CN208685594U - A kind of novel pre-stressed tubular pole that photovoltaic plant uses - Google Patents

A kind of novel pre-stressed tubular pole that photovoltaic plant uses Download PDF

Info

Publication number
CN208685594U
CN208685594U CN201821220109.6U CN201821220109U CN208685594U CN 208685594 U CN208685594 U CN 208685594U CN 201821220109 U CN201821220109 U CN 201821220109U CN 208685594 U CN208685594 U CN 208685594U
Authority
CN
China
Prior art keywords
tubular pole
upright post
hollow bore
bracket
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821220109.6U
Other languages
Chinese (zh)
Inventor
张令喜
宋卫杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou ATSI New Energy Development Co.,Ltd.
Original Assignee
Suzhou Gaochuangte New Energy Sources Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gaochuangte New Energy Sources Development Co Ltd filed Critical Suzhou Gaochuangte New Energy Sources Development Co Ltd
Priority to CN201821220109.6U priority Critical patent/CN208685594U/en
Application granted granted Critical
Publication of CN208685594U publication Critical patent/CN208685594U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The utility model discloses the novel pre-stressed tubular poles that a kind of photovoltaic plant uses, including tubular pole ontology and bracket upright post, the tubular pole body interior offers hollow bore, hollow bore is internally provided with lateral spacing body, the bottom of the bracket upright post is inserted into the hollow bore of tubular pole ontology, and the bottom of bracket upright post and the upper surface of lateral spacing body contradict, and the grouting slurry of covered stent column is filled in the hollow bore of lateral spacing body upper end.The utility model reasonable structural arrangement, engineering practice meet calculation assumption condition, realize no-welding installation, are not necessarily to vibrated concrete, constructing operation is convenient, and work efficiency is high, and connection structure is reliable, and construction quality is guaranteed.

Description

A kind of novel pre-stressed tubular pole that photovoltaic plant uses
Technical field
The utility model relates to concrete tubular pile technical field, novel pre-stressed pipe that specially a kind of photovoltaic plant uses Stake.
Background technique
With the development of heliotechnics, the engineering for installing photovoltaic plant is more and more, and conventional construction method is using branch Frame bottom plate and the steel plate of prestressed concrete pipe pile end are welded, and this way is time-consuming and laborious, and construction is complicated, and quality is difficult to Guarantee, is unable to reach used calculation assumption condition when design.It is inadequate often to will appear weld seam bearing capacity in practical projects, Weld seam tear occurs to destroy, and then column is caused to tilt, serious person causes total to be toppled, and photovoltaic module damage is brought tight The economic loss and security risk of weight, so being badly in need of a kind of easy construction and safe and reliable mounting means.
Utility model content
The purpose of this utility model is to provide the novel pre-stressed tubular poles that a kind of photovoltaic plant uses, to solve above-mentioned back The problem of being proposed in scape technology.
To achieve the above object, the utility model provides the following technical solutions:
A kind of novel pre-stressed tubular pole that photovoltaic plant uses, including tubular pole ontology and bracket upright post, the tubular pole ontology Inside offers hollow bore, and hollow bore is internally provided with lateral spacing body, and the bottom of the bracket upright post is inserted into tubular pole sheet In the hollow bore of body, and the bottom of bracket upright post and the upper surface of lateral spacing body contradict, positioned at the hollow of lateral spacing body upper end The grouting slurry of covered stent column is filled in through-hole.
As a further solution of the present invention: being fixedly connected at the top of the bracket upright post with photovoltaic bracket, the light Volt bracket includes tilt frame, first connecting rod and the second connecting rod for be bonded fixation with photovoltaic panel, the first connecting rod and the Two connecting rod bottoms are fixedly connected with bracket upright post top, are fixed and are connected with the bottom of tilt frame lower end surface at the top of first connecting rod Connect, at the top of second connecting rod be fixedly connected at the top of tilt frame lower end surface.
As a further solution of the present invention: the grouting slurry is using microdilatancy grouting slurry.
As a further solution of the present invention: the bracket upright post uses alloy profile column, bracket upright post is cut Face is U-shaped, H-type or N-type.
As a further solution of the present invention: the transverse direction spacing body is using lateral mesh sheet or lateral plate.
As a further solution of the present invention: the tubular pole ontology uses prestressed concrete pipe pile, tubular pole ontology Inside it is evenly arranged multiple stirrups along its length, evenly distributed in the circumferential direction in tubular pole ontology there are multiple main reinforcements, main reinforcement is prolonged It is identical as the length direction of tubular pole ontology to stretch direction, each main reinforcement respectively with each stirrup binding and fixing.
Compared with prior art, the utility model has the beneficial effects that reasonable structural arrangement, engineering practice meets meter Hypothesis condition is calculated, realizes no-welding installation, is not necessarily to vibrated concrete, constructing operation is convenient, and work efficiency is high, and connection structure can It leans on, construction quality is guaranteed.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram for the novel pre-stressed tubular pole that photovoltaic plant uses;
Fig. 2 is the structural schematic diagram that the novel pre-stressed tubular pole that a kind of photovoltaic plant uses is overlooked.
In figure: 1- tubular pole ontology, 2- hollow bore, 3- transverse direction spacing body, 4- grouting slurry, 5- tilt frame, 6- branch erect Column, 7- second connecting rod, 8- first connecting rod.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1~2, the utility model provides a kind of technical solution: a kind of photovoltaic plant uses novel pre-stressed Tubular pole, including tubular pole ontology 1 and bracket upright post 6, offer hollow bore 2 inside the tubular pole ontology 1, inside hollow bore 2 It is provided with lateral spacing body 3, the bottom of the bracket upright post 6 is inserted into the hollow bore 2 of tubular pole ontology 1, and bracket upright post 6 Bottom and the upper surface of lateral spacing body 3 contradict, and covered stent column 6 is filled in the hollow bore 2 of lateral 3 upper end of spacing body Grouting slurry.
Wherein, 6 top of the bracket upright post is fixedly connected with photovoltaic bracket, and the photovoltaic bracket is including being used for and photovoltaic panel It is bonded fixed tilt frame 5, first connecting rod 8 and second connecting rod 7, the first connecting rod 8 and 7 bottom of second connecting rod are and bracket It is fixedly connected at the top of column 6,8 top of first connecting rod is fixedly connected with the bottom of 5 lower end surface of tilt frame, 7 top of second connecting rod It is fixedly connected at the top of 5 lower end surface of tilt frame.
The grouting slurry 4 is using microdilatancy grouting slurry;The bracket upright post 6 uses alloy profile column, and branch erects The section of column 6 is U-shaped, H-type or N-type, such as Fig. 2, the section of bracket upright post 6 are U-shaped;The transverse direction spacing body 3 is using lateral mesh sheet Or lateral plate;The tubular pole ontology 1 uses prestressed concrete pipe pile, is evenly arranged along its length in tubular pole ontology 1 more A stirrup, it is evenly distributed in the circumferential direction in tubular pole ontology 1 to have multiple main reinforcements, the extending direction of main reinforcement and the length of tubular pole ontology 1 Spend direction it is identical, each main reinforcement respectively with each stirrup binding and fixing.
The construction making step of tubular pole ontology 1 are as follows: the main reinforcement and stirrup of S1 setting prestressed concrete pipe pile;S2 setting is horizontal To mesh sheet or lateral plate, and it is reliably connected with main reinforcement;S3 casting concrete carries out tubular pile centrifugal molding;S4 tubular pile maintenance;S5 Tubular pole demoulding.
Increase lateral mesh sheet or lateral plate when manufacturing tubular pole ontology 1, in hollow bore 2 inside it, When photovoltaic plant is constructed, by the hollow bore 2 of the 6 insertion tube pile body 1 of bracket upright post of photovoltaic bracket, then, lead to hollow Grouting slurry or concrete are poured in hole 2, before concrete setting, lateral mesh sheet or lateral plate to bracket upright post 6 and are filled Slurry or concrete are played a supporting role, and are played anchorage effect to bracket upright post after grouting material or concrete setting, are finally reached Bracket upright post 6 is reliably fixed.
The utility model reasonable structural arrangement, engineering practice meet calculation assumption condition, realize no-welding installation, nothing Vibrated concrete is needed, constructing operation is convenient, and work efficiency is high, and connection structure is reliable, and construction quality is guaranteed.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this is practical new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this is practical new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing for the equivalent requirements of the claims will be fallen in All changes in justice and range are embraced therein.It should not treat any reference in the claims as limiting Related claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (6)

1. the novel pre-stressed tubular pole that a kind of photovoltaic plant uses, including tubular pole ontology and bracket upright post, it is characterised in that: described It is offered hollow bore (2) inside tubular pole ontology (1), hollow bore (2) is internally provided with lateral spacing body (3), and the branch erects The bottom of column (6) is inserted into the hollow bore (2) of tubular pole ontology (1), and the bottom of bracket upright post (6) and lateral spacing body (3) Upper surface contradict, be located at the grouting in the hollow bore (2) of lateral spacing body (3) upper end filled with covered stent column (6) and starch Expect (4).
2. the novel pre-stressed tubular pole that a kind of photovoltaic plant according to claim 1 uses, it is characterised in that: the bracket It is fixedly connected at the top of column (6) with photovoltaic bracket, the photovoltaic bracket includes for being bonded fixed tilt frame with photovoltaic panel (5), first connecting rod (8) and second connecting rod (7), the first connecting rod (8) and second connecting rod (7) bottom with bracket upright post (6) Top is fixedly connected, and is fixedly connected at the top of first connecting rod (8) with the bottom of tilt frame (5) lower end surface, at the top of second connecting rod (7) It is fixedly connected at the top of tilt frame (5) lower end surface.
3. the novel pre-stressed tubular pole that a kind of photovoltaic plant according to claim 1 uses, it is characterised in that: the grouting Slurry (4) is using microdilatancy grouting slurry.
4. the novel pre-stressed tubular pole that a kind of photovoltaic plant according to claim 1 uses, it is characterised in that: the bracket Column (6) uses alloy profile column, and the section of bracket upright post (6) is U-shaped, H-type or N-type.
5. the novel pre-stressed tubular pole that a kind of photovoltaic plant according to claim 1 uses, it is characterised in that: the transverse direction Spacing body (3) is using lateral mesh sheet or lateral plate.
6. the novel pre-stressed tubular pole that a kind of photovoltaic plant according to claim 5 uses, it is characterised in that: the tubular pole Ontology (1) uses prestressed concrete pipe pile, is evenly arranged multiple stirrups, tubular pole ontology along its length in tubular pole ontology (1) (1) evenly distributed in the circumferential direction in have multiple main reinforcements, the extending direction of main reinforcement is identical as the length direction of tubular pole ontology (1), Each main reinforcement respectively with each stirrup binding and fixing.
CN201821220109.6U 2018-07-31 2018-07-31 A kind of novel pre-stressed tubular pole that photovoltaic plant uses Active CN208685594U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821220109.6U CN208685594U (en) 2018-07-31 2018-07-31 A kind of novel pre-stressed tubular pole that photovoltaic plant uses

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821220109.6U CN208685594U (en) 2018-07-31 2018-07-31 A kind of novel pre-stressed tubular pole that photovoltaic plant uses

Publications (1)

Publication Number Publication Date
CN208685594U true CN208685594U (en) 2019-04-02

Family

ID=65883028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821220109.6U Active CN208685594U (en) 2018-07-31 2018-07-31 A kind of novel pre-stressed tubular pole that photovoltaic plant uses

Country Status (1)

Country Link
CN (1) CN208685594U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827270A (en) * 2020-07-20 2020-10-27 国网山东省电力公司潍坊供电公司 Direct-connection hollow PHC pipe pile mechanism, pole tower construction method and manufacturing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827270A (en) * 2020-07-20 2020-10-27 国网山东省电力公司潍坊供电公司 Direct-connection hollow PHC pipe pile mechanism, pole tower construction method and manufacturing method

Similar Documents

Publication Publication Date Title
CN209538693U (en) A kind of template single side bracing
CN105649213A (en) Construction method for large steel structural embedded part in dense reinforcement distribution region
CN204753836U (en) Connected node of precast reinforced concrete roof beam and coincide post
CN208685594U (en) A kind of novel pre-stressed tubular pole that photovoltaic plant uses
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN106758839A (en) A kind of strutting system and its installation method of the cast-in-place segmental construction of pier top
CN203846507U (en) Pre-stress supporting structure for strip-shaped rectangular foundation pit
CN103967020B (en) A kind of prestressing force suspension device for elongated rectangular shape foundation ditch
CN103967021B (en) A kind of prestressing force support system for elongated rectangular shape foundation ditch
CN104164882B (en) Side slope builds construction method and the structure on supporting and protection structure beam basis
CN108797380B (en) Suspension construction device and construction method for suspension irrigation continuous beam bracket
CN203846505U (en) Supporting structure used for long edges of strip-shaped and rectangular foundation pit
CN203559570U (en) Operating platform for steel pipe support frame overhung on surrounding columns
CN202766974U (en) Bent cap bearing frame without full framing
CN214195007U (en) Combined connection node of steel reinforced concrete beam and column
CN203846508U (en) Pre-stress supporting system for strip-shaped and rectangular foundation pit
CN211285682U (en) Deepwater cantilever type tower crane foundation structure
CN110805141B (en) Connecting device and method for steel pipe column and shock insulation support after jacking of building
CN209816675U (en) A assembled bracket for construction of 0# piece of rectangle mound
CN210031746U (en) Steel casing drilling platform for bridge construction
CN203222734U (en) Bridge guardrail metal stand column base construction leveling device
CN102587404B (en) Construction method for large-sized blast furnace foundation
CN104929316B (en) A kind of cement concrete pillar and its construction method
CN215926949U (en) Steel leaning tower force rod type support structure system
CN203846511U (en) Pre-stress supporting device for strip-shaped and rectangular foundation pit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 215000 environmental protection industrial park, 369 deer Road, hi tech Zone, Jiangsu, Suzhou

Patentee after: Suzhou ATSI New Energy Development Co.,Ltd.

Address before: 215000 environmental protection industrial park, 369 deer Road, hi tech Zone, Jiangsu, Suzhou

Patentee before: SUZHOU GAOCHUANGTE NEW ENERGY SOURCES DEVELOPMENT Co.,Ltd.