CN208668804U - Cornice roof boarding - Google Patents

Cornice roof boarding Download PDF

Info

Publication number
CN208668804U
CN208668804U CN201820937921.4U CN201820937921U CN208668804U CN 208668804 U CN208668804 U CN 208668804U CN 201820937921 U CN201820937921 U CN 201820937921U CN 208668804 U CN208668804 U CN 208668804U
Authority
CN
China
Prior art keywords
mounting hole
clinch
panel
roof boarding
fastener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820937921.4U
Other languages
Chinese (zh)
Inventor
汪洋
郭伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Sanyi Building System Co Ltd
Original Assignee
Shenzhen Sanyi Building System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Sanyi Building System Co Ltd filed Critical Shenzhen Sanyi Building System Co Ltd
Priority to CN201820937921.4U priority Critical patent/CN208668804U/en
Application granted granted Critical
Publication of CN208668804U publication Critical patent/CN208668804U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a kind of cornice roof boarding, and the cornice roof boarding includes first panel, and the end of the first panel is formed with the first clinch, and first clinch offers the first mounting hole;Second panel, the end of the second panel are formed with the second clinch, and second clinch offers the second mounting hole, and second mounting hole extends along the length direction of the second panel;And fastener;First clinch is overlapped in the upper surface of second clinch, and the fastener is successively inserted in first mounting hole and second mounting hole, and is moved in second mounting hole.The technical solution of the utility model enables to two adjacent surfaces plate to realize Telescopic, so that two adjacent surfaces sheet separation caused by efficiently solving the problems, such as because of temperature load, wind load etc. becomes larger or mutual extrusion.

Description

Cornice roof boarding
Technical field
The utility model relates to building structure technology field, in particular to a kind of cornice roof boarding.
Background technique
Cornice is located at the descending of roofing, is the most places of roofing Accumulated Rainwater.Existing cornice roof boarding generallys use coloured silk Steel plate can expand with heat and contract with cold, such that between two adjacent surfaces plate since panel is in environmental change with temperature change generation Gap is too big or mutual extrusion, gap, which becomes larger, can generate drainage, and mutual extrusion can cause panel deformation, or even can not make With.
Utility model content
The main purpose of the utility model is to provide a kind of cornice roof boarding, it is intended to so that two adjacent surfaces plate can realize it is flexible Function, so that two adjacent surfaces sheet separation caused by efficiently solving because of temperature load, wind load etc. becomes larger or mutual extrusion Problem.
To achieve the above object, the utility model proposes cornice roof boarding, comprising: first panel, the first panel End be formed with the first clinch, first clinch offers the first mounting hole;Second panel, the second panel End is formed with the second clinch, and second clinch offers the second mounting hole, and second mounting hole is along described second The length direction of panel extends;And fastener;First clinch is overlapped in the upper surface of second clinch, described Fastener is successively inserted in first mounting hole and second mounting hole, and is moved in second mounting hole.
Optionally, first mounting hole is circular hole, and second mounting hole is slotted hole.
Optionally, define first mounting hole center to the first panel towards the end of the second panel away from From for d1, d1 >=50mm;Second mounting hole center is defined to the second panel towards the end of the first panel Distance is d2, d2 >=50mm.
Optionally, the diameter range of first mounting hole is 4mm to 8mm.
Optionally, the fastener is waterproof core-pulling rivet.
Optionally, first mounting hole is equipped with multiple, width of multiple first mounting holes along the first panel The setting of direction interval;Second mounting hole be equipped with it is multiple, multiple second mounting holes are along the width side of the second panel It is arranged to interval;The fastener be equipped with it is multiple, a fastener is inserted in first mounting hole and one described second In mounting hole, and in removable in second mounting hole.
Optionally, the cornice roof boarding further includes bonding piece, and the side of the bonding piece is connected to first overlap joint Portion, the other side are connected to second clinch.
Optionally, the bonding piece is arranged adjacent to first mounting hole and second mounting hole.
Optionally, the bonding piece is butyl rubber belt.
Optionally, the cornice roof boarding further includes sealant, and the sealant is pasted on the bonding piece and described the Between one clinch, and it is pasted between the bonding piece and second clinch.
The technical solution of the utility model, cornice roof boarding include first panel, second panel and fastener, first panel End form the first clinch, the end of second panel forms the second clinch, and the first clinch is overlapped in the second clinch Upper surface efficiently avoid rainwater so that rainwater smoothly flows to second panel by first panel and seeped by two sides sheet separation The phenomenon that entering;Meanwhile the first mounting hole is opened up in the first clinch, the second mounting hole, and are opened up in the second clinch Two mounting holes extend along the length direction of second panel, and fastener is successively arranged in the first mounting hole and the second mounting hole, and It is moved in the second mounting hole, in this way, may make first panel and second panel to realize mutually flexible function, thus effectively Solve the problems, such as that the two adjacent surfaces sheet separation because of caused by temperature load, wind load etc. becomes larger or mutual extrusion.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, the structure that can also be shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the decomposition diagram of one embodiment of the utility model cornice roof boarding;
Fig. 2 is the decomposition diagram at another visual angle of the utility model cornice roof boarding.
Drawing reference numeral explanation:
Label Title Label Title
100 Roof boarding 31 Second clinch
10 First panel 311 Second mounting hole
11 First clinch 50 Fastener
111 First mounting hole 70 Bonding piece
30 Second panel 90 Sealant
The embodiments will be further described with reference to the accompanying drawings for the realization, functional characteristics and advantage of the utility model aim.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, fall within the protection scope of the utility model.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment It is only used for explaining in relative positional relationship, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, such as When the fruit particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In addition, the description for being such as related to " first ", " second " in the present invention is used for description purposes only, and cannot manage Solution is its relative importance of indication or suggestion or the quantity for implicitly indicating indicated technical characteristic.Define as a result, " the One ", the feature of " second " can explicitly or implicitly include at least one of the features.It is " more in the description of the present invention, It is a " it is meant that at least two, such as two, three etc., unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " connection ", " fixation " etc. should do broad sense reason Solution, for example, " fixation " may be a fixed connection, may be a detachable connection, or integral;It can be mechanical connection, it can also To be electrical connection;It can be directly connected, the connection inside two elements can also be can be indirectly connected through an intermediary Or the interaction relationship of two elements, unless otherwise restricted clearly.It for the ordinary skill in the art, can be with The concrete meaning of above-mentioned term in the present invention is understood as the case may be.
It in addition, the technical solution between each embodiment of the utility model can be combined with each other, but must be with ability Based on domain those of ordinary skill can be realized, it will be understood that when the combination of technical solution appearance is conflicting or cannot achieve The combination of this technical solution is not present, also not within the protection scope of the requires of the utility model.
The utility model proposes a kind of cornice roof boardings 100.
As depicted in figs. 1 and 2, in 100 1 embodiment of the utility model cornice roof boarding, cornice roof boarding 100 includes: First panel 10, the end of first panel 10 are formed with the first clinch 11, and the first clinch 11 offers the first mounting hole 111;With second panel 30, the end of second panel 30 is formed with the second clinch 31, and the second clinch 31 offers the second peace Hole 311 is filled, the second mounting hole 311 extends along the length direction of second panel 30;And fastener 50;First clinch 11 is overlapped in The upper surface of second clinch 31, fastener 50 are successively inserted in the first mounting hole 111 and the second mounting hole 311, and in It is moved in two mounting holes 311.
Specifically, first panel 10 and second panel 30 are usually color steel plate, for being layed in roofing, first panel and the Two panels are rectangular slab, and its two long side turns down to form groove structure towards the same side, when being layed in roofing, groove Opening upwards setting, and second panel 30 is fixed on eaves away from the end of first panel 10, and it is directly fixed to can be its end In eaves, it is solid to be also possible to be fixed on eaves by panel.In this way, rainwater then can be successively along when encountering rainwater weather One panel 10 and the length direction of second panel 30 flow to eaves, finally flow to ground by eaves.First clinch 11 is set to the For one panel 10 towards the end of second panel 30, the second clinch 31 is set to second panel 30 towards the end of first panel 10, And first clinch 11 be overlapped in the upper surface of the second clinch 31, be so arranged, when encountering rainy weather, rainwater can edge The upper surface of the first clinch 11 successfully flow to the upper surface of second panel 30, be effectively prevented from rainwater by two sides sheet separation The phenomenon that infiltration, occurs.Meanwhile first clinch 11 offer first mounting hole 111 compatible with fastener 50, second takes Socket part 31 offers second mounting hole 311 corresponding with the first mounting hole 111, and the second mounting hole 311 is long along second panel 30 The long hole that direction extends is spent, the length direction of the long hole can be parallel to the length direction of second panel 30, the length of the long hole Direction can also have certain angle with the length direction of second panel 30.Fastener 50 is inserted in the first mounting hole 111 simultaneously It is revealed in the lower surface of the first clinch 11, and the fastener 50 is fixed in the hole wall of the first mounting hole 111, generally, fastening Part 50 is waterproofing fastening piece 50, is penetrated into avoid rainwater by the first mounting hole 111;Fastener 50 is revealed under the first clinch 11 The end on surface is inserted in the second mounting hole 311, and can along second panel 30 length to moving, in this way, can be realized One panel 10 and the mutually flexible function of second panel 30, to efficiently solve due tos temperature load, wind load etc. Caused two adjacent surfaces sheet separation becomes larger or the problem of mutual extrusion.
It should be noted that fastener 50 is generally single side for the ease of the installation of first panel 10 and second panel 30 The fastener 50 of installation, such as screw or self-plugging rivet, when fastener 50 is screw, the first mounting hole 111 is threaded hole, spiral shell Nail is threadedly connected in threaded hole;When fastener 50 is self-plugging rivet, self-plugging rivet and the riveting of the first mounting hole 111 are fixed.
Therefore, the technical solution of the utility model, cornice roof boarding 100 include first panel 10, second panel 30 and tight Firmware 50, the first clinch 11 of end formation of first panel 10, the second clinch 31 of end formation of second panel 30, first Clinch 11 is overlapped in the upper surface of the second clinch 31, so that rainwater smoothly flows to second panel 30 by first panel 10, Efficiently avoid the phenomenon that rainwater is penetrated by two sides sheet separation;Meanwhile the first mounting hole is opened up in the first clinch 11 111, the second mounting hole 311 is opened up in the second clinch 31, and the second mounting hole 311 prolongs along the length direction of second panel 30 It stretches, fastener 50 is successively arranged in the first mounting hole 111 and the second mounting hole 311, and is moved in the second mounting hole 311, In this way, may make first panel 10 and second panel 30 to realize mutually flexible function, to efficiently solve because of temperature lotus Two adjacent surfaces sheet separation caused by load, wind load etc. becomes larger or the problem of mutual extrusion.
Preferably, the first mounting hole 111 is circular hole, and the second mounting hole 311 is slotted hole.Since fastener 50 is generally justified Column sets circular hole for the first mounting hole 111, aloows fastener 50 and the inner wall of first mounting hole 111 tight Closely connected conjunction, thus the phenomenon that more effectively avoiding rainwater from being penetrated by the first mounting hole 111;Second mounting hole 311 is set as Slotted hole, radius and width are more identical than the radius of the first mounting hole 111, and its length is generally 20mm, so that fastener 50 can move along its length in the second mounting hole 311.Generally, the first mounting hole 111 uses diameter for the circle of 6mm Hole, the second mounting hole 311 use diameter for 6mm, and length is the slotted hole of 20mm.
Optionally, the diameter range of the first mounting hole 111 is 4mm to 8mm, for example, using the diameter of the first mounting hole 111 For 4mm, 6mm, 8mm etc..
Referring again to Fig. 1 and Fig. 2,111 center of the first mounting hole is defined to first panel 10 towards the second panel 30 End distance be d1, d1 >=50mm;311 center of the second mounting hole is defined to second panel 30 towards the end of first panel 10 The distance in portion is d2, d2 >=50mm.
Specifically, the clinch length D of the first clinch 11 and the second clinch 31 is general otherwise less than 100mm, to protect The bearing capacity, rigidity, the requirement of stability and deformability for demonstrate,proving panel, to guarantee that roofing meets its safety and durability is wanted It asks, the first mounting hole 111 is generally opened in the middle part of the first clinch 11, and the second mounting hole 311 is also opened in the second clinch 31 middle part, that is, d1 >=50mm, d2 >=50mm, in this way, the first clinch 11 and the second clinch 31 can be effectively ensured Stability is overlapped, and can guarantee first panel 10 and the mutually flexible stability of second panel 30 well.
Preferably, fastener 50 is waterproof core-pulling rivet.Self-plugging rivet is blind riveting fastener 50, with the first mounting hole 111 rivetings are fixed, in this way, may make the attended operation of the first clinch 11 and the second clinch 31 more convenient and effective;And And self-plugging rivet is waterproofing fastening piece 50, it can be efficiently against rainwater by the first mounting hole 111 and self-plugging rivet and its gap location The phenomenon that infiltration, occurs.
Further, the first mounting hole 111 is equipped with multiple, and multiple first mounting holes 111 are along the width side of first panel 10 It is arranged to interval;Second mounting hole 311 be equipped with it is multiple, multiple second mounting holes 311 are along the width direction interval of second panel 30 Setting;Fastener 50 be equipped with it is multiple, a fastener 50 is inserted in one first mounting hole 111 and one second mounting hole 311, and in It is moved in second mounting hole 311.
Specifically, multiple first mounting holes 111 are in a row distributed along the width direction of first panel 10, multiple second mounting holes 311 are also in a row distributed along the width direction of second panel 30, and every one second mounting hole 311 is slotted hole, and its length direction Along second panel 30 length direction be extended, a self-plugging rivet is inserted in one first mounting hole 111, and self-plugging rivet with The hole wall of first mounting hole 111, which rivets, to be fixed, and the lower end of self-plugging rivet is revealed in the lower surface of the first clinch 11, and it appears It holds and is moved in corresponding second mounting hole 311, in this way, may make first panel 10 and the mutual telescopicing performance of second panel 30 more Stablize, while also improving the overlap joint stability of the first clinch 11 and the second clinch 31.
Referring to Fig. 1, cornice roof boarding 100 further includes bonding piece 70, and the side of bonding piece 70 is connected to described One clinch 11, the other side are connected to the second clinch 31.
Specifically, bonding piece 70 is set between the first clinch 11 and second clinch 31, for eliminating first Gap between clinch 11 and the second clinch 31, to be effectively prevented from the phenomenon that rainwater penetrates into gap generation.Bonding piece 70 Generally bonding piece 70, such as double-sided adhesive etc. have the object of caking property, easy to use, and the bonding piece 70 is waterproof Part, to avoid rainwater infiltration.
Optionally, bonding piece 70 is arranged adjacent to the first mounting hole 111 and the second mounting hole 311, is so arranged, Ji Nengyou The gap between the first clinch 11 and the second clinch 31 is eliminated on effect ground, prevents rainwater from being penetrated by the gap;It again can be effectively The gap between the first mounting hole 111 and the second mounting hole 311 is eliminated, prevents rainwater from being penetrated by the gap location.Preferably, it bonds Part 70 is pasted on the upper surface of the second clinch 31, and is extended along multiple second mounting hole, 311 line directions, bonding piece 70 Width be greater than the length of the second mounting hole 311, and 70 surface of bonding piece offers and multiple allows for what self-plugging rivet lower end passed through Position hole, relief hole is also slotted hole, so that self-plugging rivet can move in the second mounting hole 311.When the first clinch 11 is taken When being connected to the upper surface of the second clinch 31, bonding piece 70 is connected to the first clinch 11 backwards to the side of the second clinch 31 Lower surface in this way, can not only enhance the overlap joint stability of the first clinch 11 and the second clinch 31, but also can eliminate first simultaneously and take The gap in the gap and the first mounting hole 111 and the second mounting hole 311 of socket part 11 and the second clinch 31, further increases roofing The waterproofness of plate 100;Also guarantee that the monnolithic case of roof boarding 100 is more beautiful simultaneously.
Preferably, bonding piece 70 is butyl rubber belt, and butyl rubber belt is a kind of waterproof sealing adhesive tape, has stronger bonding Intensity and tensile strength can not only improve the adhesion strength and leakproofness of first panel 10 and second panel 30, to make Obtaining roof boarding 100 has preferable waterproof performance;Simultaneously, additionally it is possible to adapt to the flexible change that colored steel surface plate is generated by temperature change Change, it is easy to use and effective.
Fig. 1 is further regarded to, cornice roof boarding 100 further includes sealant 90, and sealant 90 is pasted on bonding piece 70 and Between one clinch 11, and it is pasted between bonding piece 70 and the second clinch 31.
In order to increase the leakproofness between bonding piece 70 and the first clinch 11, in bonding piece 70 and the first clinch 11 it Between be arranged sealant 90;In order to increase the leakproofness between bonding piece 70 and the second clinch 31, taken in bonding piece 70 with second Sealant 90 is also set between socket part 31, to further increase the lap seal of the first clinch 11 and the second clinch 31, To further increase the waterproof performance of roof boarding 100.Optionally, sealant 90 is set along the length direction extension of bonding piece 70 It sets, so that each position of lap-joint has preferable leakproofness, further improves the waterproof performance of roof boarding 100.It is close Sealing 90 can be arranged adjacent to the edge of bonding piece 70, can also be set to the middle part of bonding piece 70;Preferably, sealant 90 is set to bonding The middle part of part 70, and neighbouring second mounting hole 311 and the first mounting hole 111 are arranged, in this way, both can guarantee first panel 10 and the The leakproofness of two panels, 30 lap-joint ensures that the leakproofness at the first mounting hole 111 and the second mounting hole 311, thus more The waterproofness of one step raising roof boarding 100.Sealant 90 have preferable leakproofness, stronger adhesion strength, at the same also have compared with Good stretch-resistance, can adapt to the telescopic variation that panel is generated by temperature change very well.Optionally, sealant selects waterproof Property adhesive sticker, to enhance the leakproofness and waterproofness of 30 lap-joint of first panel 10 and second panel, to guarantee cornice roofing Plate 100 has preferable waterproofness.
The above is only the preferred embodiment of the present invention, and therefore it does not limit the scope of the patent of the utility model, It is all under the inventive concept of the utility model, equivalent structure made based on the specification and figures of the utility model becomes It changes, or directly/be used in other related technical areas indirectly and be included in the scope of patent protection of the utility model.

Claims (10)

1. a kind of cornice roof boarding characterized by comprising
First panel, the end of the first panel are formed with the first clinch, and first clinch offers the first installation Hole;
Second panel, the end of the second panel are formed with the second clinch, and second clinch offers the second installation Hole, second mounting hole extend along the length direction of the second panel;And
Fastener;
First clinch is overlapped in the upper surface of second clinch, and the fastener is successively inserted in first peace It fills in hole and second mounting hole, and is moved in second mounting hole.
2. cornice roof boarding as described in claim 1, which is characterized in that first mounting hole is circular hole, second peace Dress hole is slotted hole.
3. cornice roof boarding as claimed in claim 2, which is characterized in that define first mounting hole center to described first The distance of panel towards the end of the second panel is d1, d1 >=50mm;Second mounting hole center is defined to described The distance of two panels towards the end of the first panel is d2, d2 >=50mm.
4. cornice roof boarding as claimed in claim 2, which is characterized in that the diameter range of first mounting hole be 4mm extremely 8mm。
5. cornice roof boarding as described in claim 1, which is characterized in that the fastener is waterproof core-pulling rivet.
6. the cornice roof boarding as described in any one of claims 1 to 5, which is characterized in that first mounting hole is equipped with more A, multiple first mounting holes are arranged along the width direction interval of the first panel;
Second mounting hole be equipped with it is multiple, multiple second mounting holes are set along the width direction interval of the second panel It sets;
The fastener be equipped with it is multiple, a fastener is inserted in first mounting hole and second mounting hole It is interior, and moved in second mounting hole.
7. cornice roof boarding as claimed in claim 6, which is characterized in that the cornice roof boarding further includes bonding piece, described The side of bonding piece is connected to first clinch, and the other side is connected to second clinch.
8. cornice roof boarding as claimed in claim 7, which is characterized in that the bonding piece is adjacent to first mounting hole and institute State the setting of the second mounting hole.
9. cornice roof boarding as claimed in claim 7, which is characterized in that the bonding piece is butyl rubber belt.
10. cornice roof boarding as claimed in claim 7, which is characterized in that the cornice roof boarding further includes sealant, described Sealant is pasted between the bonding piece and first clinch, and is pasted on the bonding piece and second clinch Between.
CN201820937921.4U 2018-06-15 2018-06-15 Cornice roof boarding Active CN208668804U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820937921.4U CN208668804U (en) 2018-06-15 2018-06-15 Cornice roof boarding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820937921.4U CN208668804U (en) 2018-06-15 2018-06-15 Cornice roof boarding

Publications (1)

Publication Number Publication Date
CN208668804U true CN208668804U (en) 2019-03-29

Family

ID=65824549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820937921.4U Active CN208668804U (en) 2018-06-15 2018-06-15 Cornice roof boarding

Country Status (1)

Country Link
CN (1) CN208668804U (en)

Similar Documents

Publication Publication Date Title
CN111910846A (en) Roof cornice structure, roof system and construction method
CN107762073B (en) Double-deck roofing system of waterproof performance improves
CN208668804U (en) Cornice roof boarding
CN212129699U (en) Waterproof construction of various steel house roofing and parapet
CN212053400U (en) Assembled roof
US9187905B2 (en) Roof or window panel to metal roofing or siding interface securement system
JP3126092U (en) Metal roofing
CN211037495U (en) Waterproof structure of big opening of ribbed slope roofing
CN216893166U (en) Roof part connecting device and roof structure
CN207597727U (en) The plane skylight waterproof connecting device of colored steel roof
CN212271426U (en) Roofing eaves mouth structure and roofing system
CN212562113U (en) Steel construction roof daylighting node structure
US11047133B1 (en) Modular rooftop with variable slope panels
CN211114455U (en) Novel ridge waterproof system
JP5297563B1 (en) Keraba decorative member and attachment method thereof
CN102704578B (en) Telescopic seam connecting method for transverse paving single-layer metal wall surface plate
GB2496232A (en) A low slope roof edge membrane retaining and sealing system
CN102720307B (en) Butt seam connecting device for horizontal single-deck metal wall panels
CN105201152B (en) Spliced container house roof
CN105201150B (en) Spliced container house roofing combines top plate
CN206784743U (en) A kind of plane skylight with stationary nodes
CN202157476U (en) Skylight
AU2015261595A1 (en) Improvements in the weatherproofing of roofs
CN209369193U (en) A kind of metal roof board system
CN205153345U (en) Skylight waterproof construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant