CN208657957U - A kind of mesona formation system - Google Patents
A kind of mesona formation system Download PDFInfo
- Publication number
- CN208657957U CN208657957U CN201721887873.4U CN201721887873U CN208657957U CN 208657957 U CN208657957 U CN 208657957U CN 201721887873 U CN201721887873 U CN 201721887873U CN 208657957 U CN208657957 U CN 208657957U
- Authority
- CN
- China
- Prior art keywords
- cooling
- cooling tube
- mesona
- filled cavity
- formation system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Confectionery (AREA)
Abstract
The utility model discloses a kind of mesona formation systems, including feed hopper, filled cavity, material-pulling device and cooling forming device, it is characterized by: the upper end of filled cavity is arranged in the feed hopper, filled cavity is equipped with a feed inlet and connect with feed hopper, the material-pulling device and cooling forming device are separately positioned on the two sides of filled cavity, the cooling forming device includes a cooling tube, multiple spaced material forming pipes are fixed with along cooling tube axis direction in the cooling tube, liquid coolant is filled between the material forming pipe and cooling tube, the material forming pipe includes a feed end and a discharge end, the feed end of the material forming pipe is connected to filled cavity, the material-pulling device will be in the material push-in material forming pipe in filled cavity.The utility model cools down mesona item gradually, efficiently completes the molding of product.
Description
Technical field
The utility model relates to a kind of mesona process equipment, especially a kind of mesona formation system.
Background technique
Mesona jelly is famous one of the snack in Fujian, and there are two types of eating methods.One of which is also popular in Guangdong,Hongkong and Macao, but at these
Area is known as bean jelly.Now mesona jelly is mainly first cast in a biggish mold by mesona item on the market, then by mould
Tool immerses in ice water or is placed in cooling in freezer, allows mesona to congeal admittedly blocking.Then it is enterprising entire mold to be put into dicer
Row slitting, the item cut is at square, though length is adjustable, maximum length is limited to the length of mold.
Above traditional mesona manufacture craft time is longer, and mesona jelly wants long cooling time in a mold, usually
It needs 4-5 hours.What is cut out must be square, and otherwise sapwood loss is larger, and length limited is in the length of mold.
Summary of the invention
In order to solve deficiency in the prior art, the purpose of this utility model is to provide a kind of high in machining efficiency, moldings
Effect is good, mesona formation system easy to use.
To achieve the above object, the utility model uses following technical scheme:
A kind of mesona formation system, including feed hopper, filled cavity, material-pulling device and cooling forming device, the charging
The upper end of filled cavity is arranged in bucket, and filled cavity is equipped with a feed inlet and connect with feed hopper, the material-pulling device and cooling and shaping
Device is separately positioned on the two sides of filled cavity, and the cooling forming device includes a cooling tube, along cooling tube in the cooling tube
Axis direction is fixed with multiple spaced material forming pipes, cold filled with liquid between the material forming pipe and cooling tube
But agent, the material forming pipe include a feed end and a discharge end, and the feed end of the material forming pipe is connected to filled cavity,
The material-pulling device will be in the material push-in material forming pipe in filled cavity.
The material-pulling device includes the promotion piston that filled cavity side is arranged in, connect with promotion piston and promotion is driven to live
Fill in the Pneumatic extension bar mobile to material forming pipe side.
The filled cavity includes that a piston pushes section and a cooling tube linkage section, and the piston pushes section to connect with cooling tube
The junction of section is equipped with the second charging switch, and one end of cooling tube linkage section pushes section to connect with piston, the other end and cooling tube
Connection.
The lower end of the feed hopper is equipped with the first charging switch.
The cooling tube is removably disposed in the side of filled cavity, and the cooling tube and filled cavity pass through clamp connection.
The cooling tube is equipped with coolant entrance close to one end of material forming pipe discharge end, and the other end of cooling tube is equipped with
The lower end of cooling tube is arranged in coolant outlet, the coolant entrance, and the upper end of cooling tube is arranged in coolant outlet.
Multiple partitions have been arranged radially along cooling tube in the cooling tube, and cooling tube is divided into multiple cooling sections, Ge Geleng
But opening connection is equipped between section, the opening of each cooling section is vertically arranged alternately.
The liquid coolant is cooling water.
The opening of each cooling section is equipped with temperature-detecting device.
The temperature-detecting device is thermometer.
The utility model uses above technical scheme, and material enters in filled cavity from feed hopper, then enters object by filled cavity
Expect in formed pipe, overall structure is simple, easy to use, the cooling water flow direction in cooling tube and the flow direction of material in material forming pipe
On the contrary, multiple cooling chambers are arranged, segmentation condensation after preventing cooling water from entering from below, directly walks bottom runner directly from a left side
Top outflow.Not only heat transfer effect is influenced, but also causes material part cooling too early, cooling water and mesona material inversely flow to setting,
Mesona item is gradually cooled down, cooling uniform, mesona appearance after cooling is mellow and full good-looking, more beautiful, each cooling section
On be additionally provided with temperature-detecting device, the convenient monitoring to each cooling section temperature accurately controls the condensing rate of each cooling section, object
Material formed pipe is detachably arranged with cooling tube, facilitates the mesona item of production different size, and conveniently to cooling and shaping pipe and material
Filling cylinder carries out dismounting cleaning, meanwhile, the utility model greatly improves the cooling efficiency of mesona item, substantially reduces mesona
The length of the cooling time of item, mesona item can also be adjusted arbitrarily.Such product is more approved by market.
Detailed description of the invention
The utility model is described in further details below in conjunction with the drawings and specific embodiments:
Fig. 1 is a kind of structural schematic diagram of mesona formation system of the utility model;
Fig. 2 is the cross section structure schematic diagram of cooling forming device.
Specific embodiment
As shown in attached drawing 1 or 2, the utility model includes feed hopper 1, filled cavity 2, material-pulling device 3 and cooling forming device
4, the upper end of filled cavity 2 is arranged in the feed hopper 1, and the lower end of the feed hopper 1 is equipped with the first charging switch 11, filled cavity 2
It is equipped with a feed inlet to connect with feed hopper 1, the material-pulling device 3 and cooling forming device 4 are separately positioned on the two of filled cavity 2
Side, the cooling forming device 4 include a cooling tube, are fixed with multiple intervals along cooling tube axis direction in the cooling tube and set
The material forming pipe 41 set is filled with liquid coolant, the material forming pipe between the material forming pipe 41 and cooling tube 4
41 include a feed end 411 and a discharge end 412, and the feed end 411 of the material forming pipe is connected to filled cavity 2, described to push away
Expect that device 3 will be in the material push-in material forming pipe 41 in filled cavity 2.The material-pulling device 3 includes being arranged in filled cavity side
Promotion piston 32, with push piston connect and drive push piston to material forming pipe side move Pneumatic extension bar 31.
The filled cavity 2 includes that a piston pushes section and a cooling tube linkage section, and the piston pushes the company of section and cooling tube linkage section
It meets place and is equipped with the second charging switch 21, one end of cooling tube linkage section pushes section to connect with piston, and the other end and cooling tube 4 connect
It connects.
Preferably, the cooling tube 4 is removably disposed in the side of filled cavity, and the cooling tube 4 passes through with filled cavity 2
Clip 5 connects.Since the core component of mesona Preparation equipment is cylinder moving component, material filled cavity and it is cooled to
Type device composition.And market often has the demand of different size to mesona product.In order in device fabrication as far as possible
Meet client to the different demands of product form, the connection between material cooling zone and material filling cylinder can be switched to by being fixedly welded
Clip loose joint so can be used for replacing the cooling and shaping pipe of different shaping, while facilitating again and filling to cooling and shaping pipe and material
Cylinder carries out dismounting cleaning.
The cooling tube is equipped with coolant entrance 42 close to one end of material forming pipe discharge end, and the other end of cooling tube is set
There is coolant outlet 43, the lower end of cooling tube is arranged in the coolant entrance 42, and cooling tube is arranged in coolant outlet 43
Upper end.Preferably, the liquid coolant is cooling water.Being arranged radially multiple partitions 44 along cooling tube in the cooling tube will
Cooling tube is divided into multiple cooling sections, 45 connection of opening is equipped between each cooling section, the opening 45 of each cooling section is vertically
It is arranged alternately.Temperature-detecting device 46 is equipped at the opening 45 of each cooling section.Preferably, the temperature-detecting device
For thermometer.
Utility model works process is as follows:
1, material will be filled in feed hopper first;
2, cooling water is squeezed into cooling tube, cooling water is by the reverse runner of material in bottom in and top out, with pipe;
3, the first charging switch is opened, simultaneously closes off the second charging switch, filling chamber piston is toward left movement, by material inspiration
In filling chamber;
4, the first charging switch is closed, the second charging switch is opened simultaneously, filling the cylinder piston turns right movement, material is pressed into
In material forming pipe;
5, it when material enters material forming pipe, and gradually begins to cool, is completed when it discharges from material forming pipe solidifying
Gu gelled solid.And complete the molding of product.
The above is only the preferred embodiments of the utility model, are not intended to limit the utility model, for this field
Technical staff for, various modifications and changes may be made to the present invention, within the spirit and principle of the utility model,
Any modification, equivalent substitution, improvement and etc. done, should be included within the scope of protection of this utility model.
Claims (10)
1. a kind of mesona formation system, including feed hopper, filled cavity, material-pulling device and cooling forming device, it is characterised in that:
The feed hopper is arranged in the upper end of filled cavity, and filled cavity is equipped with a feed inlet and connect with feed hopper, the material-pulling device with
Cooling forming device is separately positioned on the two sides of filled cavity, and the cooling forming device includes a cooling tube, in the cooling tube
Multiple spaced material forming pipes are fixed with along cooling tube axis direction, are filled between the material forming pipe and cooling tube
Have a liquid coolant, the material forming pipe includes a feed end and a discharge end, the feed end of the material forming pipe with fill out
Chamber connection is filled, the material-pulling device will be in the material push-in material forming pipe in filled cavity.
2. a kind of mesona formation system according to claim 1, it is characterised in that: the material-pulling device includes that setting exists
The promotion piston of filled cavity side connect with promotion piston and promotion piston is driven pneumatically to stretch to material forming pipe side is mobile
Contracting bar.
3. a kind of mesona formation system according to claim 1, it is characterised in that: the filled cavity includes that a piston pushes away
Dynamic section and a cooling tube linkage section, the piston pushes the junction of section and cooling tube linkage section to be equipped with the second charging and switchs, cold
But one end of pipe linkage section pushes section to connect with piston, and the other end is connect with cooling tube.
4. a kind of mesona formation system according to claim 1, it is characterised in that: the lower end of the feed hopper is equipped with the
One charging switch.
5. a kind of mesona formation system according to claim 1, it is characterised in that: the cooling tube is removably disposed
In the side of filled cavity, the cooling tube and filled cavity pass through clamp connection.
6. a kind of mesona formation system according to claim 1, it is characterised in that: the cooling tube is close to material forming
One end of pipe discharge end is equipped with coolant entrance, and the other end of cooling tube is equipped with coolant outlet, the coolant entrance setting
In the lower end of cooling tube, the upper end of cooling tube is arranged in coolant outlet.
7. a kind of mesona formation system according to claim 1, it is characterised in that: along cooling caliber in the cooling tube
Cooling tube is divided into multiple cooling sections to multiple partitions are provided with, opening connection, each cooling are equipped between each cooling section
The opening of section is vertically arranged alternately.
8. a kind of mesona formation system according to claim 1, it is characterised in that: the liquid coolant is cooling
Water.
9. a kind of mesona formation system according to claim 7, it is characterised in that: the opening of each cooling section
It is equipped with temperature-detecting device.
10. a kind of mesona formation system according to claim 9, it is characterised in that: the temperature-detecting device is temperature
Degree meter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721887873.4U CN208657957U (en) | 2017-12-28 | 2017-12-28 | A kind of mesona formation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721887873.4U CN208657957U (en) | 2017-12-28 | 2017-12-28 | A kind of mesona formation system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208657957U true CN208657957U (en) | 2019-03-29 |
Family
ID=65819513
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721887873.4U Active CN208657957U (en) | 2017-12-28 | 2017-12-28 | A kind of mesona formation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208657957U (en) |
-
2017
- 2017-12-28 CN CN201721887873.4U patent/CN208657957U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207724705U (en) | A kind of horizontal injection press | |
CN106738732A (en) | Equipment for cooling die | |
CN211074590U (en) | High-temperature injection molding mold | |
CN207711354U (en) | A kind of PVC profile dry and wet mixing vacuum sizing device | |
CN208657957U (en) | A kind of mesona formation system | |
CN207643560U (en) | A kind of horizontal toggle injection molding machine of production cutlery box | |
CN207109161U (en) | A kind of double-deck spinneret die head | |
CN107297849B (en) | Turnover open-close type rapid forming die | |
CN208359323U (en) | A kind of plastic bowl manufacture mold convenient for fast demoulding | |
CN207840067U (en) | A kind of aluminum alloy die-casting die | |
CN208263320U (en) | Injection mold with cooling pipe | |
CN104890207A (en) | Refrigerator pipe-extruding paving machine | |
CN208490767U (en) | A kind of mesona cooling system | |
CN202011141U (en) | High-efficiency cooling device for core of pipe extrusion mold | |
CN208068696U (en) | A kind of die device of fast demoulding | |
CN208133570U (en) | Squeeze out hot runner system | |
CN207154759U (en) | Aluminium alloy moulding by casting equipment | |
CN206416490U (en) | A kind of process units of door and window curtain wall section bar heat insulating strip | |
CN208263370U (en) | Constant-temperature precision injection mold | |
CN207059157U (en) | A kind of fast cooling shaping mould | |
CN207240582U (en) | A kind of dual-screw pelletizer | |
CN221249755U (en) | Cooling type injection mold | |
CN205466936U (en) | Plastic mold convenient to barb drawing of patterns | |
CN209050961U (en) | A kind of rapid thermal cycles high-gloss injection mold | |
CN209718450U (en) | A kind of cold runner device of rubber injection vulcanizing equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |