CN208702108U - Floor drain periphery concrete or mortar look for slope plastering device - Google Patents
Floor drain periphery concrete or mortar look for slope plastering device Download PDFInfo
- Publication number
- CN208702108U CN208702108U CN201821455946.7U CN201821455946U CN208702108U CN 208702108 U CN208702108 U CN 208702108U CN 201821455946 U CN201821455946 U CN 201821455946U CN 208702108 U CN208702108 U CN 208702108U
- Authority
- CN
- China
- Prior art keywords
- vertical bar
- floor drain
- brace
- slope
- slurry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a kind of floor drain periphery concretes or mortar to look for slope plastering device, it includes vertical bar, brace, smears slurry interlocking lever and brace installation set, is arranged with a floor drain in the bottom end of vertical bar and pushes against disk, the floor drain pushes against to be relatively rotatable to each other between disk and vertical bar;For the slurry interlocking lever of smearing at least provided with one, one end is installed in rotation on the lower end of vertical bar;The brace installation set is set on vertical bar, can be slided and be positioned along vertical bar length direction;At least provided with one, the upper and lower ends of brace are installed in rotation on brace installation set respectively and smear on slurry interlocking lever the brace.The floor drain periphery concrete or mortar that the utility model obtains look for slope plastering device that can disposably wipe roof slope making layer, and the gradient is accurate, easy to operate.
Description
Technical field
The utility model relates to a kind of ground look for slope appurtenance and plastering device, and in particular to a kind of floor drain periphery concrete or
Mortar looks for slope plastering device.
Background technique
When there is draining room sloping layer construction, it usually needs setting floor drain and ponding pipeline, and by the ground around floor drain
Face is arranged to inclined slope surface, so that ponding flow to lower ground leak from higher position, and the ponding pipeline to leak down through ground
Discharge, to keep room dry and comfortable.
In general, it is worker with feeling that existing terrace, which looks for slope all, is carried out looking for slope with trowel.This looks for slope mode to exist very
Big randomness needs to rely on the construction experience of worker completely, has very big uncertainty, so that later period slope surface after molding
Accuracy is not high, and irregular, and Forming Quality is poor.
Based on the above issues, it is 207419884 that China State Intellectual Property Office, which discloses notification number on May 29th, 2018,
A kind of roof slope making device, it includes crossbeam, vertical bar, angle mark ruler, number of altitude ruler and brace, the cross that this, which looks for slope device,
Beam right end is vertical with vertical bar top to be connect, and the brace left end and crossbeam left end are hinged, and being cased on vertical bar can be above and below vertical bar
The sliding sleeve of sliding, the sliding sleeve are transparent configuration, and reading reference line is labeled on sliding sleeve surface.In use, directly by upper
Lower push-and-pull sliding sleeve, and the brace can be accurately obtained by reading reference line corresponding with angle mark ruler and number of altitude ruler
The gradient parameter of position constructs to roofing referring next to the case where brace inclination, and then makes and meet design requirement
The level gradient.
Although above-mentioned look for slope device structure simple, and can accurately determine the gradient of brace, and referring to brace inclination conditions
It constructs to roofing.But this is looked for slope device to have following defects that after brace adjusts out the accurate gradient and is not easy to indicate, needs one
It will directly look for slope device to be placed in carry out looking for slope on ground, and according to visually observing whether determine the smeared gradient after the completion of worker looks for slope
It is consistent with brace tilt angle, and determine the need for doing over again after judgement, there are certain hysteresis qualitys, cannot be disposably by slope
Degree finds and completes.Meanwhile when in use, it needs to support vertical bar lower end on the ground, it is vertical with ground holding just to can ensure that tiltedly
The gradient reading of bar is correct, and the fixation of rod piece is buttressed by manpower, there is very big uncertainty, inaccurate so as to cause reading
Really, the establishment of the later period gradient is influenced.
Summary of the invention
In view of the above shortcomings of the prior art, the technical problem to be solved by the utility model is to how to provide a kind of energy
It is enough disposably to wipe roof slope making layer, and the gradient is accurate, easy to operate floor drain periphery concrete or mortar look for slope plastering device.
In order to solve the above-mentioned technical problem, the utility model uses the following technical solution:
A kind of floor drain periphery concrete or mortar look for slope plastering device, which is characterized in that it includes vertical bar, brace, smears slurry gearing
Bar and brace installation set are arranged with a floor drain in the bottom end of vertical bar and push against disk, and the floor drain pushes against can between disk and vertical bar
It relatively rotates;For the slurry interlocking lever of smearing at least provided with one, one end is installed in rotation on the lower end of vertical bar;The brace peace
Encapsulation is set on vertical bar, can be slided and be positioned along vertical bar length direction;The brace at least provided with one, brace up and down
Both ends are installed in rotation on brace installation set respectively and smear on slurry interlocking lever.In this way, using the above structure look for slope plastering dress
It sets when in use, the tilt angle for smearing slurry interlocking lever is first adjusted according to design requirement, make the tilt angle for smearing slurry interlocking lever and set
The gradient of meter is consistent, then fixes brace, so that interlocking lever position is starched in coupled smearing and angle is fixed.Finally, will
Floor drain pushes against disk and is directed at floor drain, and presses down on vertical bar, so that floor drain is pushed against disk and is close to floor drain, then rotates brace again and smear slurry
Interlocking lever is smoothed out, and be in certain slope during smearing slurry interlocking lever rotation positioned at the concrete or mortar smeared under slurry interlocking lever
Degree, the gradient are consistent with design grade.When adjusting the tilt angle for smearing slurry interlocking lever, it need to only slide up and down brace installation and be set to
Suitable position, when sliding brace installation set, coupled brace is moved, and then is driven and be connected with brace
Smear slurry interlocking lever vertical bar up and down direction rotate, thus achieve the purpose that adjust smear slurry interlocking lever tilt angle.Using upper
After stating floating device, under the rotation for smearing slurry interlocking lever, disposably mortar can be smoothed out to the specified gradient, smear slope speed
Degree is fast, and it is high-quality to smear slope, meanwhile, the accuracy of the gradient is high.Set floor drain pushes against disk and can block drainage outlet, prevents
In the pipeline that mortar leaks down with entering during plastering, line clogging is caused.Simultaneously, moreover it is possible to reduce the construction work for blocking floor drain
Sequence effectively improves construction efficiency.
Further, the lower end of vertical bar be equipped with external screw thread, on vertical bar, brace installation set have one and external screw thread
Pass through the location nut being threadedly engaged.In this way, when in use, after sliding up and down brace installation and being set to suitable position, only need to revolve
Turn location nut, is fixed on location nut on vertical bar.At this moment, location nut will form a blocking brace installation set continue to
The locating piece of lower slider displacement, so that brace installation set be made to be fixed on suitable position, and then make to be connected with brace installation set
Brace and the position for smearing slurry interlocking lever are fixed.
Further, the brace installation set includes the sleeve body covered on vertical bar, in the left and right sides of sleeve body
Two spaced fixture blocks are symmetrically arranged with, form one between two fixture blocks of every side for installing the card slot of brace;Institute
The upper end for stating brace is installed in rotation on fixture block by a shaft being arranged between fixture block.In this way, in brace installation set
Set card slot is in brace is clamped in by brace, and is connected on fixture block by shaft, connects to realize rotary type.
Further, the fixture block is the plate of one piece of semicircular in shape, is equipped on the arcwall face of fixture block for indicating angle
The graduation mark of degree is equipped with the reading pointer for being used to indicate graduation mark in the upper end of every brace.In this way, in use, only
Scale pointed by observed reading pointer is needed, that is, can determine that the tilt angle of brace, and then extrapolates the inclination for smearing slurry interlocking lever
Angle, so as to accurately in place by the positioning of brace installation set, connect so that smearing slurry after sliding brace installation set
Lever tilt angle is accurate enough, to ensure that the slope surface gradient after the later period smears slurry is accurate.
Further, floor drain pushes against above disk, the lower end of vertical bar is equipped with a mounting seat, a left side for the mounting seat
Right both ends stretch out the outer that floor drain pushes against outside disk or pushes against disk with floor drain and are in same level;The brace and smear slurry interlocking lever
It is equipped with two, two braces and smears the left and right sides that slurry interlocking lever is separately mounted to vertical bar;It is described to smear the interior of slurry interlocking lever
Side is installed in rotation on the outside of mounting seat, and the lower end of brace is installed in rotation on the middle part for smearing slurry interlocking lever.In this way,
Set mounting seat can provide enough installation sites for the rotation connection of brace on vertical bar so that vertical bar, brace,
It smears slurry interlocking lever and forms an entirety, so that coupled slurry interlocking lever of smearing also rotates with, and realization is looked for when rotating vertical bar
Slope plastering movement.Brace lower end may be rotatably mounted at smear slurry interlocking lever in the middle part of so that brace, vertical bar and smear slurry interlocking lever between
A triangle is formed, it is extremely firm, meanwhile, it is arranged behind middle part, during looking for slope to plaster, brace can divide to the maximum extent
Load smears mortar extruding force suffered by slurry interlocking lever.
Further, a clamp sleeve is arranged on brace installation set upper side, vertical bar.In this way, when in use, can lead to
Brace installation set is pressed and is positioned by the mode for crossing hand steered clamp sleeve, prevent brace, smear slurry interlocking lever in rotary course by
It is moved up after to the extruding of mortar.
Further, the outside bending in the top of the vertical bar, bending part form a rotating handles.In this way, in use, only
Rotating handles need to be rotated, vertical bar will rotate therewith, and rotate so more laborsaving.
Further, the rotating handles of a perpendicular connection are fixedly installed in the upper end of vertical bar, in the end of handle
Equipped with a rubber grips set.In this way, more laborsaving when rotation.
Further, the first cover plate and the second cover plate of the coaxial heart, the first set are installed in the bottom end of vertical bar
The diameter of disk is greater than the diameter of the second cover plate, and is spaced setting, and the first cover plate and the second cover plate are parallel with floor drain abutting disk,
It being pushed against in floor drain and is equipped with a through-hole in the middle part of disk, large through-hole of the through-hole by being located at the small through hole of upper end and positioned at lower end forms,
The small through hole and large through-hole is concentric and mutual connection;Second cover plate of vertical bar is placed in floor drain and pushes against in the large through-hole of disk, and
With its tight fit, the spacing between the first cover plate and the second cover plate is consistent with small through hole axial height, and the diameter of the first cover plate
It greater than the diameter of small through hole, is placed in floor drain and pushes against on disk upper surface, push against disk upper surface with floor drain and be close to.In this way, in vertical bar
It when rotation, socket-connects since floor drain pushes against disk with the second cover plate on vertical bar, so that floor drain, which pushes against disk, to be rotated with it.
And floor drain is pushed against into the through-hole on disk and is set as down big up small pattern, after being arranged in this way, floor drain pushes against the through hole in the middle part of disk
A step is formed, can prevent vertical bar from pushing against disk with floor drain and fall off.And institute's shape between the first cover plate and the second cover plate on vertical bar
At gap form one and can be used for deduct pushing against disk upper end and being formed by step and be clamped in interior, further prevent floor drain to push against
Disk falls off.
Compared with prior art, it is following excellent that the floor drain periphery concrete or mortar that the utility model obtains look for slope plastering device to have
Point:
1, after using floating device, slurry interlocking lever rotation is smeared by rotation vertical bar drive, and then can be disposably by sand
Slurry smoothes out, and it is fast to smear slope speed, and it is high-quality to smear slope;Brace installation set is configured to slide and after the structure that positions, in cunning
After dynamic brace installation set, can adjust it is coupled smear the tilt angle of slurry interlocking lever, and then make to smear inclining for slurry interlocking lever
Rake angle is consistent with the setting gradient, so that the accuracy of the gradient is high after molding.
2, graduation mark set in brace installation set is corresponding with reading pointer set by jib head, in use,
Scale pointed by observed reading pointer is only needed, that is, can determine that the tilt angle of brace, and then extrapolates and smears inclining for slurry interlocking lever
Rake angle, so as to accurately position brace installation set in place, so that smearing slurry after sliding brace installation set
Interlocking lever tilt angle is accurate enough, to ensure that the slope surface gradient after the later period smears slurry is accurate.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that plastering device in slope is looked for when graduation mark being arranged on fixture block in embodiment;
Fig. 2 is the mounting structure schematic diagram that vertical bar and floor drain push against disk in embodiment;
Fig. 3 is the structural schematic diagram that plastering device in slope is looked for when graduation mark is arranged on vertical bar in embodiment.
In figure: vertical bar 1, external screw thread 11, the first cover plate 12, the second cover plate 13, mounting seat 14, brace installation set 2, sleeve
Main body 21, graduation mark 23, brace 3, reading pointer 31, smears slurry interlocking lever 4, floor drain abutting disk 5, small through hole 51, leads to greatly fixture block 22
Hole 52, location nut 6, clamp sleeve 7, rotating handles 8.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
Embodiment:
As shown in Figure 1-Figure 3, floor drain periphery provided in this embodiment concrete or mortar look for slope plaster device, it include vertical bar 1,
Brace 3 smears slurry interlocking lever 4 and brace installation set 2, is arranged with a floor drain in the bottom end of vertical bar 1 and pushes against disk 5, the floor drain supports
In being horizontally disposed with, floor drain pushes against to be relatively rotatable to each other tight disk 5 between disk 5 and vertical bar 1;The slurry interlocking lever 4 of smearing is at least provided with one
A, the wherein one end for smearing slurry interlocking lever 4 is installed in rotation on the lower end of vertical bar 1;The brace installation set 2 is set in vertical bar 1
On, it can slide and position along 1 length direction of vertical bar;For the brace 3 at least provided with one, the upper and lower ends of brace 3 respectively can
It is rotatably mounted at brace installation set 2 and smears on slurry interlocking lever 4;A pressure is arranged on 2 upper end of brace installation set, vertical bar 1
Fixed cylinder 7.In the specific implementation process, screw rod can be used instead of vertical bar 1, and be respectively arranged in the upper and lower ends of brace installation set 2
One locking nut positions it.Before smearing slope, brace installation set 2 need to be slided up and down, makes to smear slurry interlocking lever 4 and is adjusted to suitable
The gradient, it is then that brace installation set 2 is fixed.When smearing slope, vertical bar 1 is rotated, brace 3 is driven and smears slurry interlocking lever 4 and revolve together therewith
Turn, so that mortar be smoothed out, and is in slope surface shape.
As shown in Figure 1, floor drain pushes against above disk 5, the lower end of vertical bar 1 is equipped with a mounting seat 14, the installation bottom
The left and right ends of seat 14 stretch out the outer that floor drain pushes against outside disk 5 or pushes against disk 5 with floor drain and are in same level;The brace 3
Two are equipped with slurry interlocking lever 4 is smeared, and two braces 3 and smear the left and right sides that slurry interlocking lever 4 is separately mounted to vertical bar 1;Institute
It states and smears the outside that the inside for starching interlocking lever 4 is installed in rotation on mounting seat 14, the lower end of brace 3, which is installed in rotation on, smears
Starch the middle part of interlocking lever 4.
Specifically, the sliding of above-mentioned brace installation set 2 and be located through such as flowering structure realization: in brace installation set 2
Portion is equipped with a vertical through holes, and the diameters of the vertical through holes is slightly larger than the diameter of vertical bar 1, so that brace installation set 2 can be
It rotates and slides on vertical bar 1.The lower end of vertical bar 1 be equipped with external screw thread 11, on vertical bar 1, brace installation set 2 have one with
External screw thread 11 passes through the location nut 6 being threadedly engaged.It is outer on location nut 6 and vertical bar in use, working as rotational positioning nut 6
After screw thread 11 cooperates, it is fixed on vertical bar 1.To form the block for stopping brace installation set 2 to glide, and then realize brace
Installation set 2 positions on vertical bar 1.Certainly, in the specific implementation, it is perpendicular with vertical bar 1 that one can also be arranged in brace installation set
Threaded hole, brace installation set 2 is fixed on vertical bar 1 by the fastening screw that one and corresponding threaded holes close.
As shown in Figure 1, brace 3 and the mounting structure of brace installation set 2 are as follows: brace installation set 2 includes covering on vertical bar 1
Sleeve body 21, be symmetrically arranged with two spaced fixture blocks 22 in the left and right sides of sleeve body 21, the two of every side
One is formed between fixture block 22 for installing the card slot of brace 3;The upper end of the brace 3 is arranged between fixture block 22 by one
Shaft is installed in rotation on fixture block 22.
The tilt angle for smearing slurry interlocking lever 4 is determined in order to be more accurate and easily, so that the later period is formed by slope surface slope
Degree is accurate, looks for slope plastering device to be additionally provided with the measurement marking line for measuring 3 angle of brace in the present embodiment.It is specific next
It says, fixture block 22 is the plate of one piece of semicircular in shape, the graduation mark 23 for indicating angle is equipped on the arcwall face of fixture block 22,
The upper end of every brace 3 is equipped with the reading pointer 31 for being used to indicate graduation mark.In use, need to will only read 31 institute of pointer
Corresponding graduation mark 23 reads the tilt angle of i.e. knowable brace 3, and then according to the tilt angle of brace 3, calculation is smeared slurry and connected
The tilt angle of lever 4.Certainly, when specifically used, it will can first smear slurry interlocking lever 4 and keep horizontality, the tilt angle of brace 3
It reads, the tilt angle of brace 3 calculates brace 3 finally to be adjusted when then adding horizontality further according to angle needed for slope surface
The degree arrived, so that smearing slurry interlocking lever 4 reaches accurate tilt angle.
Above-mentioned fixture block 22 can be used transparent material and be made, and the reading pointer 31 is using red symbol stroke on brace 3
(as shown in Figure 1).The reading protrusion of pointer 31 can also be arranged with brace 3, make thereon end face with 22 outer end face of fixture block in same
On horizontal plane.
As shown in figure 3, in the specific implementation, the above-mentioned tilt angle for smearing slurry interlocking lever 4 can be controlled accurately in the following way
System: gradient marking line and value of slope are indicated in the lower end of vertical bar 1, numerical value corresponding to 2 lower end of brace installation set is to smear slurry
The value of slope of interlocking lever 4.
For the ease of rotation vertical bar 1 and slurry interlocking lever 4 is smeared, the outside bending in top of the vertical bar 1, bending part forms one
Rotating handles.Certainly, in the specific implementation, also vertical bar 1 can be assisted to rotate by such as flowering structure: in the fixed peace in the upper end of vertical bar 1
Rotating handles 8 equipped with a perpendicular connection are equipped with a rubber grips set in the end of rotating handles 8.
As shown in Fig. 2, in order in vertical bar 1 and when smearing slurry interlocking lever 4 and rotating, floor drain pushes against motionless, this reality that resists floor drain of disk 5
Applying in example looks for slope plastering device to use such as flowering structure: being equipped with the first cover plate 12 of the coaxial heart in the bottom end of vertical bar 1
With the second cover plate 13, the diameter of first cover plate 12 is greater than the diameter of the second cover plate 13, and is spaced setting, 12 He of the first cover plate
Second cover plate 13 is parallel with floor drain abutting disk 5, pushes against in floor drain and is equipped with a through-hole in the middle part of disk 5, and the through-hole is upper by being located at
The small through hole 51 at end and large through-hole 52 positioned at lower end form, the small through hole 51 and large through-hole 52 is concentric and mutual connection;
Second cover plate 13 of vertical bar 1 is placed in floor drain and pushes against in the large through-hole 52 of disk 5, and with its tight fit, the first cover plate 12 and second set
Spacing between disk 13 is consistent with 51 axial height of small through hole, and the diameter of the first cover plate 12 is greater than the diameter of small through hole 51, and
It is placed in floor drain to push against on 5 upper surface of disk, pushes against 5 upper surface of disk with floor drain and be close to.
Finally, it should be noted that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application technology
Scheme, although applicant is described in detail the utility model referring to preferred embodiment, those skilled in the art
Should be appreciated that those, the technical solution of the present invention is modified or equivalently replaced, without departing from the technical program
Objective and range should all cover in the scope of the claims of the utility model.
Claims (9)
1. a kind of floor drain periphery concrete or mortar look for slope plastering device, which is characterized in that it includes vertical bar (1), brace (3), smears slurry
Interlocking lever (4) and brace installation set (2) are arranged with a floor drain in the bottom end of vertical bar (1) and push against disk (5), and the floor drain pushes against
It is relatively rotatable to each other between disk (5) and vertical bar (1);Slurry interlocking lever (4) of smearing at least provided with one, rotationally pacify by one end
Mounted in the lower end of vertical bar (1);The brace installation set (2) is set on vertical bar (1), can slide along vertical bar (1) length direction
And it positions;For the brace (3) at least provided with one, the upper and lower ends of brace (3) are installed in rotation on brace installation set respectively
(2) it and smears on slurry interlocking lever (4).
2. floor drain periphery according to claim 1 concrete or mortar look for slope plastering device, which is characterized in that in vertical bar (1)
Lower end is equipped with external screw thread (11), and on vertical bar (1), brace installation set (2) has one and matched with external screw thread (11) by screw thread
The location nut (6) of conjunction.
3. floor drain periphery according to claim 2 concrete or mortar look for slope plastering device, which is characterized in that the brace installation
Set (2) includes covering the sleeve body (21) on vertical bar (1), between the left and right sides of sleeve body (21) is symmetrically arranged with two
One is formed between the fixture block (22) of setting, two fixture blocks (22) of every side for installing the card slot of brace (3);The brace
(3) shaft that upper end is arranged between fixture block (22) by one is installed in rotation on fixture block (22).
4. floor drain periphery according to claim 3 concrete or mortar look for slope plastering device, which is characterized in that the fixture block (22)
For the plate of one piece of semicircular in shape, the graduation mark (23) for indicating angle is equipped on the arcwall face of fixture block (22), at every
The upper end of brace (3) is equipped with the reading pointer (31) for being used to indicate graduation mark.
5. floor drain periphery according to claim 1 or 2 or 3 or 4 concrete or mortar look for slope plastering device, which is characterized in that
Floor drain pushes against above disk (5), the lower end of vertical bar (1) is equipped with a mounting seat (14), the left and right two of the mounting seat (14)
End stretches out the outer that floor drain abutting disk (5) pushes against disk (5) outside or with floor drain and is in same level;The brace (3) and smear slurry
Interlocking lever (4) is equipped with two, two braces (3) and smears the left and right sides that slurry interlocking lever (4) is separately mounted to vertical bar (1);
Described to smear the outside that mounting seat (14) are installed in rotation on the inside of slurry interlocking lever (4), the lower end of brace (3) is rotationally
It is mounted on the middle part for smearing slurry interlocking lever (4).
6. floor drain periphery according to claim 1 or 2 or 3 or 4 concrete or mortar look for slope plastering device, which is characterized in that
A clamp sleeve (7) is arranged on brace installation set (2) upper end, vertical bar (1).
7. floor drain periphery according to claim 1 or 2 or 3 or 4 concrete or mortar look for slope plastering device, which is characterized in that institute
The outside bending in top of vertical bar (1) is stated, bending part forms a rotating handles.
8. floor drain periphery according to claim 1 or 2 or 3 or 4 concrete or mortar look for slope plastering device, which is characterized in that
The upper end of vertical bar (1) is fixedly installed with the rotating handles (8) of a perpendicular connection, is equipped with one in the end of rotating handles (8)
Rubber grips set.
9. floor drain periphery according to claim 1 or 2 or 3 or 4 concrete or mortar look for slope plastering device, which is characterized in that
The bottom end of vertical bar (1) is equipped with the first cover plate (12) and the second cover plate (13) of the coaxial heart, first cover plate (12)
Diameter is greater than the diameter of the second cover plate (13), and is spaced setting, and the first cover plate (12) and the second cover plate (13) are pushed against with floor drain
Disk (5) is parallel, floor drain push against disk (5) in the middle part of be equipped with a through-hole, the through-hole by be located at upper end small through hole (51) and position
Large through-hole (52) in lower end forms, the small through hole (51) and large through-hole (52) is concentric and mutual connection;The of vertical bar (1)
Two cover plates (13) be placed in floor drain push against disk (5) large through-hole (52) in, and with its tight fit, the first cover plate (12) and the second cover plate
(13) spacing between is consistent with small through hole (51) axial height, and the diameter of the first cover plate (12) is greater than the straight of small through hole (51)
Diameter is placed in floor drain and pushes against on disk (5) upper surface, pushes against disk (5) upper surface with floor drain and is close to.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821455946.7U CN208702108U (en) | 2018-09-06 | 2018-09-06 | Floor drain periphery concrete or mortar look for slope plastering device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821455946.7U CN208702108U (en) | 2018-09-06 | 2018-09-06 | Floor drain periphery concrete or mortar look for slope plastering device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208702108U true CN208702108U (en) | 2019-04-05 |
Family
ID=65946600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821455946.7U Active CN208702108U (en) | 2018-09-06 | 2018-09-06 | Floor drain periphery concrete or mortar look for slope plastering device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208702108U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108952123A (en) * | 2018-09-06 | 2018-12-07 | 中冶建工集团有限公司 | Floor drain periphery concrete or mortar look for slope plastering device and its application method |
-
2018
- 2018-09-06 CN CN201821455946.7U patent/CN208702108U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108952123A (en) * | 2018-09-06 | 2018-12-07 | 中冶建工集团有限公司 | Floor drain periphery concrete or mortar look for slope plastering device and its application method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108952123A (en) | Floor drain periphery concrete or mortar look for slope plastering device and its application method | |
CN204590538U (en) | A kind of inside-corner trowel of adjustable angle | |
CN208702108U (en) | Floor drain periphery concrete or mortar look for slope plastering device | |
CN107389041B (en) | A kind of device and its construction assisting casing centering axis | |
CN106885768A (en) | Highway detection determines device and assay method with swinging friction coefficient | |
CN112282326A (en) | Metal point type triangular pyramid self-leveling auxiliary positioning device | |
CN215329234U (en) | Pavement sand paving device and measuring device for pavement structure depth | |
CN206944902U (en) | Wedge-shaped seamed edge depth measurement device | |
CN205209941U (en) | Highway detects with pendulum -type coefficient of friction survey device | |
CN209369371U (en) | A kind of floor leveling component | |
CN109162183A (en) | A kind of bituminous pavement paving THICKNESS CALCULATION model and real-time measurement equipment | |
CN213812289U (en) | Slope construction lofting instrument | |
CN204388850U (en) | A kind of portable multi-function surveyor's staff | |
CN201495782U (en) | Concrete thickness control frame | |
CN210893101U (en) | Slope measuring device for building construction | |
CN210887981U (en) | Device for ensuring slope and gap of acid-resistant tile paving | |
CN204649128U (en) | Concrete thickness measuring chi | |
CN209230631U (en) | A kind of mixing pile construction setting-out fixed-point apparatus | |
CN209099768U (en) | A kind of adjustable drawbar device suitable for large volume concrete structural | |
CN213868821U (en) | Metal point type triangular pyramid self-leveling auxiliary positioning device | |
CN214276900U (en) | Elevation transfer device for pavement construction | |
CN216890790U (en) | Device for leveling layer flatness construction of coke oven top plate | |
CN219655672U (en) | Water level monitoring device | |
CN220541909U (en) | Concrete crack width detection device | |
CN215374967U (en) | Mortar consistency tester |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |