CN208668427U - A kind of excavation of foundation pit slope control tool - Google Patents
A kind of excavation of foundation pit slope control tool Download PDFInfo
- Publication number
- CN208668427U CN208668427U CN201821348506.1U CN201821348506U CN208668427U CN 208668427 U CN208668427 U CN 208668427U CN 201821348506 U CN201821348506 U CN 201821348506U CN 208668427 U CN208668427 U CN 208668427U
- Authority
- CN
- China
- Prior art keywords
- scale
- excavation
- control tool
- foundation pit
- slope control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model provides a kind of excavation of foundation pit slope control tool, including multiple scales, pass through hinged axis connection between each scale, the tool is equipped with handheld terminal and weight bearing end, the scale is equipped with scale, and the weight bearing end is equipped with weight bearing hole, and weight bearing hole has penetrated traction rope, one end of traction rope is capable of fixing on handheld terminal, and the other end connects pendant.The slope control tool construction is simple and convenient to operate, and significantly improves working efficiency, in Excavation Process, can easily be controlled at any time gradient inspection;Meanwhile the slope control tool can fold, and reduce storage space, be convenient for carrying.
Description
Technical field
The utility model relates to a kind of excavation of foundation pit slope control tools, are mainly used for the excavation of foundation pit stage, when foundation pit is adopted
When with sloping timbering, it to be used for the field control slope gradient.
Background technique
Foundation pit is the heatable adobe sleeping platform excavated in basic engineering position by substrate absolute altitude and basic plane size.It should basis before excavation
Geological hydrology data determines excavation plan in conjunction with live nearby buildings situation, and performs water-proof drainage work.It excavates not deep
The available method for putting side slope of person, makes Stability of Earth Slopes, and gradient size is provided to determine by related construction.It excavates relatively deep and neighbouring builds
The person that builds object, can use foundation pit walls method for protecting support, gunite concrete wall protecting method, and Large Foundation Pit even uses diaphram wall and colonnade
Formula cast-in-situ bored pile is the methods of chain, protection outside soil layer collapse into;No influencer is nearby built, underground can be reduced with well-point method
Water level, using slope open cut;Natural cold air freezing process excavation etc. can be used in cold district.
Urban Bridge Deep Foundation Pit is mainly used for cushion cap, abutment and Extended chemotherapy construction, is generally divided into non-support and has branch
Protect two classes.In the excavation of foundation pit stage, can slope angle control proper, directly affect perception effect after molding, and stage excavation
In the process, if slope control is improper, slope foot is difficult to hold away from edge of foundation distance, may cause secondary excavation, time-consuming.
Utility model content
The purpose of the utility model is to provide a kind of excavation of foundation pit slope control tool, the slope control tool construction letters
It is single, easy to operate, working efficiency is significantly improved, in Excavation Process, easily gradient inspection can be controlled at any time;Together
When, which can fold, and reduce storage space, be convenient for carrying.
To achieve the above object, the technical solution adopted in the utility model are as follows:
A kind of excavation of foundation pit slope control tool, including multiple scales pass through hinged axis connection, the work between each scale
Tool is equipped with handheld terminal and weight bearing end, and the scale is equipped with scale, and the weight bearing end is equipped with weight bearing hole, and weight bearing hole has penetrated traction
Rope, one end of traction rope are capable of fixing on handheld terminal, and the other end connects pendant.
Preferred as the utility model, the scale is made for flitch.
Preferred as the utility model, the length and width of the multiple scale is all different, it is therefore an objective to can when folding
To prevent the influence of articulated shaft.
Preferred as the utility model, the articulated shaft is rivet, can be by the manual rotary folding of scale by rivet
To together.
Preferred as the utility model, the scale division value of the scale is 2cm.
Compared with prior art, the utility model has the following beneficial effects:
1, the utility model excavation of foundation pit slope control tool is used for the scene slope gradient when foundation pit uses sloping timbering
Control, which is simple and convenient to operate.
2, it can be folded between each scale of the utility model excavation of foundation pit slope control tool by hinged axis connection
Together, it conveniently takes, store.
3, the utility model excavation of foundation pit slope control tool facilitates operation when in use, when measuring the length of traction rope
Can use scale can measure, and data both horizontally and vertically can be obtained to get gradient numerical value is arrived, simply fastly in scale
It is prompt.
Detailed description of the invention
Fig. 1 is the side view of the utility model slope control tool;
Fig. 2 is the plan view of the utility model slope control tool;
Fig. 3 is the folded state diagram of the utility model slope control tool;
Fig. 4 is the use state diagram of the utility model slope control tool;
In figure, 1, scale, 2, scale, 3, articulated shaft, 4, weight bearing end, 5, handheld terminal, 6, weight bearing hole, 7, traction rope, 8, hang
Pendant.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer
Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described.
Embodiment 1
Figures 1 and 2 show that the structural schematic diagram of the slope control tool of the utility model.As illustrated in fig. 1 and 2, a kind of
Excavation of foundation pit slope control tool, including multiple scales 1 are connected by articulated shaft 3 between each scale 1, which is equipped with hand
End 5 and weight bearing end 4 are held, the scale 1 is equipped with scale 2, and the weight bearing end 4 is equipped with weight bearing hole 6, and weight bearing hole 6 has penetrated traction
Rope 7, one end of traction rope 7 is capable of fixing on handheld terminal 5, and the other end connects pendant 8.
As a kind of embodiment of the utility model, the scale 1 is made for flitch, and scale 2 is carved on flitch,
The scale division value of scale 2 is 2cm.When marking scale 2, every 2cm draws a black line from the 15cm at the weight bearing end 4 of scale 1,
Every 10cm draws a red line.
As a kind of embodiment of the utility model, the length and width of the multiple scale 1 is all different, it is therefore an objective to
The influence of articulated shaft 3 can be prevented when folding.As a kind of embodiment of the utility model, the articulated shaft 3 is rivet, is led to
It crosses rivet and multiple scales 1 can be can be manually rotated and is folded together, conveniently take and store, reduce space, as shown in Figure 3.
In the present embodiment, which includes three scales 1, respectively the comprising weight bearing end 4
One scale, the third scale comprising handheld terminal 5, and the second scale between the first scale and third scale, the first scale,
The length of second scale and third scale is sequentially reduced, adjacent to differ 5 ~ 10cm, the first scale, the second scale and the between the two
The width of three scales is sequentially increased, adjacent to differ 3 ~ 5cm between the two.Meanwhile in the present embodiment, traction rope 7 can use cotton
Line can also be used nut, can also be used other objects with constant weight using other lines, pendant 8.It is led in folding and unfolding
After the completion of messenger 7, traction rope 7 can be fastened on handheld terminal 5.
The control tool of the utility model when in use, as shown in figure 4, scale 1 is laid flat top of the slope, hangs down with side slope top curve
It is directly stretched out into foundation pit, putting down traction rope 7 makes pendant 8 freely hang, and when pendant 8 just contacts slope surface, writes down the quarter of scale 1
Degree withdraws scale 1, measures the length of traction rope 7, the slope gradient that you can get it.The utility model is accurate convenient for operation, measurement.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of excavation of foundation pit slope control tool, which is characterized in that the tool includes multiple scales, is passed through between each scale
Hinged axis connection, the tool are equipped with handheld terminal and weight bearing end, and the scale is equipped with scale, and the weight bearing end is equipped with weight bearing hole,
Weight bearing hole has penetrated traction rope, and one end of traction rope is capable of fixing on handheld terminal, and the other end connects pendant.
2. excavation of foundation pit slope control tool according to claim 1, which is characterized in that the scale be flitch make and
At.
3. excavation of foundation pit slope control tool according to claim 1, which is characterized in that the length of the multiple scale and
Width is all different.
4. excavation of foundation pit slope control tool according to claim 1, which is characterized in that the articulated shaft is rivet, is led to
Crossing rivet can be by the manual rotary folding of scale to together.
5. excavation of foundation pit slope control tool according to claim 1, which is characterized in that the scale division value of the scale is
2cm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821348506.1U CN208668427U (en) | 2018-08-21 | 2018-08-21 | A kind of excavation of foundation pit slope control tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821348506.1U CN208668427U (en) | 2018-08-21 | 2018-08-21 | A kind of excavation of foundation pit slope control tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208668427U true CN208668427U (en) | 2019-03-29 |
Family
ID=65839129
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821348506.1U Active CN208668427U (en) | 2018-08-21 | 2018-08-21 | A kind of excavation of foundation pit slope control tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208668427U (en) |
-
2018
- 2018-08-21 CN CN201821348506.1U patent/CN208668427U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103616493B (en) | A kind of three-dimensional artificial rainfall reservoir landslide physical experiments equipment | |
CN209066448U (en) | A kind of combined foundation ditch support structure | |
CN204418150U (en) | Field deviational survey automatic acquisition device | |
CN103486954A (en) | Coal mine roadway deformation measuring device and method | |
CN208668427U (en) | A kind of excavation of foundation pit slope control tool | |
CN107269015A (en) | A kind of deep pit monitor protector based on Municipal Road Engineering | |
CN105953698A (en) | Floor thickness measuring tool and measuring method | |
CN204302275U (en) | A kind of soil in protected field moisture and salt regime experimental rig of improvement | |
CN212865959U (en) | Foundation ditch protector for civil engineering | |
CN207180683U (en) | A kind of building construction formwork verticality measuring tool | |
CN204590040U (en) | Support of Foundation Pit Excavation device | |
CN203396325U (en) | Concrete floor thickness measurement device | |
CN203551036U (en) | Underground water level measuring device | |
CN104878735A (en) | Soil osmotic coefficient in-situ testing device and testing method thereof | |
CN209025090U (en) | A kind of foundation pit construction parameter detection device | |
CN204008399U (en) | A kind of soil permeability coefficient is measured integrated apparatus in batches | |
CN209854723U (en) | Leveling tripod device for rock-socketed pile planting of anchor rod | |
CN203940876U (en) | A kind of walker of surveying instrument | |
CN206330519U (en) | Goaf top plate measurer for thickness | |
CN206154263U (en) | Plotting tool case for civil engineering | |
CN205152953U (en) | Deep concrete gauge stick | |
CN208857822U (en) | A kind of pipeline directly excavates detection and combines protective plate with test pit | |
CN219571415U (en) | Engineering mapping device | |
CN205480068U (en) | Building surveying who can be used to hard ground triangular supports surveys and signs | |
CN221037425U (en) | Portable dipperstick is used in building engineering survey and drawing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |