CN208650557U - A kind of tool of the locking of the steel bonding rest under restrictive condition - Google Patents

A kind of tool of the locking of the steel bonding rest under restrictive condition Download PDF

Info

Publication number
CN208650557U
CN208650557U CN201821354522.1U CN201821354522U CN208650557U CN 208650557 U CN208650557 U CN 208650557U CN 201821354522 U CN201821354522 U CN 201821354522U CN 208650557 U CN208650557 U CN 208650557U
Authority
CN
China
Prior art keywords
permanent magnetism
baffle
column
tool
steel bonding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821354522.1U
Other languages
Chinese (zh)
Inventor
赵延军
齐忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Haiyuan Nuclear Technology Development Co Ltd
Original Assignee
Tianjin Haiyuan Nuclear Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Haiyuan Nuclear Technology Development Co Ltd filed Critical Tianjin Haiyuan Nuclear Technology Development Co Ltd
Priority to CN201821354522.1U priority Critical patent/CN208650557U/en
Application granted granted Critical
Publication of CN208650557U publication Critical patent/CN208650557U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of under restrictive condition tool that steel bonding rest locks, including permanent magnetism pedestal, rectangular bars column and pressing plate, the inside of the permanent magnetism pedestal offers elongated slot, sliding rail is provided on the inside of the rectangular bars column, the inside of the sliding rail is equipped with sliding block, support plate is provided on the left of the baffle, the upper surface of the baffle is fixed with shaft, the upper surface of the rectangular bars column is fixed with limited post, the inside for penetrating slot is equipped with lock bolt, is equipped with permanent magnetism briquetting on the right side of the permanent magnetism compression bar.The tool that steel bonding rest locks under restrictive condition is able to carry out over-the-counter installation, at the scene using the tool can not electricity consumption and motor machine, do not weld and work with torches, without expansion bolt anchoring etc., it can be used in special trade, it can guarantee the stability on steel construction during the construction quality of steel-bonded reinforcement and steel bonding adhesive curing, secondly the device is easy to use, and easy to operate, it can be used repeatedly.

Description

A kind of tool of the locking of the steel bonding rest under restrictive condition
Technical field
The utility model relates to steel bonding rest locking tool technical fields, specially one kind steel bonding rest under restrictive condition The tool of locking.
Background technique
In the industry of the inflammable explosive articles such as middle petroleum, middle petrochemical industry, military project, production, storage building are by being used for a long time, such as Fruit is not repaired, and building is faced with safe handling problem, but maintenance needs face many restrictive conditions, are unable to electricity consumption and motor Tool, cannot weld and work with torches, cannot use expansion bolt anchor etc., there are construction safety hidden danger, are carried out by steel bonding When strengthening construction, gluing, expansion bolt anchoring, glue bolt is needed to glue anchor, usual steel bonding glue jointly according to code requirement steel-bonded reinforcement According to the difference of temperature environment, can just be fully cured within general 48 hours or so.But existing steel bonding rest locking tool can not It is installed outside the venue, and its installation process is more troublesome, steel bonding regular time is longer, and support plate is caused to carry out steel bonding process It is middle to lead to the failure of steel bonding because roll-off occurs in own wt, in view of the above-mentioned problems, we have proposed one kind in restrictive condition The tool of lower steel bonding rest locking.
Utility model content
The purpose of this utility model is to provide a kind of under restrictive condition tool that steel bonding rest locks, it is above-mentioned to solve It proposes that general steel bonding rest locking tool can not be installed outside the venue in background technique, and its installation process is more troublesome, glues Steel regular time is longer, and support plate is caused, because roll-off occurs in own wt, to lead to steel bonding during carrying out steel bonding The problem of failure.
To achieve the above object, the utility model provides the following technical solutions: one kind steel bonding rest under restrictive condition is locked Solid tool, including permanent magnetism pedestal, rectangular bars column and pressing plate, the inside of the permanent magnetism pedestal offers elongated slot, and elongated slot Inside is equipped with permanent magnetism column, and the rear and front end of the permanent magnetism column is respectively connected with permanent magnetism compression bar, sets on the inside of the rectangular bars column It is equipped with sliding rail, and rectangular bars column is located at the surface of permanent magnetism compression bar, the inside of the sliding rail is equipped with sliding block, and the inside of sliding block Baffle is installed, support plate is provided on the left of the baffle, the upper surface of the baffle is fixed with shaft, and the top of shaft It is connected with adjustable arc plate, the adjustable arc plate is internally provided with limiting slot, and the upper surface of the rectangular bars column is fixed There is limited post, the inside of the pressing plate, which offers, penetrates slot, and pressing plate is located at the right side of baffle, the inside installation for penetrating slot There is lock bolt, permanent magnetism briquetting is installed, and the surface of permanent magnetism briquetting is provided with briquetting permanent magnetism and opens on the right side of the permanent magnetism compression bar It closes.
Preferably, the permanent magnetism pedestal passes through and is connected between elongated slot and permanent magnetism column, and about permanent magnetism between permanent magnetism compression bar The cross central line of pedestal is symmetrical, and is parallel to each other between permanent magnetism compression bar.
Preferably, the rectangular bars column, which passes through, constitutes slide construction between sliding rail and sliding block and baffle, and under baffle Surface and the lower surface of support plate are located in same level.
Preferably, the adjustable arc plate between shaft and baffle by being rotatablely connected, and adjustable arc plate passes through limit It is connected between slot and limited post.
Preferably, the limited post is uniformly distributed along the upper surface of rectangular bars column, and the outer dia and limit of limited post The inside diameter of position slot is equal.
Preferably, it is mutually perpendicular between the pressing plate and permanent magnetism compression bar, and pressing plate is by penetrating between slot and lock bolt It is threadedly coupled.
Compared with prior art, the utility model has the beneficial effects that being somebody's turn to do the work that steel bonding rest locks under restrictive condition Tool is able to carry out over-the-counter installation, at the scene using the tool can not electricity consumption and motor machine, do not weld and work with torches, do not have to Expansion bolt anchoring etc., can use in special trade, can guarantee the construction quality of steel-bonded reinforcement on steel construction and glue Stability during steel adhesive curing can carry out installation in over-the-counter processing space, need not employ electronic construction tool and electricity at the scene Gas welding etc., reduces working procedure, reduces construction cost, and secondly the device is easy to use, easy to operate, can make repeatedly With the rectangular bars column being somebody's turn to do in the tool that steel bonding rest locks under restrictive condition between sliding rail and sliding block and baffle by constituting Slide construction coats steel bonding glue at the back side of support plate, then by the left-hand face of metal product support plate and permanent magnetism pedestal it Between carry out magnetic connection, by the vertical building body surface being fixed on steel construction of the device, finally push baffle to the left Mobile, so that fitting between the left-hand face of baffle and the right lateral surface of support plate, which passes through sliding rail, sliding block and baffle Setting, the position of support plate can be fixed, avoid to support plate carry out steel bonding during because support plate from retransmit Raw displacement, causes steel bonding to fail, which passes through the setting of limiting slot, limited post, adjustable arc plate and shaft, can be to baffle Position be fixed, avoid baffle that roll-off occurs, which is provided with multiple limited posts, therefore the position of baffle can be with Into row stochastic change, baffle is fixed to different size of support plate, passes through permanent magnetism briquetting, elongated slot, permanent magnetism Mutual cooperation between pedestal and permanent magnetism column, to carry out absorption fixation to support plate, ensure that so that the device has magnetism Stability on steel construction during the construction quality of steel-bonded reinforcement and steel bonding adhesive curing
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model overlooking structure diagram;
Fig. 3 is enlarged structure schematic diagram at A in the utility model Fig. 2.
In figure: 1, permanent magnetism pedestal;2, elongated slot;3, permanent magnetism column;4, permanent magnetism compression bar;5, rectangular bars column;6, sliding rail;7, sliding Block;8, baffle;9, support plate;10, shaft;11, adjustable arc plate;12, limiting slot;13, limited post;14, pressing plate;15, it penetrates Slot;16, lock bolt;17, permanent magnetism briquetting;18, briquetting permanent-magnetic switching.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of locking of the steel bonding rest under restrictive condition Tool, including permanent magnetism pedestal 1, rectangular bars column 5 and pressing plate 14, the inside of permanent magnetism pedestal 1 offers elongated slot 2, and elongated slot 2 is interior Portion is equipped with permanent magnetism column 3, and the rear and front end of permanent magnetism column 3 is respectively connected with permanent magnetism compression bar 4, and permanent magnetism pedestal 1 passes through elongated slot 2 and permanent magnetism column It is connected between 3, and the cross central line between permanent magnetism compression bar 4 about permanent magnetism pedestal 1 is symmetrical, and phase between permanent magnetism compression bar 4 It is mutually parallel, permanent magnetism column 3 is applied in the inside of permanent magnetism pedestal 1 by elongated slot 2, then again by two permanent magnetism compression bars 4 respectively and forever The left and right ends of magnetic pole 3 are connected, and the inside of rectangular bars column 5 is provided with sliding rail 6, and rectangular bars column 5 is located at permanent magnetism compression bar 4 Surface, the inside of sliding rail 6 is equipped with sliding block 7, and the inside of sliding block 7 is equipped with baffle 8, and the left side of baffle 8 is provided with support plate 9, rectangular bars column 5 is by constituting slide construction, and the lower surface of baffle 8 and support plate 9 between sliding rail 6 and sliding block 7 and baffle 8 Lower surface be located in same level, steel bonding glue is coated at the back side of support plate 9, then by a left side for metal product support plate 9 Magnetic connection is carried out between side surface and permanent magnetism pedestal 1, by the vertical building body surface being fixed on steel construction of the device, Finally baffle 8 is pushed to move to the left, so that fit between the left-hand face of baffle 8 and the right lateral surface of support plate 9, the dress Set the setting by sliding rail 6, sliding block 7 and baffle 8, the position of support plate 9 can be fixed, avoid to support plate 9 into Because the self weight of support plate 9 is subjected to displacement during row steel bonding, steel bonding is caused to fail, the upper surface of baffle 8 is fixed with shaft 10, and turns The top of axis 10 is connected with adjustable arc plate 11, and adjustable arc plate 11 is internally provided with limiting slot 12, rectangular bars column 5 it is upper Surface is fixed with limited post 13, and adjustable arc plate 11 between shaft 10 and baffle 8 by being rotatablely connected, and adjustable arc plate 11 is logical It crosses between limiting slot 12 and limited post 13 and is connected, after baffle 8 is moved to suitable position, by adjustable arc plate 11 by turning Axis 10 is rotated up, so that limiting slot 12 is directly socketed on corresponding limited post 13, passes through limiting slot 12, limited post 13, the position of baffle 8 can be fixed in the setting of adjustable arc plate 11 and shaft 10, and baffle 8 is avoided to occur to glide now As limited post 13 is uniformly distributed along the upper surface of rectangular bars column 5, and the inside of the outer dia of limited post 13 and limiting slot 12 Diameter is equal, which is provided with multiple limited posts 13, therefore the position of baffle 8 can be into row stochastic change, so that baffle 8 Different size of support plate 9 can be fixed, the inside of pressing plate 14, which offers, penetrates slot 15, and pressing plate 14 is located at baffle 8 Right side, the inside for penetrating slot 15 is equipped with lock bolt 16, and the right side of permanent magnetism compression bar 4 is equipped with permanent magnetism briquetting 17, and permanent magnetism The surface of briquetting 17 is provided with briquetting permanent-magnetic switching 18, is mutually perpendicular between pressing plate 14 and permanent magnetism compression bar 4, and pressing plate 14 is by wearing It is threadedly coupled between through groove 15 and lock bolt 16, the inside that lock bolt 16 is applied in pressing plate 14 by penetrating slot 15 makes The lower end for obtaining lock bolt 16, which extends, to be inserted in inside the building body with steel construction, so that vertical being fixed on of the device be built Building body surface, by lower lock block permanent-magnetic switching 18, by mutual between permanent magnetism briquetting 17, elongated slot 2, permanent magnetism pedestal 1 and permanent magnetism column 3 Cooperation, to carry out absorption fixation to support plate 9, ensure that the steel-bonded reinforcement on steel construction so that the device has magnetism Stability during construction quality and steel bonding adhesive curing.
Working principle: when using the tool that steel bonding rest locks under restrictive condition, permanent magnetism column 3 is passed through into length first Slot 2 is applied in the inside of permanent magnetism pedestal 1, and then two permanent magnetism compression bars 4 are connected with the left and right ends of permanent magnetism column 3 respectively again, Steel bonding glue is coated at the back side of support plate 9, and pressing plate 14 is threadedly coupled between slot 15 and lock bolt 16 by penetrating, by lock bolt 16 inside for being applied in pressing plate 14 by penetrating slot 15, so that the lower end of lock bolt 16, which extends, is inserted in building with steel construction Inside building body, thus by the device it is vertical be fixed on building body surface, by lower lock block permanent-magnetic switching 18, pass through permanent magnetism briquetting 17, the mutual cooperation between elongated slot 2, permanent magnetism pedestal 1 and permanent magnetism column 3 so that the device have magnetism, thus to support plate 9 into Row absorption is fixed, and finally baffle 8 is pushed to move to the left, so that between the left-hand face of baffle 8 and the right lateral surface of support plate 9 It fits, after baffle 8 is moved to suitable position, adjustable arc plate 11 is rotated up by shaft 10, so that limiting slot 12 are directly socketed on corresponding limited post 13, which passes through the setting of sliding rail 6, sliding block 7 and baffle 8, can be to branch The position of supporting plate 9 is fixed, and avoids causing to glue because the self weight of support plate 9 is subjected to displacement during carrying out steel bonding to support plate 9 Steel failure, the working principle of here it is this under restrictive condition tool that steel bonding rest locks.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of tool of the locking of the steel bonding rest under restrictive condition, including permanent magnetism pedestal (1), rectangular bars column (5) and pressing plate (14), it is characterised in that: the inside of the permanent magnetism pedestal (1) offers elongated slot (2), and the inside of elongated slot (2) is equipped with permanent magnetism The rear and front end of column (3), the permanent magnetism column (3) is respectively connected with permanent magnetism compression bar (4), the inside setting of the rectangular bars column (5) Have sliding rail (6), and rectangular bars column (5) is located at the surface of permanent magnetism compression bar (4), the inside of the sliding rail (6) is equipped with sliding block (7), it and on the inside of sliding block (7) is equipped with baffle (8), is provided with support plate (9) on the left of the baffle (8), the baffle (8) Upper surface be fixed with shaft (10), and adjustable arc plate (11) are connected with above shaft (10), the adjustable arc plate (11) be internally provided with limiting slot (12), the upper surface of the rectangular bars column (5) is fixed with limited post (13), the pressing plate (14) inside, which offers, to be penetrated slot (15), and pressing plate (14) is located at the right side of baffle (8), the inside peace for penetrating slot (15) Equipped with lock bolt (16), it is equipped with permanent magnetism briquetting (17) on the right side of the permanent magnetism compression bar (4), and the surface of permanent magnetism briquetting (17) It is provided with briquetting permanent-magnetic switching (18).
2. a kind of tool of the steel bonding rest under restrictive condition locking according to claim 1, it is characterised in that: it is described forever Magnetic pedestal (1) passes through to be connected between elongated slot (2) and permanent magnetism column (3), and about permanent magnetism pedestal (1) between permanent magnetism compression bar (4) Cross central line is symmetrical, and is parallel to each other between permanent magnetism compression bar (4).
3. a kind of tool of locking of the steel bonding rest under restrictive condition according to claim 1, it is characterised in that: the length Rectangular column (5) by constituting slide construction between sliding rail (6) and sliding block (7) and baffle (8), and the lower surface of baffle (8) and The lower surface of support plate (9) is located in same level.
4. a kind of tool of locking of the steel bonding rest under restrictive condition according to claim 1, it is characterised in that: the work Dynamic arc panel (11) between shaft (10) and baffle (8) by being rotatablely connected, and adjustable arc plate (11) passes through limiting slot (12) It is connected between limited post (13).
5. a kind of tool of locking of the steel bonding rest under restrictive condition according to claim 1, it is characterised in that: the limit Position column (13) is uniformly distributed along the upper surface of rectangular bars column (5), and the outer dia of limited post (13) and limiting slot (12) Inside diameter is equal.
6. a kind of tool of locking of the steel bonding rest under restrictive condition according to claim 1, it is characterised in that: the pressure It is mutually perpendicular between plate (14) and permanent magnetism compression bar (4), and pressing plate (14) is by penetrating spiral shell between slot (15) and lock bolt (16) Line connection.
CN201821354522.1U 2018-08-22 2018-08-22 A kind of tool of the locking of the steel bonding rest under restrictive condition Active CN208650557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821354522.1U CN208650557U (en) 2018-08-22 2018-08-22 A kind of tool of the locking of the steel bonding rest under restrictive condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821354522.1U CN208650557U (en) 2018-08-22 2018-08-22 A kind of tool of the locking of the steel bonding rest under restrictive condition

Publications (1)

Publication Number Publication Date
CN208650557U true CN208650557U (en) 2019-03-26

Family

ID=65791094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821354522.1U Active CN208650557U (en) 2018-08-22 2018-08-22 A kind of tool of the locking of the steel bonding rest under restrictive condition

Country Status (1)

Country Link
CN (1) CN208650557U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868188A (en) * 2018-08-22 2018-11-23 天津核海源科技发展有限公司 A kind of tool to lock in restrictive condition lower steel plate bonding from absorption rest
CN110196405A (en) * 2019-06-27 2019-09-03 南方电网科学研究院有限责任公司 Auxiliary system for electric energy meter on-site calibrator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868188A (en) * 2018-08-22 2018-11-23 天津核海源科技发展有限公司 A kind of tool to lock in restrictive condition lower steel plate bonding from absorption rest
CN108868188B (en) * 2018-08-22 2023-12-12 天津核海源科技发展有限公司 Tool for bonding and self-adsorption supporting locking of steel plate under limiting condition
CN110196405A (en) * 2019-06-27 2019-09-03 南方电网科学研究院有限责任公司 Auxiliary system for electric energy meter on-site calibrator

Similar Documents

Publication Publication Date Title
CN208650557U (en) A kind of tool of the locking of the steel bonding rest under restrictive condition
CN203684454U (en) Concrete-filled steel tube frame combined shear wall
CN109057045A (en) A kind of big plate connection component of assembled non-bearing exterior wall
CN205088823U (en) Hanging piece for stone curtain wall
CN209040306U (en) A kind of big plate connection component of assembled non-bearing exterior wall
CN206175824U (en) A subway gallows locking device
CN212105190U (en) Convenient calibration positioning device for connecting steel structures
CN113700140A (en) High-strength self-fastening steel structure joint for energy-saving building and manufacturing method thereof
CN208750160U (en) A kind of para-seismic support C-type steel Two bors d's oeuveres connector
CN108868188A (en) A kind of tool to lock in restrictive condition lower steel plate bonding from absorption rest
CN116290368A (en) Anti-fatigue combined steel structure
CN209891396U (en) Intercolumnar bearing structure for steel construction
CN102364125A (en) Large lockset
CN106194883B (en) A kind of cluster telescopic oil cylinder group
CN210529935U (en) Primary and secondary beam of steel structure platform
CN208363872U (en) Night bolt door lock
CN209378347U (en) A kind of fixed device of safety rope
CN206379240U (en) Transformer support body
CN207073277U (en) A kind of construction scaffold safety connector
CN208981512U (en) A kind of assembling type steel structure that node has just connect occlusion splicing system
CN208650556U (en) Steel bonding rest locking frame under a kind of restrictive condition
CN205744736U (en) A kind of attachment means, automobile pedal bracket and automobile
CN205780113U (en) Weight, large-sized structural parts connection locator
CN206667533U (en) A kind of assembling type steel structure house non-bearing wall body construction
CN211572662U (en) A sign indicating number structure for assembled building unit curtain system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant