- CN208650248U CN208650248U CN201820850781.7U CN201820850781U CN208650248U CN 208650248 U CN208650248 U CN 208650248U CN 201820850781 U CN201820850781 U CN 201820850781U CN 208650248 U CN208650248 U CN 208650248U
- Authority
- CN
- China
- Prior art keywords
- pipe
- accumulator
- sewage conduct
- dredging
- dredging structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Air Transport Of Granular Materials (AREA)
Abstract
The utility model discloses a kind of sewage conduct dredging structures, belong to pipe-dredging field, its key points of the technical solution are that: sewage conduct includes runner pipe parallel to the ground and vertically through in the maintenance pipe on ground, dredging structure includes injecting device and guide pipe, injecting device include for reservoir conduit dredging agent accumulator, be connected to the conveying hose of accumulator one end and be connected to the pneumatic supply of the accumulator other end;The guide pipe is set in conveying hose periphery, and the guide pipe includes inserting end and is vertically connected at extension end of the inserting end far from accumulator one end, and extension end is in runner pipe and the length of extension end is less than the internal diameter of maintenance pipe;Inserting end extends away from end one end and stretches out maintenance pipe and extend to above the ground.The utility model has the advantages that Quick dredging can be carried out to sewage conduct by dredging structure when tamper and runner pipe have a certain distance, it is simple to operate.
Description
Technical field
The utility model relates to pipe-dredging fields, and in particular to a kind of sewage conduct dredging structure.
Background technique
One modern city be unable to do without underground blow-off line.Gathering for these pipelines, has effectively ensured the life in city
It produces and lives.But sewage conduct blocking is thing common in urban life, line clogging can carry out serious inconvenience to urban belt,
As some serious hard objects blockings, it is obstructed to will cause water flow, brings inconvenience to daily life.More there is serious person's meeting
Cause pipeline to flow back, allow entire street ponding, becomes very to can't bear, so that the dredging of pipeline is particularly important.
Sewage conduct includes runner pipe parallel to the ground and vertically through the maintenance pipe for being connected to runner pipe, at present usually
When sewage conduct blocking, people using hand-held elastic poker, rotation manually come stirring-up sewage pipeline take out of it is stifled
Plug thing.But when the tamper in sewage conduct is more and has a certain distance between tamper and maintenance pipe, this
Kind mode is ineffective.
Utility model content
The purpose of the utility model is to provide a kind of sewage conduct dredging structures, its advantage is that when tamper and maintenance pipe have
When a certain distance, Quick dredging can be carried out to sewage conduct by dredging structure, it is simple to operate.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of for sewage conduct
Dredging structure, sewage conduct includes runner pipe parallel to the ground and vertically through in the maintenance pipe on ground, dredging structure packet
Include injecting device and guide pipe, injecting device include for reservoir conduit dredging agent accumulator, be connected to the conveying of accumulator one end
Hose and the pneumatic supply for being connected to the accumulator other end;
The guide pipe is set in conveying hose periphery, and the guide pipe includes that inserting end is remote with inserting end is vertically connected at
Extension end from accumulator one end, extension end is in runner pipe and the length of extension end is less than the internal diameter of maintenance pipe;
Inserting end extends away from end one end and stretches out maintenance pipe and extend to above the ground.
Through the above technical solutions, in use, conveying hose is inserted into guide pipe, until conveying hose is far from accumulator
One end passes through guide pipe and extends extension end far from inserting end one end, then holds guide pipe for guide pipe insertion sewage conduct
Maintenance pipe, so that guide pipe is constantly close to runner pipe, until extension end is in runner pipe, then movement is stretched in the horizontal direction
Enter end, so that extension end moves horizontally in runner pipe, until then advertising accumulator by pneumatic supply at line clogging
Interior pipe-dredging agent, so that pipe-dredging agent is flow in sewage conduct along conveying hose, pipe-dredging agent and sewer pipe
Interior tamper occurs to chemically react and decompose tamper, is finally completed dredging operation.The setting of guide pipe can clear up with
Maintenance pipe has the tamper of certain distance, and simple to operate.
The utility model is further arranged to: the accumulator includes material stocking pipe and is threaded in the material stocking pipe two
The feed pipe and passage at end, the feed pipe offer feed inlet, the passage and institute far from conveying hose one end
Conveying hose is stated to be fixedly connected;
It is vertically connected with communicating pipe in the material stocking pipe, is connect by air inlet pipe with the air compressor machine communicating pipe;
The first valve that control opens or closes the feed inlet is equipped between the feed pipe and the material stocking pipe.
Through the above technical solutions, rotating the first valve when fill pipe dredging agent, feed inlet being opened, pipeline is dredged
Obstruction-removing prescription pours into accumulator;After filling, the first valve is rotated, feed inlet is closed, prevents air compressor machine in operation, will be managed
Pipeline dredging agent is blown out by feed inlet, is damaged to staff.
The utility model is further arranged to: between the communicating pipe one end and the air inlet pipe far from the material stocking pipe
The second valve equipped with control air inlet.
Through the above technical solutions, closing the second valve when fill pipe dredging agent, prevent pipe-dredging agent along connection
Pipe enters air inlet pipe, by plug for air inlet pipe;After filling, the second valve is opened, enters compressed air in accumulator.
The utility model is further arranged to: the pneumatic supply is air compressor machine.
The utility model is further arranged to: the junction between the adjacent each component of the accumulator is wound with sealing
Band.
Through the above technical solutions, the setting of band, close for carrying out to the junction between accumulator adjacent component
The phenomenon that sealing, preventing gas leakage generation, causes security risk.
The utility model is further arranged to: conveying hose is the anticorrosion hose made of polytetrafluoroethylene material.
Through the above technical solutions, pipe-dredging agent has certain corrosivity, the setting of anticorrosive property material, Ke Yiti
The service life of high conveying hose.
The utility model is further arranged to: the ectonexine of the accumulator and the guide pipe is painted with erosion resistant coating.
Through the above technical solutions, the service life of accumulator and guide pipe can be improved in the setting of erosion resistant coating.
The utility model is further arranged to: the erosion resistant coating is polyethylene anticorrosive coating.
The utility model is further arranged to: the guide pipe is threadedly coupled by several connecting tubes.
Through the above technical solutions, guide pipe can be carried out to assembly and disassembly, carrying when, is more convenient, and
Conveying hose can be protruded into guide pipe a part, then connecting tube is spliced, is then proceeded to conveying hose in guide pipe
It is mobile.So circulation, splices guide pipe while protruding into conveying hose inside guide pipe, so that conveying hose is more
It is easy to protrude into from inserting end, it is more convenient when stretching out, and use from extension end.
In conclusion the utility model has the following beneficial effects:
1, the setting of dredging structure can carry out Quick dredging to sewage conduct, simple to operate;
2, the tamper that pipe has certain distance can be cleared up and be overhauled to the setting of guide pipe;
3, the setting that feed pipe and passage are threadedly coupled with material stocking pipe, in use for some time convenient for staff,
It is disassembled and is cleared up or checked;
4, the setting of band prevents showing for gas leakage for being sealed to the junction between accumulator adjacent component
As occurring, security risk is caused.
Detailed description of the invention
Fig. 1 is the connection relationship diagram that sewage conduct and dredging structure are embodied in the present embodiment;
Fig. 2 is the connection relationship diagram that accumulator and air compressor machine are embodied in the present embodiment;
Fig. 3 is the structural schematic diagram that accumulator is embodied in the present embodiment.
In figure, 1, sewage conduct;11, runner pipe;12, maintenance pipe;2, accumulator;21, material stocking pipe;22, feed pipe;221,
Feed inlet;23, passage;24, communicating pipe;25, the first valve;26, the second valve;3, conveying hose;4, guide pipe;41, even
Socket part;42, extension end;5, air compressor machine;6, air inlet pipe;7, band.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.The wherein identical attached drawing of identical components
Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "upper", "lower", " bottom
Face " and " top surface " refer to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from particular elements geometry
The direction at center.
Embodiment: a kind of dredging structure of sewage conduct, as shown in Figure 1, being equipped with sewage conduct 1, sewage pipe below ground
Road 1 is including runner pipe 11 parallel to the ground and vertically through in the maintenance pipe 12 on ground.Dredging structure includes injecting device and leads
To pipe 4, injecting device include for reservoir conduit dredging agent accumulator 2, be connected to 2 one end of accumulator conveying hose 3 and even
It is connected to the pneumatic supply of 2 other end of accumulator.Pneumatic supply selects air compressor machine 5 in the present embodiment.
Guide pipe 4 is set in 3 periphery of conveying hose.Guide pipe 4 includes inserting end 41 and is vertically connected at inserting end 41 far
Extension end 42 from 2 one end of accumulator, extension end 42 is in runner pipe 11 and the length of extension end 42 is less than maintenance pipe 12
Internal diameter.Inserting end 41 extends away from 42 one end of end stretching maintenance pipe 12 and extends to above the ground.
In use, conveying hose 3 is inserted into guide pipe 4, until conveying hose 3 passes through guiding far from 2 one end of accumulator
Pipe 4 extends extension end 42 far from 41 one end of inserting end, then holds guide pipe 4 and guide pipe 4 is inserted into the inspection of sewage conduct 1
Pipe 12 is repaired, so that the constantly close runner pipe 11 of guide pipe 4, until extension end 42 is in runner pipe 11, then in the horizontal direction
Upper mobile inserting end 41, so that extension end 42 moves horizontally in runner pipe 11, until then passing through sky at line clogging
Press 5 advertises the pipe-dredging agent in accumulator 2, so that pipe-dredging agent is flow in sewage conduct 1 along conveying hose 3, pipe
Pipeline dredging agent occurs to chemically react and decompose tamper with the tamper in sewage conduct 1, is finally completed dredging operation.Guiding
The tamper that pipe 12 has certain distance can be cleared up and be overhauled to the setting of pipe 4, and simple to operate.
As shown in Fig. 2, accumulator 2 in be equipped with for fill pipe dredging agent cavity, accumulator 2 include material stocking pipe 21 with
And it is threaded in the feed pipe 22 and passage 23 at 21 both ends of material stocking pipe, feed pipe 22 is offered far from 3 one end of conveying hose
Feed inlet 221(combination Fig. 3), passage 23 is fixedly connected with conveying hose 3.Communicating pipe 24 is vertically connected in material stocking pipe 21,
Communicating pipe 24 is connect by air inlet pipe 6 with air compressor machine 5.In use, pipe-dredging agent is poured into feed pipe by feed inlet 221
22, and then flow into accumulator 2.Then start air compressor machine 5, accumulator 2 is carried out to advertise operation, by pipe-dredging agent advertise to
Then conveying hose 3 flow in sewage conduct 1 through guide pipe 4 and carries out dredging operation.
The first valve 25 that control opens or closes feed inlet 221 is equipped between feed pipe 22 and the material stocking pipe 21.It fills out
When filling pipe-dredging agent, the first valve 25 is rotated, feed inlet 221 is opened, pipe-dredging agent is poured into accumulator 2;Filling
After, the first valve 25 is rotated, feed inlet 221 is closed, prevents air compressor machine 5 in operation, by pipe-dredging agent by feeding
Mouth 221 is blown out, and is damaged to staff.
Communicating pipe 24 is equipped with the second valve 26 of control air inlet between one end and air inlet pipe 6 far from the material stocking pipe 21.
When fill pipe dredging agent, the second valve 26 is closed, prevents pipe-dredging agent from entering air inlet pipe 6 along communicating pipe 24, by air inlet
Pipe 6 blocks;After filling, the second valve 26 is opened, enters compressed air in accumulator 2.
Junction between the adjacent each component of accumulator 2 is wound with band 7.The setting of band 7, for storing
The phenomenon that junction between 2 adjacent component of device is sealed, prevents gas leakage generation, causes security risk.
Pipe-dredging agent has certain corrosivity, and the ectonexine of accumulator 2 and guide pipe 4 is painted with erosion resistant coating.Cause
Relatively conventional for anticorrosion hose, therefore directly be set as being made of anticorrosive property material by conveying hose 3, use when, can
Directly to use, brushing erosion resistant coating is not needed.Making for accumulator 2, conveying hose 3 and guide pipe 4 can be improved in such setting
Use the service life.Conveying hose 3 can be the anticorrosion hose made of polytetrafluoroethylene material and be also possible to by other fluoroplastics
Manufactured anticorrosion hose.The erosion resistant coating of the ectonexine brushing of accumulator 2 and guide pipe 4 can be polyethylene anticorrosive coating, can also
To be the erosion resistant coating made of other anti-corrosion materials.
Further, guide pipe 4 is threadedly coupled by several connecting tubes.So set, guide pipe 4 can be carried out group
Assembly and disassembly, carrying when, are more convenient.And conveying hose 3 can be protruded into 4 a part of guide pipe, it then will connection
Pipe splicing, then proceedes to move conveying hose 3 in guide pipe 4.So circulation, is protruded into guide pipe 4 by conveying hose 3
Guide pipe 4 is spliced while portion, so that conveying hose 3 is easier to protrude into from inserting end 41, is stretched out from extension end 42, and
And it is easy to use.
The course of work: when needing to dredge sewage conduct 1, conveying hose 3 is inserted into guide pipe 4, until conveying
Hose 3 passes through guide pipe 4 far from 2 one end of accumulator and extends extension end 42 far from 41 one end of inserting end, then holds guide pipe 4
And guide pipe 4 is inserted into the maintenance pipe 12 of sewage conduct 1, so that the constantly close runner pipe 11 of guide pipe 4, until at extension end 42
In in runner pipe 11, inserting end 41 is then moved in the horizontal direction, so that extension end 42 moves horizontally in runner pipe 11, directly
To at 1 blocking of sewage conduct, the pipe-dredging agent in accumulator 2 is then advertised by air compressor machine 5, pipe-dredging agent along
Conveying hose 3, which is flow in sewage conduct 1, carries out dredging operation.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (9)
1. a kind of sewage conduct dredging structure, sewage conduct (1) include runner pipe parallel to the ground (11) and vertically through in
The maintenance pipe (12) on ground, it is characterized in that: dredging structure includes injecting device and guide pipe (4), injecting device includes being used for memotron
The accumulator (2) of pipeline dredging agent, the conveying hose (3) for being connected to accumulator (2) one end and it is connected to accumulator (2) other end
Pneumatic supply;
The guide pipe (4) is set in conveying hose (3) periphery, and the guide pipe (4) includes inserting end (41) and vertical connection
In the extension end (42) of inserting end (41) far from accumulator (2) one end, extension end (42) are in runner pipe (11) and extension end
(42) length is less than the internal diameter of maintenance pipe (12);
Inserting end (41) extends away from end (42) one end and stretches out maintenance pipe (12) and extend to above the ground.
2. a kind of sewage conduct dredging structure according to claim 1, it is characterized in that: the accumulator (2) includes material stock
Pipe (21) and the feed pipe (22) and passage (23) for being threaded in the material stocking pipe (21) both ends, the feed pipe (22)
Feed inlet (221) are offered far from described conveying hose (3) one end;
It is vertically connected with communicating pipe (24) on the material stocking pipe (21), communicating pipe (24) passes through air inlet pipe (6) and the pneumatic supply
Connection;
It is equipped with control between the feed pipe (22) and the material stocking pipe (21) and opens or closes the first of the feed inlet (221)
Valve (25).
3. a kind of sewage conduct dredging structure according to claim 2, it is characterized in that: the communicating pipe (24) is far from described
The second valve (26) of control air inlet is equipped between one end and the air inlet pipe (6) of material stocking pipe (21).
4. a kind of sewage conduct dredging structure according to claim 1, it is characterized in that: the pneumatic supply is air compressor machine (5).
5. a kind of sewage conduct dredging structure according to claim 3, it is characterized in that: the adjacent each portion of the accumulator (2)
Junction between part is wound with band (7).
6. a kind of sewage conduct dredging structure according to claim 5, it is characterized in that: the conveying hose (3) is by gathering
Anticorrosion hose made of tetrafluoroethene material.
7. a kind of sewage conduct dredging structure according to claim 6, it is characterized in that: the accumulator (2) and described leading
Erosion resistant coating is painted with to the ectonexine of pipe (4).
8. a kind of sewage conduct dredging structure according to claim 7, it is characterized in that: the erosion resistant coating is polyethylene anticorrosion
Layer.
9. a kind of sewage conduct dredging structure according to claim 1, it is characterized in that: the guide pipe (4) is if by involvement
Adapter tube is threadedly coupled.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820850781.7U CN208650248U (en) | 2018-06-01 | 2018-06-01 | A kind of sewage conduct dredging structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820850781.7U CN208650248U (en) | 2018-06-01 | 2018-06-01 | A kind of sewage conduct dredging structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208650248U true CN208650248U (en) | 2019-03-26 |
Family
ID=65779707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820850781.7U Expired - Fee Related CN208650248U (en) | 2018-06-01 | 2018-06-01 | A kind of sewage conduct dredging structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208650248U (en) |
-
2018
- 2018-06-01 CN CN201820850781.7U patent/CN208650248U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108166993B (en) | A kind of portable slip casting casing bit and application method suitable for grouting behind shaft or drift lining | |
CN107940161A (en) | Pipe repairing method and pipeline for pipeline rehabilitation are met and discussed connection structure | |
CN101338847A (en) | HDPE tube welding-free interpenetration inner liner pipe-repairing method | |
CN208650248U (en) | A kind of sewage conduct dredging structure | |
CN110985808A (en) | Drainage pipeline steel hoop repairing construction method | |
CN105864562A (en) | Method for repairing underground steel pipeline by non-excavation insertion | |
CN108755872A (en) | A kind of blow-off line multistage dredging method | |
CN107725965B (en) | A method of leakage point between gas trunklines pipeline branch mouth and branch pipeline root valve is blocked from inside | |
CN109611610B (en) | Continuous pipe jacking construction device and construction method for fluid pipeline | |
US20220178486A1 (en) | Methods and systems for sealing a premise-side pipe | |
CN102606845A (en) | Non-excavating spiral winding restoring method for underground pipelines | |
CN211232016U (en) | Socket-embedded self-fixing steel-plastic composite full-swinging dragging pipe | |
CN109763842B (en) | Pump pipe for conveying concrete in long tunnel and construction method using pump pipe | |
CN106813104A (en) | A kind of pipeline is moved and changes engineering oil recovery systems | |
CN208363199U (en) | A kind of blow-off line segmentation dredging structure | |
CN206626410U (en) | A kind of pipeline, which moves, changes engineering oil recovery systems | |
CN208373761U (en) | A kind of novel complete-section tunnel boring machine grouting pipeline cleaning device | |
CN207686762U (en) | The pneumatic pipeline of fully-mechanized mining working transports slurries device over long distances | |
JP4658111B2 (en) | Piping system manufacturing apparatus, manufacturing method and repair method | |
KR100930817B1 (en) | Cleaning module for using pig cleaner | |
CN213422986U (en) | Industrial pipeline welding seam detection device | |
CN208363201U (en) | A kind of sewer line dredging device | |
CN220168879U (en) | Water leakage preventing device for pipeline | |
CN211176334U (en) | Pipeline leakage point detection device | |
CN213871603U (en) | Non-excavation formula underground pipeline restoration structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |