CN208668456U - Segmented pipe gallery - Google Patents

Segmented pipe gallery Download PDF

Info

Publication number
CN208668456U
CN208668456U CN201820853554.XU CN201820853554U CN208668456U CN 208668456 U CN208668456 U CN 208668456U CN 201820853554 U CN201820853554 U CN 201820853554U CN 208668456 U CN208668456 U CN 208668456U
Authority
CN
China
Prior art keywords
pipe gallery
segmented
inner tube
tube
segmented pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820853554.XU
Other languages
Chinese (zh)
Inventor
杜祝遥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Institute of Technology
Original Assignee
Shaanxi Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Institute of Technology filed Critical Shaanxi Institute of Technology
Priority to CN201820853554.XU priority Critical patent/CN208668456U/en
Application granted granted Critical
Publication of CN208668456U publication Critical patent/CN208668456U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to civic building engineering field, is related to a kind of segmented pipe gallery, including the first pipe gallery and the second pipe gallery;The structure of first pipe gallery and the second pipe gallery is identical;First pipe gallery is connect with the second pipe gallery socket joint;The connecting hole for being additionally provided with stiffener on the end face that first pipe gallery is in contact with the second pipe gallery and matching with stiffener structure;Stiffener is inserted into connecting hole.The utility model provides one kind easy to assembly rationally, the resource that uses manpower and material resources sparingly, the segmented pipe gallery that can be reduced piping lane operation maintenance cost and can increase its ability for bearing pressure or load.

Description

Segmented pipe gallery
Technical field
The utility model belongs to civic building engineering field, is related to a kind of piping lane more particularly to a kind of segmented integrated pipe Corridor.
Background technique
Urban Underground pipe gallery is in Urban Underground for concentrating laying gas supply, water supply, the default pipeline of municipal administration and power supply With the public tunnel of the municipal pipelines such as the communications cable, in addition it is a kind of advanced layout pattern, Urban Underground pipe that heat supply etc. is all Net construction is estimated will to bring 400,000,000,000 to 500,000,000,000 yuan of investments, play the role of important support to economic growth, and give pipe network material, The industries such as safety monitoring and pipe gallery engineering bring quick dilatation opportunity, will produce to improvement appearance of city, guarantee urban safety Raw immeasurable important function.Existing piping lane is usually the following two kinds mode: first is that field cast-in-place, second is that prefabrication.It is existing The mode of casting vibrates not firm, it is larger that a possibility that micro-crack occurs in the piping lane later period, can leave leakage to the requirement height that manually vibrates Water hidden danger;And prefabricated piping lane directly fastens at splicing seams, the gap of seam crossing is larger, and to waterproof requirement height, water-proofing treatment is difficult Degree is big, and factory's manufacture is difficult, logistics transportation is difficult and in-site installation is difficult, and construction cost is high.
Utility model content
In order to solve the above technical problems in background technology, the utility model provides a kind of conjunction easy to assembly It manages, the resource that uses manpower and material resources sparingly, piping lane operation maintenance cost can be reduced and its ability for bearing pressure or load can be increased Segmented pipe gallery.
To achieve the goals above, the utility model adopts the following technical solution:
A kind of segmented pipe gallery, it is characterised in that: the segmented pipe gallery include the first pipe gallery and Second pipe gallery;The structure of first pipe gallery and the second pipe gallery is identical;First pipe gallery It is connect with the second pipe gallery socket joint;It is additionally provided with and adds on the end face that first pipe gallery is in contact with the second pipe gallery Strong reinforcing bar and the connecting hole to match with stiffener structure;In the stiffener insertion connecting hole.
Above-mentioned first pipe gallery and the second pipe gallery include that outer tube, inner tube, rack, glove set tube seat And inlet and outlet well;The outer pipe sleeve is outside inner tube and coaxial with inner tube;The rack is arranged in inner tube Inner wall on;Glove, which is provided with, on the rack sets tube seat;The inlet and outlet well through outer tube and inner tube and with it is interior It is connected inside layer pipe.
Reinforcing rib is provided between above-mentioned rack and inner tube.
Above-mentioned outer tube and inner tube are round tubes.
Above-mentioned segmented pipe gallery further includes the connection gasket for being placed in the first pipe gallery and the second pipe gallery bottom Layer;The outer layer pipe outer wall is in contact with bed course is connect.
The outer wall of above-mentioned outer tube is provided with fin;Be provided on the connection bed course match with the structure of fin it is recessed Slot;The fin of the outer tube is arranged in the groove of connection bed course.
Above-mentioned segmented pipe gallery further includes the cap rock being placed at the top of the first pipe gallery and the second pipe gallery;Institute It states cap rock and is interlocked with bed course is connect.
Above-mentioned cap rock is provided with fin and groove with the position that bed course is in contact is connect.
Above-mentioned segmented pipe gallery further include through outer tube and inner tube and with the inspection that is connected inside inner tube Cha Jing.
Above-mentioned glove set tube seat include street illumination cable hub slot, power cable hub slot, communications cable hub slot, to Waterpipe, storm sewer, sewage conduct and gas pipeline.
The utility model has the advantages that:
The utility model provides a kind of segmented pipe gallery, including the first pipe gallery and the second pipe gallery; The structure of first pipe gallery and the second pipe gallery is identical;First pipe gallery and the second pipe gallery socket joint connect It connects;Be additionally provided on the end face that first pipe gallery is in contact with the second pipe gallery stiffener and with stiffener structure The connecting hole to match;Stiffener is inserted into connecting hole.Existing docking connecting method is revised as by the utility model first Bayonet joint mode, meanwhile, in socket joint contact surface, it is additionally provided with stiffener and connecting hole, passes through stiffener And the socket joint connection of connecting hole and the first pipe gallery and the second pipe gallery, the connection effect of seam crossing can be significantly improved Fruit, globality is more preferable, and stability is stronger, and the phenomenon that seam crossing cracks is less likely to occur using piping lane, reduces piping lane operation dimension Cost is protected, its ability for bearing pressure or load can be increased;It is easy to assembly reasonable to can achieve, and use manpower and material resources sparingly resource Effect.
Detailed description of the invention
Fig. 1 is the schematic cross-sectional view of segmented pipe gallery provided by the utility model;
In figure:
1- imports and exports well;2- outer tube;3- inner tube;4- rack;5- street illumination cable hub slot;6- power cable Hub slot;7- communications cable hub slot;8- feedwater piping;9- storm sewer;10- sewage conduct;11- gas pipeline;12- is recessed Slot;13- fin;14- stiffener;15- connecting hole;16- inspection shaft;17- cap rock;18- reinforcing rib;19- connection bed course.
Specific embodiment
Referring to Fig. 1, the utility model provides a kind of segmented pipe gallery, and segmented pipe gallery includes first comprehensive Piping lane and the second pipe gallery;The structure of first pipe gallery and the second pipe gallery is identical;First pipe gallery It is connect with the second pipe gallery socket joint;Reinforcement steel is additionally provided on the end face that first pipe gallery is in contact with the second pipe gallery Muscle 14 and the connecting hole 15 to match with 14 structure of stiffener;Stiffener 14 is inserted into connecting hole 15.The utility model Existing docking connecting method is revised as bayonet joint mode first, meanwhile, in socket joint contact surface, it is additionally provided with and adds Strong reinforcing bar and connecting hole, pass through stiffener and connecting hole and the socket joint of the first pipe gallery and the second pipe gallery Connection, can significantly improve the connection effect of seam crossing, globality is more preferable, and stability is stronger.
First pipe gallery and the second pipe gallery used by the utility model include outer tube 2, inner tube 3, Rack 4, glove set tube seat and inlet and outlet well 1;Outer tube 2 is sleeved on 3 outside of inner tube and, internal layer coaxial with inner tube 3 Pipe 3 is mounted on the inner wall of outer tube 2 by high-strength bolt;Rack 4 is fixed at inner tube 3 by high-strength bolt Inner wall on;Glove, which is provided with, on rack 4 sets tube seat;Import and export well 1 through outer tube 2 and inner tube 3 and with inner tube 3 Inside is connected.
In order to enable stability is stronger, reinforcing rib is provided between rack 4 provided by the utility model and inner tube 3 18, allow the more preferable stronger setting of rack 4 in inner tube 3.
Outer tube 2 and inner tube 3 are round tubes.For the ease of construction, segmented used by the utility model is comprehensive Piping lane further includes the connection bed course 19 for being placed in the first pipe gallery and the second pipe gallery bottom;2 outer wall of outer tube with connect Bed course 19 is in contact.The outer wall of outer tube 2 is provided with fin 13;It is provided on connection bed course 19 and matches with the structure of fin 13 Groove 12;The fin 13 of outer tube 2 is arranged in the groove 12 of connection bed course 19.Segmented pipe gallery further includes being placed in Cap rock 17 at the top of one pipe gallery and the second pipe gallery;Cap rock 17 is interlocked with bed course 19 is connect.Cap rock 17 with connect The position that bed course 19 is in contact is provided with fin and groove.
Segmented pipe gallery further include through outer tube 2 and inner tube 3 and with the inspection that is connected inside inner tube 3 Well 16.It includes street illumination cable hub slot 5, power cable hub slot 6, communications cable hub slot 7, feed pipe that glove, which sets tube seat, Road 8, storm sewer 9, sewage conduct 10 and gas pipeline 11.
Segmented pipe gallery provided by the utility model can be prefabrication, and length is changeable, factory Production is relatively easy, and logistics transportation is also relatively simple, and installation is simple more controllable, and construction cost is relatively low.

Claims (10)

1. a kind of segmented pipe gallery, it is characterised in that: the segmented pipe gallery includes the first pipe gallery and the Two pipe galleries;The structure of first pipe gallery and the second pipe gallery is identical;First pipe gallery with The connection of second pipe gallery socket joint;Reinforcement is additionally provided on the end face that first pipe gallery is in contact with the second pipe gallery Reinforcing bar (14) and the connecting hole (15) to match with stiffener (14) structure;The stiffener (14) is inserted into connecting hole (15) in.
2. segmented pipe gallery according to claim 1, it is characterised in that: first pipe gallery and second comprehensive Closing piping lane includes that outer tube (2), inner tube (3), rack (4), glove set tube seat and inlet and outlet well (1);The outer layer It is external and coaxial with inner tube (3) that pipe (2) is sleeved on inner tube (3);Inner wall of rack (4) setting in inner tube (3) On;Glove, which is provided with, on the rack (4) sets tube seat;The inlet and outlet well (1) runs through outer tube (2) and inner tube (3) And it is connected with inner tube (3) inside.
3. segmented pipe gallery according to claim 2, it is characterised in that: the rack (4) and inner tube (3) it Between be provided with reinforcing rib (18).
4. segmented pipe gallery according to claim 3, it is characterised in that: the outer tube (2) and inner tube (3) It is round tube.
5. according to segmented pipe gallery described in Claims 2 or 3 or 4, it is characterised in that: the segmented pipe gallery is also Connection bed course (19) including being placed in the first pipe gallery and the second pipe gallery bottom;Outer tube (2) outer wall and company Cushion layer (19) is in contact.
6. segmented pipe gallery according to claim 5, it is characterised in that: the outer wall of the outer tube (2) is provided with Fin (13);The groove (12) to match with the structure of fin (13) is provided on connection bed course (19);The outer tube (2) fin (13) setting is in the groove (12) of connection bed course (19).
7. segmented pipe gallery according to claim 6, it is characterised in that: the segmented pipe gallery further includes setting Cap rock (17) at the top of the first pipe gallery and the second pipe gallery;The cap rock (17) is engaged with bed course (19) is connect It closes.
8. segmented pipe gallery according to claim 7, it is characterised in that: the cap rock (17) with connect bed course (19) The position being in contact is provided with fin and groove.
9. segmented pipe gallery according to claim 8, it is characterised in that: the segmented pipe gallery further includes passing through The inspection shaft (16) wearing outer tube (2) and inner tube (3) and being connected with inner tube (3) inside.
10. segmented pipe gallery according to claim 9, it is characterised in that: it includes that municipal administration is shone that the glove, which sets tube seat, Bright cable hub slot (5), power cable hub slot (6), communications cable hub slot (7), feedwater piping (8), storm sewer (9), Sewage conduct (10) and gas pipeline (11).
CN201820853554.XU 2018-06-04 2018-06-04 Segmented pipe gallery Expired - Fee Related CN208668456U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820853554.XU CN208668456U (en) 2018-06-04 2018-06-04 Segmented pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820853554.XU CN208668456U (en) 2018-06-04 2018-06-04 Segmented pipe gallery

Publications (1)

Publication Number Publication Date
CN208668456U true CN208668456U (en) 2019-03-29

Family

ID=65823388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820853554.XU Expired - Fee Related CN208668456U (en) 2018-06-04 2018-06-04 Segmented pipe gallery

Country Status (1)

Country Link
CN (1) CN208668456U (en)

Similar Documents

Publication Publication Date Title
CN105064400A (en) Urban comprehensive pipe rack of steel corrugated plate structure
CN206268618U (en) A kind of pipeline support frame used in pipe gallery and its external member
CN105862990A (en) Prefabricated assembly well wall structure and construction method thereof
CN201502826U (en) Spigot-and-socket type fusing plastic pipeline
CN208668456U (en) Segmented pipe gallery
CN205839796U (en) Pipe gallery internode attachment structure
CN208136954U (en) Precast splice type Pipe rack
CN202416361U (en) Inspection well for improving sealing performance of interface and branch pipe connected with inspection well
CN205934965U (en) Utility tunnel
CN2799670Y (en) Precast forming glass reinforced plastics manhole
CN203052068U (en) Multifunctional quick-opening ladder tee huff section
CN206669143U (en) A kind of buried draining steel strip reinforced HDPE helical bellowses
CN205314126U (en) FRP pipe corridor
CN205171548U (en) Novel plastics piping lane
CN204326105U (en) A kind of plastic inspection well
CN105908778A (en) Comprehensive pipe rack for corrugated spiral pipe structure
CN209873999U (en) City utility tunnel drainage pipe inserts a mouth tube coupling
CN201803021U (en) Combustion gas underground inlet pipe
CN203052096U (en) Multifunctional special-shaped tee huff section
CN207893311U (en) A kind of high sealing HDPE double-wall corrugated pipes convenient for splicing
CN105887925A (en) Comprehensive pipe rack of corrugated circular tube structure
CN207512520U (en) It is a kind of can long distance water transfer high-speed railway
CN206992655U (en) A kind of electrical bushing
CN205242438U (en) Utility tunnel
CN205804467U (en) Be suitable to the anchor block formula drain tap well of long-distance large-caliber surface aqueduct

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329

Termination date: 20190604

CF01 Termination of patent right due to non-payment of annual fee