CN208668918U - A kind of frame body steel pipe that mark scale is known - Google Patents
A kind of frame body steel pipe that mark scale is known Download PDFInfo
- Publication number
- CN208668918U CN208668918U CN201820991236.XU CN201820991236U CN208668918U CN 208668918 U CN208668918 U CN 208668918U CN 201820991236 U CN201820991236 U CN 201820991236U CN 208668918 U CN208668918 U CN 208668918U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- frame body
- kinds
- color
- mark scale
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a kind of frame body steel pipe that mark scale is known, it is characterized in that, including steel pipe, wherein steel pipe is hollow cylindrical, wherein white primer is coated on steel pipe periphery, color scale identifies there are three types of wherein applying on three faces of steel pipe circumference, wherein three kinds of color scales are identified as different sizes.The utility model steel pipe sets up steel pipe support, it is system size direct view, accurate, construction optimization, construction is set up abnormal convenient and efficient, class monitor and group leader and Quality Inspector can compare card of telling somebody what one's real intentions are at any time and inspect by random samples in work progress, frame body time of inspecting for acceptance also greatlys save, and construction effect is in controllable state, finally effectively reduces security risk.It is also simultaneously the keeping of circulation material, metering provides the guarantee of intuitive quantization.
Description
[technical field]
The utility model relates to the frame body use that frame body steel pipe more particularly to a kind of mark scale in construction project practice are known
Steel pipe.
[background technique]
Provide that " high and big die plate engineering " must be worked out according to " the biggish part-to-item project safety management method of risk "
Special construction plan, steel pipe frame body are set up size and must be checked with professional software, and scheme can be real after expert authenticates
It applies and sets up.After erection construction is completed, tissue special project is needed to check and accept, an important indicator of examination is exactly to compare scheme checking computations
Size carries out actual measurement actual quantities to steel pipe frame body and checks and accepts.
The FAQs that existing frame body is checked and accepted first is that do not set up arbitrarily by scheme regulation, be in particular in:
1) it is not set up by predetermined size: the random expanded stent upright bar of operator vertically and horizontally spacing, step pitch, or reduction level
Rod piece (often lacks a horizon bar every row's upright bar in one direction, makes the calculating slenderness ratio of certain upright bars at multiplication
Greatly);
2) bar of sweeping the floor is not arranged by regulation: frame body main part is often formerly set up forming by practical operation personnel, so
Scaffolder is gradually carrying out consolidation process to frame body afterwards.Sweep the floor bar then due to its setting after, cause operator need " bending over "
It can walk in frame body, and cause to be not achieved to sweep the floor and requirement of the bar apart from ground 200mm or even be cancelled;
3) bridging is not arranged by regulation: when setting up bridging, overlap joint is unsatisfactory for that " overlapping part is no less than 1m, and answers
It is fixed using no less than 2 rotary buckles.It intersects in upright bar, until central node distance is not more than the detailing requiments of 150mm ".
According to above-mentioned analysis, due to fastener type steel pipe frame body it is intrinsic the characteristics of can arbitrarily adjusting, installation personnel is sometimes
It follows the line of least resistance, is not set up in strict accordance with size as defined in erection scheme.Inspect for acceptance personnel because of frame body upright bar intensively
It does not enter and actual measurement actual quantities is carried out to all sizes inside frame body, leave security risk for subsequent use.
The utility model, which is directed to very clear can to see clearly during frame body is set up and in inspecting for acceptance, sets up ruler
It is very little whether to meet the requirements, propose a kind of frame body steel pipe and production and preparation method thereof that mark scale is known.It is practical new using this
The steel pipe that a kind of mark scale of type is known sets up steel pipe support, system size direct view, accurate, and abnormal side is set up in construction optimization, construction
Just quick, class monitor and group leader and Quality Inspector can compare card of telling somebody what one's real intentions are at any time and inspect by random samples in work progress, and frame body is inspected for acceptance the time
It greatlys save, construction effect is in controllable state, finally effectively reduces security risk.It is simultaneously also the guarantor of circulation material
Pipe, metering provide the guarantee of intuitive quantization.
[utility model content]
The task of the utility model is to solve the deficiencies in the prior art, provides a kind of frame body steel pipe that mark scale is known,
On the other hand the method for manufacture and use thereof of the steel pipe is provided.
The utility model adopts the technical scheme that
A kind of frame body steel pipe that mark scale is known, including steel pipe, wherein steel pipe is hollow cylindrical, wherein steel pipe circumference
White primer is coated on face, wherein there are three types of color scales to identify for painting on three faces of steel pipe circumference, wherein three kinds of color scale marks
Knowing is different sizes.
Further, above-mentioned three kinds of colors can for the three kinds of colors combinations of red, yellow and blue or it is any other not
With three kinds of color combinations.
Further, above-mentioned three kinds of scales can be red color segment 200mm, yellow section 500mm, blue section 1000mm, or
The other sizes of requirement of engineering.
Further, above-mentioned steel pipe can be used as upright bar or cross bar, can require according to erection scheme, and accurately finding needs
It is installed the installation dimension position wanted.
A kind of making and use method for the frame body steel pipe that mark scale is known comprising the steps of:
Step 1: then japanning, steel pipe coat different sizes in steel pipe periphery first in steel pipe coated white priming paint respectively
Red, yellow, blue three kinds of scales mark.In three faces of a root canal, different sizes are identified in different colors respectively, such as: it is red
200mm sections, 500mm sections of yellow, 1000mm sections of blue also can according to need mark into 100mm sections red, yellow 500mm
Section, 1000mm sections of blue or requirement of engineering other sizes;
Step 2: building, built according to construction requirement;
Step 3: inspecting for acceptance, can survey according to erection scheme or whether range estimation penstock installation meets and set up size and want
It asks.
The utility model has the following beneficial effects:
The utility model steel pipe sets up steel pipe support, system size direct view, accurate, and abnormal side is set up in construction optimization, construction
Just quick, class monitor and group leader and Quality Inspector can compare card of telling somebody what one's real intentions are at any time and inspect by random samples in work progress, and frame body is inspected for acceptance the time
It greatlys save, construction effect is in controllable state, finally effectively reduces security risk.It is simultaneously also the guarantor of circulation material
Pipe, metering provide the guarantee of intuitive quantization.
[Detailed description of the invention]
Fig. 1 is the structural schematic diagram of the utility model embodiment.
Fig. 2 is the utility model embodiment shuttering supporting schematic diagram.
Fig. 3 is the jacking installation requirement schematic diagram of the utility model embodiment.
Fig. 4 is the support system effect diagram of penstock installation of the utility model with sizing.
[specific embodiment]
In order to keep technological means of the utility model clear, it is practical new that this is further described with reference to the accompanying drawing
Type,
The frame body steel pipe that a kind of mark scale is known as shown in Figure 1, including steel pipe, wherein steel pipe is hollow cylindrical,
It is coated with white primer on middle steel pipe periphery, wherein there are three types of color scales to identify for painting on three faces of steel pipe circumference, wherein three kinds
Color scale is identified as different sizes.
Above-mentioned three kinds of colors can be the three kinds of color combinations of red, yellow and blue or any other different three kinds of face
Colour cell is closed.
Above-mentioned three kinds of scales can be red color segment 200mm, yellow section 500mm, blue section 1000mm or requirement of engineering
Other sizes.
Above-mentioned steel pipe can be used as upright bar or cross bar, can require according to erection scheme, accurately find the installation of needs
Size positions are installed.
A kind of making and use method for the frame body steel pipe that mark scale is known comprising the steps of:
Step 1: then japanning, steel pipe coat different sizes in steel pipe periphery first in steel pipe coated white priming paint respectively
Red, yellow, blue three kinds of scales mark.In three faces of a root canal, different sizes are identified in different colors respectively, such as: it is red
200mm sections, 500mm sections of yellow, 1000mm sections of blue also can according to need mark into 100mm sections red, yellow 500mm
Section, 1000mm sections of blue or requirement of engineering other sizes;
Step 2: building, built according to construction requirement;
Step 3: inspecting for acceptance, can survey according to erection scheme or whether range estimation penstock installation meets and set up size and want
It asks.
It is illustrated by taking Fig. 2 high and big die plate support scheme beams of concrete lower template support system arrangement as an example below.
Beams of concrete lower template support system arranges list
Its beam formwork supporting system schematic diagram as shown in Fig. 2,
By beam formwork supporting system schematic diagram and jacking installation requirement Fig. 3 as it can be seen that the support system vertically and horizontally horizon bar step pitch
1500mm;Transfer 400mm;Sweep the floor bar 200mm;(size is shored in removing to beam bottom cross bar 500mm, and beam bottom cross bar installation site is practical
For 200mm under tube top).
It is as shown in Figure 4 with the support system effect picture of the penstock installation with sizing:
As seen from the figure, high-supported formwork support system is set up with the steel pipe with sizing, open-and-shut can checks and sets up
Frame body whether meet erection scheme size requirement.
Above embodiments are merely used to help understand the method and its core concept of the utility model;Meanwhile for ability
The those skilled in the art in domain have change based on the idea of the present invention in specific embodiments and applications
Place, to sum up, the content of the present specification should not be construed as a limitation of the present invention.
Claims (4)
1. the frame body steel pipe that a kind of mark scale is known, which is characterized in that including steel pipe, the steel pipe is hollow cylindrical, institute
It states and is coated with white primer on steel pipe periphery, there are three types of color scales to identify for painting on three faces of the steel pipe circumference, and described three kinds
Color scale is identified as different sizes.
2. the frame body steel pipe that a kind of mark scale according to claim 1 is known, which is characterized in that three kinds of colors can
Think the three kinds of color combinations of red, yellow and blue or any other different three kinds of colors combinations.
3. the frame body steel pipe that a kind of mark scale according to claim 1 is known, which is characterized in that three kinds of scales can
Think red color segment 200mm, yellow section 500mm, the other sizes of blue section 1000mm or requirement of engineering.
4. the frame body steel pipe that a kind of mark scale according to claim 1 is known, which is characterized in that the steel pipe can be used as
Upright bar or cross bar, can require according to erection scheme, and the installation dimension position for accurately finding needs is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820991236.XU CN208668918U (en) | 2018-06-26 | 2018-06-26 | A kind of frame body steel pipe that mark scale is known |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820991236.XU CN208668918U (en) | 2018-06-26 | 2018-06-26 | A kind of frame body steel pipe that mark scale is known |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208668918U true CN208668918U (en) | 2019-03-29 |
Family
ID=65824776
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820991236.XU Active CN208668918U (en) | 2018-06-26 | 2018-06-26 | A kind of frame body steel pipe that mark scale is known |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208668918U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643548A (en) * | 2018-06-26 | 2018-10-12 | 深圳市建设(集团)有限公司 | A kind of frame body steel pipe and production and preparation method thereof that mark scale is known |
-
2018
- 2018-06-26 CN CN201820991236.XU patent/CN208668918U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108643548A (en) * | 2018-06-26 | 2018-10-12 | 深圳市建设(集团)有限公司 | A kind of frame body steel pipe and production and preparation method thereof that mark scale is known |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108592895B (en) | Building construction detection system, method and equipment based on three-dimensional laser scanning | |
CN105696467B (en) | A kind of formwork frame construction method based on P-BIM technologies | |
CN105587130B (en) | A kind of space net shell solder sphere positioner and its application method | |
CN208668918U (en) | A kind of frame body steel pipe that mark scale is known | |
CN102518204B (en) | Buddha ceremonial canopy and manufacturing method thereof | |
EP3786605A1 (en) | Construction method for a cantilever beam on a central pier | |
CN109944450B (en) | Structure construction multi-point synchronous high-precision positioning method based on Beidou GNSS & BIM | |
CN116188205B (en) | Intelligent analysis management and control system for building construction based on Internet of things technology | |
CN108643548A (en) | A kind of frame body steel pipe and production and preparation method thereof that mark scale is known | |
CN107513916A (en) | The imitative ice and snow road precast construction method of annular | |
CN110565856B (en) | Quick installation method for double-curved-surface metal plate curtain wall | |
CN207296429U (en) | A kind of cast-in-situ floor thickness control instrument | |
CN111691684B (en) | Installation and construction method for whole trusses of large-span pipe truss | |
CN213976724U (en) | Curtain cell cube track hoisting structure | |
CN111270653B (en) | One-time pouring construction method for hydraulic dam side water-stop steel plate | |
CN104153479B (en) | Reaction plate loading hole construction method and constructing device thereof | |
CN110315035A (en) | Fan-shaped sections of slab continuous pedestal installation measuring device and its construction method | |
CN110057342B (en) | Method for monitoring plane displacement by using total station and level gauge | |
CN110836016A (en) | Floor thickness detector and construction process using same | |
CN218375398U (en) | Adjustable tie bar unwrapping wire ware | |
CN109629429B (en) | Method for determining construction control elevation of cable-stayed bridge cantilever | |
CN214884882U (en) | Portable cast-in-place concrete floor thickness control device | |
CN219219821U (en) | Casing pipe positioning device | |
CN117026842A (en) | Double-splicing coupling installation method for arch ribs of fully assembled steel tube arch bridge | |
CN112031826B (en) | Method for remedying tunnel deformation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |