CN208672389U CN201821441787.5U CN201821441787U CN208672389U CN 208672389 U CN208672389 U CN 208672389U CN 201821441787 U CN201821441787 U CN 201821441787U CN 208672389 U CN208672389 U CN 208672389U
Authority
CN
China
Prior art keywords
water
pump
pipeline
sampling valve
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821441787.5U
Other languages
Chinese (zh)
Inventor
汪水吉
黄育华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Province Ji Longde Environmental Technology Co Ltd
Original Assignee
Fujian Province Ji Longde Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Province Ji Longde Environmental Technology Co Ltd filed Critical Fujian Province Ji Longde Environmental Technology Co Ltd
Priority to CN201821441787.5U priority Critical patent/CN208672389U/en
Application granted granted Critical
Publication of CN208672389U publication Critical patent/CN208672389U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Treatment Of Water By Oxidation Or Reduction (AREA)

Abstract

The utility model discloses one kind to adopt water distribution system, it applies in automatic water quality monitoring system, first water pump and the first sampling valve pass through pipeline successively connection, second water pump and the second sampling valve pass through pipeline successively connection, the output end of first sampling valve and the second sampling valve respectively with the input channel connection of settling pit, the output end of settling pit, filter, the input terminal of diaphragm pump passes through pipeline successively connection, the output end of diaphragm pump and the analysis cell connection, diaphragm pump is filtered for sending the water sample in the settling pit to the filter, and the filtered water sample is sent into the analysis cell and is analyzed;PLC control system is electrically connected first water pump, the first sampling valve, the second water pump, the second sampling valve.By adopting the above technical scheme, the utility model is beneficial in that, it can be achieved that automatically switching water pump, the functions such as circuit failure is alarmed and eliminated, pipeline cleans automatically.

Description

One kind adopting water distribution system
Technical field
The utility model relates to water quality monitoring fields more particularly to one kind to adopt water distribution system.
Background technique
It is become more and more important currently, carrying out automatic monitoring to water quality.In order to understand the water quality situation in river in real time, control The influence of emergency event, in recent years, China establish Water Automatic Monitoring System on each emphasis river, lake successively, pass through peace Water quality automatic checkout system real-time monitoring quality of water environment and its pollution variety situation are filled, is protection, management and the water of water environment Prevention and cure of pollution provide important information.Water quality automatic checkout system is with modern sensor, automatic measurement, automatic control, meter A comprehensive on-line automatic prison composed by the new and high technologies such as calculation machine and relevant dedicated analysis software and communication network Survey system is the Digitalized management platform monitored real-time, quickly to surface water, drinking water source and pollution sources water quality and quantity, It is the important technological means that environmental protection department realizes effective monitoring water source environment changed factor, controls environmental pollution.Due to Water sample is extracted frequently with the immersible pump adopted in water distribution system from river etc., often takes out the impurity such as the mud of river bed, river sand together It takes, only single intake pipe road is easy to happen blocking, influences the normal operation of system.
Utility model content
The utility model to solve the above problems, provides one kind and adopts water distribution system.This system has operation steady Determine, required equipment is simple, flexible operation, cheap advantage.
The utility model adopts the following technical solution: one kind adopting water distribution system, applies in automatic water quality monitoring system, packet Include PLC control system, settling pit, analysis cell, filter, diaphragm pump, the first water pump, the first sampling valve, the second water pump, Successively connection, second water pump and second sample by pipeline for two sampling valves, first water pump and the first sampling valve By pipeline successively connection, the output end of first sampling valve and the second sampling valve joins with the input channel of settling pit valve respectively It is logical, the output end of the settling pit, filter, diaphragm pump input terminal pass through pipeline successively connection, the output of the diaphragm pump End and the analysis cell connection, the diaphragm pump are filtered for sending the water sample in the settling pit to the filter, And the filtered water sample is sent into the analysis cell and is analyzed;The PLC control system electrical connection described first takes Water pump, the first sampling valve, the second water pump, the second sampling valve.
It preferably, further include the pressure inductor in pipeline, the pressure inductor and PLC control system electricity Connection, the pressure inductor is used to acquire the pressure data in pipeline, and is sent in PLC control system, PLC control system Judge pipeline whether normal operation.
It preferably, further include cleaning water pipe, the input terminal of the cleaning water pipe accesses tap water after coupling a booster pump, defeated Outlet passes through settling pit, analysis cell, filter, the first water pump, the second water pump described in corresponding washing valve connection respectively;Institute Clean water pipe is stated for carrying out blowback cleaning to pipeline, prevents pipeline blockage.
It preferably, further include ozone machine, the ozone machine is connected to the input terminal of cleaning water pipe by an ejector, described smelly Oxygen machine is used to carry out pipeline to handle except algae.
It preferably, further include air compressor, the air compressor passes through on settling pit air purge valve and the settling pit The pipeline connection in portion, the pipeline connection that the air compressor passes through the top of analysis cell air purge valve and analysis cell.
Preferably, the lower part of the settling pit passes through sand basin water valve and sewage pipe connection, the lower part of the analysis cell Pass through analysis cell drain valve and sewage pipe connection.
Preferably, the top of the settling pit is equipped with overflow pipe and sewage pipe connection, and the top of the analysis cell, which is equipped with, overflows Flow tube and sewage pipe connection.
Preferably, first water pump is immersible pump, self priming pump or centrifugal self-priming pump;Second water pump be immersible pump, Self priming pump or centrifugal self-priming pump.
Preferably, first sampling valve and the first sampling valve are all electrical ball valve.
By adopting the above technical scheme, the utility model is beneficial in that pipeline is former, it can be achieved that automatically switching water pump The functions such as barrier is alarmed and eliminated, pipeline cleans automatically;It is designed using double pump, dual circuit, two pipeline alternate runs are mended each other It fills, two-way water intaking pipeline installs electrical ball valve respectively, and PLC control system can be by controlling the start and stop of water pump, electrical ball valve Switch automatically switches water pump, carrys out the normal operation of control system;PLC control system is sentenced by the pressure sensor in pipeline The operation conditions of disconnected pipeline, carries out fault alarm;Equipped with the cleaning cleaning units such as water pipe and air compressor, pipeline is carried out anti- Blowing-out is washed, and pipeline blockage is prevented;Can be regular to pipeline progress or irregular except algae is handled equipped with uniting except phytem, avoid pipeline It is blocked because multiplying algae.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Appended drawing reference: 1, PLC control system;2, settling pit;3, analysis cell;4, filter;5, diaphragm pump;6, the first water intaking Pump;7, the first sampling valve;8, the second water pump;9, the second sampling valve;10, water pipe is cleaned;11, booster pump;12, valve is washed;13, Ozone machine;14, ejector;15, settling pit air purge valve;16, analysis cell air purge valve;17, sand basin water valve;18, analysis cell is arranged Water valve;19, sewage pipe, 20, air compressor.
Specific embodiment
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing.
The utility model as shown in Figure 1, one kind adopts water distribution system, including PLC control system 1, settling pit 2, analysis cell 3, Filter 4, diaphragm pump 5, the first water pump 6, the first sampling valve 7, the second water pump 8, the second sampling valve 9, first water intaking Successively connection, second water pump 8 and the second sampling valve 9 are successively joined by pipeline by pipeline for pump 6 and the first sampling valve 7 It is logical, the output end of first sampling valve 7 and the second sampling valve 9 respectively with the input channel connection of settling pit 2, the settling pit 2 output end, filter 4, diaphragm pump 5 input terminal by pipeline successively connection, the output end of the diaphragm pump 5 with described point 3 connection of pond is analysed, the diaphragm pump 5 is filtered for sending the water sample in the settling pit 2 to the filter 4, and incited somebody to action Water sample after filter send into the analysis cell 3 and is analyzed;The PLC control system 1 is electrically connected first water pump 6, One sampling valve 7, the second water pump 8, the second sampling valve 9.
It further include the pressure inductor in pipeline, the pressure inductor is electrically connected with the PLC control system, institute Pressure inductor is stated for acquiring the pressure data in pipeline, and is sent in PLC control system, PLC control system judgement pipe Road whether normal operation.
It further include cleaning water pipe 10, the input terminal of the cleaning water pipe 10 accesses tap water after coupling a booster pump 11, defeated Outlet is taken by settling pit 2 described in corresponding 12 connection of washing valve, analysis cell 3, filter 4, the first water pump 6, second respectively Water pump 8;The cleaning water pipe 10 is used to carry out blowback cleaning to pipeline, prevents pipeline blockage.
It further include ozone machine 13, the ozone machine 13 is connected to the input terminal of cleaning water pipe 10 by an ejector 14, described Ozone machine 13 is used to carry out pipeline to handle except algae.
It further include air compressor 20, the air compressor 20 passes through on settling pit air purge valve 15 and the settling pit 2 The pipeline connection in portion, the pipeline connection that the air compressor 20 passes through the top of analysis cell air purge valve 16 and analysis cell 3.
By sand basin water valve 17 and 19 connection of sewage pipe, the lower part of the analysis cell 3 is logical for the lower part of the settling pit 2 Cross analysis cell drain valve 18 and 19 connection of sewage pipe.
The top of the settling pit 2 is equipped with overflow pipe and 19 connection of sewage pipe, and the top of the analysis cell 3 is equipped with overflow pipe With 19 connection of sewage pipe.
In the present embodiment, the first water pump 6 is immersible pump, and the second water pump 8 is immersible pump.First sampling valve 7 and first Sampling valve 9 all uses electrical ball valve.
The working principle of the utility model is as follows:
1, after system energization, after PLC control system 1 receives host computer enabling signal, sand basin water valve is controlled first 17 and analysis cell drain valve 18 open, settling pit 2 and analysis cell 3 are emptied, restart settling pit air purge valve 15 and analysis Pond air purge valve 16, while starting corresponding washing valve 12 and ozone machine 13, analysis cell 3, settling pit 2, filter 4, first are taken The pipeline of water pump 6, the second water pump 8 pipeline be rinsed;
2, after the completion of rinsing, PLC control system 1 starts the first water pump 6 and is sampled, and activates to open the first sampling valve 7, enter water sample in settling pit 2, if in preset time, water sample reaches high liquid level, PLC control system 1 stops the first water intaking Pump work;If high liquid level is not achieved, it will judge that the first water pump 6 is faulty, and provide fault alarm;Starting second takes simultaneously Water pump 8 is sampled;If the second water pump 8 is also faulty, system enters standby mode;
3, the starting diaphragm pump 5 of PLC control system 1 is evacuated to analysis cell 3, mentions by the water sample after desilting after the filtering of filter 4 Water quality analyzing instrument is supplied to use;
4, after waiting water sample to be completed, system enters standby mode.
Although specifically showing and describing the utility model in conjunction with preferred embodiment, those skilled in the art is answered This is understood, in the spirit and scope for not departing from the utility model defined by the appended claims, in form and details On the utility model is made a variety of changes, be the protection scope of the utility model.

Claims (9)

1. one kind adopts water distribution system, apply in automatic water quality monitoring system, which is characterized in that including PLC control system, desilting Pond, analysis cell, filter, diaphragm pump, the first water pump, the first sampling valve, the second water pump, the second sampling valve, described first Successively connection, second water pump and the second sampling valve are successively joined by pipeline by pipeline for water pump and the first sampling valve It is logical, the output end of first sampling valve and the second sampling valve respectively with the input channel connection of settling pit, the settling pit Output end, filter, diaphragm pump input terminal joined by pipeline successively connection, the output end of the diaphragm pump and the analysis cell Logical, the diaphragm pump is filtered for sending the water sample in the settling pit to the filter, and will be filtered described Water sample send into the analysis cell and is analyzed;The PLC control system be electrically connected first water pump, the first sampling valve, Second water pump, the second sampling valve.
2. one kind as described in claim 1 adopts water distribution system, which is characterized in that further include the pressure sensitive in pipeline Device, the pressure inductor are electrically connected with the PLC control system, and the pressure inductor is used to acquire the number pressure in pipeline According to, and be sent in PLC control system, PLC control system judge pipeline whether normal operation.
3. one kind as described in claim 1 adopts water distribution system, which is characterized in that further include cleaning water pipe, the cleaning water pipe Input terminal couple a booster pump after access tap water, output end respectively by settling pit described in corresponding washing valve connection, divide Analyse pond, filter, the first water pump, the second water pump;The clean water pipe is used to carry out blowback cleaning to pipeline, prevents pipeline Blocking.
4. one kind as described in claim 1 adopts water distribution system, which is characterized in that further include ozone machine, the ozone machine passes through One ejector is connected to the input terminal of cleaning water pipe, and the ozone machine is used to carry out pipeline to handle except algae.
5. one kind as described in claim 1 adopts water distribution system, which is characterized in that it further include air compressor, the air pressure Contracting machine passes through the pipeline connection of settling pit air purge valve and the settling pit top, and the air compressor passes through analysis cell air purge valve With the pipeline connection on the top of analysis cell.
6. one kind as described in claim 1 adopts water distribution system, which is characterized in that the lower part of the settling pit passes through sand basin The lower part of water valve and sewage pipe connection, the analysis cell passes through analysis cell drain valve and sewage pipe connection.
7. one kind as described in claim 1 adopts water distribution system, which is characterized in that the top of the settling pit be equipped with overflow pipe with The top of sewage pipe connection, the analysis cell is equipped with overflow pipe and sewage pipe connection.
8. one kind as described in claim 1 adopts water distribution system, which is characterized in that first water pump is immersible pump, self-priming Pump or centrifugal self-priming pump;Second water pump is immersible pump, self priming pump or centrifugal self-priming pump.
9. one kind as described in claim 1 adopts water distribution system, which is characterized in that first sampling valve and the first sampling valve are all For electrical ball valve.
CN201821441787.5U 2018-09-04 2018-09-04 One kind adopting water distribution system Active CN208672389U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821441787.5U CN208672389U (en) 2018-09-04 2018-09-04 One kind adopting water distribution system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821441787.5U CN208672389U (en) 2018-09-04 2018-09-04 One kind adopting water distribution system

Publications (1)

Publication Number Publication Date
CN208672389U true CN208672389U (en) 2019-03-29

Family

ID=65842199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821441787.5U Active CN208672389U (en) 2018-09-04 2018-09-04 One kind adopting water distribution system

Country Status (1)

Country Link
CN (1) CN208672389U (en)

Similar Documents

Publication Publication Date Title
CN106219635B (en) A kind of ultrapure water machine intelligent management method
CN101887064A (en) Automatic water quality monitoring system
KR20100021389A (en) Automatic cleaning device of automatic measure for the quality of water for monitoring water pollution
CN214750211U (en) Automatic water quality monitoring system
CN208672389U (en) One kind adopting water distribution system
CN106153593A (en) Can the water monitoring device of dosing
CN206074451U (en) Can dosing water monitoring device
CN209123686U (en) A kind of pure water automatic reverse flushing water purifier of detectable filter element life
CN111364582A (en) Intelligent rainwater and sewage diversion system and method
CN102650859A (en) Intelligent control system and control method of ultra-pure water dispenser
CN214600619U (en) On-line spraying tank device
CN214121925U (en) Full-automatic settlement detector
CN106227070B (en) A kind of ultrapure water machine intelligence cloud management
CN213455585U (en) Water quality on-line automatic monitoring device
CN212483565U (en) Extraction formula water quality monitoring station
CN204807564U (en) Intelligence sample preprocessor
CN209577533U (en) One kind being used for clinac deflection coil cleaning device
CN210923669U (en) Sewage drain outlet water quality monitoring device
CN208485745U (en) A kind of water tank filter with automatic filtering system
CN210216695U (en) Sewage on-line monitoring water supply and drainage device
CN110624702B (en) Intelligent centrifugal oil purifier
CN104020268B (en) Water quality safety online auto monitoring system servomechanism installation
CN207774936U (en) A kind of secondary flusher of water treatment facilities
CN208331550U (en) A kind of heat distribution pipeline decontamination apparatus
CN205091293U (en) Water electrode probe belt cleaning device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant