CN208651820U - A kind of natural gas extraction tube support arrangement - Google Patents

A kind of natural gas extraction tube support arrangement Download PDF

Info

Publication number
CN208651820U
CN208651820U CN201821018902.8U CN201821018902U CN208651820U CN 208651820 U CN208651820 U CN 208651820U CN 201821018902 U CN201821018902 U CN 201821018902U CN 208651820 U CN208651820 U CN 208651820U
Authority
CN
China
Prior art keywords
arc panel
welded
natural gas
pedestal
cylindrical drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821018902.8U
Other languages
Chinese (zh)
Inventor
刘学伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821018902.8U priority Critical patent/CN208651820U/en
Application granted granted Critical
Publication of CN208651820U publication Critical patent/CN208651820U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses a kind of natural gas extraction tube support arrangements, including pedestal and support rod, the top of the pedestal is welded with support rod, the top of the support rod is welded with the first arc panel, the top left hand of first arc panel is connected with the second arc panel by connecting shaft, screw rod is bolted on the outer wall of second arc panel, the right side of second arc panel is connected by bolt with the first arc panel, and the left and right sides of the pedestal is welded with fixed mechanism.The natural gas extraction tube support arrangement, the different natural gas line of thickness can be fixed, beaing disk can drive column to move down, teeth, which will drive gear rotation, makes arc inserting column make arc-shaped rotation and make it through through-hole to produce in cylindrical drum and be pierced into soil, to improve the bearing capacity and stability of entire pedestal, blast weather is met to the fixation reliability requirement of pedestal, whole the phenomenon that shifting or even toppling over is avoided, improves safety.

Description

A kind of natural gas extraction tube support arrangement
Technical field
The utility model relates to natural gas extraction technical field, specially a kind of natural gas extraction tube support arrangement.
Background technique
Common natural gas line bracket only plays a supporting role to natural gas line, and existing support device is directly anchored to It is embedded on the concrete substrate of underground, such structures under wind ability is poor, it is difficult to which meeting blast weather can to the fixation of support device The phenomenon that requiring by property, support device can be made to shift or even topple over, reduces safety when use.
Utility model content
The purpose of this utility model is to provide a kind of natural gas extraction tube support arrangements, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the utility model provides the following technical solutions: a kind of natural gas extraction is filled with pipeline support It sets, including pedestal and support rod, the top of the pedestal is welded with support rod, and the top of the support rod is welded with the first arc Plate, the top left hand of first arc panel are connected with the second arc panel by connecting shaft, on the outer wall of second arc panel It is bolted with screw rod, the right side of second arc panel is connected by bolt with the first arc panel;
The left and right sides of the pedestal is welded with fixed mechanism, and the fixed mechanism includes cylindrical drum, the cylindrical drum Outer wall bottom end be reserved with through-hole, the top of the cylindrical drum is socketed with upper cover, and the bottom end of the cylindrical drum is plugged with conical head, The top of the conical head is welded with connecting column, and the top of the connecting column is welded with column, and the left and right sides of the column is equal Integrally formed with teeth, the outside engagement of the teeth is connected with gear, and the gear is connect by shaft and cylindrical drum axis, described The bottom end of gear is welded with the arc inserting column to match with through-hole, and the top of the column is welded with disk, the cylindrical drum It is welded with block at left and right sides of inner cavity, and block is located at the lower end of disk.
Preferably, the quantity of the through-hole is two, and two through-holes are symmetrical arranged relative to cylindrical drum.
Preferably, the lower surface of the screw rod is pasted with rubber block.
Preferably, from left to right gap weldig has inserting column for the bottom end of the pedestal, and the spacing between inserting column is cm.
Compared with prior art, the utility model has the beneficial effects that the natural gas extraction tube support arrangement, 1, logical It crosses and rotates the second arc panel to the left connecting shaft can be driven to rotate on the first arc panel, natural gas line is placed into first It can support in arc panel, the first arc panel and the second arc panel can be fixed together by tightening bolt, It rotates clockwise screw rod and can be contacted with the surface of natural gas line and it is fixed, different natural of thickness can be fixed Feed channel;
2, cylindrical drum and conical head can be driven while enter in ground by beaing upper cover, and upper cover is dismantled from cylindrical drum Get off, beaing disk can drive column to move down, and engaged and be connected with gear by teeth, and teeth, which will drive gear rotation, to be made Arc inserting column makees arc-shaped rotation and makes it through through-hole to produce in cylindrical drum and be pierced into soil, to improve entire pedestal Bearing capacity and stability meet blast weather to the fixation reliability requirement of pedestal, entirety are avoided to shift or even topple over The phenomenon that, improve safety.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the fixed mechanism structural schematic diagram of the utility model.
In figure: 1, pedestal, 2, support rod, 3, inserting column, 4, fixed mechanism, 401, cylindrical drum, 402, through-hole, 403, shaft, 404, column, 405, block, 406, upper cover, 407, disk, 408, teeth, 409, gear, 410, arc inserting column, 411, connection Column, 412, conical head, the 5, first arc panel, 6, connecting shaft, 7, screw rod, 8, rubber block, the 9, second arc panel, 10, bolt.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
The utility model provides a kind of technical solution referring to FIG. 1-2: a kind of natural gas extraction tube support arrangement, Including pedestal 1 and support rod 2, the top of the pedestal 1 is welded with support rod 2, and from left to right gap is welded for the bottom end of the pedestal 1 It is connected to inserting column 3, and the spacing between inserting column 3 is 4cm, the stability for reinforcing pedestal 1, institute can be inserted in ground by inserting column 3 The top for stating support rod 2 is welded with the first arc panel 5, and the top left hand of first arc panel 5 is connected with the by connecting shaft 6 Two arc panels 9 are bolted with screw rod 7 on the outer wall of second arc panel 9, and rotating clockwise screw rod 7 can be with natural gas line Surface contact on it is fixed, the lower surface of the screw rod 7 is pasted with rubber block 8, can prevent spiral shell by rubber block 8 Bar 7 wears natural gas line, and the right side of second arc panel 9 is connected by bolt 10 with the first arc panel 5, by tightening spiral shell First arc panel 5 and the second arc panel 9 can be fixed together by bolt 10, and loose bolts 10 can make the second arc panel 9 can be with Connecting shaft 6 is driven to rotate on the first arc panel 5;
The left and right sides of the pedestal 1 is welded with fixed mechanism 4, and the fixed mechanism 4 includes cylindrical drum 401, described The outer wall bottom end of cylindrical drum 401 is reserved with through-hole 402, and the quantity of the through-hole 402 is two, and two through-holes 402 relative to Cylindrical drum 401 is symmetrical arranged, and the top of the cylindrical drum 401 is socketed with upper cover 406, and cylindrical drum can be driven by beaing upper cover 406 401 and conical head 412 simultaneously enter in ground, upper cover 406 can be disassembled from cylindrical drum 401, the cylindrical drum 401 Bottom end be plugged with conical head 412, the top of the conical head 412 is welded with connecting column 411, the top of the connecting column 411 It is welded with column 404, the left and right sides of the column 404 is integrally formed tooth 408 with teeth, the outside engagement of the teeth 408 Be connected with gear 409, the gear 409 is connect by shaft 403 and 401 axis of cylindrical drum, the bottom end of the gear 409 be welded with The arc inserting column 410 that through-hole 402 matches, beaing disk 407 can drive column 404 to move down, and pass through teeth 408 and tooth Wheel 409 engagement be connected, teeth 408 will drive gear 409 rotation make arc inserting column 410 make it is arc-shaped rotation make it through through-hole 402 produce in cylindrical drum 401 and are pierced into soil, and the top of the column 404 is welded with disk 407, the cylindrical drum 401 It is welded with block 405 at left and right sides of inner cavity, and block 405 is located at the lower end of disk 407, it can be to disk by block 405 407 are limited, and prevent disk 407 from beaing downwards too deep.
In use, whole device to be transported to the position being supported to natural gas line, upper cover 406 is beaten using tool Cylindrical drum 401 and conical head 412 can be driven while being entered in ground, after being inserted into suitable depth, by upper cover 406 from cylinder It is disassembled on cylinder 401, beaing disk 407 can drive column 404 to move down, and teeth 408, which will drive the rotation of gear 409, to be made Arc inserting column 410 makees arc-shaped rotation and makes it through through-hole 402 to produce in cylindrical drum 401 and be pierced into soil, to improve The bearing capacity and stability of entire pedestal 1, later by 406 sets of the upper cover tops in cylindrical drum 401, by rotating second to the left Arc panel 9 can drive connecting shaft 6 to rotate on the first arc panel 5, and natural gas line is placed into the first arc panel 5 can be with It supports, first arc panel 5 and the second arc panel 9 can be fixed together by tightening bolt 10, turned clockwise Dynamic screw rod 7 can be contacted with the surface of natural gas line is fixed it, is fixed conveniently, securely and reliably.

Claims (4)

1. a kind of natural gas extraction tube support arrangement, including pedestal (1) and support rod (2), the top weldering of the pedestal (1) It is connected to support rod (2), it is characterised in that: the top of the support rod (2) is welded with the first arc panel (5), first arc The top left hand of plate (5) is connected with the second arc panel (9) by connecting shaft (6), is spirally connected on the outer wall of second arc panel (9) Have screw rod (7), the right side of second arc panel (9) is connected by bolt (10) with the first arc panel (5);
The left and right sides of the pedestal (1) is welded with fixed mechanism (4), and the fixed mechanism (4) includes cylindrical drum (401), The outer wall bottom end of the cylindrical drum (401) is reserved with through-hole (402), and the top of the cylindrical drum (401) is socketed with upper cover (406), the bottom end of the cylindrical drum (401) is plugged with conical head (412), and the top of the conical head (412) is welded with connection The top of column (411), the connecting column (411) is welded with column (404), the left and right sides of the column (404) one at Type has teeth (408), and the outside engagement of the teeth (408) is connected with gear (409), and the gear (409) passes through shaft (403) it is connect with cylindrical drum (401) axis, the bottom end of the gear (409) is welded with the arc inserting column to match with through-hole (402) (410), the top of the column (404) is welded with disk (407), is welded at left and right sides of the inner cavity of the cylindrical drum (401) Have block (405), and block (405) is located at the lower end of disk (407).
2. a kind of natural gas extraction tube support arrangement according to claim 1, it is characterised in that: the through-hole (402) quantity is two, and two through-holes (402) are symmetrical arranged relative to cylindrical drum (401).
3. a kind of natural gas extraction tube support arrangement according to claim 1, it is characterised in that: the screw rod (7) Lower surface be pasted with rubber block (8).
4. a kind of natural gas extraction tube support arrangement according to claim 1, it is characterised in that: the pedestal (1) From left to right gap weldig has inserting column (3) for bottom end, and the spacing between inserting column (3) is 4cm.
CN201821018902.8U 2018-06-29 2018-06-29 A kind of natural gas extraction tube support arrangement Expired - Fee Related CN208651820U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821018902.8U CN208651820U (en) 2018-06-29 2018-06-29 A kind of natural gas extraction tube support arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821018902.8U CN208651820U (en) 2018-06-29 2018-06-29 A kind of natural gas extraction tube support arrangement

Publications (1)

Publication Number Publication Date
CN208651820U true CN208651820U (en) 2019-03-26

Family

ID=65782650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821018902.8U Expired - Fee Related CN208651820U (en) 2018-06-29 2018-06-29 A kind of natural gas extraction tube support arrangement

Country Status (1)

Country Link
CN (1) CN208651820U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177429A (en) * 2020-09-30 2021-01-05 广州东彤科技有限公司 A fixed ground nail for camping tent
CN112628470A (en) * 2020-12-30 2021-04-09 南京浦易梵电子商务有限公司 Petroleum pipeline supporting seat
CN114413070A (en) * 2021-12-24 2022-04-29 海安发达石油仪器科技有限公司 Petroleum pipeline strutting arrangement

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177429A (en) * 2020-09-30 2021-01-05 广州东彤科技有限公司 A fixed ground nail for camping tent
CN112628470A (en) * 2020-12-30 2021-04-09 南京浦易梵电子商务有限公司 Petroleum pipeline supporting seat
CN114413070A (en) * 2021-12-24 2022-04-29 海安发达石油仪器科技有限公司 Petroleum pipeline strutting arrangement
CN114413070B (en) * 2021-12-24 2023-02-10 海安发达石油仪器科技有限公司 Petroleum pipeline strutting arrangement

Similar Documents

Publication Publication Date Title
CN208651820U (en) A kind of natural gas extraction tube support arrangement
CN206758951U (en) Multifunctional power construction machine
CN209555912U (en) A kind of prefabricated pile for assembled architecture
CN209413132U (en) A kind of half grout sleeve
CN211637716U (en) Soil remediation medicament filling device
CN207812742U (en) A kind of connection structure of novel fabricated shear wall
CN213448327U (en) Slope protection net mechanism for hydraulic engineering
CN212297926U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN115055500A (en) Be used for prosthetic coastal waters bank contaminated soil of ocean engineering to administer injection device
CN208577905U (en) A kind of highway subgrade broken stone pile
CN111262510A (en) Flat single-shaft multi-point transmission system
CN209130126U (en) A kind of interior swivel mount of the planetary reducer for dry pore-forming screw rod anchoring drilling machine
CN207878222U (en) A kind of bituminous concrete process equipment
CN208604591U (en) A kind of novel building foundation pile
CN217481472U (en) Grouting seepage reduction device in confined aquifer
CN213014722U (en) Vertical bearing joint of steel pipe
CN112431235B (en) High-exposed foundation pile detection device for photovoltaic power generation
CN210655081U (en) Rapeseed cake transfer roll-over stand
CN206800382U (en) A kind of spiral ground pile
CN216008443U (en) Mounting structure of underground water distributor
CN220013778U (en) Water stopping structure for connecting prefabricated bearing platform with steel pipe pile
CN211830660U (en) Flat single-shaft multi-point transmission system
CN214739048U (en) Wallboard in assembled building convenient to dismantle and installation
CN216339492U (en) Pile frame for triaxial mixing pile machine
CN218408778U (en) Temporary supporting structure for ground pipeline construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190326

Termination date: 20210629