of easy-to-mount geological disaster Expired - Fee Related CN208702263U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821223653.6U CN208702263U (en) 2018-08-01 2018-08-01 A kind of on-site maintenance structure of easy-to-mount geological disaster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821223653.6U CN208702263U (en) 2018-08-01 2018-08-01 A kind of on-site maintenance structure of easy-to-mount geological disaster

Publications (1)

Publication Number Publication Date
CN208702263U true CN208702263U (en) 2019-04-05

Family

ID=65940240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821223653.6U Expired - Fee Related CN208702263U (en) 2018-08-01 2018-08-01 A kind of on-site maintenance structure of easy-to-mount geological disaster

Country Status (1)

Country Link
CN (1) CN208702263U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424818A (en) * 2019-08-05 2019-11-08 重庆建工第三建设有限责任公司 A kind of construction baffle and its method for enclosing to be arranged in construction site
CN114868732A (en) * 2022-06-22 2022-08-09 山东郎昆农业科技有限公司 Agricultural net with insecticidal function and preparation method thereof
CN114961415A (en) * 2022-05-17 2022-08-30 国网甘肃省电力公司 Anti-false-entry safety fence with alarm system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424818A (en) * 2019-08-05 2019-11-08 重庆建工第三建设有限责任公司 A kind of construction baffle and its method for enclosing to be arranged in construction site
CN114961415A (en) * 2022-05-17 2022-08-30 国网甘肃省电力公司 Anti-false-entry safety fence with alarm system
CN114961415B (en) * 2022-05-17 2023-08-01 国网甘肃省电力公司 Anti-false-entry safety fence with alarm system
CN114868732A (en) * 2022-06-22 2022-08-09 山东郎昆农业科技有限公司 Agricultural net with insecticidal function and preparation method thereof

Similar Documents

Publication Publication Date Title
CN208702263U (en) A kind of on-site maintenance structure of easy-to-mount geological disaster
CN202936646U (en) Foldable support for airing clothes and sheets
CN203478141U (en) Dismountable suspension lighting device
CN205247848U (en) Novel education show board
CN206572185U (en) A kind of omnipotent suspension bracket lifted for projector
CN206873718U (en) A kind of combined type marble cell curtain wall
CN205959574U (en) Outdoor easy -to -draw is precious
CN205508336U (en) Novel manpower resources information display device
CN208957306U (en) Children education electronic interactive blank cart
CN207669250U (en) A kind of roller frame container structure
CN208383130U (en) A kind of building engineering construction level meter support device
CN103720252B (en) A kind of folding jardiniere
CN106647135A (en) Internet e-commerce teaching projection screen
CN203290534U (en) Multifunctional double bass stool
CN207729147U (en) A kind of Leading format device holder
CN206642772U (en) A kind of rack for test tube
CN205116897U (en) Pointed tent
CN110123039A (en) Clothes hanger and storage box device in wardrobe
CN205092014U (en) Mark automatic machine that hangs of tablet
CN221241231U (en) Pig fence for pig breeding convenient to equipment
CN213420421U (en) Dust bag support of dust chamber of pollution prevention and control equipment
CN208090211U (en) A kind of collapsible instrument of surveying and mapping holder
CN215933129U (en) A movable propaganda device for student's management
CN208144023U (en) Multifunctional fruit tree draws branch device
CN213629715U (en) Teaching equipment for computer education

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190405

Termination date: 20190801

CF01 Termination of patent right due to non-payment of annual fee