CN208651932U - One kind can Rapid pipe installation - Google Patents
One kind can Rapid pipe installation Download PDFInfo
- Publication number
- CN208651932U CN208651932U CN201821330087.9U CN201821330087U CN208651932U CN 208651932 U CN208651932 U CN 208651932U CN 201821330087 U CN201821330087 U CN 201821330087U CN 208651932 U CN208651932 U CN 208651932U
- Authority
- CN
- China
- Prior art keywords
- tube body
- annular groove
- hole
- pipe
- pipe installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Quick-Acting Or Multi-Walled Pipe Joints (AREA)
Abstract
The utility model discloses one kind can Rapid pipe installation, including the first tube body, the second tube body, engaging item, the outside of first tube body one end is equipped with first annular groove;The inside of second tube body one end is equipped with second annular groove, first through hole is additionally provided on second tube body, described first through hole one end is connected with second annular groove, it is connected on the outside of the first through hole other end and the second tube body, first tube body inserts in second tube body in one end of second annular groove with one end of first annular groove, the first annular groove and second annular groove split form accommodating chamber, the engaging one end is inserted in accommodating chamber by first through hole, and forms annular engaging circle according to the receiving cavity configuration.The utility model pipe installation process is simple and fast, can effectively solve the problems, such as realize that Pipe installing connects, and stablizes pipeline configuration, can bear pulling force using the heat mode of melting in the prior art, can be used for level and bore pipe in pipe pulling construction surely.
Description
Technical field
The utility model relates to a kind of pipelines, more particularly to a kind of quick-installed pipeline
Background technique
When carrying out municipal pipeline project installation or maintenance, the problems such as Chang Huiyou ponding, occurs, and needs quickly to carry out multiple
Tube body splicing installation is suitable to duct length, the substances such as ponding, mud is shifted by pipeline, it is ensured that municipal pipeline engineering
It can be normally carried out.But it is larger to shift ponding, the conduit volume of the substances such as mud, can not be realized in a manner of screw thread rotation pipeline it
Between connection and sealing.Existing pipeline is mostly welded and fused in such a way that heat is melted, and realizes the installation of pipeline, but to melt technique numerous for heat
Trivial, the used time is longer, and not can guarantee pipe side wall consistency of thickness, easily leads to pipeline during pipe in pipe pulling construction and breaks, causes
Work progress is stagnated, and being normally carried out for municipal pipeline engineering is influenced.
Utility model content
The utility model provide one kind can Rapid pipe installation, melt welded pipe line not at least to solve heat in the prior art
The problem of capable of bearing excessive pulling force.
The utility model discloses one kind can Rapid pipe installation, including the first tube body, the second tube body, engaging item, it is described
The outside of first tube body one end is equipped with first annular groove;The inside of second tube body one end is equipped with second annular groove, institute
It states and is additionally provided with first through hole on the second tube body, described first through hole one end is connected with second annular groove, and the first through hole is another
It is connected on the outside of one end and the second tube body, there is one end of first annular groove to insert in second tube body and have for first tube body
In one end of second annular groove, the first annular groove and second annular groove split form accommodating chamber, the engaging item
One end is inserted in accommodating chamber by first through hole, and forms annular engaging circle according to the receiving cavity configuration.
Further, second tube body includes first sleeve structure, through-pipe structure, the first outer expander structure, and described
One outer expander structure one end is small-bore tubing mouth, and the other end is imperial palace foot-path calibre, the small-bore tubing mouth and through-pipe structure internal diameter
Equal, the imperial palace foot-path calibre is equal with the internal diameter of first sleeve structure, first sleeve structure one end and the first outer expander
The imperial palace foot-path calibre of structure is connected, and described through-pipe structure one end is connected with the small-bore tubing mouth of the first outer expander structure, and described the
Second ring groove, first through hole are respectively positioned in first sleeve structure.
Further, the outer diameter of first tube body is identical as the internal diameter of first sleeve structure, first tube body
Outer diameter is identical as through-pipe structure outer diameter.
Further, the first sealing ring is additionally provided in second tube body, first sealing ring is located at the second annular
Between groove and the first outer expander structure.
Further, first tube body is recessed far from third annular is additionally provided on the outside of one end of first annular groove
Slot.
Further, first tube body is additionally provided with the second cannula structure, second far from one end of first annular groove
Outer expander structure, described second outer expander structure one end are small-bore tubing mouth, and the other end is imperial palace foot-path calibre, the small-bore tubing
Mouth is equal with the first internal diameter of tube body, and the imperial palace foot-path calibre is equal with the internal diameter of the second cannula structure, second cannula structure
One end is connected with the imperial palace foot-path calibre of the second outer expander structure, and the inside of the second cannula structure other end is equipped with fourth annular
Groove is additionally provided with the second through-hole in second cannula structure, and second through-hole one end is connected with fourth annular groove, described
It is connected on the outside of the second through-hole other end and the second cannula structure, the small internal diameter of first tube body one end and the second outer expander structure
Nozzle is connected.
Further, the second sealing ring is additionally provided in second cannula structure, second sealing ring is located at the 4th
Between annular groove and the second outer expander structure.
Further, first tube body, the second tube body are modified PVC pipe.
The invention also discloses a kind of installation methods of above-mentioned pipeline, which is characterized in that the installation method is as follows:
First tube body inserts in one end in the second tube body with second annular groove with one end of first annular groove, makes
Second annular groove is aligned to form annular seal space with first annular groove, and the one end for engaging item is inserted into from first through hole, makes
Engaging item forms ring structure under the action of annular seal space, realizes relatively fixed, completion of first tube body with the second tube body
Installation.
The utility model compared with prior art, by setting the first tube body, the second pipe structure for pipeline, and
It is respectively provided on one tube body, the second tube body and leads to after the first tube body, the second tube body split for groove that is fixed and sealing
The insertion for crossing engaging item forms annular engaging circle, realizes and is mutually clamped fixation between the first tube body, the second tube body, it is ensured that composition
Pipeline configuration stablize, the larger pulling force for enabling pipeline configuration to bear to generate in work progress can be used for level without being opened
Surely during the pipe in pipe pulling construction such as brill pipe in pipe pulling construction.
In addition, the utility model pipeline has the advantages that installation is simple, it is only necessary to the insertion groove of item, Ji Keshi will be engaged
The installation of existing pipeline.Meanwhile the utility model need to only extract engaging item when carrying out pipeline disassembly, the first tube body, the second pipe
It can be split between body, realize fast quick-detach, it is complete rear not easy to disassemble to efficiently solve Pipe installing in the prior art
Problem.
Detailed description of the invention
Fig. 1 is the first tube body of the utility model embodiment the schematic diagram of the section structure;
Fig. 2 is the second tube body of the utility model embodiment the schematic diagram of the section structure;
Fig. 3 is the schematic cross-section that the second tube body of the utility model embodiment has second annular groove;
Fig. 4 is the schematic diagram of the section structure under the first tube body of the utility model embodiment and the second tube body split state;
Fig. 5 is that the utility model embodiment engages an insert state structural schematic diagram;
Fig. 6 is that the utility model embodiment engages a fully-inserted state structural schematic diagram;
Fig. 7 is the schematic diagram of the section structure that the first tube body of the utility model embodiment has third annular groove;
Fig. 8 is that the first tube body of the utility model embodiment has the second cannula structure structural schematic diagram;
Fig. 9 is under the first tube body and the second tube body split state that the utility model embodiment has the second cannula structure
The schematic diagram of the section structure.
Specific embodiment
In order to make those skilled in the art better understand the scheme of the utility model, below in conjunction with the utility model reality
The attached drawing in example is applied, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that described
Embodiment is only the embodiment of the utility model a part, instead of all the embodiments.Based on the reality in the utility model
Example is applied, every other embodiment obtained by those of ordinary skill in the art without making creative efforts is all answered
When the range for belonging to the utility model protection.
It should be noted that the specification and claims of the utility model and term " first " in above-mentioned attached drawing,
" second " etc. is to be used to distinguish similar objects, without being used to describe a particular order or precedence order.
The utility model embodiment disclose one kind can Rapid pipe installation, including the first tube body 1, the second tube body 2, engaging
Item 3, as shown in Figure 1, the outside of described first tube body, 1 one end is equipped with first annular groove 11;As shown in figure 3, second pipe
The inside of 2 one end of body is equipped with second annular groove 211, is additionally provided with first through hole 212, the first through hole on second tube body
212 one end are connected with second annular groove 211, are connected on the outside of 212 other end of first through hole and the second tube body 2, and described
One tube body 1, which inserts in second tube body 2 with one end of first annular groove 11, to be had in one end of second annular groove 211,
The first annular groove 11 forms accommodating chamber with 211 split of second annular groove, and described 3 one end of engaging item passes through first through hole
212 insert in accommodating chamber, and form annular engaging circle according to the receiving cavity configuration.
Optionally, as shown in Fig. 2, second tube body 2 is extended out including first sleeve structure 21, through-pipe structure 23, first
Pipe structure 22, described first outer 22 one end of expander structure are small-bore tubing mouth, and the other end is imperial palace foot-path calibre, the small-bore tubing
Mouth is equal with 23 internal diameter of through-pipe structure, and the imperial palace foot-path calibre is equal with the internal diameter of first sleeve structure 21, the first sleeve
21 one end of structure is connected with the imperial palace foot-path calibre of the first outer expander structure 22, described 23 one end of through-pipe structure and the first outer expander knot
The small-bore tubing mouth of structure 22 is connected, and the second annular groove 211, first through hole 212 are respectively positioned in 21 structure of first sleeve.
Wherein, 1 structure of the first tube body is as shown in Figure 1, have first annular groove 11 on the outside of one end of the first tube body 1, and the
Two tube bodies, 2 structure is as shown in Fig. 2, the second tube body 2 is tubular-shaped structures, first sleeve structure 21, through-pipe structure 23, the first outer expander
Structure 22 is integrated.The internal diameter of the first sleeve structure 21 of second tube body 2 is identical as the outer diameter of the first tube body 1, and first
Tube body 1, which can be stablized, to be inserted into first sleeve structure 21, and the cross section structure of first sleeve structure 21 is as shown in figure 3, first is logical
Connecting on the outside of 212 one end of hole and first sleeve structure 21,212 other end of first through hole connects with second annular groove 211, and the
One through-hole, 212 place straight line and the angle of 211 outer circle of second annular groove are on-right angle, and preferably included angle is 30-60 degree.Also
It is noted that as shown in figure 5, one end that engaging item 3 is inserted into accommodating chamber has prong structure 31.
The installation method of the utility model embodiment pipeline, as follows:
As shown in figure 4, the first tube body 1 inserts in the second tube body 2 with one end of first annular groove 11 has the second ring
One end of connected in star 211 makes second annular groove 211 be aligned to form annular seal space with first annular groove 11, such as Fig. 5 institute
Show, one end of engaging item 3 is inserted into from first through hole 212, as shown in fig. 6, engaging item 3 is formed under the action of annular seal space
Ring structure realizes relatively fixed, completion installation of first tube body 1 with the second tube body 2.
Pipeline is set 2 structure of the first tube body 1 and the second tube body by the utility model embodiment, and in 1 He of the first tube body
It is respectively provided on second tube body 2 and passes through card after the first tube body 1 and the second 2 split of tube body for groove that is fixed and sealing
Being fixed to each other between the first tube body 1 and the second tube body 2 is realized in the insertion for closing item 3, and it is excellent to have that installation is simple, engaging effect is good
Point can facilitate tube body to pull, and stablize pipeline configuration, can bear pulling force, can be used for level and bore pipe in pipe pulling construction surely.Meanwhile this reality
With new embodiment when carrying out pipeline disassembly, engaging item 3 need to only be extracted, it can between the first tube body 1 and the second tube body 2
It is split, realizes fast quick-detach, efficiently solved the problems, such as not easy to disassemble after Pipe installing is complete in the prior art.In addition, this
Utility model embodiment is by setting non-straight for 212 place straight line of first through hole and the angle of 211 outer circle of second annular groove
Angle makes to engage item 3 convenient for by reducing the insertion difficulty of engaging item 3, together in the insertion second annular groove 211 of first through hole 212
The prong structure 31 of Shi Kahe item 3 further facilitates the insertion of engaging item, it is ensured that engaging item 3 during insertion will not be with receiving
The side wall of chamber generates larger friction, guarantees the Fast Installation of pipeline.
The utility model embodiment allows second pipe 2 to the first tube body 1 by using the first outer expander structure 22
Insertion degree is defined, and prevents from causing the annular of first annular groove 11, second recessed due to tube body 1 is excessively inserting or is inserted into not enough
The problem of dislocation can not be installed occurs between slot 211, only when the first tube body 1 is stopped by the first outer expander structure 22,
Ability split forms complete accommodating chamber between first annular groove 11 and second annular groove 211, to reduce pipeline
Installation difficulty improves Pipe installing efficiency.
Particularly, the outer diameter of first tube body 1 is identical as the internal diameter of first sleeve structure 21, first tube body 1
Outer diameter is identical as 23 outer diameter of through-pipe structure.
Particularly, the first sealing ring is additionally provided in second tube body 2, first sealing ring is located at second annular groove
211 and first between outer expander structure 22.
Wherein, the first sealing ring is rubber ring, and the first sealing ring is fixed on the using gluing or by the way of being fixed
In sleeve structure 21.First sealing ring carries out the gap of the first tube body 1, the second tube body 2 to replenish sealing, realizes dual-seal
Effect.
The utility model embodiment further enhances the leakproofness inside pipeline by the way that the first sealing ring is respectively adopted,
A possibility that leaking after reduction Pipe installing improves the safety and reliability that pipeline uses.
Particularly, as shown in fig. 7, being additionally provided on the outside of the described one end of first tube body 1 far from first annular groove 11
Three annular grooves 12.
Wherein, as shown in fig. 7, the first annular groove 11 at 1 both ends of the first tube body, third annular groove 12 are symmetrical junction
Structure.
The utility model embodiment passes through annular using symmetrical first annular groove 11, third at 1 both ends of the first tube body
Groove 12, the second tube body 2 can be fixed by making 1 both ends of the first tube body, so only need to by using the second tube body 2, the first tube body 1,
The successively fixed installation for realizing longer pipe road of second tube body 2, it is ensured that pipeline configuration disclosed in the utility model embodiment can
Applied to a variety of construction sites.
Particularly, as shown in figure 8, first tube body 1 is additionally provided with the second casing far from one end of first annular groove 11
Structure 5, the second outer expander structure 4, described second outer 4 one end of expander structure are small-bore tubing mouth, and the other end is imperial palace foot-path calibre,
The small-bore tubing mouth is equal with 1 internal diameter of the first tube body, and the imperial palace foot-path calibre is equal with the internal diameter of the second cannula structure 5, institute
It states 5 one end of the second cannula structure to be connected with the imperial palace foot-path calibre of the second outer expander structure 4,5 other end of the second cannula structure
Inside be equipped with fourth annular groove 51, be additionally provided with the second through-hole in second cannula structure 5, second through-hole one end with
Fourth annular groove 51 is connected, and is connected on the outside of the second through-hole other end and the second cannula structure 5, first tube body 1 one
End is connected with the small-bore tubing mouth of the second outer expander structure 4.
Wherein, as shown in figure 9, pipeline is made of the first tube body 1, the second tube body 2 in the utility model embodiment, the first pipe
Body 1 has in one end insertion first sleeve structure 21 of first annular groove 11, first annular groove 11 and second annular groove
211, take in engaging item 3 insertion first through hole 212, realize the first tube body 1, the second tube body 2 it is relatively fixed.First tube body
1, it is identical structure that the second tube body 2 is practical.
The utility model embodiment makes the first tube body by setting structure identical with the second tube body 2 for the first tube body 1
1 and second tube body 2 complete installation after, one end of the first tube body can still carry out tube body connection, facilitate realize pipeline lengthening.Together
When, the utility model embodiment simplifies the composition of pipeline by uniformly setting identical structure for the first tube body 1, the second tube body 2
Structure facilitates carry out Tube formation, improves Pipe installing efficiency.
Particularly, the second sealing ring is additionally provided in second cannula structure 5, second sealing ring is located at fourth annular
Between groove 51 and the second outer expander structure 4.
Wherein, the second sealing ring is rubber ring, and the second sealing ring is fixed on the using gluing or by the way of being fixed
In two cannula structures 5.
The utility model embodiment further enhances the leakproofness inside pipeline by the way that the second sealing ring is respectively adopted,
A possibility that leaking after reduction Pipe installing improves the safety and reliability that pipeline uses.
Optionally, first tube body 1, the second tube body 2 are modified PVC pipe.
Wherein, the first tube body 1, the second tube body 2 are anti-ultraviolet modified PVC pipe.
The utility model embodiment by using modified PVC pipe as the first tube body 1 and the second tube body 2, it is hard using pvc pipe
The feature that degree is high, corrosion resistance is strong, light reduces pipeline and splices difficulty, and improves the service life of pipeline, it is ensured that pipeline is right
It still can normal use when sewage containing corrosivity is shifted.Meanwhile the utility model embodiment changes by using anti-ultraviolet
Property pvc pipe, improve the ultraviolet-resistant capacity of pipeline, avoid pipeline because long-time exposure under ultraviolet light due to cause pipeline excessively old
The problem of change, service life reduce.
Finally it should be noted that above embodiments are only to illustrate the technical solution of the utility model rather than limit it
System, although the utility model is described in detail referring to above-described embodiment, those of ordinary skill in the art should
Understand, technical staff read present specification after specific implementation of the utility model can still be modified or
Equivalent replacement, but these are modified or are changed within all without departing from present utility model application accompanying claims protection scope.
Claims (8)
1. one kind can Rapid pipe installation, which is characterized in that it is described can Rapid pipe installation include the first tube body, the second tube body,
Engage item, the outside of first tube body one end is equipped with first annular groove;The inside of second tube body one end is equipped with second
Annular groove is additionally provided with first through hole on second tube body, and described first through hole one end is connected with second annular groove, described
Be connected on the outside of the first through hole other end and the second tube body, first tube body inserts in described the with one end of first annular groove
Two tube bodies have in one end of second annular groove, and the first annular groove and second annular groove split form accommodating chamber,
The engaging one end is inserted in accommodating chamber by first through hole, and forms annular engaging circle according to the receiving cavity configuration.
2. according to claim 1 can Rapid pipe installation, which is characterized in that second tube body includes first sleeve knot
Structure, through-pipe structure, the first outer expander structure, described first outer expander structure one end are small-bore tubing mouth, and the other end is large diameter
Nozzle, the small-bore tubing mouth is equal with through-pipe structure internal diameter, and the imperial palace foot-path calibre is equal with the internal diameter of first sleeve structure,
First sleeve structure one end is connected with the imperial palace foot-path calibre of the first outer expander structure, outside described through-pipe structure one end and first
The small-bore tubing mouth of expander structure is connected, and the second annular groove, first through hole are respectively positioned in first sleeve structure.
3. according to claim 2 can Rapid pipe installation, which is characterized in that the outer diameter and first sleeve of first tube body
The internal diameter of structure is identical, and the outer diameter of first tube body is identical as through-pipe structure outer diameter.
4. according to claim 3 can Rapid pipe installation, which is characterized in that be additionally provided with the first sealing in second tube body
Circle, first sealing ring are located between second annular groove and the first outer expander structure.
5. according to claim 3 can Rapid pipe installation, which is characterized in that first tube body is far from first annular groove
One end on the outside of be additionally provided with third annular groove.
6. according to claim 3 can Rapid pipe installation, which is characterized in that first tube body is far from first annular groove
One end be additionally provided with the second cannula structure, the second outer expander structure, described second outer expander structure one end is small-bore tubing mouth, separately
One end is imperial palace foot-path calibre, and the small-bore tubing mouth is equal with the first internal diameter of tube body, the imperial palace foot-path calibre and the second casing knot
The internal diameter of structure is equal, and second cannula structure one end is connected with the imperial palace foot-path calibre of the second outer expander structure, and described second set
The inside of the pipe structure other end is equipped with fourth annular groove, is additionally provided with the second through-hole in second cannula structure, and described second
Through-hole one end is connected with fourth annular groove, is connected on the outside of the second through-hole other end and the second cannula structure, and described first
Tube body one end is connected with the small-bore tubing mouth of the second outer expander structure.
7. according to claim 6 can Rapid pipe installation, which is characterized in that be additionally provided with second in second cannula structure
Sealing ring, second sealing ring are located between fourth annular groove and the second outer expander structure.
8. according to claim 1 can Rapid pipe installation, which is characterized in that first tube body, the second tube body are to change
Property pvc pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821330087.9U CN208651932U (en) | 2018-08-16 | 2018-08-16 | One kind can Rapid pipe installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821330087.9U CN208651932U (en) | 2018-08-16 | 2018-08-16 | One kind can Rapid pipe installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208651932U true CN208651932U (en) | 2019-03-26 |
Family
ID=65790491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821330087.9U Active CN208651932U (en) | 2018-08-16 | 2018-08-16 | One kind can Rapid pipe installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208651932U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108775462A (en) * | 2018-08-16 | 2018-11-09 | 广东科朗管道修复技术有限公司 | One kind can Rapid pipe installation |
-
2018
- 2018-08-16 CN CN201821330087.9U patent/CN208651932U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108775462A (en) * | 2018-08-16 | 2018-11-09 | 广东科朗管道修复技术有限公司 | One kind can Rapid pipe installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208651932U (en) | One kind can Rapid pipe installation | |
CN202001741U (en) | Node reinforcing and dual sealing structure of glass reinforced plastic pipes | |
CN208670400U (en) | A kind of quick release pipe laying | |
CN101504096A (en) | Plug-in type pipe movable connector | |
CN108775462A (en) | One kind can Rapid pipe installation | |
CN212745497U (en) | Detachable pipeline interface structure capable of adapting to geological settlement | |
CN108916513A (en) | A kind of quick release pipe laying | |
CN203423471U (en) | Connector of tracer line or buried cab for gas and water supply plastic pipe system | |
CN217537064U (en) | Connecting pipe butt-joint structure and inspection well thereof | |
CN211475200U (en) | Combined PVC (polyvinyl chloride) pipe easy to assemble and disassemble | |
CN201090144Y (en) | Inclined plane jack-in type closing joint connecting inner tube | |
CN205919047U (en) | Pipeline is fast to be connected | |
CN210034667U (en) | Reinforced anti-settling jacking pipe for trenchless construction | |
CN203559845U (en) | Multifunctional casing joint patching device | |
CN110486560B (en) | House water supply pipeline | |
CN201561227U (en) | Plastic pipe fitting for mechanical connection | |
CN200949728Y (en) | Plastic pipe inserting anti-dropping pipeline | |
CN108505966A (en) | Slurry column structure design method and double-condensation double-density slurry column | |
CN202647039U (en) | Socket locking device for glass fiber reinforced plastic pipe | |
CN207213487U (en) | A kind of no-dig technique expands closing-type pipe-repairing | |
CN213929787U (en) | Pipeline structure convenient to loading and unloading | |
CN205639991U (en) | Tube fitting | |
GB2174776A (en) | Sealing pipelines | |
CN221799740U (en) | Full-drift diameter continuous oil pipe blanking plug | |
CN219843370U (en) | Annular limiting type electrician pipe fitting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |