CN208698599U - Powder tank car and its unload guide integrated pipeline - Google Patents
Powder tank car and its unload guide integrated pipeline Download PDFInfo
- Publication number
- CN208698599U CN208698599U CN201820929577.4U CN201820929577U CN208698599U CN 208698599 U CN208698599 U CN 208698599U CN 201820929577 U CN201820929577 U CN 201820929577U CN 208698599 U CN208698599 U CN 208698599U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- guide
- powder tank
- powder
- tank car
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Air Transport Of Granular Materials (AREA)
Abstract
Guide integrated pipeline, including guide pipeline (4) are unloaded the utility model discloses a kind of powder tank car, inner end is the guide end for the conveying powder into powder tank body (11);Discharge pipelines, inner end are for the delivery end from sucks powder in powder tank body (11), and outer end is connected to the outer end of the guide pipeline (4);Public pipeline (2), outer end are the butt end for connecting powder lot feeding device or powder catching device, and inner end is connected to the outer end of the outer end of the guide pipeline (4) and the discharge pipelines;At least two control valves are separately positioned in the guide pipeline (4) and the discharge pipelines.Since guide path and discharging path have shared one section of public pipeline and discharge operation and guide operation may be implemented, so as to reduce cost, also helps and bigger powder delivered payload capability is provided under the premise of meeting passage capacity.The utility model discloses a kind of including the above-mentioned powder tank car for unloading guide integrated pipeline.
Description
Technical field
The utility model relates to powder carry technical fields more particularly to one kind to unload guide integrated pipeline.The utility model
It further relates to a kind of including the above-mentioned powder tank car for unloading guide integrated pipeline.
Background technique
Cement is the leading products of building materials industry, and market constantly increases the demand of cement, but also results in simultaneously not
Break increased energy waste and environmental pollution;It can solve these problems using bulk cement.As bulk cement popularization degree is got over
Come higher, many limited engineering sites of construction space begin to use bulk cement also to substitute bagged cement, and traditional dissipate
Dress bulk cement carrier cannot complete transporting to the limited engineering site of construction space for task.
Bulk cement tanker generally requires to carry out discharge operation (conveying powder outward from tank car) and guide operation (to tank
Powder is conveyed in vehicle), above two operation is usually to pass through discharge pipelines and guide pipeline is realized;Discharge pipelines and passage
Road is often arranged in the tank body two sides of bulk cement tanker.
Arrangement above not only causes bulk cement tanker size to compromise passage capacity, to also improve bulk cement greatly
The cost of tank car.
Certainly, the above situation not only exists only in bulk cement tanker, and conveying the tank cars of other powders, that there is also this is similar
The problem of.
Utility model content
The purpose of the utility model is to provide one kind to unload guide integrated pipeline, and structure size is smaller, cost is relatively low.This reality
It is to provide with novel another object a kind of including the above-mentioned powder tank car for unloading guide integrated pipeline.
To achieve the above object, what the utility model provided a kind of powder tank car unloads guide integrated pipeline, comprising:
Guide pipeline, inner end are the guide end for conveying powder into powder tank body;
Discharge pipelines, inner end are for the delivery end from sucks powder in powder tank body, outer end and the passage
The outer end on road is connected to;
Public pipeline, outer end are the butt end for connecting powder lot feeding device or powder catching device, inner end
It is connected to the outer end of the outer end of the guide pipeline and the discharge pipelines;
At least two control valves are separately positioned in the guide pipeline and the discharge pipelines.
Preferably, the control valve is specially butterfly valve or ball valve.
Preferably, the delivery end is equipped with tubaeform material sucking port.
Preferably, the butt end is equipped with active tube joint.
Preferably, the discharge pipelines include the bending for being located at the straight pipe in outside and being detachably connected with the straight pipe
Pipeline section, the straight pipe are provided with control close to the position of the straight pipe close to the position of outer end and the bending pipeline section
Valve, and the control valve of the bending pipeline section is set to the outside of the powder tank body.
The utility model additionally provides a kind of powder tank car, including powder tank body, and the powder tank body is equipped with above-mentioned
Powder tank car described in one unloads guide integrated pipeline.
Preferably, the material guide port of the guide pipeline is located at the intracorporal top of the powder material tank, and the discharge pipelines unload
Material end is located at the intracorporal bottom of the powder material tank, and the two is staggered scheduled distance on the length direction of the powder tank body.
Preferably, the material guide port of the guide pipeline is oriented parallel to the length direction of the powder tank body.
Preferably, the public pipeline and the straight pipe are coaxially disposed, and both positioned at the outer of the powder tank body
Side.
Preferably, the powder tank car is specially bulk cement tanker.
Provided by the utility model to unload guide integrated pipeline, guide path and discharging path have shared one section of public pipe
Road switchs cooperation by least two control valves accordingly, can realize discharge operation and guide operation respectively.It can save in this way
About material, reduction manufacturing cost, may also be advantageous for reducing structure size, under the premise of meeting passage capacity, can have bigger
Powder delivered payload capability.
In a specific embodiment, the straight pipe of the discharge pipelines and bending pipeline section are provided with control valve, this
Be conducive to avoid discharge pipelines charge in guide operation, reduce the pressure loss, improves guide efficiency.
Powder tank car provided by the utility model has the advantages that corresponding, repeats no more.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is the embodiments of the present invention, for those of ordinary skill in the art, without creative efforts, also
Other attached drawings can be obtained according to the attached drawing of offer.
Fig. 1 is powder tank car partial structural diagram provided by specific embodiment of the present invention;
Fig. 2 is the schematic side view of powder tank car partial structurtes shown in Fig. 1;
Fig. 3 is the stereoscopic schematic diagram that guide integrated pipeline is unloaded provided by specific embodiment of the present invention;
Fig. 4 is the schematic elevation view that guide integrated pipeline is unloaded shown in Fig. 3;
Fig. 5 is the schematic side view that guide integrated pipeline is unloaded shown in Fig. 3.
Appended drawing reference of the Fig. 1 into Fig. 5 is as follows:
1- pipe fitting;The public pipeline of 2-;3- material guide port;4- guide pipeline;5- guide butterfly valve;6- the first discharging butterfly valve;7-
Straight pipe;8- material sucking port;9- the second discharging butterfly valve;10- bends pipeline section.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model core is to provide one kind and unloads guide integrated pipeline, and structure size is smaller, cost is relatively low.This is practical
Novel another core is to provide a kind of including the above-mentioned powder tank car for unloading guide integrated pipeline.
Fig. 1 to Fig. 5 is please referred to, Fig. 1 is that powder tank car partial structurtes provided by specific embodiment of the present invention are shown
It is intended to;Fig. 2 is the schematic side view of powder tank car partial structurtes shown in Fig. 1;Fig. 3 is mentioned by specific embodiment of the present invention
The stereoscopic schematic diagram for unloading guide integrated pipeline supplied;Fig. 4 is the schematic elevation view that guide integrated pipeline is unloaded shown in Fig. 3;Fig. 5 is figure
The schematic side view of guide integrated pipeline is unloaded shown in 3.
In the first specific embodiment, the guide integrated pipeline provided by the utility model that unloads can complete two kinds of works
Industry: guide operation and discharge operation.
Wherein, material guide port 3 can be set in the inner end of guide pipeline 4, which is for conveying powder into powder tank body 11
The guide end of material, the outer end of guide pipeline 4 are connected with the inner end of public pipeline 2.It should be noted that the utility model is herein
And " inner end " described below, it refers both in public pipeline 2, guide pipeline 4 and the discharge pipelines three that will describe apart from powder
The closer one end of 11 inner distance of tank body, three are accordingly called " outer end " apart from farther away one end.
In guide pipeline 4 be equipped with control valve (such as guide butterfly valve 5), so as to open so that guide pipeline 4 with it is public
Pipeline 2 is connected to, or is closed so that the two disconnects.It should be noted that " control valve " described in the utility model, can only have
It is turned on or off function, the purpose of this utility model has may be implemented in this;However control valve can also be further equipped with
The function of flow adjustment, so that the function of pipeline more horn of plenty.
In addition, the control valve can be different based on conveyed type of powder etc. actual conditions, select butterfly valve except
Form, such as ball valve etc..
Guide pipeline 4 is connected to public pipeline 2 and is equipped with control valve between the two, and the relative positional relationship of the two can
To determine as the case may be, be not necessarily set as it is shown in Fig. 2 generally vertically.
The outer end of public pipeline 2 is its butt end, is held for connecting powder lot feeding device (when guide operation) or powder
Connection device (when discharge operation).In order to dock conveniently, pipe fitting 1 can also be set in butt end.
Unloading guide integrated pipeline further includes discharge pipelines, and inner end is for the discharging from sucks powder in powder tank body 11
End, the delivery end can also install tubaeform material sucking port 8;The outer end of discharge pipelines is connected to the outer end of guide pipeline 4.
Control valve is again provided in discharge pipelines, so as to open so that discharge pipelines are connected to public pipeline 2, or
It closes so that the two disconnects.
Likewise, discharge pipelines are connected to public pipeline 2 and are equipped with control valve, the relative position of the two between the two
Relationship can determine as the case may be, not necessarily be set as shown in Fig. 2 substantially coaxial.
When needing to carry out guide operation, the control valve in guide pipeline 4 is opened and the control valve in discharge pipelines is closed, powder
Material can enter public pipeline 2 by the butt end, guide pipeline 4 then enters powder tank body 11 by guide end.Need into
When row discharge operation, the control valve in discharge pipelines is opened and the control valve in guide pipeline 4 is closed, and powder can be by described
Delivery end enters discharge pipelines, public pipeline 2 is then exported by the butt end.
As it can be seen that provided by the utility model unload guide integrated pipeline, guide path and discharging path have shared one section
Public pipeline 2, cooperation is switched by control valve accordingly, can realize discharge operation and guide operation respectively;To save
Material reduces manufacturing cost, and may also be advantageous for reduction structure size makes powder tank car under the premise of meeting passage capacity
There can be bigger powder delivered payload capability.
Some further improvement can also be made to the guide integrated pipeline provided by the utility model that unloads.
For example, discharge pipelines itself can be straight tube, bend pipe or other forms, it is not necessary to be defined in certain particular form;
But based on the considerations of obtaining further technical effect, two pipeline sections can be further arranged to: straight pipe 7 and with it is straight
The bending pipeline section 10 that pipeline section 7 is detachably connected, refer to the prior art for the specific detachable connection method of the two, no longer superfluous herein
It states.Wherein, straight pipe 7 is located at outside, and outer end is the outer end of discharge pipelines;The outer end and straight pipe 7 for bending pipeline section 10 connect
Logical, inner end is the inner end of discharge pipelines.
When encountering the unfavorable situations such as powder blocking, straight pipe 7 can be removed and bend the connection relationship of pipeline section 10, to be
Blocking cleaning work provides convenience.
A control valve can be respectively set in straight pipe 7 and bending pipeline section 10, such as in straight pipe 7 close to its outer end
The first discharging butterfly valve 6 is arranged in position, the second discharging butterfly valve 9 is arranged close to the position of straight pipe 7 in bending pipeline section 10, and make second
Discharging butterfly valve 9 is located at except powder tank body 11.
In this way, not only block clearing is easy to operate, moreover, the closing of the first discharging butterfly valve 6 is advantageous during guide operation
In avoiding charge in discharge pipelines, the pressure loss is reduced, improves guide efficiency.
Powder tank car provided by the utility model, including powder tank body 11 and each above described unload guide integrated pipeline
In any one;Powder tank body 11 and the structure unloaded except guide integrated pipeline, refer to the prior art.
Referring to FIG. 1, powder tank car further can also be arranged in a specific embodiment.
For example, the material guide port 3 of guide pipeline 4 can be set to the top position in powder tank body 11, meanwhile, it is unloaded described
The delivery end on expects pipe road is set to the bottom position in powder tank body 11, also, by the two on the length direction of powder tank body 11
Be staggered scheduled distance;Certainly, the preset distance not emphasizes some specific numerical value, but indicates can have in conjunction with tank body
The normalized form of body carries out reasonable selection.Such setting is conducive to powder reasonable layout in tank body, further ensures and leads
Material operation and discharge operation are gone on smoothly.
In addition, 3 direction of material guide port of guide pipeline 4 can be set to the length direction for being parallel to powder tank body 11, lead in this way
Expect that powder can be more uniformly distributed in powder tank body 11 when operation, to improve useful load.
Public pipeline 2 can also be coaxially disposed with straight pipe 7, and both be located at the outside of powder tank body 11.
As previously mentioned, powder tank car provided by the utility model can be bulk cement tanker, it is also possible to load fortune
The equipment of other defeated powders.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with other
The difference of embodiment, the same or similar parts in each embodiment may refer to each other.
Guide integrated pipeline is unloaded and powder tank car is described in detail to provided by the utility model above.Herein
In apply specific case the principles of the present invention and embodiment be expounded, the explanation of above embodiments is only used
The method and its core concept of the utility model are understood in help.It should be pointed out that for those skilled in the art
For, without departing from the principle of this utility model, several improvements and modifications can be made to this utility model, these
Improvement and modification are also fallen into the protection scope of the utility model claims.
Claims (10)
1. a kind of powder tank car unloads guide integrated pipeline characterized by comprising
Guide pipeline (4), inner end are the guide end for the conveying powder into powder tank body (11);
Discharge pipelines, inner end are for the delivery end from sucks powder in powder tank body (11), outer end and the passage
The outer end on road (4) is connected to;
Public pipeline (2), outer end are butt end for connecting powder lot feeding device or powder catching device, inner end with
The outer end of the guide pipeline (4) is connected to the outer end of the discharge pipelines;
At least two control valves are separately positioned in the guide pipeline (4) and the discharge pipelines.
2. powder tank car as described in claim 1 unloads guide integrated pipeline, which is characterized in that the control valve is specially butterfly
Valve or ball valve.
3. powder tank car as claimed in claim 2 unloads guide integrated pipeline, which is characterized in that the delivery end is equipped with loudspeaker
The material sucking port (8) of shape.
4. powder tank car as claimed in claim 3 unloads guide integrated pipeline, which is characterized in that the butt end is equipped with activity
Pipe fitting (1).
5. powder tank car according to any one of claims 1-4 unloads guide integrated pipeline, which is characterized in that the discharge duct
Road includes the bending pipeline section (10) for being located at the straight pipe (7) in outside and being detachably connected with the straight pipe (7), the straight pipe
(7) it is provided with control valve close to the position of the straight pipe (7) close to the position of outer end and bending pipeline section (10), and
The control valve of bending pipeline section (10) is set to the outside of the powder tank body (11).
6. a kind of powder tank car, including powder tank body (11);It is characterized in that, powder tank body (11) installation is wanted just like right
Powder tank car described in asking 5 unloads guide integrated pipeline.
7. powder tank car as claimed in claim 6, which is characterized in that the material guide port (3) of the guide pipeline is located at the powder
Top in batch can body (11), the delivery end of the discharge pipelines is located at the bottom in the powder tank body (11), and the two exists
Be staggered scheduled distance on the length direction of the powder tank body (11).
8. powder tank car as claimed in claim 7, which is characterized in that material guide port (3) direction of the guide pipeline (4) is parallel
In the length direction of the powder tank body (11).
9. powder tank car as claimed in claim 8, which is characterized in that the public pipeline (2) and the straight pipe (7) are coaxial
Setting, and both it is located at the outside of the powder tank body (11).
10. powder tank car as claimed in claim 9, which is characterized in that the powder tank car is specially bulk cement tanker.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820929577.4U CN208698599U (en) | 2018-06-14 | 2018-06-14 | Powder tank car and its unload guide integrated pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820929577.4U CN208698599U (en) | 2018-06-14 | 2018-06-14 | Powder tank car and its unload guide integrated pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208698599U true CN208698599U (en) | 2019-04-05 |
Family
ID=65936102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820929577.4U Active CN208698599U (en) | 2018-06-14 | 2018-06-14 | Powder tank car and its unload guide integrated pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208698599U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108545012A (en) * | 2018-06-14 | 2018-09-18 | 安徽星马专用汽车有限公司 | Powder tank car and its unload guide integrated pipeline |
-
2018
- 2018-06-14 CN CN201820929577.4U patent/CN208698599U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108545012A (en) * | 2018-06-14 | 2018-09-18 | 安徽星马专用汽车有限公司 | Powder tank car and its unload guide integrated pipeline |
CN108545012B (en) * | 2018-06-14 | 2024-04-26 | 安徽星马专用汽车有限公司 | Powder tank car and unloading and guiding integrated pipeline thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208698599U (en) | Powder tank car and its unload guide integrated pipeline | |
CN108545012A (en) | Powder tank car and its unload guide integrated pipeline | |
CN2795159Y (en) | Continuous pneumatic conveyor for bulk material | |
CN111661598A (en) | Spiral coal feeder for turnover coal unloading system | |
CN210456689U (en) | Hybrid unloading system suitable for bulk material transport vehicle | |
CN204210955U (en) | A kind of tank body assembly of lower-discharging type discharging and powder tank superimposed trailer | |
KR101815545B1 (en) | Pneumatic material conveying system | |
CN208561035U (en) | Discharging type powder grain material discharge system | |
CN109178945B (en) | Dense-phase pneumatic conveying system based on flow state and pressure characteristic joint control | |
CN211993584U (en) | Powder automatic feeding device and environment-friendly cement mixing pile send grey system | |
CN110354745A (en) | A kind of double elevator feeding mixing systems | |
CN207903543U (en) | Material distribution Input System | |
CN208731720U (en) | Particle material transportation semitrailer external gas source gas handling system | |
CN211337950U (en) | Pneumatic conveying device for adjusting blanking through conical cap | |
CN211282230U (en) | Powder material transportation semitrailer with discharge pipeline arranged at bottom | |
CN215046962U (en) | Stock solution feed bin air conveying system | |
CN217024531U (en) | Material conveying system and desulfurization system | |
CN213678896U (en) | Vacuum feeding machine | |
CN108792665A (en) | Discharging type powder grain material discharge system | |
CN209550149U (en) | A kind of powder material conveyance conduit rapid cleaning device | |
CN213568467U (en) | Exhaust filtering structure of solid material blanking system | |
CN210184358U (en) | Material distribution device and bread pattern drawing machine with same | |
CN221164805U (en) | Four-channel bifurcation funnel with balanced material distribution | |
CN220589883U (en) | Smooth structure of blender pipeline | |
CN217946910U (en) | Double-inlet and double-outlet type powder particle conveying switching pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |