CN208701115U - A kind of core-spun yarn process units - Google Patents

A kind of core-spun yarn process units Download PDF

Info

Publication number
CN208701115U
CN208701115U CN201821428544.8U CN201821428544U CN208701115U CN 208701115 U CN208701115 U CN 208701115U CN 201821428544 U CN201821428544 U CN 201821428544U CN 208701115 U CN208701115 U CN 208701115U
Authority
CN
China
Prior art keywords
roller
core
spun yarn
forming roller
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821428544.8U
Other languages
Chinese (zh)
Inventor
田毅菲
沈乐
段清忠
张军
陈刘剑
刘�英
赵道伟
蒋跃雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Pujiang Alloy Materials Ltd By Share Ltd
Original Assignee
Nanjing Pujiang Alloy Materials Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Pujiang Alloy Materials Ltd By Share Ltd filed Critical Nanjing Pujiang Alloy Materials Ltd By Share Ltd
Priority to CN201821428544.8U priority Critical patent/CN208701115U/en
Application granted granted Critical
Publication of CN208701115U publication Critical patent/CN208701115U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Inorganic Fibers (AREA)

Abstract

The utility model discloses a kind of core-spun yarn process units, including successively horizontally disposed band steel disk, core-spun yarn molding machine, take-up reel, the core-spun yarn molding machine includes base, the base is successively arranged steel band to take-up reel direction by band steel disk and makes roller in order, steel band groove roller, first groove forming roller, second groove forming roller, third groove forming roller, core material doffer, 4th groove forming roller, groove sealing roll, groove undercut roller, first undercut forming roller, second undercut forming roller, third undercut forming roller, 4th undercut forming roller, 5th undercut forming roller, first core wire sizing roller, second core wire sizing roller, first core wire loading roller, third core wire sizing roller, second core wire loading roller;Core material doffer includes multiple platform balance formula spiral Weightlessness balances being arranged on base, and the feeder pipe of platform balance formula spiral Weightlessness balance is located at the surface of steel band.

Description

A kind of core-spun yarn process units
Technical field
The utility model relates to founding materials field, specifically a kind of core-spun yarn process units.
Background technique
Core-spun yarn is formed by band shape steel band winding alloying pellet, powder, winds outer appearnce liny circle, core-spun yarn is in China Production and application study start from eighties of last century late nineteen eighties, pass through steel-making, the joint efforts of founder author, packet over 30 years Core wire technology and its faster development and good effect are achieved in ladle metallurgy and cast iron nodularization, inoculation.Cored Line be mainly used in breed, external refining, the aspect of special elements alloying three.Core-spun yarn is main to apply in STEELMAKING PRODUCTION In the desulfurization of molten steel, deoxidation, alloying, microalloying, steel inclusion denaturation and continuous casting steel Calcium treatment.In cast iron industry In, be mainly used in the alloying of cast iron, de- S processing, breed in spheroidising.
Traditional core-spun yarn core material preparation method majority is put into electric furnace according to core material ingredient preparation raw material using mix-melting method After middle melting, it is cast to graded crushing after being cooled and shaped in alloy mould ingot;And traditional core material relies on and slips to feed under gravity In funnel, the irregular phenomenon of feeding easily occur: the core wire deviation of weight between constituent parts length (m) is big, exceeded.
Utility model content
Technical problem to be solved in the utility model is, the shortcomings that for the above prior art, proposes a kind of core-spun yarn Process units, including successively horizontally disposed band steel disk, core-spun yarn molding machine, take-up reel, the core-spun yarn molding machine packet Base is included, the base is successively arranged steel band by band steel disk to take-up reel direction and makes roller, steel band groove roller, the molding of the first groove in order Roller, the second groove forming roller, third groove forming roller, core material doffer, the 4th groove forming roller, groove sealing roll, groove Undercut roller, the first undercut forming roller, the second undercut forming roller, third undercut forming roller, the 4th undercut forming roller, the 5th undercut at Type roller, the first core wire sizing roller, the second core wire sizing roller, the first core wire loading roller, third core wire sizing roller, the reinforcing of the second core wire Roller;
Core material doffer includes multiple platform balance formula spiral Weightlessness balances being arranged on base, platform balance formula spiral Weightlessness balance Feeder pipe is located at the surface of steel band;
The control method of core-spun yarn process units sequentially includes the following steps:
Step 1: first preparing with a thickness of 0.25mm-0.6mm, wide 45mm-55mm cold-rolled strip selects core material granularity for 0- Then the raw material of 2mm are calculated according to required core material ingredient obtained, corresponding raw material are respectively put into corresponding In scale formula spiral Weightlessness balance;
Step 2: and then starting device, under the driving force of core-spun yarn molding machine and take-up reel, steel band is with 20-60m/ The speed of min moves, when required Determining Composition of Cored Wire obtained be 25% magnesium, 50% silicon, 25% iron when, steel band is respectively provided with Magnesium, silicon, iron core material platform balance formula spiral Weightlessness balance rate of feeding ratio are as follows: 1:1:2:1;When required Determining Composition of Cored Wire obtained is When 30% magnesium, 50% silicon, 20% iron, steel band, be respectively provided with magnesium, silicon, iron core material platform balance formula spiral Weightlessness balance feeding speed Spend ratio are as follows: 5:6:10:4;
Step 3: and then cold-rolled strip gradually forms in core-spun yarn molding machine, and the section of core-spun yarn is round or square Type.
Core-spun yarn process units above-mentioned, it is directly Φ 7- Φ 16mm when the section of core wire is circle, when section is square Shape Shi Qichang is wide having a size of 10-16mm having a size of 7-10mm.
Core-spun yarn process units above-mentioned, when required Determining Composition of Cored Wire obtained be 25% magnesium, 50% silicon, 25% iron When, steel band, be respectively provided with magnesium, silicon, iron core material platform balance formula spiral Weightlessness balance rate of feeding ratio are as follows: 1:1:2:1;
The control method of core-spun yarn process units sequentially includes the following steps:
Step 1: first prepare with a thickness of 0.25mm, wide 45mm cold-rolled strip selects core material granularity for the raw material of 0.3mm, Then it is calculated according to required core material ingredient obtained, it is weightless that corresponding raw material are respectively put into corresponding platform balance formula spiral In scale;
Step 2: and then starting device, under the driving force of core-spun yarn molding machine and take-up reel, steel band is with 20m/min's Speed movement, and with magnesium, silicon, iron core material platform balance formula spiral Weightlessness balance rate of feeding be respectively 20m/min, 40m/min, 20m/min;
Step 3: and then cold-rolled strip gradually forms in core-spun yarn molding machine, and the section of core-spun yarn is circle.
Core-spun yarn process units above-mentioned, when required Determining Composition of Cored Wire obtained be 30% magnesium, 50% silicon, 20% iron When, steel band, be respectively provided with magnesium, silicon, iron core material platform balance formula spiral Weightlessness balance rate of feeding ratio are as follows: 5:6:10:4;
The control method of core-spun yarn process units sequentially includes the following steps:
Step 1: first preparing with a thickness of 0.6mm, wide 55mm cold-rolled strip selects core material granularity for the raw material of 2mm, then It is calculated according to required core material ingredient obtained, corresponding raw material is respectively put into corresponding platform balance formula spiral Weightlessness balance In;
Step 2: and then starting device, under the driving force of core-spun yarn molding machine and take-up reel, steel band is with 60m/min's Speed movement, be respectively provided with magnesium, silicon, iron core material platform balance formula spiral Weightlessness balance rate of feeding be 72m/min, 120m/min, 48m/min;
Step 3: and then cold-rolled strip gradually forms in core-spun yarn molding machine, and the section of core-spun yarn is square type.
Core-spun yarn process units above-mentioned, when required Determining Composition of Cored Wire obtained be 25% magnesium, 50% silicon, 25% iron When, steel band, be respectively provided with magnesium, silicon, iron core material platform balance formula spiral Weightlessness balance rate of feeding ratio are as follows: 1:1:2:1;
The control method of core-spun yarn process units sequentially includes the following steps:
Step 1: first preparing with a thickness of 0.5mm, wide 50mm cold-rolled strip selects core material granularity for the raw material of 1.5mm, so It is calculated afterwards according to required core material ingredient obtained, corresponding raw material is respectively put into corresponding platform balance formula spiral Weightlessness balance In;
Step 2: and then starting device, under the driving force of core-spun yarn molding machine and take-up reel, steel band is with 40m/min's Speed movement, when required Determining Composition of Cored Wire obtained be 30% magnesium, 50% silicon, 20% iron when, be respectively provided with magnesium, silicon, iron core The rate of feeding of the platform balance formula spiral Weightlessness balance of material is 40m/min, 80m/min, 40m/min;
Step 3: and then cold-rolled strip gradually forms in core-spun yarn molding machine, and the section of core-spun yarn is circle.
The utility model has the beneficial effects that
1, platform balance formula spiral Weightlessness balance is referred in the preparation process of core-spun yarn, using weighing bucket and feeder as whole A scale body does not stop the sampling that weight signal is carried out to scale body by instrument, and the changing ratio for calculating weight in the unit time is made Acquisition for instantaneous flow, this flow is extremely important, is the basis that can Weightlessness balance accurately measure, and is calculated by the inside of instrument Method carries out the control operation for approaching target flow, and speed is fast, and precision is high, high-efficient;It can be seen that it is not by scale from principle The machinery change of body and feeder influences, it is calculated weight difference (difference weight), compared with conventional dynamic measurement means, Advantage is self-evident, is flow (t/h, kg/min) for control object, and the transportable property of material is good, measuring accuracy It is required that can be used as a kind of preferred plan using weight-loss method metering when high;
When Weightlessness balance works, what the measurement reality of feed bin was completed in the quiescent state, two weights are measured according to two working conditions It measures difference and calculates flow.Difference can also be compensated with flow given value error in next cycle, and the two weight Time of measuring is completed in a few minutes, is not influenced by sensor zero drift and temperature drift etc..Therefore it can get quite high Measuring accuracy, system meters precision can reach 0.5%.
2, totally-enclosed stainless steel structure is suitble to various severe scenes;The all steel of device systems, generally using stainless Steel, the poor occasion of suitable environment condition, and have the characteristics that sturdy and durable, maintenance is small, be not afraid of high-temperature material.Many enterprises Industry is power consumption rich and influential family, thus how an energy saving and critically important project.Since Weightlessness balance uses totally-enclosed knot Structure does not generate dust in blending process, saves dust-extraction unit, and structure is simple, without mating with weighing belt etc., both saves equipment Investment, and electric energy has been saved, improve production efficiency.
3, the utility model is suitable for the upgrading to existing core-spun yarn unit, and infusion of financial resources is few.Improve feeding The efficiency of operation of factory can be substantially improved in accuracy, stability and reliability, reduce the labor intensity of worker.Biography is overturned Material mode under unified central planning.
4, precisely feed is realized.It is measured and is fed using multiple platform balance formula spiral Weightlessness balances, realize every kind of raw material by formula Precisely feed.Various core materials are delivered directly on core-spun yarn steel band, energy according to required ratio by platform balance formula spiral Weightlessness balance Enough accomplish that every meter of core material weight error is ± 1 gram, and international advanced enterprises can accomplish that every meter of core material weight error is ± 3 at present Gram.As particularly importantly: the content of magnesium of core-spun yarn core material can be made accurate when preparing magnesium-rich pellet agent, error is minimum.This is right It is precisely controlled core-spun yarn additional amount in user, improves nodularization, pregnant effect shows superior especially.
5, it is pioneering for core-spun yarn to be prepared as utility model people for platform balance formula spiral Weightlessness balance, produces unexpected effect Fruit.Platform balance formula spiral Weightlessness balance main equipment is relatively simple for structure, and stream system is closed, without material leakage fugitive dust problem, to material Change of properties and environmental suitability are very strong, and measuring accuracy is high, and reliable for operation, maintenance workload is less.
6, energy conservation and environmental protection reduces cost.Match raw material without molten, reduces the molten power consumption with process, environmental pollution, raw material is not High-temperature oxydation can be generated, not will increase the content of magnesia when especially preparing magnesium-rich pellet agent core-spun yarn, core material is not molten with straight Addition is connect, energy conservation and environmental protection reduces cost.Electric energy 1000-1280 degree can be saved by averagely preparing core-spun yarn per ton.
7, steel band in the utility model, be respectively provided with magnesium, silicon, iron core material platform balance formula spiral Weightlessness balance rate of feeding ratio Are as follows: 5:6:10:4 or 1:1:2:1, the proportionate relationship are the applicant to be calculated and experiment obtains as a result, not being by long-term Simple can be obtained by limited experiment, can guarantee the stability and reliability of production, while can be improved core-spun yarn Quality;Core-spun yarn process units is scientific and reasonable simultaneously, and strip passes sequentially through steel band and makes roller, the first steel band groove roller, second in order Groove forming roller, third groove forming roller, core material doffer, the 4th groove forming roller, groove sealing roll, groove undercut roller, First undercut forming roller, the second undercut forming roller, third undercut forming roller, the 4th undercut forming roller, the first core wire sizing roller, Two core wire sizing rollers, the first core wire loading roller, third core wire sizing roller, the second core wire loading roller, can not only increase set in this way Standby stability, and it is rationally distributed, and high production efficiency, whole equipment is small in size, and occupied space is few, save the cost.
Detailed description of the invention
Fig. 1 is structural schematic diagram in the utility model;
Wherein: 1- band steel disk, 2- take-up reel, 3- base, 4- steel band make roller, 5- the first steel band groove roller in order, and 6- first rolls Slot shaping roller, 7- the second groove forming roller, 8- third groove forming roller, the 4th groove forming roller of 9-, 10- groove sealing roll, 11- Groove undercut roller, 12- the first undercut forming roller, 13- the second undercut forming roller, 14- third undercut forming roller, the 4th undercut of 15- Forming roller, the 5th undercut forming roller of 16-, 17- the first core wire sizing roller, 18- the second core wire sizing roller, the reinforcing of the first core wire of 19- Roller, 20- third core wire sizing roller, 21- the second core wire loading roller, 22- platform balance formula spiral Weightlessness balance.
Specific embodiment
The utility model is described in further detail below, device used below is existing product, can It directly purchases and obtains, its rotation is driven by motor in Slot shaping roller, groove undercut roller in core-spun yarn molding machine etc.;
Embodiment 1
A kind of core-spun yarn process units provided in this embodiment, including successively horizontally disposed band steel disk 1, core-spun yarn molding Device, take-up reel 2, the core-spun yarn molding machine include base 3, the base 3 by band steel disk 1 to 2 direction of take-up reel successively Equipped with steel band make in order roller 4, steel band groove roller 5, the first groove forming roller 6, the second groove forming roller 7, third groove forming roller 8, Core material doffer, the 4th groove forming roller 9, groove sealing roll 10, groove undercut roller 11, the first undercut forming roller 12, second Undercut forming roller 13, third undercut forming roller 14, the 4th undercut forming roller 15, the 5th undercut forming roller 16, the first core wire sizing Roller 17, the second core wire sizing roller 18, the first core wire loading roller 19, third core wire sizing roller 20, the second core wire loading roller 21;
Core material doffer includes three platform balance formula spiral Weightlessness balances 22 being arranged on base 3, and platform balance formula spiral is weightless The feeder pipe of scale 22 is located at the surface of steel band;
When required Determining Composition of Cored Wire obtained be 25% magnesium, 50% silicon, 25% iron when, steel band, be respectively provided with magnesium, silicon, The rate of feeding ratio of the platform balance formula spiral Weightlessness balance 22 of iron core material are as follows: 1:1:2:1;
The control method of core-spun yarn process units sequentially includes the following steps:
Step 1: first prepare with a thickness of 0.25mm, wide 45mm cold-rolled strip selects core material granularity for the raw material of 0.3mm, Then it is calculated according to required core material ingredient obtained, it is weightless that corresponding raw material are respectively put into corresponding platform balance formula spiral In scale 22;
Step 2: and then starting device, under the driving force of core-spun yarn molding machine and take-up reel 2, steel band is with 20m/min Speed movement, and the rate of feeding of platform balance formula spiral Weightlessness balance 22 with magnesium, silicon, iron core material is respectively 20m/min, 40m/ min,20m/min;
Step 3: and then cold-rolled strip gradually forms in core-spun yarn molding machine, and the section of core-spun yarn is circle, core It is directly Φ 12mm when the section of line is circle.
Embodiment 2
A kind of core-spun yarn process units provided in this embodiment, structure is identical as the structure of embodiment 1, wherein when required Determining Composition of Cored Wire obtained be 25% magnesium, 50% silicon, 25% iron when, steel band, the platform balance formula for being respectively provided with magnesium, silicon, iron core material The rate of feeding ratio of spiral Weightlessness balance 22 are as follows: 1:1:2:1;
The control method of core-spun yarn process units sequentially includes the following steps:
Step 1: first preparing with a thickness of 0.5mm, wide 50mm cold-rolled strip selects core material granularity for the raw material of 1.5mm, so It is calculated afterwards according to required core material ingredient obtained, corresponding raw material is respectively put into corresponding platform balance formula spiral Weightlessness balance In 22;
Step 2: and then starting device, under the driving force of core-spun yarn molding machine and take-up reel 2, steel band is with 40m/min Speed movement, when required Determining Composition of Cored Wire obtained be 30% magnesium, 50% silicon, 20% iron when, be respectively provided with magnesium, silicon, iron The rate of feeding of the platform balance formula spiral Weightlessness balance 22 of core material is 40m/min, 80m/min, 40m/min;
Step 3: and then cold-rolled strip gradually forms in core-spun yarn molding machine, and the section of core-spun yarn is circle, core It is directly Φ 7mm when the section of line is circle.
Embodiment 3
A kind of core-spun yarn process units provided in this embodiment, structure is identical as the structure of embodiment 1, wherein when required Determining Composition of Cored Wire obtained be 30% magnesium, 50% silicon, 20% iron when, steel band, the platform balance formula for being respectively provided with magnesium, silicon, iron core material The rate of feeding ratio of spiral Weightlessness balance 22 are as follows: 5:6:10:4;
The control method of core-spun yarn process units sequentially includes the following steps:
Step 1: first preparing with a thickness of 0.6mm, wide 55mm cold-rolled strip selects core material granularity for the raw material of 2mm, then It is calculated according to required core material ingredient obtained, corresponding raw material is respectively put into corresponding platform balance formula spiral Weightlessness balance 22 In;
Step 2: and then starting device, under the driving force of core-spun yarn molding machine and take-up reel 2, steel band is with 60m/min Speed movement, be respectively provided with magnesium, silicon, iron core material platform balance formula spiral Weightlessness balance 22 rate of feeding be 72m/min, 120m/ min,48m/min;
Step 3: and then cold-rolled strip gradually forms in core-spun yarn molding machine, and the section of core-spun yarn is square type, it is long It is wide having a size of 16mm having a size of 10mm.
Above embodiments are only to illustrate the technical idea of the utility model, and the protection model of the utility model cannot be limited with this Enclose, it is all according to the utility model proposes technical idea, any changes made on the basis of the technical scheme each falls within this reality Within the scope of novel protected.

Claims (2)

1. a kind of core-spun yarn process units, including successively horizontally disposed band steel disk (1), core-spun yarn molding machine, take-up reel (2), it is characterised in that: the core-spun yarn molding machine includes base (3), and the base (3) is by band steel disk (1) to take-up reel (2) direction is successively arranged steel band and makes roller (4), steel band groove roller (5), the first groove forming roller (6), the second groove forming roller in order (7), third groove forming roller (8), core material doffer, the 4th groove forming roller (9), groove sealing roll (10), groove undercut Roller (11), the first undercut forming roller (12), the second undercut forming roller (13), third undercut forming roller (14), the 4th undercut molding Roller (15), the 5th undercut forming roller (16), the first core wire sizing roller (17), the second core wire sizing roller (18), the reinforcing of the first core wire Roller (19), third core wire sizing roller (20), the second core wire loading roller (21);
The core material doffer includes multiple platform balance formula spiral Weightlessness balances (22) being arranged on base (3), the platform balance formula The feeder pipe of spiral Weightlessness balance (22) is located at the surface of steel band.
2. core-spun yarn process units according to claim 1, it is characterised in that: the section of the core wire is circle Shi Qizhi Be connected in Φ 7- Φ 16mm, when section be rectangle Shi Qichang having a size of 7-10mm, it is wide having a size of 10-16mm.
CN201821428544.8U 2018-08-31 2018-08-31 A kind of core-spun yarn process units Active CN208701115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821428544.8U CN208701115U (en) 2018-08-31 2018-08-31 A kind of core-spun yarn process units

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821428544.8U CN208701115U (en) 2018-08-31 2018-08-31 A kind of core-spun yarn process units

Publications (1)

Publication Number Publication Date
CN208701115U true CN208701115U (en) 2019-04-05

Family

ID=65945221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821428544.8U Active CN208701115U (en) 2018-08-31 2018-08-31 A kind of core-spun yarn process units

Country Status (1)

Country Link
CN (1) CN208701115U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109055660A (en) * 2018-08-31 2018-12-21 南京浦江合金材料股份有限公司 A kind of core-spun yarn process units that can be precisely controlled core material ingredient and its control method
CN110877061A (en) * 2019-08-14 2020-03-13 上海盛宝冶金科技有限公司 Production unit of double-layer core-spun wire

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109055660A (en) * 2018-08-31 2018-12-21 南京浦江合金材料股份有限公司 A kind of core-spun yarn process units that can be precisely controlled core material ingredient and its control method
CN109055660B (en) * 2018-08-31 2024-02-27 南京浦江合金材料股份有限公司 Cored wire production device capable of accurately controlling core material components and control method thereof
CN110877061A (en) * 2019-08-14 2020-03-13 上海盛宝冶金科技有限公司 Production unit of double-layer core-spun wire
CN110877061B (en) * 2019-08-14 2021-09-07 上海盛宝冶金科技有限公司 Production unit of double-layer core-spun wire

Similar Documents

Publication Publication Date Title
CN208701115U (en) A kind of core-spun yarn process units
CN107130105B (en) A kind of method for improving sinter basicity coefficient of stabilization and its proportioner used
CN104325105A (en) On-line weighing, sizing and correcting method of continuous casting slab
JPS5592259A (en) Continuous production of low oxygen copper wire
CN110283956A (en) Whether go out most devices and methods therefor for rational judgment Blast furnace slag
CN109055660A (en) A kind of core-spun yarn process units that can be precisely controlled core material ingredient and its control method
CN113275533B (en) Automatic control device for pouring temperature of molten steel in continuous casting tundish
CN102156486A (en) Control method for adding water in mixture in sintering production
CN109332614A (en) A kind of non-equilibrium casting beam blank mould cooling controller of single-point and control method
CN203764920U (en) Continuous-casting billet cutting length measuring device
CN108246996A (en) A kind of method for improving casting machine cutting scale qualification rate
CN1280041A (en) Method and device for measuring data to automatically operating contineous casting machine
CN107824756A (en) Steel control method more than a kind of slab caster tundish based on continuous temperature measurement
CN203649344U (en) Continuous casting crystallizer with automatic alarming and slag discharging functions
CN210945664U (en) Blast furnace slag discharge on-line detection device
CN203983025U (en) Low voltage mutual inductor production line
CN205949857U (en) Package mouth of a river installation centering rack in middle of billet caster
CN205665131U (en) Sintering cooperation material moisture detection and analysis device
CN205228602U (en) Be applied to belt weigher structure among ceramic raw materials proportioning controlling system
CN102019414A (en) Control method of steel cast ending
CN114523082B (en) Manufacturing system for continuous casting process of high-quality special steel
CN217570783U (en) Improved aluminum-iron alloy pouring chute
CN206573193U (en) A kind of Novel hot steel billet scale on machine for moving steel
CN210367864U (en) Reverberatory furnace adds phosphoric acid device
CN104131126A (en) Blast furnace slag flow detection method based on fuzzy model

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant