CN208701433U - A kind of railway facilitates railway installation equipment - Google Patents

A kind of railway facilitates railway installation equipment Download PDF

Info

Publication number
CN208701433U
CN208701433U CN201821063070.1U CN201821063070U CN208701433U CN 208701433 U CN208701433 U CN 208701433U CN 201821063070 U CN201821063070 U CN 201821063070U CN 208701433 U CN208701433 U CN 208701433U
Authority
CN
China
Prior art keywords
fixedly connected
pedestal
railway
rail
telescopic rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821063070.1U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Boao Zongheng Network Technology Co ltd
Qingdao Shunrong Machinery Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821063070.1U priority Critical patent/CN208701433U/en
Application granted granted Critical
Publication of CN208701433U publication Critical patent/CN208701433U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a kind of railways to facilitate railway installation equipment, including pedestal, pedestal front surface central location is fixedly connected with power control cabinet, pedestal front surface two sides are equipped with solar energy electroplax by L shape strut, one side bottom of pedestal is fixedly connected with the first sprocket wheel by bearing block, the pedestal top left hand is fixedly connected with Material collecting box for harvesting, the Material collecting box for harvesting left upper portion is rotatably connected to the second sprocket wheel by first motor, on the pedestal top, lower two sides slidably connect the first sliding block by the first sliding rail, first upper end of slide block is equipped with column, the base top central location is fixedly connected with air compressor machine, the base top other side is equipped with feed box, the chassis interior middle section, which is fixed by the bracket, is connected with mounting table.The utility model has the advantages that installation effectiveness is high, rail structure is stable and energy saving by setting hopper, Material collecting box for harvesting, feed box, solar energy electroplax, air compressor machine and bolt fastening nested structure.

Description

A kind of railway facilitates railway installation equipment
Technical field
The utility model relates to railway art, specially a kind of railway facilitates railway installation equipment.
Background technique
Railway is sometimes referred to as certain railway " line " such as Beijing-Guangzhou Railway, the sometimes referred to as set of railway line and including old line new line or a line Two wires creates one under justice and still falls within certain railway system as the expansion of certain railway renames, and the classification of rail in high-speed rail epoch is very complicated, has The classification of the different angles such as road network grade, speed per hour grade, passenger-cargo grade, high-speed rail grade are higher than I grade of state's iron, and I grade of state's iron has plenty of fastly Fast railway, has plenty of common railway, and standard track is for meter-gage and broad gauge, in the trichotomy of speed per hour grade, commonly Railway is compared to speed rail and high-speed railway, is then that common railway is compared to rapid transit railway, the utility model tool in dichotomy Body is that a kind of railway facilitates railway installation equipment.
But there are deficiencies below for the prior art:
1, efficiency is lower during the installation process for railway;
2, during the installation process, the fixation of rail is undesirable for railway, and device is in night work, electric by the external world The waste of the energy is caused in source.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of railway and facilitates railway installation equipment, solves The problem of installation effectiveness is lower, fixation is unstable and energy waste exists in the prior art.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of railway facilitates railway installation equipment, Including pedestal, the base bottom two sides are fixedly connected with one group of traveling wheel, and pedestal front surface central location is fixedly connected There is power control cabinet, pedestal front surface two sides are equipped with solar energy electroplax by L shape strut, and solar energy electroplax is installed on L shape Above strut, middle section is fixedly connected with headlamp on the left of the L shape strut, and one side bottom of pedestal connects by the way that bearing block is fixed It is connected to the first sprocket wheel, the pedestal top left hand is fixedly connected with Material collecting box for harvesting, and the Material collecting box for harvesting left upper portion passes through first motor It is rotatably connected to the second sprocket wheel, and hopper, the pedestal are connected with by chain chain conveyer between the first sprocket wheel and the second sprocket wheel The upper and lower two sides in top slidably connect the first sliding block by the first sliding rail, and first upper end of slide block is equipped with column, described vertical Column inside front is fixedly connected with the second telescopic rod by second crossbar, and the second telescopic rod is installed on outside second crossbar bottom Side, the base top central location are fixedly connected with air compressor machine, and the base top other side is equipped with feed box, and is fed It is equidistant inside case to be fixedly connected with fixed frame, offer feed inlet on the right side of the base top immediately below feed box, it is described into Material mouth bottom base inner right side is provided with sliding slot, and sliding slot is arranged horizontal by 30-degree angle, the chassis interior middle section It is fixed by the bracket and is connected with mounting table, and mounting table front and back chassis interior front and rear sides are slidably connected by the second sliding rail Second sliding block, second upper end of slide block is fixedly connected with first crossbar by third telescopic rod, under the first crossbar passes through The T-shaped plate that end right side is installed is fixedly connected with the second motor, and second motor is set to T-shaped plate top two sides, and described second Bolt fastening set T-shaped plate bottom middle section is rotatably connected to by output end below motor and is fixedly connected with the first telescopic rod.
Preferably, the base bottom central position is fixedly connected with support by hydraulic cylinder, and support is installed on liquid Cylinder pressure center bottom.
Preferably, first telescopic rod and the second telescopic rod bottom end are fixedly connected with the first fixing clamp and by casing Two fixing clamps, and the first fixing clamp is installed on the outside of casing shoe.
Preferably, inside pipe casing is extended at the top of second fixing clamp, and connected on the inside of casing by tracheae and air compressor machine It connects.
Preferably, first sliding rail and the second sliding rail arranged on left and right sides are separately installed with the first limited block and the second limit Block.
(3) beneficial effect
The utility model provides a kind of railway and facilitates railway installation equipment, have it is following the utility model has the advantages that
(1) the utility model is fixed by setting hopper, Material collecting box for harvesting, feed box, fixed frame, sliding slot, mounting table, first Folder, the second fixing clamp and bolt fastening set have the effect of improving railway installation effectiveness, it is lower to solve railway installation effectiveness Problem drives the rotation of the second sprocket wheel by the rotation of first motor, and chain conveyer is connected between the first sprocket wheel and the second sprocket wheel Hopper, hopper carry out conveying effect to rail, are delivered to inside Material collecting box for harvesting, and column is moved by the first sliding block in the first sliding rail upper end Dynamic, the second telescopic rod carries out telescopic action to the first fixing clamp and the second fixing clamp, promotes the first fixing clamp and the second fixing clamp Clamping operation is carried out to rail, the movement again by the first sliding block in the second sliding rail upper end is realized inside rail to feed box Transport, the fixed frame inside feed box carries out orderly fixation to rail, slided by sliding slot to mounting table table by feed inlet Face, third telescopic rod is mobile in the second sliding rail upper end by the second sliding block, using the first fixing clamp and the second fixing clamp to rail It clamping, the second sliding block promotes third telescopic rod to be moved to rail and is laid with road surface in the movement of the second sliding rail upper end again, the Three telescopic rods and the first telescopic rod carry out telescopic action simultaneously, so that contacting between rail and laying road surface and keeping the steady of structure It is qualitative, while the fastening of bolt is carried out using bolt fastening set to rail, by gathering materials automatically, being fed and the row orderly to rail Sequence has been saved a large amount of time, and then realizes the promotion of railway installation effectiveness.
(2) the utility model has energy saving by setting solar energy electroplax, headlamp, casing, tracheae and air compressor machine With the effect of railway structure fixing-stable, solve the problems, such as that equipment is fixed to the waste of resource and rail structure unstable, the bottom of at The two sides of seat front surface are fixedly connected with solar energy electroplax by L shape strut, using solar energy electroplax as generating equipment, for peace The headlamp in middle section provides power supply on the left of L shape strut, realizes the illumination of equipment night operation, and the first fixing clamp is installed on set Pipe Basolateral, the second fixing clamp is installed on the inside of casing shoe, and extends into inside pipe casing, the inside of casing using tracheae with Air compressor machine connection, air compressor machine compress air, carry out squeezing action to the second fixing clamp by tracheae, promote first to fix Rail is fixed in folder and the second fixing clamp, and then realizes to the saving of the equipment energy and the promotion of rail structure stability.
Detailed description of the invention
Fig. 1 is the utility model schematic elevation view;
Fig. 2 is the utility model chassis interior structural schematic diagram;
Fig. 3 is the utility model Material collecting box for harvesting schematic side view.
In figure: 1 chain, 2 first sliding blocks, 3 hoppers, 4 first limited blocks, 5 first sprocket wheels, 6 bearing blocks, 7 second sprocket wheels, 8 First motor, 9 columns, 10 Material collecting box for harvesting, 11 air compressor machines, 12 fixed frames, 13 feed boxs, 14 traveling wheels, 15 power control cabinets, 16 supports, 17 hydraulic cylinders, 18 pedestals, 19 headlamps, 20 first sliding rails, 21 solar energy electroplax, 22L shape strut, 23 second motors, 24 bolts Adapter sleeve, 25 second sliding blocks, 26 second limited blocks, 27 first crossbars, 28T shape plate, 29 mounting tables, 30 feed inlets, 31 sliding slots, 32 Second sliding rail, 33 first telescopic rods, 34 brackets, 35 first fixing clamps, 36 second crossbars, 37 second telescopic rods, 38 tracheaes, 39 sets Pipe, 40 second fixing clamps, 41 third telescopic rods.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1-3, the utility model provides a kind of technical solution: a kind of railway facilitates railway installation equipment, wraps Pedestal 18 is included, 18 two sides of the bottom of pedestal are fixedly connected with one group of traveling wheel 14, pass through hydraulic cylinder at 18 lower center position of pedestal 17 are fixedly connected with support 16, and support 16 is installed on 17 center bottom of hydraulic cylinder, and 18 front surface central location of pedestal is fixed to be connected It is connected to power control cabinet 15,18 front surface two sides of pedestal are equipped with solar energy electroplax 21 by L shape strut 22, and solar energy electroplax 21 is pacified Loaded on 22 top of L shape strut, 22 left side middle section of L shape strut is fixedly connected with headlamp 19, and 18 1 side bottom of pedestal passes through bearing Seat 6 is fixedly connected with the first sprocket wheel 5, and 18 top left hand of pedestal is fixedly connected with Material collecting box for harvesting 10, and 10 left upper portion of Material collecting box for harvesting passes through First motor 8 is rotatably connected to the second sprocket wheel 7, and is connected between the first sprocket wheel 5 and the second sprocket wheel 7 by 1 chain conveyer of chain Hopper 3, the upper and lower two sides in 18 top of pedestal slidably connect the first sliding block 2, the installation of 2 upper end of the first sliding block by the first sliding rail 20 There is column 9,9 inside front of column is fixedly connected with the second telescopic rod 37 by second crossbar 36, and the second telescopic rod 37 is installed In 36 bottom outside of second crossbar, 18 top center position of pedestal is fixedly connected with air compressor machine 11, the 18 top other side of pedestal peace Equipped with feed box 13, and 13 inside of feed box is equidistant is fixedly connected with fixed frame 12, and 18 top right side feed box 13 of pedestal is just Lower section offers feed inlet 30, and 30 bottom base of feed inlet, 18 inner right side is provided with sliding slot 31, and sliding slot 31 horizontal by 30-degree angle setting, 18 inside middle section of pedestal are fixedly connected with mounting table 29, and 29 front and back pedestal of mounting table by bracket 34 18 inside front and rear sides slidably connect the second sliding block 25 by the second sliding rail 32, and the first sliding rail 20 and the second sliding rail 32 are left and right Two sides are separately installed with the first limited block 4 and the second limited block 26, and 25 upper end of the second sliding block connects by the way that third telescopic rod 41 is fixed It is connected to first crossbar 27, first crossbar 27 is fixedly connected with the second motor 23, the second electricity by the T-shaped plate 28 installed on the right side of lower end Machine 23 is set to 28 top two sides of T-shaped plate, is rotatably connected to bolt fastening by output end below the second motor 23 and covers 24, passes through The rotation of first motor 8 drives the rotation of the second sprocket wheel 7, and chain conveyer is connected with hopper 3 between the first sprocket wheel 5 and the second sprocket wheel 7, Hopper 3 carries out conveying effect to rail, is delivered to inside Material collecting box for harvesting 10, and column 9 is by the first sliding block 2 in 20 upper end of the first sliding rail Mobile, the second telescopic rod 37 carries out telescopic action to the first fixing clamp 35 and the second fixing clamp 40, promotes 35 He of the first fixing clamp Second fixing clamp 40 carries out clamping operation to rail, the movement again by the first sliding block 2 in 20 upper end of the second sliding rail, realizes iron Transport inside rail to feed box 13, the fixed frame 12 inside feed box 13 carry out orderly fixation to rail, pass through feed inlet 30 are slided by sliding slot 31 to 29 surface of mounting table, and third telescopic rod 41 is mobile in 32 upper end of the second sliding rail by the second sliding block 25, Rail is clamped using the first fixing clamp 35 and the second fixing clamp 40, the second sliding block 25 is in 32 upper end of the second sliding rail again It is mobile, promote third telescopic rod 41 to be moved to rail and be laid with road surface, third telescopic rod 41 and the first telescopic rod 33 are stretched simultaneously Contracting effect so that contacting and keeping the stability of structure between rail and laying road surface, while covering 24 pairs of iron using bolt fastening Rail carries out the fastening of bolt, by gathering materials automatically, being fed and the sequence orderly to rail, has saved a large amount of time, Jin Ershi The promotion of existing railway installation effectiveness, 28 bottom middle section of T-shaped plate is fixedly connected with the first telescopic rod 33, the first telescopic rod 33 and second 37 bottom end of telescopic rod is fixedly connected with the first fixing clamp 35 and the second fixing clamp 40 by casing 39, and the first fixing clamp 35 is installed It is extended into inside casing 39 at the top of 39 Basolateral of casing, the second fixing clamp 40, and passes through tracheae 38 and sky on the inside of casing 39 Press 11 connects, and is fixedly connected with solar energy electroplax 21 by L shape strut 22 in the two sides of 18 front surface of pedestal, utilizes solar energy Battery plate 21 is used as generating equipment, provides power supply to be mounted on the headlamp 19 in 22 left side middle section of L shape strut, realizes that equipment night is made The illumination of industry, the first fixing clamp 35 are installed on 39 Basolateral of casing, and the second fixing clamp 40 is installed on the inside of 39 bottom end of casing, and It extending into inside casing 39, the inside of casing 39 is connect using tracheae 38 with air compressor machine 11, and air compressor machine 11 compresses air, Squeezing action is carried out to the second fixing clamp 40 by tracheae 38, the first fixing clamp 35 and the second fixing clamp 40 is promoted to carry out rail It is fixed, and then realize to the saving of the equipment energy and the promotion of rail structure stability.
Working principle: in use, opening first motor 8 by power control cabinet 15, second is driven by the rotation of first motor 8 The rotation of sprocket wheel 7, chain conveyer is connected with hopper 3 between the first sprocket wheel 5 and the second sprocket wheel 7, and hopper 3 carries out conveying work to rail With being delivered to inside Material collecting box for harvesting 10, column 9 is mobile in 20 upper end of the first sliding rail by the first sliding block 2, and the second telescopic rod 37 is to the One fixing clamp 35 and the second fixing clamp 40 carry out telescopic action, and the first fixing clamp 35 and the second fixing clamp 40 is promoted to carry out rail Operation is clamped, the fortune inside rail to feed box 13 is realized in the movement again by the first sliding block 2 in 20 upper end of the second sliding rail Defeated, the fixed frame 12 inside feed box 13 carries out orderly fixation to rail, is slided by sliding slot 31 to placement by feed inlet 30 29 surface of platform, third telescopic rod 41 is mobile in 32 upper end of the second sliding rail by the second sliding block 25, utilizes the first fixing clamp 35 and the Two fixing clamps 40 clamp rail, and the second sliding block 25 promotes third telescopic rod in the movement of 32 upper end of the second sliding rail again 41, which are moved to rail, is laid with road surface, and third telescopic rod 41 and the first telescopic rod 33 carry out telescopic action simultaneously, so that rail and paving If the stability of structure is contacted and kept between road surface, while the fastening that 24 pairs of rails carry out bolt is covered using bolt fastening, it is real The installation of existing railway, greatly improves the efficiency of railway installation, in the installation process of railway, the two sides of 18 front surface of pedestal It is fixedly connected with solar energy electroplax 21 by L shape strut 22, using solar energy electroplax 21 as generating equipment, to be mounted on L shape The headlamp 19 in 22 left side middle section of strut provides power supply, realizes the illumination of equipment night operation, and the first fixing clamp 35 is installed on set 39 Basolateral of pipe, the second fixing clamp 40 is installed on the inside of 39 bottom end of casing, and is extended into inside casing 39, the inside of casing 39 It is connect using tracheae 38 with air compressor machine 11, air compressor machine 11 compresses air, is carried out by tracheae 38 to the second fixing clamp 40 Squeezing action promotes the first fixing clamp 35 and the second fixing clamp 40 that rail is fixed, and then realizes the section to the equipment energy About with the promotion of rail structure stability.
It can to sum up obtain, the utility model passes through setting hopper 3, Material collecting box for harvesting 10, feed box 13, solar energy electroplax 21, pneumatics Machine 11 and bolt fastening cover 24 structures, solve and low railway installation effectiveness, the wasting of resources and rail structure exists in the prior art Fixed unstable problem.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of railway facilitates railway installation equipment, including pedestal (18), it is characterised in that: pedestal (18) two sides of the bottom It is fixedly connected with one group of traveling wheel (14), pedestal (18) the front surface central location is fixedly connected with power control cabinet (15), described Pedestal (18) front surface two sides are equipped with solar energy electroplax (21) by L shape strut (22), and solar energy electroplax (21) is installed on L Above shape strut (22), middle section is fixedly connected with headlamp (19) on the left of the L shape strut (22), pedestal (18) the side bottom Portion is fixedly connected with the first sprocket wheel (5) by bearing block (6), and pedestal (18) top left hand is fixedly connected with Material collecting box for harvesting (10), Material collecting box for harvesting (10) left upper portion is rotatably connected to the second sprocket wheel (7) by first motor (8), and the first sprocket wheel (5) It is connected with hopper (3) between the second sprocket wheel (7) by chain (1) chain conveyer, the upper and lower two sides in pedestal (18) top pass through First sliding rail (20) slidably connects the first sliding block (2), and the first sliding block (2) upper end is equipped with column (9), the column (9) inside front is fixedly connected with the second telescopic rod (37) by second crossbar (36), and the second telescopic rod (37) is installed on the Two cross bars (36) bottom outside, pedestal (18) top center position are fixedly connected with air compressor machine (11), the pedestal (18) The top other side is equipped with feed box (13), and feed box (13) is internal equidistant is fixedly connected with fixed frame (12), the bottom It is offered feed inlet (30) immediately below seat (18) top right side feed box (13), feed inlet (30) bottom base (18) is internal Right side is provided with sliding slot (31), and sliding slot (31) is arranged horizontal by 30-degree angle, and the internal middle section of the pedestal (18) passes through Bracket (34) is fixedly connected with mounting table (29), and the internal front and rear sides of mounting table (29) front and back pedestal (18) are sliding by second Rail (32) slidably connects the second sliding block (25), and the second sliding block (25) upper end is fixedly connected with by third telescopic rod (41) First crossbar (27), the first crossbar (27) are fixedly connected with the second motor by the T-shaped plate (28) installed on the right side of lower end (23), second motor (23) is set to T-shaped plate (28) top two sides, is turned below second motor (23) by output end Dynamic to be connected with bolt fastening set (24), T-shaped plate (28) the bottom middle section is fixedly connected with the first telescopic rod (33).
2. a kind of railway according to claim 1 facilitates railway installation equipment, it is characterised in that: pedestal (18) bottom Portion's central position is fixedly connected with support (16) by hydraulic cylinder (17), and support (16) is installed in hydraulic cylinder (17) bottom end Portion.
3. a kind of railway according to claim 1 facilitates railway installation equipment, it is characterised in that: first telescopic rod (33) pass through casing (39) with the second telescopic rod (37) bottom end and be fixedly connected with the first fixing clamp (35) and the second fixing clamp (40), And first fixing clamp (35) be installed on casing (39) Basolateral.
4. a kind of railway according to claim 3 facilitates railway installation equipment, it is characterised in that: second fixing clamp (40) it is internal to extend into casing (39) for top, and is connect by tracheae (38) with air compressor machine (11) on the inside of casing (39).
5. a kind of railway according to claim 1 facilitates railway installation equipment, it is characterised in that: first sliding rail (20) and the second sliding rail (32) arranged on left and right sides is separately installed with the first limited block (4) and the second limited block (26).
CN201821063070.1U 2018-07-05 2018-07-05 A kind of railway facilitates railway installation equipment Active CN208701433U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821063070.1U CN208701433U (en) 2018-07-05 2018-07-05 A kind of railway facilitates railway installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821063070.1U CN208701433U (en) 2018-07-05 2018-07-05 A kind of railway facilitates railway installation equipment

Publications (1)

Publication Number Publication Date
CN208701433U true CN208701433U (en) 2019-04-05

Family

ID=65937903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821063070.1U Active CN208701433U (en) 2018-07-05 2018-07-05 A kind of railway facilitates railway installation equipment

Country Status (1)

Country Link
CN (1) CN208701433U (en)

Similar Documents

Publication Publication Date Title
CN108891432A (en) Railway tunnel maintenance car group
CN208701433U (en) A kind of railway facilitates railway installation equipment
CN208964136U (en) A kind of double handgrip automatic loading machines of planer-type
CN107009122B (en) LED lamp assembly loading attachment
CN110421509A (en) Back windshield attachment mounting tool and its working method
CN206551539U (en) A kind of carton Production line device
CN109281237A (en) A kind of railway emergency rescue disaster relief is with sleeper automatic laying machine device people
CN211174116U (en) Shield tunnel pipeline moving device
CN207982688U (en) Bolt automatic feed dividing feed mechanism
CN109822310A (en) A kind of Relining manipulator portal structure
CN207171854U (en) A kind of chip pin detection fixture
CN205926875U (en) Limit clamp of steel sheet bender
CN206041932U (en) Solar cell panel turning device
CN211269204U (en) Workstation for industrial design convenient to use
CN210703335U (en) A frock that is used for case jar omega strengthening rib to install
CN208342774U (en) A kind of dust removal workbench
CN204585055U (en) Diesel locomotive ventilation experiment air channel model clamping tooling
CN203771959U (en) Water drainage device
CN210420735U (en) Portable hydraulic tamping machine
CN209773027U (en) Waste collecting device is used in generator production
CN207209239U (en) Material mobile platform
CN208557343U (en) A kind of semi-automatic mobile door guide rail ball more changing device
CN206397156U (en) A kind of dabbing chassis
CN205898802U (en) Telescopic concrete pile examines test table
CN209277561U (en) A kind of concrete vibrating stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200110

Address after: No. 2443, Dongyue Middle Road, Huangdao District, Qingdao, Shandong Province

Patentee after: Qingdao Shunrong Machinery Co.,Ltd.

Address before: 510000 Guangzhou High-tech Industrial Development Zone Science Avenue 231, 233 Skirt Building B1B2, 1st, 2nd, 3rd and 4th floors

Patentee before: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Effective date of registration: 20200110

Address after: 510000 Guangzhou High-tech Industrial Development Zone Science Avenue 231, 233 Skirt Building B1B2, 1st, 2nd, 3rd and 4th floors

Patentee after: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Address before: 710065 No. 90, West Dingbai Road, Yanta District, Xi'an City, Shaanxi Province

Patentee before: Li Jianing

TR01 Transfer of patent right