CN208669253U - Heapstead in oil-gas field development - Google Patents

Heapstead in oil-gas field development Download PDF

Info

Publication number
CN208669253U
CN208669253U CN201821181806.5U CN201821181806U CN208669253U CN 208669253 U CN208669253 U CN 208669253U CN 201821181806 U CN201821181806 U CN 201821181806U CN 208669253 U CN208669253 U CN 208669253U
Authority
CN
China
Prior art keywords
installation
sealant
roof
sides
heapstead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821181806.5U
Other languages
Chinese (zh)
Inventor
胡旭
孙博宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petroleum Institute Harbin
Original Assignee
Petroleum Institute Harbin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petroleum Institute Harbin filed Critical Petroleum Institute Harbin
Priority to CN201821181806.5U priority Critical patent/CN208669253U/en
Application granted granted Critical
Publication of CN208669253U publication Critical patent/CN208669253U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

Heapstead in oil-gas field development, including roof, sealant, fixing sleeve, fixing glue, installation set, sealing ring, drainpipe, sealing flange, sealing plate, heapstead in the oil-gas field development has roof, the roof two sides have parapet, it is adapted on the upside of the roof with sealant, the sealant connects roof, the roof has multiple fixed groovings, the fixed grooving is connected and fixed set, fixing glue is connected through a screw thread inside the fixing sleeve, the fixing sleeve two sides have convex grooving, the sealant connects multiple installation sets, the installation set two sides have positioning protrusion, the positioning protrusion and convex grooving are adapted, the convex grooving connects positioning protrusion, the fixing glue is sequentially connected installation set, fixing sleeve, there is installation projecting slot on the outside of the sealant, the sealing plate two sides tool There is installation protrusion.

Description

Heapstead in oil-gas field development
Technical field
The utility model relates to the heapsteads in field of mining more particularly to a kind of oil-gas field development.
Background technique
Heapstead in oil-gas field development can be improved protection and management to well head, and rainwater can deeply hold oil gas field Hair is made troubles, however the installation position inaccurate of the heapstead in existing oil-gas field development, and it is integrally close to reduce heapstead Feng Xing.
Utility model content
The utility model In view of the above shortcomings of the prior art, in the oil-gas field development that a kind of accurate positioning is provided Heapstead.
The purpose of this utility model is to be achieved through the following technical solutions:
A kind of heapstead in oil-gas field development, including roof, sealant, fixing sleeve, fixing glue, installation set, sealing ring, Drainpipe, sealing flange, sealing plate, the heapstead in the oil-gas field development have roof, and the roof two sides have daughter Wall, the roof upside are adapted with sealant, and the sealant connects roof, and the roof has multiple fixed groovings, institute It states fixed grooving and is connected and fixed set, fixing glue is connected through a screw thread inside the fixing sleeve, the fixing sleeve two sides have positioning Projecting slot, the sealant connect multiple installation sets, and the installation set two sides have positioning protrusion, the positioning protrusion and positioning Projecting slot is adapted, and the convex grooving connects positioning protrusion, and the fixing glue is sequentially connected installation set, fixing sleeve, described There is installation projecting slot, the sealing plate two sides have installation protrusion, the installation protrusion and installation projecting slot on the outside of sealant It is adapted, the installation projecting slot connection installation protrusion.
The sealant two sides have seal groove, and the seal groove connects sealing ring, the drainpipe inner end connection Sealing ring, the parapet inside have draining tube seat, and the draining tube seat connects drainpipe, and drainpipe has clamp flange, Sealing flange is connected on the outside of the clamp flange, connection fastening nail inside the sealing flange, the fastening nail is sequentially connected close Seal flange, clamp flange, parapet.
The utility model has the advantages that
Fixing sleeve is fixed in fixed grooving, enables fixing sleeve and roof stable connection.Positioning protrusion is caught in convex grooving It is interior, make the connection accurate positioning of installation set and fixed inner room, and then make roof and sealant stable connection.Installation protrusion is caught in peace It fills in projecting slot, enable sealing plate and seals the connection accurate positioning of interlayer, and enable sealing plate and sealant junction good seal, And then enable installation set and sealant junction good seal.Sealing ring is fixed in seal groove, connects sealing ring and sealant It connects firm, and makes drainpipe stable connection opposite with sealant.Fastening nail is sequentially connected sealing flange, clamp flange, parapet, Increase the stability of drainpipe Yu parapet opposed configuration.Heapstead accurate positioning in this oil-gas field development, improves Heapstead overall tightness.
Detailed description of the invention
Fig. 1 is the heapstead structural schematic diagram in oil-gas field development described in the utility model.
Fig. 2 is Fig. 1 partial enlarged view described in the utility model.
Fig. 3 is parapet described in the utility model, drain structure schematic diagram.
Specific embodiment
The utility model is described in further detail below according to drawings and examples:
A kind of heapstead in oil-gas field development, including it is roof 1, sealant 2, fixing sleeve 4, fixing glue 5, installation set 8, close Seal 13, drainpipe 14, sealing flange 16, sealing plate 19, the heapstead in the oil-gas field development have roof 1, the room 1 two sides are pushed up with parapet 11,1 upside of roof is adapted with sealant 2, and the sealant 2 connects roof 1, the room Top 1 has multiple fixed groovings 3, and the fixed grooving 3 is connected and fixed set 4, is connected through a screw thread fixation inside the fixing sleeve 4 Nail 5,4 two sides of fixing sleeve have convex grooving 6, and the sealant 2 connects multiple installation sets 8,8 two sides of installation set With positioning protrusion 7, the positioning protrusion 7 is adapted with convex grooving 6, and the convex grooving 6 connects positioning protrusion 7, The fixing glue 5 is sequentially connected installation set 8, fixing sleeve 4, has installation projecting slot 9, the sealing plate on the outside of the sealant 2 19 two sides have installation protrusion 10, and the installation protrusion 10 is adapted with installation projecting slot 9, the connection of installation projecting slot 9 peace Dress protrusion 10.
2 two sides of sealant have seal groove 12, and the seal groove 12 connects sealing ring 13, the drainpipe 14 Inner end connects sealing ring 13, has draining tube seat 18 inside the parapet 11, and the draining tube seat 18 connects drainpipe 14, row Water pipe 14 has clamp flange 15, and sealing flange 16 is connected on the outside of the clamp flange 15, is connected inside the sealing flange 16 Fastening nail 17, the fastening nail 17 are sequentially connected sealing flange 16, clamp flange 15, parapet 11.
Fixing sleeve 4 is fixed in fixed grooving 3, enables fixing sleeve 4 and 1 stable connection of roof.Positioning protrusion 7 is caught in convex In grooving 6, make the connection accurate positioning between installation set 8 and fixing sleeve 4, and then makes roof 1 and 2 stable connection of sealant.Installation Protrusion 10 be caught in installation projecting slot 9 in, enable the connection accurate positioning between sealing plate 19 and sealant 2, and enable sealing plate 19 with it is close 2 junction good seal of sealing, and then enable installation set 8 and 2 junction good seal of sealant.Sealing ring 13 is fixed on sealing ring In slot 12, make sealing ring 13 and 2 stable connection of sealant, and makes drainpipe 14 and sealant 2 with respect to stable connection.Fastening nail 17 It is sequentially connected sealing flange 16, clamp flange 15, parapet 11, increases the stabilization of drainpipe 14 Yu 11 opposed configuration of parapet Property.Heapstead accurate positioning in this oil-gas field development, improves heapstead overall tightness.

Claims (2)

1. the heapstead in a kind of oil-gas field development, it is characterized in that: include roof, sealant, fixing sleeve, fixing glue, installation set, Sealing ring, drainpipe, sealing flange, sealing plate, the heapstead in the oil-gas field development have roof, the roof two sides tool There is parapet, be adapted on the upside of the roof with sealant, the sealant connects roof, and the roof has multiple fixing sleeves Slot, the fixed grooving are connected and fixed set, and fixing glue is connected through a screw thread inside the fixing sleeve, and the fixing sleeve two sides have Convex grooving, the sealant connect multiple installation sets, and the installation set two sides have a positioning protrusion, the positioning protrusion with Convex grooving is adapted, and the convex grooving connects positioning protrusion, and the fixing glue is sequentially connected installation set, fixing sleeve, Have on the outside of the sealant and projecting slot is installed, the sealing plate two sides have installation protrusion, and the installation protrusion and installation are convex Grooving is adapted, the installation projecting slot connection installation protrusion.
2. the heapstead in oil-gas field development according to claim 1, it is characterized in that: the sealant two sides have sealing Ring recess, the seal groove connect sealing ring, and the drainpipe inner end connects sealing ring, has drainpipe inside the parapet Slot, the draining tube seat connect drainpipe, and drainpipe has clamp flange, connects sealing flange, institute on the outside of the clamp flange Connection fastening nail inside sealing flange is stated, the fastening nail is sequentially connected sealing flange, clamp flange, parapet.
CN201821181806.5U 2018-07-25 2018-07-25 Heapstead in oil-gas field development Expired - Fee Related CN208669253U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821181806.5U CN208669253U (en) 2018-07-25 2018-07-25 Heapstead in oil-gas field development

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821181806.5U CN208669253U (en) 2018-07-25 2018-07-25 Heapstead in oil-gas field development

Publications (1)

Publication Number Publication Date
CN208669253U true CN208669253U (en) 2019-03-29

Family

ID=65829609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821181806.5U Expired - Fee Related CN208669253U (en) 2018-07-25 2018-07-25 Heapstead in oil-gas field development

Country Status (1)

Country Link
CN (1) CN208669253U (en)

Similar Documents

Publication Publication Date Title
CN208669253U (en) Heapstead in oil-gas field development
CN205742761U (en) A kind of efficient sealed gap structure of roof boarding
KR100803398B1 (en) A connector for drain of a1r conditioner
CN207739838U (en) A kind of curtain wall metallic sheath window
CN207110283U (en) A kind of roofing eave stopper structure
CN205135243U (en) Combined door frame
CN203684979U (en) Draining cover of outward opening window
CN207863711U (en) Component is endured in one kind
CN206888798U (en) Assembled PC component door and window systems
CN206233827U (en) A kind of waterproof cover on cell curtain wall casement window opening inwards
CN205298893U (en) Urban water supply and drainage is connecting pipe for system
CN207348266U (en) A kind of glass connecting device of shower room
CN106499298B (en) Assembled PC component door and window system
CN105257148A (en) Combined type door frame and assembly method thereof
KR101636260B1 (en) Down pipe with a wall fixing apparatus
CN206145332U (en) Drainage pipe's crooked transform structure
CN205349095U (en) Frontier defense water structure is received to wall body and windowsill handing -over department mutually
CN206801340U (en) Fixed window window frame structure
CN208748989U (en) Cornice sealing structure
CN216340336U (en) Assembling section bar of unitized curtain wall
CN213143649U (en) Go out roofing pipeline waterproof construction
CN210002714U (en) various steel tile roof waterproof clamp structure device
CN206503399U (en) Rhone and carport
CN209384387U (en) Connection structure between a kind of cabinet in novel box type house
CN217519289U (en) External flue smoke leakage prevention check valve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329

Termination date: 20200725

CF01 Termination of patent right due to non-payment of annual fee